lrtp freight projects, october 22, 2014

14
LRTP Freight Projects Freight Transportation Advisory Committee| October 22, 2014

Upload: miami-dade-metropolitan-planning-organization

Post on 14-Aug-2015

48 views

Category:

Government & Nonprofit


3 download

TRANSCRIPT

Page 1: LRTP Freight Projects, October 22, 2014

LRTP Freight ProjectsFreight Transportation Advisory Committee| October 22, 2014

Page 2: LRTP Freight Projects, October 22, 2014

2

Page 3: LRTP Freight Projects, October 22, 2014

3

Page 4: LRTP Freight Projects, October 22, 2014

Introduction National Emphasis on Freight – reflected in LRTP

Efficient freight movement important to local economy and connections to global economy

2014 Miami-Dade Freight Plan integrated within LRTP

Non-Freight Specific – Projects that improve both freight and passenger vehicle movements –incorporated into Project Priorities

Freight Specific – Projects that improve primarily freight movement – incorporated in Freight Set-Aside

4

“Freight Friendly LRTP”

Page 5: LRTP Freight Projects, October 22, 2014

LRTP -Freight Corridors and Set –Aside Projects

5

Page 6: LRTP Freight Projects, October 22, 2014

Non-Freight Specific Projects

Golden Glades Interchange – $1b+

SR-836 (Dolphin) - $180m

I-395 - $600m+

SR-821 (HEFT) - $1b+

SR-997 (Krome) - $300m

NW 25 St Viaduct AND Extension to SR-821 (HEFT)

6

Page 7: LRTP Freight Projects, October 22, 2014

Priority Bands

7

$570m ($6)

$1.7b ($30)

$3.0b ($29)

$6.6b ($62)

Note: Costs are in MillionsTotal Revenue (Freight Set-Asides)

Page 8: LRTP Freight Projects, October 22, 2014

Freight Intense Areas

8

Page 9: LRTP Freight Projects, October 22, 2014

Freight Specific

9

*Projects to be identified through future freight planning efforts

Page 10: LRTP Freight Projects, October 22, 2014

Freight Specific- Priority I

10

Project Limits From Limits To Description

Le Jeune Road NW 28th Street Make SB left-turn protected only. Close the gap for sidewalks. Discontinued sidewalk north of NW 28th Street on the east side of Le Jeune Road

NW 72nd Avenue NW 74th Avenue SR-836 (Dolphin) The intersections at 12th, 25th, 36th, 58th need improvement for turning radii, left-turn storage, and signal timing (left-turn clearance).

Truck Parking Improvement NW 36th Street/NW 37th Avenue

Develop a truck staging/parking area near NW 36th Street and NW 37th Avenue for the Port of Miami River

Page 11: LRTP Freight Projects, October 22, 2014

Freight Specific- Priority II

11

Project Limits From Limits To Description

Medley freight hub streetlight and local roadway improvements

Add street lights to local roads in Medley to increase safety and help to facilitate expanded hours of operations.

NW 116 Way US-27 (Okeechobee) South River Dr Improve signal operations with truck headways and lost time. Retime and improve signal coordination.

NW 42 Ave (LeJeune) NW 28 St North of NW 31 StFlatten the access point to allow fast in-and-out. On the east side of LeJeune merge and close some access points and move them.

NW 58 St NW 82 Ave NW 74 AveHigh number of access points on the south side of NW 58th Street. Merge and reduce access points close to busy intersections if possible.

NW 58 St NW 74 Ave Extend right turn radius at this location. Truck backing up at NB downstream; Move the access/egress point future downstream.

NW 72 Ave (Milam Dairy) NW 58 St NW 74 StHigh number of access points and side streets on the west side. Merge and reduce access points, extend right turn radius onto side streets.

NW 74 St NW 84 Ave NW 74 AveMerge and close some access points on south side of NW 74 St if possible. Provide advance signage WB lane drop after NW 79th Pl.

NW 82 Ave NW 41 St NW 25 St Widen from 2 to 4 lanes

NW South River Drive NW 36th Street Reduce the slope on NB approach is possible. Improve timing and coordination between South River Dr and Le Jeune Rd.

Truck Parking Improvement US-27 (Okeechobee)/ SR-821 (HEFT)

Provide a location in the area of Okeechobee Road and the HEFT for long-term truck parking and staging.

US-27 (Okeechobee) NW 138 Ave NW 79 Ave Signal timing improvements, improve access and improve signing to provide better flow

W 16 Ave US-27 (Okeechobee) NW South River DriveImprove signal timing and coordination considering truck headways. Pull back curb at the right turn spot to allow wider right turn radius.

Way-Finding Sign Improvement Program

Improve county-wide wayfinding for movements to/from regional freight hubs

Page 12: LRTP Freight Projects, October 22, 2014

Freight Specific- Priority III & IV

12

Project Limits From Limits To Description

NW North River Drive SR-112 NW 27 Ave Repave, mark center lane as truck standing permitted, widen where possible to provide side-or-road truck parking

Truck Parking Improvement NW 12 St/ sr-821 (HEFT) Truck Parking facility adjacent to Dolphin Station Transit Terminal Park-and-Ride

Project Limits From Limits To Description

Truck Parking Improvement Development of additional parking facilities. Strategic locations to be determined.

Page 13: LRTP Freight Projects, October 22, 2014

Illustrative ProjectTruck Parking Feasibility Study FDOT study for truck parking on state owned land at NW

corner of Turnpike and NW 12th Street

13

Truck Parking

Park-N-Ride

NW

117

AVE

NW

122

AVE

Page 14: LRTP Freight Projects, October 22, 2014

Questions?

14