1 Newport City Council Road Works Report for the period Saturday 28 th July 2018 to Friday 3 rd August 2018 Signing and Guarding Temporary Traffic Lights Road Closure Temporary lane closure Diversion route in place Stop and Go Give and Take Footway Closed Priority working LOCATION DESCRIPTION OF WORKS START DATE END DATE TRAFFIC MANAGEMENT A4072 approach to Tredegar Park Roundabout Junction 28 Improvement works – highway resurfacing 01.08.18 03.08.18 Temporary full night road closure A467 northbound approach to Tredegar Park Roundabout Junction 28 Improvement works – highway resurfacing 01.08.18 03.08.18 Temporary full night road closure

Upload: vuhanh

Post on 29-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

1

Newport City Council

Road Works Report for the period

Saturday 28th July 2018 to Friday 3

rd August 2018

Signing and

Guarding

Temporary

Traffic

Lights Road

Closure

Temporary

lane closure

Diversion

route in

place

Stop and Go Give and Take Footway Closed Priority working

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

A4072 approach to Tredegar Park

Roundabout

Junction 28 Improvement works –

highway resurfacing

01.08.18 03.08.18 Temporary full night road

closure

A467 northbound approach to

Tredegar Park Roundabout

Junction 28 Improvement works –

highway resurfacing

01.08.18 03.08.18 Temporary full night road

closure

2

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

A467 Forge Road southbound

approach to Tredegar Park

Roundabout

Junction 28 Improvement works –

highway resurfacing

03.08.18

06.08.18

06.08.18

08.08.18

Temporary full night road

closure

A48 Cardiff Road approach to

Pont Ebbw Roundabout and

approach to Tredegar Park

Roundabout

Junction 28 Improvement works –

highway resurfacing

30.07.18 31.07.18 Temporary full night road

closure

A48 Cardiff Road Northbound Junction 28 Improvement works –

highway resurfacing

01.08.18 03.08.18 Temporary full night road

closure

A48 Cardiff Road Southbound

from Junction 28 to Cleppa Park

Junction 28 Improvement works -

installation of narrow lanes and

site clearance

28.03.17 31.08.18 Narrow Lanes and lane closures

between 09.30 and 15.30

A48 Cardiff Road Northbound

from Cleppa Park to junction 28

Junction 28 Improvement works –

highway construction

29.03.17 31.08.18 Temporary lane closure

A48 Cardiff Road Northbound

from Tredegar Park to Pont Ebbw

Junction 28 Improvement works –

highway construction

02.11.17 31.08.18 Narrow Lanes and lane closures

between 09.30 and 15.30

3

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

A48 Southbound approach to

Tredegar Park from Pont Ebbw

Junction 28 Improvement works –

highway construction

02.11.17 31.08.18 Narrow Lanes and lane closures

between 09.30 and 15.30

Aberthaw Circle outside number

122

Virgin Media contractors clearing

blockage in the footway

26.07.18 30.07.18 Signing & Guarding

Allt-yr-yn Avenue outside number

55

Virgin Media contractors

installing new tee in the footway

31.07.18

02.08.18 Signing & Guarding

Allt-yr-yn Heights adjacent to

number 11

Welsh Water contractors carrying

out mains repair

25.07.18 30.07.18 Give and take

Anthony Drive outside number

104

Welsh Water contractors altering

stop tap

31.07.18 02.08.18 Signing & Guarding

Aston Crescent outside number 33 Welsh Water contractors

renewing stop tap

01.08.18 03.08.18 Signing & Guarding

4

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Baldwin Close outside number 7 Wales and West Utilities laying

