Page 1: Laydown & Compaction

The California Asphalt Pavement Association

October 25-26, 20172017 Fall Conference; Doubletree Hotel, Sacramento , CA

Page 2: Laydown & Compaction

Promoting

Learning

Advocating

Networking

2

Page 3: Laydown & Compaction

3

2013 Utah Asphalt Conference; Sandy UT - March 27-28, 2013

Page 4: Laydown & Compaction

4

We are ENGINEERS

HOW do we make it happen!!!

Page 5: Laydown & Compaction

2013 Utah Asphalt Conference; Sandy UT - March 27-28, 2013

Page 6: Laydown & Compaction

2013 Utah Asphalt Conference; Sandy UT - March 27-28, 2013

Page 7: Laydown & Compaction

What is Compaction? Performance Requires Proper Compaction Keys to Compaction Quality Control Summary

7

Page 8: Laydown & Compaction

8

Page 9: Laydown & Compaction

9

Page 10: Laydown & Compaction

10

Page 11: Laydown & Compaction

“to join or pack closelytogether; consolidate;condense.”

– dictionary.com

11

Page 12: Laydown & Compaction

12

Page 13: Laydown & Compaction

13

Page 14: Laydown & Compaction

1% change of in-place density = 10% change in performance life!!!

14

Page 15: Laydown & Compaction

Mix Characteristics

15

Page 16: Laydown & Compaction

16

Page 17: Laydown & Compaction

Nominal maximum size: “one sieve size larger than the first sieve to retain more than 10 percent of the material” - NAPA

t/NMAS

3:1 minimum

4:1 optimal

5:1 very coarse mixes

6:1 adjust thickness or mix type

17

Page 18: Laydown & Compaction

18

Data: NCAT

Page 19: Laydown & Compaction

19

NCAT - Brown and Heitzman 2013

Page 20: Laydown & Compaction

Permeability in a coarse dense-graded 12.5mm Superpave surface mix

20

Page 21: Laydown & Compaction

What happens when mix voids change?

Higher?

Lower?

21

Page 22: Laydown & Compaction

Temperatures

22

Page 23: Laydown & Compaction

Compact at the highest temperature possible!!

What is that Temperature?

23

Page 24: Laydown & Compaction

Does the mix have tender zones?

What temperature range should we avoid compactive effort?

24

Page 25: Laydown & Compaction

3 Inch Lift50°F Air &

Surface Temp300°F Mix

Delivery temp44 min to

complete compaction operations

25

Page 26: Laydown & Compaction

1” - Lift

50°F - Air &

Surface Temp

300°F - Mix

Delivery temp

7 minutes to

complete

compaction

operations

26

Page 27: Laydown & Compaction

Existing Pavement Structure

27

Page 28: Laydown & Compaction

28

Page 29: Laydown & Compaction

If there is surface cracking or rutting due to plastic movement of the mix, the entire surface should be milled

29

Page 30: Laydown & Compaction

Laydown Process

30

Page 31: Laydown & Compaction

31

Page 32: Laydown & Compaction

32

Page 33: Laydown & Compaction

33

Page 34: Laydown & Compaction

34

Page 35: Laydown & Compaction

35

Page 36: Laydown & Compaction

36Data: MNDOT

Page 37: Laydown & Compaction

Rolling Operations

37

Page 38: Laydown & Compaction

38

What drum width is right for the project?

Page 39: Laydown & Compaction

39

Page 40: Laydown & Compaction

Key considerations for optimizing roller operations: Frequency Amplitude Speed Passes

40

Page 41: Laydown & Compaction

41

Page 42: Laydown & Compaction

42

Page 43: Laydown & Compaction

43

Page 44: Laydown & Compaction

44

Page 45: Laydown & Compaction

45

Page 46: Laydown & Compaction

46

Wid

th o

f m

at Pass1

Pass 2

Pass 3

Pass 4

This is a 5 pass pattern that

provides 2 complete coverages.

Page 47: Laydown & Compaction

Conduct trial section to determine appropriate equipment setup and rolling pattern to achieve target densities.

47

Page 48: Laydown & Compaction

48

MIX PROD SCREED BREAK INTER FINISH

Trial 1 325F 290F 280F 250F 200F

Trial 2 290F 250F 240F 190F 135F

MIX AVG (%) BREAK INTER FINISH

Trial 1 93.2 4V 4V 2V

Trial 2 94.1 2V 4V 2S

Temperature

Density

Page 49: Laydown & Compaction

Contractor QC Inspection

49

Page 50: Laydown & Compaction

Monitor Operations:

Temps

Density

Rolling pattern

Mix properties

50

Page 51: Laydown & Compaction

51

Page 52: Laydown & Compaction

52

Page 53: Laydown & Compaction

Intelligent Compaction (IC)

53

Page 54: Laydown & Compaction

“Intelligent compaction (IC) is an innovative pavement construction technology that equips conventional rollers with instrumentation that is used to monitor and control the material compaction process.”

54

Page 55: Laydown & Compaction

“…ensures that the target properties of the layer are more uniform and are more efficiently achieved.”

55

Page 56: Laydown & Compaction

GPS Positioning

Passes

Location

Temperature ICMV Real-Time Graphical

Interface Data Analysis

“…ensures that the target properties of the layer are more uniform and are more efficiently achieved.”

56

Page 57: Laydown & Compaction

57

Page 58: Laydown & Compaction

“…ensures that the target properties of the layer are more uniform and are more efficiently achieved.”

58

Page 59: Laydown & Compaction

1. The primary conclusion that can be drawn from the FHWA/TPR study is that IC is very effective for achieving the target level of HMA compaction while at the same time increasing the uniformity of the material.

2. The IC roller demonstrations provided proof that IC rollers could track roller passes, monitor HMA surface temperature, and report an ICMV that the operator could use to better control the compaction process.

5. IC equipment can be used effectively to develop compaction curves and to determine the optimum number of roller passes.

6. The correlation studies show correlation between the ICMVs and in-situ measurements, including HMA density (from nuclear and non-nuclear density gauges) and certain deflection-based parameters i.e., normalized maximum deflection and layer modulus. However, there is considerable variability in the correlations.

59

Page 60: Laydown & Compaction

Rolling Towards Performance

60

Page 61: Laydown & Compaction

61

Establish the targets Identify the equipment

setup, the pattern, and the monitoring schedule.

Identify control and action limits

Identify actions to reestablish target

Page 62: Laydown & Compaction

What contributes to success? Mix quality Temperatures

(ambient & mix Existing structure Equipment setup Rolling Pattern

62

Page 63: Laydown & Compaction

COMMUNICATION UNIFORMITY

63

Page 64: Laydown & Compaction

Brandon Milar, P.E.Technical DirectorCalifornia Asphalt Pavement [email protected]

64