Land Surveying / Engineering Surveying I

Chapter 4 : Levelling (Part 2)

Page 2: Land Surveying Chapter 2 Leveling p2

3.7 Rise and Fall Method3.71 Sample Loop 13.72 Booking Observations3.73 Reducing Level (Rise & Fall)3.74 Loop Misclosure3.75 Adjusting Misclosure

3.8 Height of Collimation Method3.81 Reducing Level (HPC)3.82 Loop Misclosure

Contents

Page 3: Land Surveying Chapter 2 Leveling p2

Sample Loop 1 shows all the readings for the leveling sequence recorded in a rise & fall field book.

The calculation proceeds in the following manner, in which the height of a point is related to that of a previous point.

3.7 Rise and Fall Method

Page 4: Land Surveying Chapter 2 Leveling p2

BM A

CP 1

CP 2

CP 3

Kerb

Post

Kerb

Setup 1

Setup 2

Setup 3

Setup 4

3.71 Sample Loop 1

Page 5: Land Surveying Chapter 2 Leveling p2

BM A

CP 1CP 2

CP 3

Kerb

Post

KerbSetup 1

BS IS FS Point

BM A

CP 1

1.321

3.986

3.72 Booking Observation

Page 6: Land Surveying Chapter 2 Leveling p2

BM A

CP 1CP 2

CP 3

Kerb

Post

KerbSetup 1

Setup 2

BS IS FS Point

1.321 BM A

3.986 CP 1

Kerb

Post

CP 2

2.567

1.255

3.658

0.670

3.72 Booking Observation

Page 7: Land Surveying Chapter 2 Leveling p2

BM A

CP 1CP 2

CP 3

Kerb

Post

KerbSetup 1

Setup 2

Setup 3

BS IS FS Point

1.321 BM A

2.567 3.986 CP 1

1.255 Kerb

3.658 Post

0.670 CP 2

Kerb

CP 3

3.492

2.586

1.542

3.72 Booking Observation

Page 8: Land Surveying Chapter 2 Leveling p2

BM A

CP 1CP 2

CP 3

Kerb

Post

KerbSetup 1

Setup 4

Setup 2

Setup 3

BS IS FS Point

1.321 BM A

2.567 3.986 CP 1

1.255 Kerb

3.658 Post

3.492 0.670 CP 2

2.586 Kerb

1.542 CP 3

BM A2.643

3.817

3.72 Booking Observation

Page 9: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 CP 1

1.255 Kerb3.658 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.73 Reducing Level (Rise & Fall)

Page 10: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 Kerb3.658 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.73 Reducing Level (Rise & Fall)

Page 11: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.73 Reducing Level (Rise & Fall)

Page 12: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.73 Reducing Level (Rise & Fall)

Page 13: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.73 Reducing Level (Rise & Fall)

Page 14: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 CP 33.817 BM A

3.73 Reducing Level (Rise & Fall)

Page 15: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 1.044 51.182 CP 3

3.817 BM A

3.73 Reducing Level (Rise & Fall)

Page 16: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 1.044 51.182 CP 33.817 1.174 50.008 BM A

3.73 Reducing Level (Rise & Fall)

Page 17: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 1.044 51.182 CP 33.817 1.174 50.008 BM A

10.023 10.015

3.73 Reducing Level (Rise & Fall)

Page 18: Land Surveying Chapter 2 Leveling p2

When the Initial RL column of the table has been completed, a check on the arithmetic involved is possible and must always be applied.

This check is BS - FS = RISES - FALLS

= Last RL – First RL

3.73 Reducing Level (Rise & Fall)

Page 19: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 1.044 51.182 CP 33.817 1.174 50.008 BM A

10.023 10.015

0.008

3.73 Reducing Level (Rise & Fall)

Page 20: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 1.044 51.182 CP 33.817 1.174 50.008 BM A

10.023 10.015 6.250 6.242

0.008

3.73 Reducing Level (Rise & Fall)

Page 21: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 1.044 51.182 CP 33.817 1.174 50.008 BM A

10.023 10.015 6.250 6.242

0.008 0.008

3.73 Reducing Level (Rise & Fall)

Page 22: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 1.044 51.182 CP 33.817 1.174 50.008 BM A

