lor key plan 01
TRANSCRIPT
Drawing no: HS2-ARP-07-DR-RW-03101
Drawing no: HS2-ARP-07-DR-RW-03102
Drawing no: HS2-ARP-07-DR-RW-03103
Drawing no: HS2-ARP-07-DR-RW-03105
Drawing no: HS2-ARP-07-DR-RW-03108
Drawing no: HS2-ARP-07-DR-RW-03107
Drawing no: HS2-ARP-07-DR-RW-03109
Drawing no: HS2-ARP-07-DR-RW-03104
Drawing no: HS2-ARP-07-DR-RW-03106
Drawing no: HS2-ARP-07-DR-RW-03110
Drawing no: HS2-ARP-07-DR-RW-03111
Drawing no: HS2-ARP-07-DR-RW-03112
Drawing no: HS2-ARP-07-DR-RW-03113
Drawing no: HS2-ARP-07-DR-RW-03114
Drawing no: HS2-ARP-07-DR-RW-03115
Drawing no: HS2-ARP-07-DR-RW-03116
Drawing no: HS2-ARP-07-DR-RW-03117
Drawing no: HS2-ARP-07-DR-RW-03118
Drawing no: HS2-ARP-07-DR-RW-03119
Drawing no: HS2-ARP-07-DR-RW-03120
Drawing no: HS2-ARP-07-DR-RW-03121
Drawing no: HS2-ARP-07-DR-RW-03122
Drawing no: HS2-ARP-07-DR-RW-03123
Drawing no: HS2-ARP-07-DR-RW-03124
Drawing no: HS2-ARP-07-DR-RW-03125
Drawing no: HS2-ARP-07-DR-RW-03126
Drawing no: HS2-ARP-07-DR-RW-03128
Drawing no: HS2-ARP-07-DR-RW-03129
Drawing no: HS2-ARP-07-DR-RW-03127
Drawing no: HS2-ARP-07-DR-RW-03130
A1 A
9
B C D E F G H I J K L M N O P
Drawing No
Drawing Status
Discipline
Scale at A1
Job No
Issue
Drawing Title
Issue Date By Chkd Appd
Job TitleClient
10
8
7
6
5
4
2
1
3
Do not scale ' Arup
Reproduced by permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office ' Crown
copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 0100049190.
Draft & Confidential
www.arup.com
T +44(0)121 213 3000 F +44(0)121 213 3001
Solihull, West Midlands B90 8AE
The Arup Campus, Blythe Gate, Blythe Valley Park
J:\209000\2
09742-0
0\4 Intern
al Project
Data\4-0
3 Dra
win
gs\C
_Civil\C
R_
Railways\0
7_Line_of_
Route\Pla
n a
nd Profile M
aster Files\R
oute 3\H
S2-A
RP-0
7-D
R-R
W-0
3100.d
gn
High Speed 2
Rail
For Co-ordination1:250000
209742-00
HS2-ARP-07-DR-RW-03100
/ /271009 HW CL PH
For Co-ordination
1.0
2.0
Key Plan
Route 3
N
Feasibility Study/ /291009 HW CL PH
Additional Features Shown
2.0
Notes
1.
2.
3.
The information contained in this drawings is based
on the feasibility study undertaken for HS2 in 2009.
This drawing is for the use of HS2 only and is not for
external distribution.
This drawings shows the indicative location of a rail
corridor and its associated Civil Engineering works
and is subject to further study.
4.
5.
6.
7.
The corridor shown does not show or consider utility
locations. This is subject to further study.
The corridor shown does not consider ground
conditions. This is subject to further study.
All vertical information is based on the OS 5m grid,
and interpolated levels.
The rail corridor shown has been located to minimise
the impact to the environmental constraints identified
on the Environmental Features Legend shown.
Legend
Edge of earthworks
Formation boundary
Rail
Embankment
Cutting