1 Limpopo Provincial Government Department of Roads and Transport Infrastructure Conditional Grant EPWP Expenditure Presenter M.M Makibelo HOD

Upload: nora

Post on 15-Jan-2016

50 views

Category:

Documents


0 download

DESCRIPTION

Limpopo Provincial Government. Department of Roads and Transport Infrastructure Conditional Grant EPWP Expenditure Presenter M.M Makibelo HOD. Introduction. The Province has a challenge of linking the economic hubs to stimulate Economic growth. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Limpopo Provincial Government

1

Limpopo Provincial Government

Department of Roads and Transport

Infrastructure Conditional Grant EPWP Expenditure

Presenter M.M Makibelo HOD

Page 2: Limpopo Provincial Government

2

Introduction

The Province has a challenge of linking the economic hubs to stimulate Economic growth.

Being rural Province the provincial plan is to make sure that motorists does not drive more than 10 km before they can reach tar road. The Department utilized 100% of the Conditional Grant on projects during the previous financial year.

EPWP fencing projects: Fence is being stolen along the roads by community members, thus stray animals still impose danger to the road users.

EPWP road construction and maintenance project: (i) Emerging contractors do not have finance to sustain their businesses which compel some of the projects abandoned. (ii) Lack of management skills.

Page 3: Limpopo Provincial Government

3

  2006/07. 2007/08 2008/09 2009/10

  BudgetExpend

iture BudgetExpendi

ture BudgetExpendit

ure BudgetExpendi

ture

Expenditure Item R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Conditional Grant 291,786 291,786 377,096 380,950 0 415,748 0

EPWP- Gundo Lashu 41,000 39,743 31,243 0 35,180 0 84,244 0

EPWP – Fencing Project 10,000 9,151 32,122 0 32,382 0 68,762 0

TOTAL 342,786 340,680 440,461 53,461 448,512 0 568,754 0

ALLOCATION OF GRANTS AND EPWP BUDGET, TO 2006/07 TO 2010

Page 4: Limpopo Provincial Government

4

RAL NO.

ROAD NO. DESCRIPTION ACTIVITYLOCAL

MUNICIPALITYDISTRICT

BUDGET R'000

YEAR END

EXPEND R'000

BALANCE R'000

% COMPL

341 D19 Polokwane-Matlala-TibaneUpgrading(gravel to tar)

Polokwane Capricorn 26,434 26,184 250  100

346D3840/D3187/D3981/D3260

Giyani to PhalaborwaUpgrading(gravel to tar)

Giyani/ Ba-Phalaborwa

Mopani 26,222 26,159 63 100

347D4100/D4250/ D4191/D4190

Flag Boshielo Dam (Serageng) to Veeplaats to Apel and Apel to Mmabulela

Upgrading(gravel to tar)

Makhuduthamaga Sekhukhune 0 0 0 100

350D3500,D4380, D3505,D3561, D192

GaKgabudi to Mapela to Bakenberg to Mogalakwena to Marulaneng to Segole to Rapadi to Marken

Upgrading(gravel to tar)

Mogalakwena Waterberg 26,088 25,798 290 100

351 D3110 Ga-Seleka to ShongoaneUpgrading(gravel to tar)

Mogalakwena Waterberg 23,534 22,842 692 100

352 D1589, D217 Schiermonikoog to KromhoekUpgrading(gravel to tar)

Blouberg Capricorn 33,775 32,348 1,427 100

353 P277/1 Makonde to MasisiUpgrading(gravel to tar)

Thulamela/ Mutale Vhembe 30,418 30,417 1 100

375 D21 Sekororo to The OaksUpgrading(gravel to tar)

Maruleng Mopani 18,137 16,876 1,261 100

376D4285/D4373/ D4300,D4300

Maseremole/Nebo-Mabitwane-Ragaphela-GaMatlala-Madiilo - Mamphokgo.