new service

30.07.18 03.08.18 Give and take

Bank Street outside number 14a Welsh Water contractors carrying

out permanent reinstatement

27.07.18 30.07.18 Signing & Guarding

Batchelor Road outside number

16

Welsh Water contractors

renewing existing sop tap

26.07.18 30.07.18 Signing & Guarding

Bessemer Close s/o No. 1-5 to the

rear of numbers 14-18

Wales and West Utilities carrying

out gas main replacement

23.07.18 30.08.18 Give and take

Blaen-y-pant Crescent outside

number 6b

Welsh Water contractors carrying

out lining works inside in the

manhole

27.07.18 01.08.18 Give and take

Bishton Road approximately

93mts from the junction of Station

Road

British Telecom contractors

installing chamber and 30mts of

duct in the carriageway

30.07.18 09.08.18 Temporary two way lights

5

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Bishton Road entrance to

Copsford

British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Priority working

Bridge Street outside Gemelli’s Network rail contractors carrying

out remedial work to the footway

30.07.18 17.08.18 Temporary multi way lights

Brookside side of number 514

Monnow Way

British Telecom contractors

installing 2mt of 2 poly ducts in

the footway and cabinet

31.07.18 08.08.18 Signing & Guarding

Brynglas Drive outside number 94 Western Power Distribution

contractors locating and repairing

a street lighting cable fault

26.07.18 31.07.18 Give and take

Byrde Close outside number 3 Welsh Water contractors

Renew existing stop tap

30.07.18 01.08.18 Signing & Guarding

Caerleon Road over rail bridge

near Sheaf Lane

Network rail contractors carrying

installing encapsulated

scaffolding to carry out

maintenance work safely

03.08.18 05.08.18 Temporary over night road

closure between 23:00 hrs to

07:00hrs

6

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Caerleon Road over rail bridge

near Sheaf Lane

Network rail contractors carrying

out maintenance work to the rail

over bridge with encapsulated

scaffolding in place

21.07.18 31.03.19 Temporary Two way lights;

Manually controlled at peak

times

Caerleon Road just past the St

Julian’s Public House

Two way lights in place to

provide a pedestrian walkway

whilst ground investigation work

is being carried out

25.07.18 31.08.18 Temporary Two way lights

Caerleon Road outside number

527

Western Power Distribution

contractors locating and repairing

street lighting cable fault

26.07.18 31.07.18 Signing & Guarding

Caerleon Road junction with

Heather Road

Welsh Water contractors

renewing manhole cover in the

carriageway

Sunday 5th August

2018

Stop and Go

Caerphilly Road adjacent to post

office

British Telecom contractors

installing 5mt of duct in the

footway, 3mts of duct in the

carriageway and cabinet

29.07.18 01.08.18 Signing & Guarding

7

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Cardiff Road outside Argus Depot Western Power Distribution

contractors repairing a feeder

pillar

25.07.18 30.07.18 Signing & Guarding

Cardiff Road outside number 102 Welsh Water contractors repairing

leaking communication pipe

26.07.18 31.07.18 Signing & Guarding

Cardiff Road between Craig-y-

haul Drive and Cardiff’s boundary

British Telecom contractors

repairing a cover

Sunday 5th August Temporary lane closure

Cefn Road near the junction of

Ruskin Avenue

Welsh Water contractors making

safe area and investigating void

26.07.18 03.08.18 Signing & Guarding

Celtic Way between roundabout

with South Lake Drive and the

roundabout with Cardiff Road

Welsh Water contractors to install

new fire and domestic supply

30.07.18 10.08.18 Give and take

Chaffinch Way on footpath

opposite number 11

British Telecom contractors

disconnecting and removing a

kiosk

28.07.18 31.07.18 Signing & Guarding

8

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Charlotte Walk outside number 14 Welsh Water contractors repairing

leaking communication pipe

25.07.18 30.07.18 Footway Closure

Chepstow Road outside number

39

Virgin Media Contractors clearing

blockage in carriageway

29.07.18 29.07.18 Stop and Go

Chepstow Road near the junction

of Hereford Street, rail over

bridge

Network rail contractors carrying

out bridge strengthening and

installation of new overhead

bracing works

28.07.18

04.08.18

11.08.18

29.07.18

05.08.18

12.08.18

Temporary Multi way lights

between 22:00 to 08:00hrs

Chepstow Road opposite entrance

to Gathercombe House

British Telecom contractors

disconnecting and removing a

kiosk

02.08.18 06.08.18 Signing & Guarding

Christchurch Road outside

number 88b

Wales and West Utilities

contractors laying new service

02.08.18 08.08.18 Temporary Two way lights

Church Lane 20mts away from

number 20 Church Crescent

British Telecom contractors

disconnecting and removing a

kiosk

28.07.18 31.07.18 Give and take

9

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Church Row outside Hall British Telecom contractors

