PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 Jakarta Selatan No. Rekaman: 03/ROT/2015-001 Berlaku Efektif: 1 Januari 2015 Rencana Operasi 2015 Edisi : 01 Revisi : 00 Halaman : 159 LAMPIRAN 9 SRLYA A B I 250 MVA 1 2 3 4 5 6 7 C D A1 U1 400 MW U2 400 MW U3 400 MW U4 400 MW U7 600 MW U5 600 MW U6 600 MW U8 800 MW II 250 MVA 1 2 A B A1 NEW SRLYA I 500 MVA DEPOK A1 II 500 MVA 1 2 3 4 A B MTWAR GT1.1 140 MW GT2.1 145 MW GT3.1 143 MW GT4.1 143 MW GT1.2 140 MW GT2.2 145 MW GT3.2 143 MW GT4.2 143 MW GT1.3 140 MW ST1.4 220 MW GT2.3 145 MW GT3.3 143 MW GT4.3 143 MW GT5.1 250 MW ST5.0 125 MW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B CRATA A1 126 MW A3 126 MW A5 126 MW A7 126 MW A2 126 MW A4 126 MW A6 126 MW A8 126 MW I 500 MVAA2 II 500 MVA A B 1 2 3 4 5 6 BDSLN II 500 MVA I 500 MVA 2 x 100 MVAR 100 MVAR 100 MVAR A2 1 2 3 4 A B UNGAR 3 PEDAN U1 660 MW U2 660 MW U3 660 MW U4 660 MW A3 II 500 MVA I 500 MVA 1 2 3 4 A B TJATI 5 6 UNGAR II 500 MVA I 500 MVA 100 MVar A3 A3 1 2 3 4 5 6 100 MVar III 500 MVA A B NBANG I 500 MVA A B 1 A4 2 II 500 MVA 1 GRSIK GT2.1 112,5 MW GT2.2 112,5 MW GT2.3 112,5 MW GT3.3 112,5 MW ST2.0 188,9 MW ST3.0 188,9 MW A4 1 2 3 4 5 6 A B I 500 MVA 100 MVar 100 MVar PEDAN A3 I 500 MVA II 500 MVA 1 2 4 5 A B 3 TASIK A2 II 500 MVA 1 2 3 4 A B I 500 MVA KDIRI A4 1 2 3 4 II 500 MVA I 500 MVA A B 100 MVar 100 MVar III 500 MVA PERUSAHAAN LISTRIK SWASTA B A4 II 500 MVA I 500 MVA U1 400 MW A4 U2 400 MW U3 800 MW U5 610 MW U6 610 MW U7 645 MW U8 645 MW U9 600 MW 1 2 3 4 5 6 7 8 50 MVar 50 MVar A C D JP JP PEC PEC PEC Sirkit 1 DOVE 64,3 KMS Sirkit 2 DOVE 64,3 KMS CLGON A1 II 500 MVA I 500 MVA 2 3 4 A B A1 III 500 MVA CBATU A2 II 500 MVA I 500 MVA III 500 MVA IV 500 MVA 2 3 4 5 6 A B 1 A2 A2 1 2 3 4 MDCAN I 500 MVA A B II 500 MVA A2 A B SBBRT A4 I 500 MVA II 500 MVA III 500 MVA 100 MVar 105 MVAR 1 2 3 4 5 6 A4 A B A1 BKASI I 500 MVA III 500 MVA A1 