land use control assurance plan for the srs wsrc …...land use control assurance plan for the srs...

22
Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 LUCIP for the Central Shops Burning/Rubble Pits, 631-1G and 631-3G Appendix F of Post-Construction Report/Corrective Measures Implementation Report/Final Remediation Report for Central Shops Burning/Rubble Pits, 631-1G and 631-3G WSRC-RP-2004-4014, Revision.1, February 2005

Upload: others

Post on 09-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR

Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4

LUCIP for the Central Shops Burning/Rubble Pits, 631-1G and 631-3G

Appendix F of Post-Construction Report/Corrective Measures Implementation

Report/Final Remediation Report for Central Shops Burning/Rubble Pits, 631-1G and 631-3G

WSRC-RP-2004-4014, Revision.1, February 2005

O9823
Typewritten Text
O9823
Typewritten Text
O9823
Typewritten Text
O9823
Typewritten Text
O9823
Typewritten Text
On August 20, 2014, the DOE submitted a letter (IACD-14-186, ARF #019770) to the EPA and SCDHEC to perform the inspections for these operable units on an annual basis. The EPA and SCDHEC approved the request in letters dated October 2, 2014 (ARF #019837) and September 17, 2014 (ARF #019816), respectively.
Page 2: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR

Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4

This page was intentionally left blank.

Page 3: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 4: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 5: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 6: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 7: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 8: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 9: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 10: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 11: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 12: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 13: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 14: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 15: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 16: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 17: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 18: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 19: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 20: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR

PCR/CMIR/FRR for CSBRP (631-1G, 3G/3GA) (U) WSRC-RP-2004-4014 Savannah River Site Revision 1 February 2005 Page F-18 of F-19

1459 RDP.doc

Figure A-1. Access Control Warning Sign

Central Shops Burning/Rubble Pits (631-1G and 631-3G/3GA)

DANGER UNAUTHORIZED PERSONNEL KEEP OUT

THIS UNIT CONTAINS HAZARDOUS SUBSTANCES.

DO NOT DIG OR EXCAVATE.

DO NOT ENTER WITHOUT CONTACTING THE

WASTE UNIT CUSTODIAN

CUSTODIAN: MANAGER, POST-CLOSURE MAINTENANCE

CONTACT PHONE: (See current phone number on the warning signs

at the OU site)

Page 21: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
Page 22: Land Use Control Assurance Plan for the SRS WSRC …...Land Use Control Assurance Plan for the SRS WSRC-RP-98-4125 Revision.1.1 Tab B-4 This page was intentionally left blank.PCR/CMIR/FRR
y6594
Rectangle