disconnecting and removing a

kiosk

03.08.18 07.08.18 Signing & Guarding

Church Street outside number 19 Virgin Media contractors

installing tee in the footway

27.07.18 31.07.18 Signing & Guarding

Church Terrace opposite

Wentwood Rise

British Telecom contractors

disconnecting and removing a

kiosk

02.08.18 06.08.18 Signing & Guarding

Collier Street opposite number 16 Welsh Water contractors sewer

and network monitoring to

check/install telemetry equipment

located inside a chamber

30.07.18 01.08.18 Give and take

Commercial Road outside number

180a

Welsh Water contractors

installing a new service

29.07.18 31.07.18 Give and take

Commercial Road junction of

Portland Street

Welsh Water contractors

renewing a cover

01.08.18 03.08.18 Give and take

10

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Commercial Road between

Mountjoy Street and Alma Street

Welsh Water contractors

renewing a manhole cover

Sunday 5th August

2018

Temporary road closure

Corporation Road from outside

Sub Station to outside number 137

to the junction of Wharf Road

Western Power Distribution

contractors carrying out 222mts of

trenching in the footway and road

for reinforcement scheme

03.08.18 07.09.18 Signing & Guarding

Corporation Road outside number

333

Welsh Water contractors

Rebuild fire hydrant cover

30.07.18 01.08.18 Give and take

Courtney Street junction of

Collier Street

Contractors carrying out work to

the footway and carriageway

resurfacing for new development

11.06.18 31.07.18 Priority working

Crescent Road outside number 30 Welsh Water contractors

renewing stop tap

01.08.18 03.08.18 Signing & Guarding

Devon place outside number 4 to

outside Devon House

Wales and West Utilities

contractors carrying out gas main

replacement

05.07.18 31.08.18 Temporary two lights

11

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Dewsland Park Road outside

number 23

Welsh Water contractors

renewing stop tap

31.07.18 02.08.18 Signing & Guarding

Dorset Crescent outside number 2

to junction with Hampshire

Crescent to outside number 77

Dorset Crescent

Wales and West Utilities

contractors carrying out gas main

replacement

11.06.18 03.08.18 Give and take

Drinkwater Gardens o/s No.14 Western Power Distribution

Contractor new electricity supply

23.07.18 31.07.18 Footway Closure

East Grove Road outside number

110

Welsh Water contractors

renewing stop tap

25.07.18 30.07.18 Give and take

Ebenezer Drive outside number 9 Welsh Water contractors

carrying out permanent

reinstatement

27.07.18 30.07.18 Give and take

Ebenezer Terrace Welsh Water contractors

renewing leaking communication

pipe

Tuesday 7th August

2018

Temporary road closure

12

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Elgar Avenue Carriageway pre-patching work

and resurfacing work

30.07.18 10.08.18 Rolling stop and go

Elgar Circle; Elgar Close Bellway Homes contractors

carrying out development work

20.02.17 31.07.18 Signing & Guarding; Temporary

lights when needed

Farnaby Close outside number 6 Welsh Water contractors carrying

urgent remedial work

25.07.18 30.07.18 Give and take

Fields Park Road outside number

62

Wales and West Utilities

contractors carrying out

permanent reinstatement

31.07.18 01.08.18 Stop and Go

Friars Road opposite number 8

and outside number 9

British Telecom contractors

installing a chamber in the

footway

31.07.18 02.08.18 Signing & Guarding

Fuscia Way Virgin Media contractors digging

of narrow trenches, installation of

cabinets, toby boxes, multiple

micro ducts and installation of

subsequent network cabling.

03.08.18 07.08.18 Signing & Guarding

13

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Gibbs Road outside number 12 Welsh Water contractors

renewing stop tap

01.08.18 03.08.18 Signing & Guarding

Gilvach Lane between Wentwood

Lodge to Llanvaches Lane

British Telecom contractors

locating and excavating 2

blockages in existing duct

02.08.18 06.08.18 Temporary road closure between

09:30 to 15:00hrs

Glanmor Park Avenue outside

number 1

Virgin Media contractors

installing tee in the footway

31.07.18 02.08.18 Signing & Guarding

Glasllwch Lane between Minerva

and Laurel (Lower section)