1 2 3 II 500 MVA IV 500 MVA Sirkit I GANNET 12,9 KMS Sirkit 2 GANNET 12,9 KMS GNDUL 1 2 3 4 5 A B A1 I 500 MVA II 500 MVA III 500 MVA A1 B NEW BLRJA A1 II 500 MVA I 500 MVA 1 2 3 4 BOJONEGARA A LENGKONG II 500 MVA I 500 MVA A B 1 2 3 4 KMBGN I 500 MVA A1 II 500 MVA 1 2 A B CWANG A1 II 500 MVA A B 1 2 I 500 MVA 3 III 500 MVA A1 A1 175 MW A2 175 MW A3 175 MW A4 175 MW SGLNG A B 1 2 3 4 5 CIBNG 1 2 3 4 5 A B A1 II 500 MVA I 500 MVA 1 2 3 4 A B 1 2 A B 6 5 CILACAP PLTU 1X600 MW IPP PLTU 1X600 MW PLN KESUGIHAN PITON KONFIGURASI JARINGAN 500 kV SISTEM JAWA BALI 100 MVar 100 MVar GRATI II 500 MVA I 500 MVA A4 GT1.1 100 MW GT1.2 100 MW GT1. 3 100 MW ST1.0 180 MW 1 2 3 4 5 6 7 A B GANET 1,5 KMS GANNET 130,8 KMS DOVE 16,8 KMS DOVE 37,9 KMS DOVE 40,9 KMS DOVE 50,5 KMS Sirkit I DOVE 48,2 KMS Sirkit 2 DOVE 48,2 KMS Sirkit I DOVE 134,8 KMS Sirkit 2 DOVE 134,8 KMS Sirkit I GANNET 30,1 KMS Sirkit 2 GANNET 30,1 KMS Sirkit 2 DOVE 7,5 KMS Sirkit 1 DOVE 7,5 KMS Sirkit 2 DOVE 14 KMS Sirkit 1 DOVE 14 KMS Sirkit I DOVE 275,6 KMS Sirkit 2 DOVE 275,6 KMS Sirkit 2 GANNET 304 KMS Sirkit 1 GANNET 304 KMS Sirkit 1 75.3 KMS Sirkit I GANET 202,4 KMS Sirkit 2 GANET 202,4 KMS Sirkit I GANNET 209,1 KMS Sirkit 2 GANNET 209,1 KMS Sirkit 1 GANNET 80,4 KMS Sirkit 2 GANNET 83,8 KMS Sirkit 2 DOVE 25,2 KMS Sirkit I DOVE 25,2 KMS Sirkit 2 ZEBRA 46 KMS Sirkit 1 ZEBRA 46 KMS Sirkit 1 GANNET 37,6 KMS Sirkit 2 GANNET 37,6 KMS BDSLN-MDCAN I GANNET 119,4 KMS BDSLN-MDCAN 2 GANNET 119,4 KMS Sirkit 2 DOVE 222,4 KMS Sirkit 1 DOVE 222,9 KMS Sirkit I DOVE 267,11 KMS Sirkit 2 DOVE 207,7 KMS Sirkit 2 DOVE 47,6 KMS Sirkit 2 DOVE 23,0 KMS Sirkit I DOVE 23,94 KMS Sirkit 2 GANNET 92,4 KMS Sirkit 1 GANNET 92,4 KMS Sirkit I GANNET 87,9 KMS Sirkit 2 GANNET 87,9 KMS KOFIGURASI JARINGAN 500 kV SISTEM JAWA BALI BIDANG OPERASI SISTEM 01-10-2014 PT PLN (PERSERO) P3B JAWA BALI EDIT TGL: A2 NEW UJBRG I 500 MVA A B 1 2 II 500 MVA 1