Upgrading(gravel to tar)

Makhudutamaga/ Marble Hall

Sekhukhune 36,051 35,953 98 100

            313,163 305,117 8,046  

Infrastructure Conditional Grant 2006/07

Page 5: Limpopo Provincial Government

5

PROJECTS FOR 2007/2008 - CONDITIONAL GRANTS UPGRADING

          

RAL NO. ROAD NO. DESCRIPTION ACTIVITYLOCAL

MUNICIPALITYDISTRICT

2006/2007 BUDGET

2007/2008 BUDGET

355BD3810/D3981/ D3811

Thomo/Altein (Shangoni KNP gate) to Khakhala to Gawula to Mahlathi to Ndindani to Hlomela to Phalaubeni to Mbaula to Phalaborwa

Upgrading (gravel to tar) and bridges Construction

Giyani Mopani   15.211

369 D3708 Mukula to Mhinga Upgrading(gravel to tar) Thulamela Vhembe 18.000 46.800

386D3246,D3186, D3849,D3847, D3982

Mamitwa to Xihoko to GaMokgwathi to Makhuva

Upgrading(gravel to tar) Tzaneen/ Giyani Mopani 12.000 38.500

387 D3398/D3332Ceres WF Knobel Hosp. to Rapitsi Bochum

Upgrading(gravel to tar)Aganang/ Molemole

Capricorn 9.000 38.400

389 D1897Radium Road (P1/3 to NW/ Cyferskuil)

Upgrading(gravel to tar) Bela Bela Waterberg 7.127 17.000

390 D3180Modjadji-Mokwakwaila-Bambeni-Nkomo.

Upgrading(gravel to tar) Letaba/Giyani Mopani 18.000 43.000

459 D3600 Elandskraal to Magatle Upgrading(gravel to tar) Marble Hall Sekhukhune 0.000 20.000

460 D3231 ThakgalaniMaintenance: Bridge reconstruction

Letaba Mopani   6.500

461 D979, D1350Tzaneen to Deerpark and Deerpark to Mokwakwaila

Mainenance: Bridge 1933 repairs and Bridge UNL02

Tzaneen Mopani 0.000 8.900

464D2219/D4295/ D1547

Jane Furse to Motetema to Groblersdal

MaintenanceFetakgomo/ Tubatse

Sekhukhune 8.000 8.000

455 P62/2 P51/3 to Groblersdal/ N-Province MaintenanceGreater

GroblersdalSekhukhune 0.000 17.000

Page 6: Limpopo Provincial Government

6

PROJECTS FOR 2007/2008 -CONDITIONAL GRANTS MAINTENANCE, cont…

484 D1296, D1261P169/2 to Lydenburg/Lebowa

and road P169/2 to road D212

Maintenance Greater TubatseSekhukhun

e0.000 7.500

485 D1458, D4100D1547/ Groblersdal to D1547/

Marble HallMaintenance Greater Marble Hall

Sekhukhune

0.000 27.000

486 P116/1, P170/1 Lydenberg and road P116/1

to Mpumalanga borderMaintenance Greater Tubatse

Sekhukhune

0.000 12.000

487 P169/2, D737P169/1 & D212 to P33/2 and

road P169/2 to Mpumalanga

Maintenance Greater TubatseSekhukhun

e0.000 38.000

488 P169/3 P33/2 to P116/1 Maintenance Greater TubatseSekhukhun

e0.000 12.300

490 P51/3End subs. Groblersdal to

P62/2Maintenance Greater Groblersdal

Sekhukhune

0.000 9.100

491 P95/1, D198 Moutse 3 to Groblersdal and

road P51/3 to end paved

Maintenance Greater GroblersdalSekhukhun

e0.000 9.700

492 P278/1Sibasa to Nzhelele to

MusekwaspoortMaintenance Thulamela/Musina Vhembe 0.000 13.550

499 P19/1 Mokopane -Kloof Pass-

MarkenMaintenance Mogalakwena Waterberg 7.000 20.000

               

  TOTALS FOR UPGRADING (from gravel to sealed)

591.500

218.911

  TOTALS FOR MAINTENANCE (Preventative maintenance done by RAL)

150.000

189.550

       

    

GRAND TOTAL BUDGET

  744.500 408.461

Page 7: Limpopo Provincial Government

7

Infrastructure Conditional Grant 2007/08

The cost of Roads construction in the province is higher than those of other provinces.