Welsh Water contractors

renewing washout hydrant

6th August 2018 Temporary road closure between

09:30 to 15:00hrs

Godfrey Road from the junction

with Bridge Street opposite

Godfrey Road car park

Wales and West Utilities

contractors laying new main and

services

02.07.18 24.08.18 Temporary Multi way lights

Goldcliff Road next to Briar

Cottage

British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Priority working

14

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Green Lane Network rail Contractors using

Stop and Go Boards to manage

construction traffic across Green

Lane into construction site

compound. Priority will be

provided to traffic moving along

Green Lane

20.11.17 31.03.19 Stop and go

Greenfield Road outside number

63

Virgin Media contractors

installing tee in the footway

27.07.18 31.07.18 Signing & Guarding

Hawarden Road outside number 5 Wales and West Utilities

contractors laying new service

30.07.18 03.08.18 Give and take

Hawse Lane Demolition and reconstruction in

order to deliver clearance for

overhead line electrification

04.07.16 ongoing Temporary road closure;

Diversion route in place.

Heather Road Between Hubert

Road and Caerleon Road

Welsh Water contractors

renewing manhole cover in the

carriageway

Sunday 5th August

2018

Temporary road closure;

Diversion route in place.

15

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Hendre Farm Drive junction of

Dunstable Road to Ringland

Circle

Wales and West Utilities

contractors laying new main and

services

30.07.18 17.08.18 Temporary Two way lights

Hendre Farm Drive opposite

number 247

British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Give and take

Hereford Street junction with

Chepstow Road

Network rail contractors carrying

out bridge strengthening and

installation of new overhead

bracing works

28.07.18

04.08.18

11.08.18

29.07.18

05.08.18

12.08.18

Temporary Multi way lights

between 22:00 to 08:00hrs

Hill Street outside number 13 Virgin Media contractors clearing

blockage in the carriageway

30.07.18 01.08.18 Give and take

Huxley Green o/s No.17 Western Power Distribution

Urgent Excavation to Locate and

repair LV Cable Fault

23.07.18 31.07.18 Footway Closure

Jones Street outside number 30 Welsh Water contractors

renewing existing stop tap

27.07.18 31.07.18 Signing & Guarding

16

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Kensington Place outside number

38

Wales and West Utilities

contractors carrying out

permanent reinstatement

31.07.18 01.08.18 Give and take

Kingsway near the wave Virgin Media contractors clearing

blockage in the footway

31.07.18 02.08.18 Signing & Guarding

Laurel Road outside number 6 British Telecom contractors

disconnecting and removing a

kiosk

28.07.18 31.07.18 Signing & Guarding

Lily Way Virgin Media contractors carrying

out remedial work

30.07.18 01.08.18 Signing & Guarding

Liswerry Road outside number 47 Welsh Water contractors

renewing existing stop tap

31.07.18 02.08.18 Signing & Guarding

Lodge Hill near Lodge Primary

School

Contractors installing new

drainage into school

25.07.18 10.08.18 Temporary Multi way lights

17

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Lodge Road near the junction of

Trinity view

Sewer connection being carried

out by contractors for new

developments off Lodge Road

30.07.18 10.08.18 Temporary Two way lights

Lodge Road rear of number 1

Walnut Drive

British Telecom contractors

installing 9mts of 2 poly ducts in

the footway and cabinet

31.07.18 08.08.18 Signing & Guarding

Llanvaches Lane from Woodland

View to Pike Road

British Telecom contractors

locating and excavating 2

blockages in existing duct

02.08.18 02.08.18 Temporary road closure between

09:30 to 15:00hrs

Lloyd Street opposite number 18 Western Power Distribution

contractors having a hoist in the

carriageway

02.08.18 02.08.18 Signing & Guarding

Maesglas Avenue rear of number

15

Welsh Water contractors

renewing leaking stop tap

27.07.18 31.07.18 Signing & Guarding

Maesglas Crescent outside

number 212

Western Power Distribution

contractors carrying out 28 mts of

trenching in the footway for new

supply

30.07.18 10.08.18 Signing & Guarding

18

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Maesglas Road outside number 4 Western Power Distribution

