Expansion Project Update4th Annual Future Projects Summit

Page 3: MacDonald Island Park 2012 Future Projects Presentation

Original Mandate

Pre‐Design Plan• In October of 2009 a capital submission for pre‐design funding in 2011 was requested from the 

Regional Municipality.  The request met the mandate of council to develop an outdoor performance and festival site in the “Lower Townsite.”

• The request was directed by the Board of Directors and met the objectives of the Strategic Planning Session.

• Project scope at that time (October 2009) suggested a $31 million initiative that had three tiers in a priority sequence: An outdoor performance facility, a shared space facility, and a baseball f ilifacility. 

Page 4: MacDonald Island Park 2012 Future Projects Presentation

Original Mandate

Modified Construction Management 

• In December of 2011 after an extensive RFP process contracts were awarded for the MacDonald Island Park Corporation Expansion projectIsland Park Corporation Expansion project.

• The process was a modified construction management process that committed the Prime Consultants to the life of the project and the Construction Manager to the completion of detailed design with the potential extension until project completion. Upon the completion ofdetailed design with the potential extension until project completion.  Upon the completion of the detailed design phase the awarded construction manager is committed to providing a Guaranteed Maximum Price an/or a Lump Sum pricing model.

• The full project team have been engaged on the design and pricing models.  p j g g g p g

• The RFP award clearly states a dedication to support local business in the Construction Process if the project moves past detailed design.

Page 5: MacDonald Island Park 2012 Future Projects Presentation

The Team

Architecture ATBBrian [email protected] ext 252 ‐main 10315 109 h S10315 109th StreetEdmonton, AB  T5J 1N3

THREESIXTY ArchitectureJ ff SittJeff Sittnerjsi ner@360architec ts.com816‐472‐3210300 W 22nd StKansas City, MO 64108y

Clark BuildersSid [email protected] ‐ 52 AvenueEdmonton, AB   T6B 3R6

Page 6: MacDonald Island Park 2012 Future Projects Presentation

Board of DirectorsProject Goalsj

World Class Development for a World Class 

World Class Development for a World Class  A Community‐Led Project 

Based on CollaborationA Community‐Led Project Based on Collaboration

Meet the Needs of Today and Tomorrow

Meet the Needs of Today and Tomorrow“Liveable” City Centre“Liveable” City Centre Based on CollaborationBased on Collaboration and Tomorrowand Tomorrow

MIPEX (MacDonald Island Park Expansion) Project Goals( ac o a d s a d a pa s o ) oject Goa s

Page 7: MacDonald Island Park 2012 Future Projects Presentation

PRE‐DESIGNPROJECT HIGHLIGHTS

Page 8: MacDonald Island Park 2012 Future Projects Presentation

Tiered ApproachPriority Projects as identified by Stakeholdersy j y

TIE

R 1

-P1

Performance Stadium TI

ER

1-P

2

Shared Space TI

ER

1-P

3Meeting and Conference

Room Facilities TI

ER

1-P

4

ER

1 –

P5

TIE

R 1

-P6

TIE

R 1

-P7

TIE

R 1

-P8

TIE

R 1

-P9

Baseball and Softball

Nature Trails

Outdoor Leisure

Youth Park with Splash

Climbing Wall

Tennis Courts RestaurantT Stadium T Facility T

SkywalkT TI T T T TFacilities Space Features Rowing

Club and Marina

TIE

R 2

-P1

Turf Field House

Addition TIE

R 2

-P2

Badminton Centre TI

ER

2-P

3

Interpretive Lookout

and Trails TIE

R 2

-P4

TIE

R 2

–P

5

TIE

R 1

-P6

TIE

R 1

-P7

TIE

R 1

-P8

TIE

R 1

-P9

Outdoor Facilities

Nature Trails

Meeting Room

Facilities

Youth Park with Splash

Features

Climbing Wall

Tennis Courts

Rowing Club and

Restaurant

1 2 3 Club and Marina

TIE

R 3

-PPerformance

Stadium to +20,000

seats

TIE

R 3

-P2

Baseball Stadium to

+10,000 seats

TIE

R 3

-P Conference Centre

Development(+50,000 sq.

Ft.l)

Page 9: MacDonald Island Park 2012 Future Projects Presentation

Pre‐Design Budget Projection

MIPEX PRE‐DESIGN BUDGETComponent Tier 1 RecommendedTier 1Outdoor Performance Stadium $                               13,000,000.00 Shared Space $                               12,000,000.00 p $ , ,Baseball/Softball Stadium $                                 7,000,000.00 Skywalk $                                 1,500,000.00 Parking and Walking Trails $                                 2,200,000.00 Subtotal $                               35,700,000.00 Contingency, FF&E, consulting $                              10,410,000.00 Total $                               46,110,000.00 Tier 2Conference Rooms $                                2,900,000.00 Marina and Rowing Club $                                     925,000.00 Waterpark $                                     950,000.00 Tennis $                                 1,000,000.00 Climbing Wall $                                     800,000.00 

