landscape restoration team field trips: july 9, 2013: red feather lakes area

11
Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area July 11, 2013: Rampart Range area

Upload: miette

Post on 22-Feb-2016

20 views

Category:

Documents


0 download

DESCRIPTION

Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area July 11, 2013: Rampart Range area. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

Landscape Restoration Team Field Trips:July 9, 2013: Red Feather Lakes areaJuly 11, 2013: Rampart Range area

Page 2: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

We very much thank the organizers of the field trips, Dick Edwards on the AR and Jeff Underhill on the Pike, and all of their staff members who contributed their time and expertise on the various projects. Both field trips were very informative for understanding treatment histories and objectives.

Page 3: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

The first stop on the AR, Red Feather 1 Unit 16 (just off the Lady Moon trailhead).

Page 4: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

The first stop on the AR, Red Feather 1 Unit 16 (this is also where the first picture of this slide show was taken).

Page 5: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

Red Feather 2; active restoration site

Page 6: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

Front Range Forest Reconstruction Network, Red Feather 58 - South

Page 7: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

The group at the first stop on the Pike, Messenger Gulch post-treatment site.

Page 8: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

Messenger Gulch post-treatment; note that this was a leave-tree marking.

Page 9: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

Pike, near Messenger Gulch in older treatment.

Page 10: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

The last stop on the Pike, Catamount 1 post-treatment. Note the large openings and landscape context of treatments between ridges.

Page 11: Landscape Restoration Team Field Trips: July 9, 2013: Red Feather Lakes area

The group on the second trip to the Pike.