contractors carrying out 10mts of

trenching in the footway for new

supply

30.07.18 10.08.18 Signing & Guarding

Malpas Road outside number 371-

373

British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Signing & Guarding

Magor Road outside Silverdale Welsh Water contractors

disconnecting service at ferrule

01.08.18 03.08.18 Give and take

Market Road near St Helliers British Telecom contractors

disconnecting and removing a

kiosk

02.08.18 06.08.18 Priority working

Marshfield Road (whole road) Wales and West Utilities carrying

out gas main replacement and

services

25.07.18 28.09.18 Temporary multi way lights

Meon Close outside number 16 Welsh Water contractors

renewing stop tap

27.07.18 31.07.18 Give and take

19

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Milton Hill British Telecom contractors

renewing a wood pole

29.07.18 29.07.18 Give and take

Monmouth Drive outside

Greenwood Flats

Truck mounted work platform

that will be positioned on the

carriageway for approximately 3

½ hours to replace a window on

the fourth floor building of

Greenwood Tower

02.08.18 02.08.18 Give and take

Monnow Way side of number 514 British Telecom contractors

installing 2mts of duct in the

footway

31.07.18 08.08.18 Signing & Guarding

Monnow Way Carriageway pre-patching work

and resurfacing work

30.07.18 10.08.18 Rolling stop and go

Narcissus Grove Virgin Media contractors to clear

blockages

27.07.18 31.07.18 Signing & Guarding

20

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Nash Road outside number 81 Welsh Water contractors carrying

out a sewer repair

27.07.18 01.08.18 Temporary multi way lights;

lights to be manually controlled

at peak times

Nelson Drive outside number 1 Wales and West Utilities carrying

out gas main replacement

30.07.18 17.08.18 Give and take

A48 Newport Road between

Craig-y-haul Drive and Cardiff’s

boundary

British Telecom contractors

repairing a cover

Sunday 5th August Temporary lane closure

Old Chepstow Road outside

number 1 The Nurseries

Welsh Water contractors

renewing leaking stop tap

25.07.18 31.07.18 Signing & Guarding

Old Roman Road outside

Primrose Cottage

British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Priority working

21

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Oliphant Circle junction Bessemer

Close to outside number 1

Wales and West Utilities

contractors carrying out gas main

replacement

23.07.18 30.08.18 Give and take

Ombersley Road outside number

33

Wales and West Utilities

contractors tracing and repairing

gas escape

26.07.18 01.08.18 Signing & Guarding

Park End outside number 42 British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Give and take

Pont Ebbw Roundabout Junction 28 Improvement works –

highway construction

20.11.17 31.07.18 Narrow Lanes and lane closures

between 09.30 and 15.30

Port Road outside Carpetright Welsh Water contractors carrying

a mains repair

25.07.18 31.07.18 Signing & Guarding

Portsketwett Street outside

number 1

Wales and West Utilities

contractors laying new service

31.07.18 03.08.18 Give and take

22

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Potter Street outside number 19a Welsh Water contractors