The Province is conducting an investigation to establish why is the cost higher than other provinces.

Overloading problems: heavy trucks damage the provincial roads as they prefer to use them other than the National Road

Provincial Treasury did not transfer all money for conditional grants for 2005/06,R16 million is still outstanding and the department has committed the funds.

Page 8: Limpopo Provincial Government

8

Application of 2006/07 budget

The Province is responsible for 6,514 kms of gravel and 21,996 kms of paved roads. Progress on Provincial roads infrastructure.

Type of job Amount R’000

Units Comments

Tarring R737m 165km and

8 bridges

Total km’s

Preventative maintanance R143m 105 km

Gundo Lashu EPWP Project R35.7m 25,3KM 998 people employed

Roads Designed at Sekhukhune District

R7.6m 14 Projects Roads shifted from Mpumalanga as a results of Cross Boundary

2007/8 Roads Designs: R10,2m Plans All designs ready for implementation

Page 9: Limpopo Provincial Government

9

EPWP NEW CONSTRUCTION PROJECTS – GUNDO LASHU

    2007 / 2008

RAL No.

ROAD No. DESCRIPTION CONSULTANT DETAILS CommentsRAL

budgetAdd

budget

     

Km Estimate      

515D4036/D4037/

D4013/D4016/ D4017 Mankweng cluster SEMENYA FURUMELE 2.70 5.00 New Construction 5.00  

516 D3899 Tickyline to Sofaya INFRABURO 3.50 4.00 New Construction 4.00  

517 D3234 Shimange - Tar NHLENGANI 2.70 3.00 New Construction 3.00  

518 D4200 Mphanama - Apel BKS 3.50 4.00 New Construction 4.00  

519 D3676, D5003Muraleni - Schoemansdal (P98/2)

T2Tech 5.30 5.00 New Construction 5.00  

520 D192 Kgopong - Makekeng AFRICAN EPA 3.00 4.00 New Construction 4.00  

422 D2231 Nakampe - Sekhiming G & C 5.00 6.00 Compl portion to D9   6.00

423 D3911, D3912 Mulalene - Crossing - Mabins MOSOMO 5.00 6.00 Compl 2nd/3rd phase to end 4.80 1.60

425 D192 Kgopong - Makekeng V & V 2.00 2.40 To reach Kgopong 3.00 0.80

428 D3676, D5003 Maebane - Makhita T2-TECH 5.00 6.00 4,5km / 3.55km repectively 4.28 1.00

429 D3234 Jokong - Shimange VELA VKE 6.00 7.20 Link D3180 to Shimange    

430 D3234 Shimange - Tar NHLENGANI 2.30 2.76 To link Shimage 2.88 0.90

432 D3700 Shakadza - Tshirunzini

AFRICAN EPA 0.40 0.48To link Shakadza to GL gravel rd

4.28 1.90

433 D3969 Muraluwe - Muswodi SMV 5.00 6.00 Link Muswodi to D3697    

434D4036/D4037/ D4013/D4016/ D4017 Mankweng cluster

SEMENYA FURUMELE 2.20 4.40 Compl loop to D4016 4.80  

378A D3211 Nakampe - Sekhiming

KWEZI V3 5.30 4.25 Compl portion to D9   6.50

380A D3769 Mafarana Gabaza

BKS 3.30 4.46 Compl Mafarana Gabaza 4.44 0.90

382A D4200 Mphanama - Apel

TSHEDZA 2.00 2.40 To reach T at D4203 3.58 0.72

384B D3200

Mokwakwaila - Lebaka (D9 tar) km 5.35 - 10.7

MOSOMO 5.90 7.20 Compl link 5.20 2.00

382B D3521 D192 - Mabuladihlare TSHEDZA 3.60 4.50

Finish original- to Masebe Hosp

   

              13.22 10.12

Page 10: Limpopo Provincial Government

10

   

kmEstim

ate     

D3836 Sikhunyane - Mpephule  

8.50 8.50 Upgrade grav to tar: Est @ R1m/km    

D4252 Mphanama - D4045  

12.00 20.40 Intended to link (Est on R1.6m /km)    