$Subtotal $                                 6,575,000.00 Contingency, FF&E, Consulting $                                1,972,500.00 Total $                                 8,547,500.00 Convention CentreField House AdditionSubtotalContingency FF&E ConsultingContingency, FF&E, ConsultingTotal $                               54,657,500.00 

Total Tier Projected Costing $        54,657,500.00 

Page 10: MacDonald Island Park 2012 Future Projects Presentation

Stakeholder Engagement

Positive Vs. Negative Feedback

80%

100%

0%

20%

40%

60%

Positive as % Negative as %Positive as % Negative as %Series1 83% 17%

Page 11: MacDonald Island Park 2012 Future Projects Presentation

DESIGNPROJECT CONCEPT & RECOMENDATION

Page 12: MacDonald Island Park 2012 Future Projects Presentation

The Proposed Development

The Dream• A full development proposal that maximizes the amenities within the space plan as supported by 

community feedback and suggestions This plan was built with the needs of the community ascommunity feedback and suggestions.  This plan was built with the needs of the community as the priority and then a cost structure was applied.  This concept provides a development that meets all needs substantiated by community feedback.

The RealityThe Reality• Use of community feedback results were applied to the dream concept  to achieve the original 

budget released during the pre‐design planning.  The goal of this approach was to maximize the delivery upon community needs while considering $55 million as the budget ceiling.  This budget maximized the delivery of priority amenities while maintaining a firm goal of achieving themaximized the delivery of priority amenities while maintaining a firm goal of achieving the budget.

Page 13: MacDonald Island Park 2012 Future Projects Presentation

A Tiered Approach

Tier One Amenities 1 Outdoor Field and Events Venue

Tier Three Amenities1 Rowing Centre1 Outdoor Field and Events Venue

2 Community Pavilion3 Shared Space and Conference4 Skywalk to Existing Facility

1 Rowing Centre2 Marina

Tier Four Amenities 4 Skywalk to Existing Facility

Tier Two Amenities 1 Tournament Centre

1 Field House Expansion2 Existing Conference Transition2 Golf Club Inclusion in SCLC1 Tournament Centre

2 Interpretative Trail Network Tier Five Amenities 1 Expansion of Outdoor Event Venue 

+20 000 seats+20,000 seats

Page 14: MacDonald Island Park 2012 Future Projects Presentation

TIER ONE

Page 15: MacDonald Island Park 2012 Future Projects Presentation

Outdoor Performance Field & Events VenueOutdoor Performance Field & Events Venue Outdoor Performance Field & Events Venue (124,000 sq. ft.)

• Synthetic Sports Field• Seating 6,000• Vending, Washrooms 

and Concessions• Media Facilities• Media Facilities• Corporate Suites• Retail Developments

Page 16: MacDonald Island Park 2012 Future Projects Presentation

Shared Space CentreShared Space Centre (59,900 sq. ft.)

• Flexible Space• Administrative Offices• Shared User Group 

Space• Art Gallery• Banquet Facility• Entry Lobby• Kitchen and Service 

Locations

Page 17: MacDonald Island Park 2012 Future Projects Presentation

SkywalkySkywalk (2,000 sq. ft.)

• Connection Point to the Existing SuncorExisting Suncor Community Leisure Centre

Page 18: MacDonald Island Park 2012 Future Projects Presentation

Concourse Level

Page 19: MacDonald Island Park 2012 Future Projects Presentation

Concourse LevelSuite LevelSuite Level

Page 20: MacDonald Island Park 2012 Future Projects Presentation

A Multi‐Function Community Facility

Page 21: MacDonald Island Park 2012 Future Projects Presentation

Community Pavilion

Community Pavilion

Community Pavilion (21,500 sq. ft.)

• Outdoor Pavilion• Community StageCommunity Stage• Ice Rink• Amphitheatre• Entry Plaza (From 

Civic Centre)• Fountain• Fire Pit• Climbing Wall• Children's 

Playground• Tennis Court

Page 22: MacDonald Island Park 2012 Future Projects Presentation

OUR SKY

The proposed design was created with the intent of celebrating our BIG sky, and the i t f N th Li ht th i it fimpact of our Northern Lights on the spirit of the region.

Page 23: MacDonald Island Park 2012 Future Projects Presentation

WINTER CITY

Wood Buffalo is a Winter City and the proposed design uses themes that l b t li t t it tcelebrate our climate as an opportunity to 

provide design inspiration and functional shelter and connectivity between catalyst projects on the Island and within the City p j yCentre.

Page 24: MacDonald Island Park 2012 Future Projects Presentation

OUR WATERWAYS

The waterways have been the heart of Wood Buffalo and are celebrated within the th f thi d d ithemes of this proposed design.  