renewing stop tap

27.07.18

31.07.18 Signing & Guarding

Queensway outside the

information station

Positioning of site compound to

use as a storage area for duration

of refurbishment works

16.04.18 10.08.18 Signing & Guarding

Queensway outside the

information station

Lane closure for furniture to be

delivered safely

30.07.18 01.08.18 Temporary lane closures

Ribble Walk outside number’s 2-

14 Brookside

Western Power Distribution 4

joint holes in the footway and

13mts in footway and verge for

supply alteration

01.08.18 08.08.18 Signing & Guarding

Ringland Circle from its junction

with SDR (A48) Ringland Way to

its junction with Hendre Farm

Drive

Wales and West Utilities carrying

out gas main replacement

30.07.18 17.08.18 Temporary road closure

Roding Close outside number 24 Welsh Water contractors

renewing service

26.07.18 30.07.18 Signing & Guarding

23

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Rowan Way opposite junction

with Larch Grove

British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Signing & Guarding

Rugby Road outside number 29a British Telecom contractors

installing a chamber in the

footway

31.07.18 02.08.18 Signing & Guarding

Rutland Place outside Church Welsh Water contractors

renewing leaking stop tap

26.07.18 30.07.18 Give and take

SDR – A48 Eastbound Junction 28 Improvement works –

highway resurfacing

30.07.18 01.08.18 Temporary full night road

closure

SDR – A48 Eastbound Junction 28 Improvement works –

highway resurfacing

07.08.18 13.08.18 Temporary full night road

closure

SDR – A48 Eastbound Junction 28 Improvement works –

highway resurfacing

14.08.18 16.08.18 Temporary full night road

closure

24

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

SDR – A48 Southbound Junction 28 Improvement works –

highway resurfacing

16.08.18 18.08.18 Temporary full night road

closure

Shetland Close outside number 3 Welsh Water contractors

renewing stop tap

27.07.18 31.07.18 Signing & Guarding

Skinner Lane To allow conversion of upper

parts of Olympia House

05.02.18 05.02.19 Temporary road closure

Skinner Street, Albany Chambers,

29-31, loading bay

Refurbishment of existing

commercial building to residential

use.

18.04.18 14.12.18 Stop and go to be used when

required

St Brides Gardens outside number

13

Welsh Water contractors

renewing service

26.07.18 31.07.18 Give and take

St Mary’s Road outside number 1 British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Give and take

25

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Sutton Road outside number 102 Welsh Water contractors

renew fire hydrant

26.07.18 30.07.18 Give and take

Temple Street side of number 132

Commercial Street

British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Give and take

The Coldra opposite number 6 British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Signing & Guarding

The Hollies at the junction of

Catherine Drive / Wellfield Road

Wales and West Utilities carrying

out gas main replacement

16.07.18 31.08.18 Give and take

Tredegar Street outside number 6 Welsh Water contractors

renew leaking stop tap

27.07.18 31.07.18 Signing & Guarding

Tregarn Close outside number 23 Welsh Water contractors

renewing stop tap

27.07.18 31.07.18 Give and take

26

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Tregarn Road side of Trelawney British Telecom contractors

disconnecting and removing a

kiosk

31.07.18 02.08.18 Give and take

Tregwilym Road o/s No. 164 Western Power Distribution 2

joint holes and 19m trenching for

cable diversion

23.07.18 03.08.18 Signing & Guarding

Tregwilym Road opposite number

156

British Telecom contractors re-

shelling cabinet and install 6mts

of poly duct in the footway

30.07.18 01.08.18 Signing & Guarding

Tudor Crescent outside number

56

Welsh Water contractors

renewing stop tap

31.07.18 02.08.18 Signing & Guarding

Tudor Road outside number 26 Welsh Water contractors

renew leaking stop tap

26.07.18 30.07.18 Give and take

Tulip Walk Virgin Media contractors Digging

of narrow trenches, installation of

cabinets, toby boxes, multiple

micro ducts and installation of

subsequent network cabling.

02.08.18 04.08.18 Signing & Guarding

27

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Ty Mawr Lane at its junction with

Marshfield Road

British Telecom contractors

replacing BT pole

Sunday 29th July

2018

Temporary road closure between

Tynewydd Drive outside number

11

Welsh Water contractors

renew cover

01.08.18 03.08.18 Give and take

Vicarage Hill adjacent to number

4

British Telecom contractors

installing 1mt of 1 way of 1 way

poly duct in the carriageway

27.07.18 31.07.18 Signing & Guarding

Victoria Avenue outside number

44

Welsh Water contractors

carrying out a mains repair

27.07.18 01.08.18 Give and take

Vivian Road outside number 14 Welsh Water contractors

renew leaking stop tap

26.07.18 30.07.18 Give and take

Waterloo Road outside number 28 Welsh Water contractors

reconnecting new supply pipe

01.08.18 03.08.18 Give and take

28

LOCATION DESCRIPTION OF WORKS START

DATE

END

DATE TRAFFIC MANAGEMENT

Wellington Road side of number

19 Vancouver Drive

British Telecom contractors

installing 47m of 1 way poly duct

in footway

25.07.18 30.07.18 Signing & Guarding

Western Avenue outside number

4

Welsh Water contractors

renew leaking stop tap

26.07.18 30.07.18 Give and take

Wharf Road from junction of

Corporation Road to junction of

Glebe Street

Western Power Distribution

contractors carrying out 222mts of

trenching in the footway and road

for reinforcement scheme

03.08.18 07.09.18 Signing & Guarding

Whittle Drive junction Malpas

Road/ Oliphant Circle

Wales and West Utilities carrying

out gas main replacement

23.07.18 30.08.18 Give and take