lor key plan 01

1
Drawing no: HS2-ARP-07-DR-RW-03101 Drawing no: HS2-ARP-07-DR-RW-03102 Drawing no: HS2-ARP-07-DR-RW-03103 Drawing no: HS2-ARP-07-DR-RW-03105 Drawing no: HS2-ARP-07-DR-RW-03108 Drawing no: HS2-ARP-07-DR-RW-03107 Drawing no: HS2-ARP-07-DR-RW-03109 Drawing no: HS2-ARP-07-DR-RW-03104 Drawing no: HS2-ARP-07-DR-RW-03106 Drawing no: HS2-ARP-07-DR-RW-03110 Drawing no: HS2-ARP-07-DR-RW-03111 Drawing no: HS2-ARP-07-DR-RW-03112 Drawing no: HS2-ARP-07-DR-RW-03113 Drawing no: HS2-ARP-07-DR-RW-03114 Drawing no: HS2-ARP-07-DR-RW-03115 Drawing no: HS2-ARP-07-DR-RW-03116 Drawing no: HS2-ARP-07-DR-RW-03117 Drawing no: HS2-ARP-07-DR-RW-03118 Drawing no: HS2-ARP-07-DR-RW-03119 Drawing no: HS2-ARP-07-DR-RW-03120 Drawing no: HS2-ARP-07-DR-RW-03121 Drawing no: HS2-ARP-07-DR-RW-03122 Drawing no: HS2-ARP-07-DR-RW-03123 Drawing no: HS2-ARP-07-DR-RW-03124 Drawing no: HS2-ARP-07-DR-RW-03125 Drawing no: HS2-ARP-07-DR-RW-03126 Drawing no: HS2-ARP-07-DR-RW-03128 Drawing no: HS2-ARP-07-DR-RW-03129 Drawing no: HS2-ARP-07-DR-RW-03127 Drawing no: HS2-ARP-07-DR-RW-03130 A1 A 9 B C D E F G H I J K L M N O P Drawing No Drawing Status Discipline Scale at A1 Job No Issue Drawing Title Issue Date By Chkd Appd Job Title Client 10 8 7 6 5 4 2 1 3 Do not scale ' Arup Reproduced by permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office ' Crown copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 0100049190. Draft & Confidential www.arup.com T +44(0)121 213 3000 F +44(0)121 213 3001 Solihull, West Midlands B90 8AE The Arup Campus, Blythe Gate, Blythe Valley Park J :\ 209000 \ 209742 - 00 \ 4 I n t e r n a l Pr o j ec t Da t a \ 4 - 03 Dr a wi ng s \ C_ Ci v il\ CR_ Ra il wa y s \ 07_ L i n e _o f _ Rou t e \ Pl a n a nd Pr o f il e Ma s t e r F il e s \ Rou t e 3 \ HS2 - ARP- 07 - DR- RW - 03100 . dgn High Speed 2 Rail For Co-ordination 1:250000 209742-00 HS2-ARP-07-DR-RW-03100 / / 27 10 09 HW CL PH For Co-ordination 1.0 2.0 Key Plan Route 3 N Feasibility Study / / 29 10 09 HW CL PH Additional Features Shown 2.0 Notes 1. 2. 3. The information contained in this drawings is based on the feasibility study undertaken for HS2 in 2009. This drawing is for the use of HS2 only and is not for external distribution. This drawings shows the indicative location of a rail corridor and its associated Civil Engineering works and is subject to further study. 4. 5. 6. 7. The corridor shown does not show or consider utility locations. This is subject to further study. The corridor shown does not consider ground conditions. This is subject to further study. All vertical information is based on the OS 5m grid, and interpolated levels. The rail corridor shown has been located to minimise the impact to the environmental constraints identified on the Environmental Features Legend shown. Legend Edge of earthworks Formation boundary Rail Embankment Cutting

Upload: highspeedrail

Post on 08-Apr-2015

122 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Lor Key Plan 01

Drawing no: HS2-ARP-07-DR-RW-03101

Drawing no: HS2-ARP-07-DR-RW-03102

Drawing no: HS2-ARP-07-DR-RW-03103

Drawing no: HS2-ARP-07-DR-RW-03105

Drawing no: HS2-ARP-07-DR-RW-03108

Drawing no: HS2-ARP-07-DR-RW-03107

Drawing no: HS2-ARP-07-DR-RW-03109

Drawing no: HS2-ARP-07-DR-RW-03104

Drawing no: HS2-ARP-07-DR-RW-03106

Drawing no: HS2-ARP-07-DR-RW-03110

Drawing no: HS2-ARP-07-DR-RW-03111

Drawing no: HS2-ARP-07-DR-RW-03112

Drawing no: HS2-ARP-07-DR-RW-03113

Drawing no: HS2-ARP-07-DR-RW-03114

Drawing no: HS2-ARP-07-DR-RW-03115

Drawing no: HS2-ARP-07-DR-RW-03116

Drawing no: HS2-ARP-07-DR-RW-03117

Drawing no: HS2-ARP-07-DR-RW-03118

Drawing no: HS2-ARP-07-DR-RW-03119

Drawing no: HS2-ARP-07-DR-RW-03120

Drawing no: HS2-ARP-07-DR-RW-03121

Drawing no: HS2-ARP-07-DR-RW-03122

Drawing no: HS2-ARP-07-DR-RW-03123

Drawing no: HS2-ARP-07-DR-RW-03124

Drawing no: HS2-ARP-07-DR-RW-03125

Drawing no: HS2-ARP-07-DR-RW-03126

Drawing no: HS2-ARP-07-DR-RW-03128

Drawing no: HS2-ARP-07-DR-RW-03129

Drawing no: HS2-ARP-07-DR-RW-03127

Drawing no: HS2-ARP-07-DR-RW-03130

A1 A

9

B C D E F G H I J K L M N O P

Drawing No

Drawing Status

Discipline

Scale at A1

Job No

Issue

Drawing Title

Issue Date By Chkd Appd

Job TitleClient

10

8

7

6

5

4

2

1

3

Do not scale ' Arup

Reproduced by permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office ' Crown

copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 0100049190.

Draft & Confidential

www.arup.com

T +44(0)121 213 3000 F +44(0)121 213 3001

Solihull, West Midlands B90 8AE

The Arup Campus, Blythe Gate, Blythe Valley Park

J:\209000\2

09742-0

0\4 Intern

al Project

Data\4-0

3 Dra

win

gs\C

_Civil\C

R_

Railways\0

7_Line_of_

Route\Pla

n a

nd Profile M

aster Files\R

oute 3\H

S2-A

RP-0

7-D

R-R

W-0

3100.d

gn

High Speed 2

Rail

For Co-ordination1:250000

209742-00

HS2-ARP-07-DR-RW-03100

/ /271009 HW CL PH

For Co-ordination

1.0

2.0

Key Plan

Route 3

N

Feasibility Study/ /291009 HW CL PH

Additional Features Shown

2.0

Notes

1.

2.

3.

The information contained in this drawings is based

on the feasibility study undertaken for HS2 in 2009.

This drawing is for the use of HS2 only and is not for

external distribution.

This drawings shows the indicative location of a rail

corridor and its associated Civil Engineering works

and is subject to further study.

4.

5.

6.

7.

The corridor shown does not show or consider utility

locations. This is subject to further study.

The corridor shown does not consider ground

conditions. This is subject to further study.

All vertical information is based on the OS 5m grid,

and interpolated levels.

The rail corridor shown has been located to minimise

the impact to the environmental constraints identified

on the Environmental Features Legend shown.

Legend

Edge of earthworks

Formation boundary

Rail

Embankment

Cutting