Upload: eka

Post on 12-Dec-2015

169 views

Category:

Documents


71 download

DESCRIPTION

ROT 2015

TRANSCRIPT

Page 1: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 159

LAMPIRAN – 9

SRLYAA

B

I

250

MVA

1 2 3 4 5 6 7

C

D

A1

U1

400

MW

U2

400

MW

U3

400

MW

U4

400

MW

U7

600

MW

U5

600

MW

U6

600

MW

U8

800

MW

II

250

MVA

1 2

A

B

A1

NEW

SRLYA

I

500

MVA

DEPOK

A1

II

500

MVA

1 2 3 4

A

B

MTWAR

GT1.1

140

MW

GT2.1

145

MWGT3.1

143

MW

GT4.1

143

MW

GT1.2

140

MW

GT2.2

145

MW

GT3.2

143

MW

GT4.2

143

MW

GT1.3

140

MW

ST1.4

220

MW

GT2.3

145

MW

GT3.3

143

MW

GT4.3

143

MWGT5.1

250

MW

ST5.0

125

MW

1 2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

CRATA

A1

126

MW

A3

126

MW

A5

126

MW

A7

126

MW

A2

126

MW

A4

126

MW

A6

126

MW

A8

126

MW

I

500

MVAA2

II

500

MVA

A

B1 2 3 4 5 6

BDSLN

II

500

MVA

I

500

MVA2 x 100

MVAR

100

MVAR

100

MVAR

A2

1 2 3 4

A

B

UNGAR 3PEDAN

U1

660

MW

U2

660

MW

U3

660

MW

U4

660

MW

A3

II

500

MVA

I

500

MVA

1 2 3 4

A

B

TJATI

5 6

UNGAR

II

500

MVA

I

500

MVA

100

MVar

A3

A3

1 2 3 4 5 6

100

MVar

III

500

MVA

A

B

NBANG

I

500

MVA

A

B1

A4

2

II

500

MVA

1

GRSIK

GT2.1

112,5

MW

GT2.2

112,5

MWGT2.3

112,5

MW

GT3.3

112,5

MW

ST2.0

188,9

MW

ST3.0

188,9

MW

A4

1 2 3 4 5 6

A

B

I

500

MVA

100

MVar

100

MVar

PEDAN

A3I

500

MVA

II

500

MVA

1 2 4 5

A

B3

TASIK

A2II

500

MVA

1 2 3 4

A

B

I

500

MVAKDIRI

A4

1 2 3 4

II

500

MVA

I

500

MVA

A

B

100

MVar

100

MVar

III

500

MVA

PERUSAHAAN

LISTRIK SWASTA

B

A4

II

500

MVA

I

500

MVA

U1

400

MW

A4U2

400

MW

U3

800

MW

U5

610

MW

U6

610

MW

U7

645

MW

U8

645

MW

U9

600

MW

1 2 3 4 5 6 7 8

50

MVar

50

MVar

A C

D

JP JP PEC PECPEC

Sirk

it 1 D

OVE

64,3

KM

S

Sirk

it 2 D

OVE

64,3

KM

S

CLGON

A1

II

500

MVA

I

500

MVA

2 3 4

A

B

A1

III

500

MVA

CBATU

A2

II

500

MVA

I

500

MVA

III

500

MVA

IV

500

MVA

2 3 4 5 6

A

B1

A2 A2

1 2 3 4

MDCAN

I

500

MVA

A

B

II

500

MVA

A2

A

B

SBBRT

A4I

500

MVA

II

500

MVA

III

500

MVA100

MVar

105

MVAR

1 2 3 4 5 6

A4

A

B

A1

BKASI

I

500

MVA

III

500

MVA

A1

1 2 3

II

500

MVA

IV

500

MVASirk

it I G

ANNE

T 1

2,9

KM

S

Sirk

it 2 G

ANNE

T 1

2,9

KM

S

GNDUL

1 2 3 4 5

A

B

A1I

500

MVA

II

500

MVAIII

500

MVA

A1

B

NEW

BLRJA

A1

II

500

MVA

I

500

MVA

1 2 3 4

BOJONEGARA

A

LENGKONG

II

500

MVA

I

500

MVA

A

B1 2 3 4

KMBGN

I

500

MVA

A1

II

500

MVA

1 2

A

B

CWANG

A1

II

500

MVA

A

B1 2

I

500

MVA

3

III

500

MVA

A1

A1

175

MW

A2

175

MW

A3

175

MW

A4

175

MW

SGLNGA

B1 2 3 4 5

CIBNG

1 2 3 4 5

A

B

A1

II

500

MVA

I

500

MVA

1 2 3 4

A

B1 2

A

B65

CILACAP

PLTU

1X600 MW

IPP

PLTU

1X600 MW

PLN

KESUGIHAN

PITON

KONFIGURASI JARINGAN 500 kV SISTEM JAWA BALI

100

MVar

100

MVar

GRATI

II

500

MVA

I

500

MVA

A4

GT1.1

100

MW

GT1.2

100

MW GT1.