Page 25: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion

Page 26: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (Field View)

Page 27: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (from suite level)

Page 28: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (from suite level)

Page 29: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (from suite level)

Page 30: MacDonald Island Park 2012 Future Projects Presentation

Main Entrance (from SCLC)

Page 31: MacDonald Island Park 2012 Future Projects Presentation

Exterior Profile (FROM SNYE Pavilion)

Page 32: MacDonald Island Park 2012 Future Projects Presentation

SNYE BRIDGE ACCESS (bridge is within City Center Mandate)

Page 33: MacDonald Island Park 2012 Future Projects Presentation

SNYE BRIDGE ACCESS (backlit with Northern Lights Effect)

Page 34: MacDonald Island Park 2012 Future Projects Presentation

TIER TWO

Page 35: MacDonald Island Park 2012 Future Projects Presentation

Baseball/Softball Tournament C t

Baseball/Softball Tournament CentreB b ll/S ftb llCentreBaseball/Softball Tournament Centre (98,000 sq. ft.)

• Synthetic Sports Field

• Two Natural Softball/Baseball Fields

• 3,000 Seats• Vending, 

Washrooms, and Concession

• Media Facility• Eight Corporate g p

Suites or Multi‐Purpose Rooms

• Players Clubhouse (Home Team)

• Event Plaza

Page 36: MacDonald Island Park 2012 Future Projects Presentation
Page 37: MacDonald Island Park 2012 Future Projects Presentation
Page 38: MacDonald Island Park 2012 Future Projects Presentation
Page 39: MacDonald Island Park 2012 Future Projects Presentation

SNYE Walking Trail (view from outfield)

Page 40: MacDonald Island Park 2012 Future Projects Presentation

Interpretative Walking TrailInterpretative Walking TrailInterpretive Trail Paved Trail System

• Activity Nodes• Information Centre• Community 

Recognition and Celebration Features

Page 41: MacDonald Island Park 2012 Future Projects Presentation

TIER THREE

Page 42: MacDonald Island Park 2012 Future Projects Presentation

Tier Three Project ViewMarina and Rowing Club

Page 43: MacDonald Island Park 2012 Future Projects Presentation

TIER FOUR

Page 44: MacDonald Island Park 2012 Future Projects Presentation

Turf Field, Badminton Centre, Golf Club House, Fitness Expansion and Re‐alignment

Page 45: MacDonald Island Park 2012 Future Projects Presentation

Financing

• $31 M is currently allocated to support the construction phase of this project in 2012.

• The release of existing funds is linked to final Council approval of the design, construction timeline, scope of work, and budget.

• The project is expected to provide a minimum build value of $55 M and a potential of $ 117 with a full build outa potential of $ 117 with a full build out.

• The timing of expenditures will be clarified with Council direction.

Page 46: MacDonald Island Park 2012 Future Projects Presentation

TimelineProposed Milestone Datesp

• April  2, 2012 Board of Directors design approval• April 5, 2012 Public consultation process begins• April 30 2012 Final Board of Directors approval of designApril 30, 2012  Final Board of Directors approval of design• May 18, 2012 Final Price review with Consultant and Construction Manager• June 2012 Project Recommendation to Council• (following based on RMWB Council Approval)(following based on RMWB Council Approval)• June 2012 Project award or RFP issued• July 1, 2012 Official Project Announcement and Ground Breaking• September 1 2012 Construction Begins• September 1, 2012 Construction Begins• July 1, 2014 Opening of Outdoor Field and Event Venue• September 1, 2014 Official Opening of Tier One

Page 47: MacDonald Island Park 2012 Future Projects Presentation

Questions:Comments and questions can be directed to:

Tim ReidChief Operating Officer, [email protected]

780 791 0070 ext 50411 C.A. Knight Way

Fort McMurray, AB   T9H 5C5

Page 48: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD

Page 49: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 50: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 51: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 52: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (Field View)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 53: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (from suite level)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 54: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (from suite level)Kids Zone (from suite level)

ICONIC.FUTURE FORWARD.COMMUNITYICONIC.FUTURE FORWARD.COMMUNITY

Page 55: MacDonald Island Park 2012 Future Projects Presentation

SNYE Walking Trail (view from outfield)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 56: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD

Page 57: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 58: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 59: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 60: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (Field View)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 61: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (from suite level)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 62: MacDonald Island Park 2012 Future Projects Presentation

SNYE Walking Trail (view from outfield)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 63: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD

Page 64: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 65: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 66: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD.COMMUNITY

Page 67: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (Field View)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 68: MacDonald Island Park 2012 Future Projects Presentation

SNYE Pavilion (from suite level)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 69: MacDonald Island Park 2012 Future Projects Presentation

SNYE Walking Trail (view from outfield)

ICONIC.FUTURE FORWARD.COMMUNITY

Page 70: MacDonald Island Park 2012 Future Projects Presentation

ICONIC.FUTURE FORWARD

Page 71: MacDonald Island Park 2012 Future Projects Presentation