10.023 10.015 6.250 6.242

0.008 0.008 0.008

3.73 Reducing Level (Rise & Fall)

Page 23: Land Surveying Chapter 2 Leveling p2

BS IS FS Rise Fall RL Remarks1.321 50.000 BM A2.567 3.986 2.665 47.335 CP 1

1.255 1.312 48.647 Kerb3.658 2.403 46.244 Post

3.492 0.670 2.988 49.232 CP 22.586 0.906 50.138 Kerb

2.643 1.542 1.044 51.182 CP 33.817 1.174 50.008 BM A

10.023 10.015 6.250 6.242

0.008 0.008 0.008

3.73 Reducing Level (Rise & Fall)

Page 24: Land Surveying Chapter 2 Leveling p2

Misclosure• The amount by which the measured height difference (DHmeas) differs

from the known height difference derived from the RLs of the starting

and finishing benchmarks (DHknown)

Misclosure = DHmeas – Dhknown

Misclosure = Last R.L. – Original R.L.

3.74 Loop Misclosure

Page 25: Land Surveying Chapter 2 Leveling p2

3.74 Loop Misclosure

Acceptable misclosures as follows :

• Small misclosures in closed level loops are expected because of the

accumulation of errors.

• If the misclosure is small, it can be adjusted.

• If the misclosure is greater than the allowable misclosure then the

levelling must be repeated.

• The usual method of correction is to apply an equal, but cumulative,

amount of the misclosure to each instrument position.

• The sign of the adjustment being opposite to that of the misclosure.

Page 26: Land Surveying Chapter 2 Leveling p2

The amount of misclosure we are prepared to accept depends on the accuracy we are hoping to achieve.

For routine levelling, the allowable misclosure is given by :

Allowable misclosure = ± mn mm

where m is a constant, and;n is the number of instrument

positions.

3.74 Loop Misclosure

Page 27: Land Surveying Chapter 2 Leveling p2

From the loop, the misclosure is +8 mm.

Therefore, the allowable misclosure is ± 54 = ± 10 mm.

The misclosure of +8 mm is smaller than allowable misclosure.

3.75 Adjusting Misclosure

Page 28: Land Surveying Chapter 2 Leveling p2

Adjustment is carried out to ensure that the measured and

known RLs of the closing benchmark agree.

The misclosure is linearly distributed according to the

number of set-ups.

The adjustment per set-up for the previous example is

( - 0.008 / 4 ) = - 0.002

3.75 Adjusting Misclosure

Page 29: Land Surveying Chapter 2 Leveling p2

BS IS FS RL Adj. Adj. RL Remarks1.321 50.000 0.000 50.000 BM A

2.567 3.986 47.335 -0.002 47.333 CP 1

1.255 48.647 Kerb

3.658 46.244 Post

3.492 0.670 49.232 CP 2

2.586 50.138 Kerb

2.643 1.542 51.182 CP 3

3.817 50.008 BM A

-1x(0.008/4)

3.75 Adjusting Misclosure

Page 30: Land Surveying Chapter 2 Leveling p2

BS IS FS RL Adj. Adj. RL Remarks1.321 50.000 0.000 50.000 BM A

2.567 3.986 47.335 -0.002 47.333 CP 1

1.255 48.647 -0.004 48.643 Kerb

3.658 46.244 -0.004 46.240 Post

3.492 0.670 49.232 -0.004 49.228 CP 2

2.586 50.138 Kerb

2.643 1.542 51.182 CP 3

3.817 50.008 BM A

-2x(0.008/4)

3.75 Adjusting Misclosure

Page 31: Land Surveying Chapter 2 Leveling p2

BS IS FS RL Adj. Adj. RL Remarks1.321 50.000 0.000 50.000 BM A

2.567 3.986 47.335 -0.002 47.333 CP 1

1.255 48.647 -0.004 48.643 Kerb

3.658 46.244 -0.004 46.240 Post

3.492 0.670 49.232 -0.004 49.228 CP 2

2.586 50.138 -0.006 50.132 Kerb

2.643 1.542 51.182 -0.006 51.176 CP 3

3.817 50.008 BM A

-3x(0.008/4)

3.75 Adjusting Misclosure

Page 32: Land Surveying Chapter 2 Leveling p2

BS IS FS RL Adj. Adj. RL Remarks1.321 50.000 0.000 50.000 BM A

2.567 3.986 47.335 -0.002 47.333 CP 1

1.255 48.647 -0.004 48.643 Kerb

3.658 46.244 -0.004 46.240 Post

3.492 0.670 49.232 -0.004 49.228 CP 2

2.586 50.138 -0.006 50.132 Kerb

2.643 1.542 51.182 -0.006 51.176 CP 3

3.817 50.008 -0.008 50.000 BM A

-4x(0.008/4)

