lecture 1 understanding project

Upload: sm-salahuddin

Post on 09-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 Lecture 1 Understanding Project

    1/30

    Understanding Project and

    International ContextProject Management: A Managerial Approach (4/e)

    By Jack R. Meredith and Samuel J. Mantel, Jr.

    1

  • 8/8/2019 Lecture 1 Understanding Project

    2/30

    Projects in Contemporary Organizations

    2

    ` Project Management has emerged because the

    characteristics of our turn-of-the-century society

    demands the development of new methods of

    management

    ` Many forces have fostered the emergence and

    expansion of Project Management

  • 8/8/2019 Lecture 1 Understanding Project

    3/30

    Forces Of Project Management

    3

    ` Three Paramount Forces driving ProjectManagement:1. The exponential expansion of human knowledge

    2. The growing demand for a broad range of complex,sophisticated, customized goods and services

    3. The evolution of worldwide competitive markets for theproduction and consumption of goods and services

    ` All 3 forces combine to mandate the use of teams

    to solve problems that used to be solvable byindividuals

  • 8/8/2019 Lecture 1 Understanding Project

    4/30

    Objectives of a Project

    4

    ` Three Project Objectives:

    ` Performance

    ` Time

    ` Cost

    ` Expectations of clients are not an additional target, but an

    inherent part of the project specifications

  • 8/8/2019 Lecture 1 Understanding Project

    5/30

    Objectives of a Project

    5

  • 8/8/2019 Lecture 1 Understanding Project

    6/30

    The Professionalism of Project Management

    6

    ` Complexity of problems facing the project manager

    ` Growth in number of project oriented organizations

    ` The Project Management Institute (PMI) was established in 1969

    ` By 1990 it had 7,500 members

    ` 5 years later, over 17,000 members

    ` And by 1998, it had exploded to over 44,000 members

    ` This exponential growth is indicative of the rapid growth in

    the use of projects` Also reflects the importance of PMI as a force in the

    development of project management as a profession

  • 8/8/2019 Lecture 1 Understanding Project

    7/30

    Project Management Institute

    7

  • 8/8/2019 Lecture 1 Understanding Project

    8/30

    Recent Changes in Managing Organizations

    8

    ` The process of managing organizations has beenimpacted by three revolutionary changes

    1. Accelerating replacement of traditional,hierarchical management by participatorymanagement

    2. Currently witnessing the adoption of the systemsapproach (sometimes called systemsengineering)

    3. Organizations establishing projects as thepreferred way to accomplish the many specific

    changes that must be made when the organizationattempts to alter its strategy

  • 8/8/2019 Lecture 1 Understanding Project

    9/30

    The Definition of a Project

    9

    ` Must make a distinction between terms:` Program - an exceptionally large, long-range objective

    that is broken down into a set of projects

    ` Task - set of activities comprising a project

    ` Work Packages - division of tasks` Work Units - division of work packages

    ` In the broadest sense, a project is a specific,

    finite task to be accomplished

  • 8/8/2019 Lecture 1 Understanding Project

    10/30

    Characteristics of a Project

    10

    ` Have a purpose

    ` Have a life cycle

    ` Interdependencies

    ` Uniqueness

    ` Conflict

  • 8/8/2019 Lecture 1 Understanding Project

    11/30

    Why Project Management?

    11

    ` Companies have experienced:

    ` Better control

    ` Better customer relations

    ` Shorter development times` Lower costs

    ` Higher quality and reliability

    ` Higher profit margins

    ` Sharper orientation toward results

    ` Better interdepartmental coordination

    ` Higher worker morale

  • 8/8/2019 Lecture 1 Understanding Project

    12/30

    Why Project Management?

    12

    ` Companies have also experienced some negatives:

    ` Greater organizational complexity

    ` Increased likelihood of organizational policy violations

    ` Higher costs

    ` More management difficulties

    ` Low personnel utilization

  • 8/8/2019 Lecture 1 Understanding Project

    13/30

    The Project Life Cycle

    13

    ` Stages of a Conventional Project:

    ` Slow beginning

    `

    Buildup of size` Peak

    ` Begin a decline

    ` Termination

  • 8/8/2019 Lecture 1 Understanding Project

    14/30

    The Project Life Cycle

    14

  • 8/8/2019 Lecture 1 Understanding Project

    15/30

    The Project Life Cycle

    15

    ` Time distribution of project effort is characterized byslow-rapid-slow

  • 8/8/2019 Lecture 1 Understanding Project

    16/30

    The Project Life Cycle

    16

    ` Other projects also exist which do not follow the

    conventional project life cycle

    ` These projects are comprised of subunits that have littleuse as a stand alone unit, yet become useful when put

    together

  • 8/8/2019 Lecture 1 Understanding Project

    17/30

    The Project Life Cycle

    17

    ` Unlike the more conventional life cycle, continued inputs of effort atthe end of the project produce significant gains in returns

  • 8/8/2019 Lecture 1 Understanding Project

    18/30

    The Project Life Cycle

    18

    ` It is essential for the Project Manager to

    understand the characteristics of the life cycle

    curve for his project

    ` The distinction between the two life cycles plays

    a critical role in the development of budgets and

    schedules for the project

  • 8/8/2019 Lecture 1 Understanding Project

    19/30

    The Project Life Cycle

    19

    ` Risk during project life cycle

    ` With most projects there is some

    uncertainty about the ability to meetproject goals

    ` Uncertainty of outcome is greatest at the

    start of a project

    ` Uncertainty decreases as the projectmoves toward completion

  • 8/8/2019 Lecture 1 Understanding Project

    20/30

    Projects in Contemporary Organizations

    20

  • 8/8/2019 Lecture 1 Understanding Project

    21/30

    Risk During Project Life Cycle

    21

    ` Uncertainty decreases as the project moves towardcompletion

  • 8/8/2019 Lecture 1 Understanding Project

    22/30

    International Project Analysis

    ` Its normative analysis` Examines characteristics, relationships and actions that should

    exist

    ` May not be empirically based

    ` Its objective is to maximize profit` Decision making is more amenable to modeling

    ` The rational model

    ` The bounded-rational model

    ` The political model

    ` The garbage can model

    22 International Project Management

  • 8/8/2019 Lecture 1 Understanding Project

    23/30

    Rational Model of Decision Making

    ` Decision maker search for all possible courses of action,to compare and to evaluate them and to choose the

    optimal solution.

    ` Recognition

    ` Diagnosis` Search

    ` Design

    ` Evaluate

    ` Choice` Authorization

    ` implementation

    23 International Project Management

  • 8/8/2019 Lecture 1 Understanding Project

    24/30

    The Bounded-Rational Model

    ` Actual decisions are made in the real world withincomplete information, under time pressure and/or with

    possible disagreement over goals

    ` The optimal solution may not always be achieved

    rationality is bounded.

    24 International Project Management

  • 8/8/2019 Lecture 1 Understanding Project

    25/30

    The Bounded-Rational Model

    1. It involves problematic search rather than completealertness

    2. Cognitive limits exist in the search process

    3. Time pressure often cut short the full search process

    4. Incrementalism and disjointedness often occcur

    5. Intuition and judgement often play important role

    6. Satisficing rather than optimal solution

    25 International Project Management

  • 8/8/2019 Lecture 1 Understanding Project

    26/30

    Political Model

    ` The political model of decision making involves shiftingcoalitions of interests and temporary alliances of decision

    makers who may, for the purpose of dealing with a

    particular problem, come together and sufficiently forget

    their differences in order to make a decision.` Bargaining

    ` Guile

    ` Coalition building

    ` biasing

    26 International Project Management

  • 8/8/2019 Lecture 1 Understanding Project

    27/30

    Garbage Can Model

    ` Events and decisions are not at all systematic andorganized anarchy.

    27 International Project Management

  • 8/8/2019 Lecture 1 Understanding Project

    28/30

  • 8/8/2019 Lecture 1 Understanding Project

    29/30

    Eclectic paradigm

    ` The eclectic paradigm is a theory in economics and is alsoknown as the OLI-Modeling, by John H. Dunning

    ` The theory of internalization itself is based on the transactioncost theory.This theory says that transactions are made withinan institution if the transaction costs on the free market are

    higher than the internal costs.This process is calledinternalization

    ` Ownership advantages: (trademark, production technique,entrepreneurial skills, returns to scale)[2]

    ` Locational advantages (existence of raw materials, low wages,special taxes or tariffs)

    ` Internalisation advantages (advantages by producing through apartnership arrangement such as licensing or a joint venture)

    International Project Management29

  • 8/8/2019 Lecture 1 Understanding Project

    30/30

    Globalization

    International Project Management30