3 100

MWST1.0

180

MW

1 2 3 4 5 6 7

A

B

GANET 1,5 KMS

GANN

ET 1

30,8

KM

S

DOVE

16,

8 KM

S

DOVE

37,

9 K

MS DO

VE 4

0,9

KM

S

DOVE

50,

5 KM

S

Sirk

it I D

OVE

48,2

KM

S

Sirk

it 2 D

OVE

48,2

KM

S

Sirkit I DOVE 134,8 KMS

Sirkit 2 DOVE 134,8 KMS

Sirk

it I G

ANNE

T 30

,1 K

MS

Sirk

it 2 G

ANNE

T 30

,1 K

MS

Sirk

it 2 D

OVE

7,5

KMS

Sirk

it 1 D

OVE

7,5

KMS

Sirk

it 2 D

OVE

14 K

MS

Sirk

it 1 D

OVE

14 K

MS

Sirkit I DOVE 275,6 KMS

Sirkit 2 DOVE 275,6 KMS

Sirkit 2 GANNET 304 KMS

Sirkit 1 GANNET 304 KMS

Sirkit 1 75.3 KMS

Sirkit I GANET 202,4 KMS

Sirkit 2 GANET 202,4 KMS

Sirkit I GANNET 209,1 KMS

Sirkit 2 GANNET 209,1 KMS

Sirkit 1 GANNET 80,4 KMS

Sirkit 2 GANNET 83,8 KMS

Sirkit 2 DOVE 25,2 KMS

Sirkit I DOVE 25,2 KMS

Sirk

it 2 Z

EBRA

46

KMS

Sirk

it 1 Z

EBRA

46

KMS

Sirkit 1 GANNET 37,6 KMS

Sirkit 2 GANNET 37,6 KMS

BDSL

N-M

DCAN

I GA

NNET

119

,4 K

MS

BDSL

N-M

DCAN

2 G

ANNE

T 11

9,4

KMS

Sirkit 2 DOVE 222,4 KMS

Sirkit 1 DOVE 222,9 KMS Sirkit I DOVE 267,11 KMS

Sirk

it 2 D

OVE

207

,7 K

MS

Sirk

it 2 D

OVE

47,6

KM

S

Sirkit 2 DOVE 23,0 KMS

Sirkit I DOVE 23,94 KMS

Sirk

it 2

GANN

ET 9

2,4

KMS

Sirk

it 1

GANN

ET 9

2,4

KMS

Sirk

it I G

ANNE

T 87

,9 K

MS

Sirk

it 2 G

ANNE

T 87

,9 K

MS

KOFIGURASI JARINGAN 500 kV

SISTEM JAWA BALI

BIDANG OPERASI SISTEM

01-10-2014PT PLN (PERSERO)

P3B JAWA BALI

EDIT TGL:

A2

NEW

UJBRG

I

500

MVA

A

B1 2

II

500

MVA

1

Page 2: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 160

LAMPIRAN – 9

KONFIGURASI JARINGAN 150 kV APB DKI JAKARTA DAN BANTEN 2015

MITSHUBISHI

CHEMICAL

7

1

3

13

5

10

12

AREA-2

KONFIGURASI JARINGAN 150 KV APB DKI JAKARTA DAN BANTEN 2015

PENDO

SALIRA

PENI

SURALAYA

1 2

4 51236

JATIRANGON

KARET

KETAPANG

ANCOL

PRIOK

A

B

7 6 5 4 3 2 18

PD KELAPA

MINIATUR

PENGGILINGAN

CONVPULOGADUNG GIS

Wahana

PLUMPANG

40 kA

20 kA

TN TINGGI

GIS

GAMBIRCURUG

CIKANDE

PAM

GORDA

PRIMA

TANGERANG

NEW SENAYAN

KEMBANGAN

CENGKARENG

ANGKE

GROGOL KEBONJERUK

KARETBARU

KEBON SIRIHBUDI

KEMULIAAN

MUARAKARANG

7 6 5 4 3 2 187 6 5 4 3A

B

PETUKANGAN SENAYAN

ABADI GP

SERPONG

MAMPANG

DANAYASAKEMANG

GANDUL 3

BEKASI 1,2

CSW

KEMAYORANMANGGA

BESAR

PULOMAS

CIPINANG

MANG

GARAI

DUREN

TIGA

TAMAN

RASUNA

CAWANG

SETIABUDI

DUKUH ATAS

CAWANG

PT Semen

SEMENBARU

ITP

SENTUL

CIKUPA JATAKE

PASARKEMIS MAXIM

SEPATAN TELUKNAGA

POLYPRIMA

ASAHIMAS

SERANG

CILEGON

ALINDO

LEGOK

LENGKONG

1 2 3

PLTGU

CILEGON

NEW

TANGERANG

PLTU

LABUAN

Tambun

CILEDUK

CITRAHABITAT

BINTARO

PONDOK INDAH

Tosan P

BALARAJA

BALARAJA

BARU

RANGKAS BT

RKBTG II

DEPOK

GANDARIA

CILEUNGSI ASPEX P

PEGANGSAN

MITSUI

CILEGON

POSCO

KDL

DURIKOSAMBI

LMK

1.01.3

1.21.1

5 4 3

RAT2

2 1

RAT1

9 10

2.1 2.2 2.3

2.2

2.1

2.0

1.0

1.3

1.2

1.1

1 2

PLTU TELUKNAGA

3 4

7

4 3 2 1

2

22129 87

28 20 68

12 6

1313

10

0

22 37

20

02128 33

16 31

61 85

24 7

MENES

14 8

SAKETI

44

31 30 15TIGARAKSA

40

38

48 41

34 4216

48 48 34

4712 41

29

42

47

3436 45

31 38 21

380 380

42 48 14

44 4744

44 2032 41

44 39

290

1724 40 41

32 45 47

46 49 30 23 52 35

45 50 51

36 49 40

36 41 41

38 44 36

45 41 43 32

2838 40

18

20 3931

35 31 24 24 29

25 4640

43 40

33

35

43 40

18 2120

CIMANGGIS

40 47 25

33 26

CIBINONG

43 42 45 17

22 1670

43 43 56

2443

KRACAK

97

BUNAR

1624

52544537 41

39 0

43 18 44 42 43

34 4142 29 15 19 39 18 24

GD POLA

0 23 3830 40 26

38 38 24 39 22

473623 37

KD SAPI

34

0

36 2520

72

32 28

4012 123842

MARUNDA

25 4529

28 373637

3832 44

18 29

43 44

345 253

315

55 64

238 237

14219

1625

39

Kosambi

57 3350

25

23

433642

P KARANGKLP GDING

47

21 19

42

KESA

28

27

26

11

41

21

353

292

GAMBIRBARU

383738

4 3 2 15 4 3 2 1

DEPOK

371

36

KEDUNG BADAK

16 25

GANDUL

1,2

8

BEKASI 3,4

GIS

PLUMPANGBARU

238

ASAHIMAS-2

30

50

50

5025

25

25

25

25

SALAK BARU

LEMBURSITU

SALAK

Cianjur

23 23 23

124 35

INDAH

KIAT

KOPO

BOGORBARU

Cianjur

5244 54

PLTU

PALABUHANRATU

CIBADAK

BARU29 48

CIAWI

BARU

241323

UBRUG

PRATU

25 8

BOGOR BARU

KED.

BADAK

162416

Interworld Steel Mills

Semanggi

Barat

Indofood

Sukses

Makmur

Gedung Pola

Dukuh

Atas

CILEGON

Asahi

Chemical

11

4

6

25

25

25

25

NKMAS

ALAM

SUTERA

2

9

CANDRA

ASRI

CILEGON

BARU-2

PT

LAUTAN

STEEL

34

HARAPAN INDAH

BAYAH

Page 3: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 161

LAMPIRAN – 9 KONFIGURASI JARINGAN SUBSISTEM AREA JAWA BARAT 2015

NORMALLY OPEN

NORMALLY CLOSE

.