3.75 Adjusting Misclosure

Page 33: Land Surveying Chapter 2 Leveling p2

BS IS FS RL Adj. Adj. RL Remarks1.321 50.000 0.000 50.000 BM A

2.567 3.986 47.335 -0.002 47.333 CP 1

1.255 48.647 -0.004 48.643 Kerb

3.658 46.244 -0.004 46.240 Post

3.492 0.670 49.232 -0.004 49.228 CP 2

2.586 50.138 -0.006 50.132 Kerb

2.643 1.542 51.182 -0.006 51.176 CP 3

3.817 50.008 -0.008 50.000 BM A

3.75 Adjusting Misclosure

Page 34: Land Surveying Chapter 2 Leveling p2

3.8 Height of Collimation Method

The level book for the reduction of the leveling is shown in the height of collimation form.

This method of reducing levels is based on the HPC being calculated for each instrument position.

Page 35: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 CP 1

1.255 Kerb3.658 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 36: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 47.335 CP 1

1.255 Kerb3.658 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 37: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 Kerb3.658 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 38: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 39: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 40: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 49.232 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 41: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 Kerb

2.643 1.542 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 42: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 43: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 51.182 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 44: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 BM A

3.81 Reducing Level (HPC)

Page 45: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

3.81 Reducing Level (HPC)

Page 46: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

3.81 Reducing Level (HPC)

Page 47: Land Surveying Chapter 2 Leveling p2

Arithmetic Check:

With the initial RL column in the table completed, the following check can be applied

BS - FS = Last RL – First RL

The second check is given by

IS + FS + RLs except first = [each HPC x no. of applications]

3.82 Loop Misclosure

Page 48: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

10.023 10.015

3.81 Reducing Level (HPC)

Page 49: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

10.023 10.015

0.008

3.81 Reducing Level (HPC)

Page 50: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

10.023 10.015

0.008

3.82 Loop Misclosure

Page 51: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

10.023 10.015

0.008 0.008

3.82 Loop Misclosure

Page 52: Land Surveying Chapter 2 Leveling p2

BS - FS = 10.023 – 10.015= 0.008 m

Last RL – First RL = 50.008 – 50.000= 0.008 m

BS - FS = Last RL – First RL

3.82 Loop Misclosure

Page 53: Land Surveying Chapter 2 Leveling p2

IS + FS + RLs except first

3.82 Loop Misclosure

Page 54: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

10.023 7.499 10.015

0.008 0.008

3.82 Loop Misclosure

Page 55: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

10.023 7.499 10.015 342.786

0.008 0.008

3.82 Loop Misclosure

Page 56: Land Surveying Chapter 2 Leveling p2

IS + FS + RLs except first

= 7.499 + 10.015 + 342.786= 360.300

3.82 Loop Misclosure

Page 57: Land Surveying Chapter 2 Leveling p2

[each HPC x no. of applications]

3.82 Loop Misclosure

Page 58: Land Surveying Chapter 2 Leveling p2

BS IS FS HPC RL Remarks1.321 51.321 50.000 BM A2.567 3.986 49.902 47.335 CP 1

1.255 48.647 Kerb3.658 46.244 Post

3.492 0.670 52.724 49.232 CP 22.586 50.138 Kerb

2.643 1.542 53.825 51.182 CP 33.817 50.008 BM A

10.023 7.499 10.015

0.008 0.008

3.82 Loop Misclosure

Page 59: Land Surveying Chapter 2 Leveling p2

S [each HPC x no. of applications]

The first HPC of 51.321 m has been used once to calculate the reduced levels of CP1.

The second of 49.902 m has been used 3 times to calculate the reduced levels of Kerb, Post and CP2.

The third of 52.724 m has been used twice to calculate the reduced levels of Kerb and CP3.

The last HPC of 53.825 m has been used once to close the levels onto BM A.

= [51.321x1]+[49.902x3]+[52.724x2]+[53.825x1] = 360.300

3.82 Loop Misclosure

Page 60: Land Surveying Chapter 2 Leveling p2

After applying the check, any acceptable misclosure is distributed as for the rise and fall method.

3.82 Loop Misclosure