D4200 Madibong - Mphanama  4.00 2.50 Complete terminated 323   3.00

D3009 London - P18/1  5.00 6.75 To close the link    

D3724 Tshifulanani - Tshivhumbe B  4.50 6.08 To complete balance    

D4263 Ga-Phaahla - Ga-Marishane Loop  

24.00 28.80 Est R 1.2 /km    

D4070,77,86 Ga Mphahlele Cluster/Loop  26.00 31.20 Est R 1.2 /km    

           0.00 3.00

         GL Upgrading Totals 62.26 25.32

EPWP NEW CONSTRUCTION PROJECTS

Page 11: Limpopo Provincial Government

11

MAINTENANCE AND REPAIR PROJECTS(GL0)2007 / 2008

    Ga Marishane (1st standard)  7.00 0.30     2.2

    1st STANDARD PROJECTS Prev. Contractor

Length (Km)

Cost/km

     

GL/T269 D3211 Nakampe - Sekhiming MVKS Civils

5.50 0.20 Repair and fog-spray    

GL/T270 D3211 Sekhiming - Bembula Rola Consultants

9.00 0.20 Repair and fog-spray    

GL/T271 D3180 Shimange - Jokong

Mmabatho Construction

10.00 0.06 Drainage    

GL/T272 D3983 Bambeni & Sekunyane - Sekiming Lulama Women Investment

9.00 0.06

GL/T274

D3853/D3854

Xikhumba - Guwela & Xikhumba - Xawela

Tshidaho Construction

7.60 0.03 Drainage (sidefill protection)    

GL/T275

D3767/D3769

Mafarana - Gabaza & Burgersdorp - Myakayaka Rea Soma Correspondace

6.00 0.25

GL/T276

D4413/D3932

Crossing - Mulelane & London Worcester Henque 3645 cc

7.20 0.35Repair, reseal and drainage (50%)

  1.70

GL/T277 D3909 Madeira Loop & Tickyline - Sofaya Dawning Business Enterprise

6.60 0.35

GL/T282 D3901 Bismark Haulking

10.00 0.25 Repair and slurry (20%)    

             0.00 5.55

Page 12: Limpopo Provincial Government

12

    2nd STANDARD PROJECTS             

     

GL/T313 D5002 Tshikororo - Dovhoni Liore Road Construction 2

0.25

Repair and slurry   0.50   0.38    

GL/T314 D3724 Tshifulanani - Tshivhumbe Fishoff 4

0.30

Repair and slurry   1.20   1.20    

GL/T315 D3695 Tshandama - Tshikwadza Bagma Roads 6.25

0.25

Repair and fog-spray       1.56    

GL/T316 D3695 Tshandama - Tshikwadza ES-EM-ES 6.25

0.25

Repair and fog-spray       1.56    

GL/T317 D3700 Tshirunzina - Shakadza KCA 6.5

0.06

Drainage           

GL/T318 D3969 Muraluwe - Muswodi

Risimati Professional Civils and Construction 6.5

0.06

Drainage    2.40   10.80  

GL/T319 D3812

Lulekani/Homo South - Mapayeni/Homo South Maraka Pula 5.06

0.45

Repair, reseal and drainage

          

GL/T320 D4264 Mapayeni - Mahlathini River North Trading 6.2

0.45

Repair, reseal and drainage

          

GL/T321 D192 P19/1 (Tar) - Kgopung A re Ageng 6.5

0.25

Repair and fog-spray   1.63   0.81    

GL/T322 D192 Kgopung - Makekeng

Lekatana Mabore Business Enterprise 6.5

0.25

Repair and fog-spray   1.63   0.81    

GL/T323 D4200 Madibeng - Mphanama Constructability II cc 9.1

0.35

    3.19       

GL/T324

D4312/3/4 Ga Phahla - Marishane Silver Solutions 142 cc 7.1

0.40

Repair, reseal and drainage (4.5km)

  1.80       

GL/T337

D4263 - D4264 Sekhukhune Loop Lulama

                

GL/T338

D4263 - D4264 Ga Maseshlaneng Loop Silver Solutions 142 cc

                

GL/T339   Mankweng cluster Nenis Construction

                

            

0.00 9.942.40

6.33 10.80 0.00

Page 13: Limpopo Provincial Government

13

    05/06 PROJECTS                    

GL/T378b D4200 Madibong - Mphanama

Lekatana Mabore Business Enterprise

5.30 0.15Repair and fog-spray(50%, 50%)

     0.40   0.40

GL/T379b

D4214/ D4264

Mphanama-Petseng/GaMar/GaPha Maraka Pula

4.50 0.15Repair and fog-spray(50%, 50%)

     0.34   0.34

GL/T379c D3701

Access Road to Madimbo Matshakatini KCA

5.80 0.15Repair and fog-spray(50%, 50%)

     0.44   0.44

GL/T380b D3378

Ga-Ngwetsana - Ga-Setshaba Nenis Construction

4.80 0.15Repair and fog-spray(50%, 50%)

     0.36   0.36

GL/T380c D3377 D19 - Kgorosi - Ga-Setshaba A re Ageng

5.50 0.15Repair and fog-spray(50%, 50%)

     0.41   0.41

GL/T381 D3911 Crossing - Mulalene KCA

5.20 0.15Repair and fog-spray(50%, 50%)

     0.39   0.39

GL/T382b D3521 D192 - Mabuladihlare Lulama Women Investment

4.50 0.15Repair and fog-spray(50%, 50%)

     0.34   0.34

GL/T383b D5003 Muraleni - Madabani Bagma Roads

5.10 0.15Repair and fog-spray(50%, 50%)

     0.38   0.38

GL/T384a D3200

Mokwakwaila - Lebaka 0 - 5.35

Risimati Professional Civils and Construction

5.00 0.15Repair and fog-spray(50%, 50%)

     0.38   0.38

             0.00 0.00 0.00

3.43 0.00 3.43

GL Maintenance Totals

0.0015.4

92.40 13.

04 10.80 4.93

CONSTRUCTION AND MAINTENANCE: LABOUR INTENSIVE

R 62.26R

40.81R

25.95R 43.43 R 15.60

R 53.45

CONSTRUCTION AND MAINTENANCE: CONVENTIONAL

R 0.00 R 0.00 R 4.13 R 17.75 R 19.40R

88.06

TOTAL R 62.26 40.81 30.08 61.18 35.00 141.51

   

   

TARGET (RAL, PIG Conditional Grant):

R 25.0

R 40.8

R 30.0 R

61.3 R 35.0

R 141.5

Page 14: Limpopo Provincial Government

14

EPWP Fencing Project: - people to be employed , 2007/08

               

DISTRICT ADULTS   YOUTH   TOTALS   TOTAL

  MALE FEMALE MALE FEMALE MALE FEMALE (M + F)

CAPRICORN 76 88 79 87 155 175 330

MOPANI 82 132 84 92 166 224 390

VHEMBE 98 144 68 68 166 212 394

SEKHUKHUNE 103 90 95 90 198 180 378

WATERBERG 150 274 79 90 229 364 593

  509 728 405 427 914 1,155 2,069

Page 15: Limpopo Provincial Government

15

SUMMARY FOR 2007/8

Type of job Amount R’000

Units Comments

EPWP Project Gundo Lashu 31,243 31KM 1,000 to be employed

EPWP Project Tsela Chueu 32,122 5,000km 2,000 to be employed

Development of emerging contractors

20,0000 Training Programme

Mainly forecast on youth and women.

Page 16: Limpopo Provincial Government

16

PROGRESS ON EPWP PROJECTS, 2007/8

2007/8 plans for road construction, road maintenance and fencing projects are in place and being implemented.

Process of appointing contractors is being finalised for new projects.

Department intends to empower local people, especially rural women.

Department is negotiating with the ESKOM Foundation and Waterberg District Municipality to join hands for the implementation of regravelling programme which will be more labour intensive.

Page 17: Limpopo Provincial Government

17

THE END