KONFIGURASI JARINGAN APB JABAR

I

5

I

I

I

2X60 MVA 1x30 MVA2x20 MVA

SEMEN

2x32 MVA

PLNGN

PMPEK

MNANG ( REG-3 )

60 MVA 2x31 MVA

105 MVAR

2x100 MVAR

4x10 MVA

20 MVA

20 MVA

3x6 MW

3x7 MW4

8x125 MW2 x 110 MW

1x30 MW2x55 MW

30 MVA

T. 6-10

2x60 MVA

100

3X60 MVA

3 x 60 MVA

NEW UBRNG

60 100

SRAGI

CKRNG

1 X 60 MVA

WYWDU

DRJAT

KMJNG

GARUT

BNJAR

BNJAR

T 2&42x60 MVA

31 MVA

6x31 MW

2x60 MVA

HRGLS

ELGAN

INDCI

20 MVA

1X30 MVA

3,5 MVA

7,5 MVA

2x 4,5 MVA1x7,5. MVA

2X100 MVAYd 5

PWKTA

CGNEA

IDRMA

IDBRT

SPFIC

PNDLI

RDLOK

2x20 MVA

1x22 MVA1x25 MVA

2x7 MVA

1X60 MVA

2X60 MVA

60 MVA

KTMKR

PBRAN

KSBRU

2x100 MVA

YY0

JTLHR

MLIGI

BKASI

(APB-1)

KSBRU

BDUTR

PDLRG

BDSLN

BDSLN

CRATA

CKLNG

1x18 MW

LMJAN

SMDRA

SNTSA

2X30 MVA

KDPTN

3x60 MVA

30 MVA 2x30 MVA3x60 MVA

2x60 MVA

1X30 MVA

2X60 MVA

60 MVA

1x10 MVA

1X20 MVA

1X30 MVA

4x60 MVA

2x15 MVA2X60 MVA

KETERANGAN :

T. 1-3-5

60 MVA

UBRNG

UBRNG SMDNG

TSMYA

MLBNG

2x20 MVA10 MVAR

10 MVAR

ARJWN

RCKEK

2x10 MVA1x30 MVA

2x60 MVA

KRCDG

RCKBA

CKSKABDTMR

CGRLG

4x60 MVA

3x60 MVA

CKPAY

MKSRI

1x30 MVA2x60 MVA

CRLMA

LGDAR

3x60 MVA

CBBAT

2x60 MVA

CBREM

92 MW

DRJAS

CNJUR

BOGOR

2x 500 MVA

3x60 MVA

2x20 MVA

1X30 MVA

1X10 MVA

KRPYG

2 x 60 MVA

2X10 MVA

12 MVA

2x25 MVA

2x60 MVA

3x 1,05 MW

1x 2 MW

1 x 1,6 MW

SKMDI

SBANG

2x30 MVA

1x30 MVA

1x10 MVA

CURUG

2x5 MVA 70/6,3 kV10 MVA 70/20 kV

2x30 MVA

1x60 MVA

PNSIA

BBKAN

2x10 MVA1x20 MVA

KUNGN

1x10 MVA2x30 MVA

TGHRG

DWUAN

MJLYA

~

B

2 3 4A

1

4R1

26 5 3 1

A

B

I

IIIIIIV

1 x 20 MVA

4

A

4 3 2B

1

2 X 60 MVA

KTT

II

III

II

II

II III

I

II

I II V

7R27R1

1X60 MVA

2x60 MVA

30 MVA

PNDRN

1x10 MVA1x20 MVA

TSBRU

B

A1 2 3 4

PEDAN I

DEPOK

PEDAN II

25 MVAR

30 MVA

55 MW110 MW

T. 7-9

2x60 MVA3x60 MVA

2x15 MVA

PRMYA

KTT PRURI

PRURI

2x 60 MVA

GDMKR

CBATU

1x30 MVA

MTWAR

JBBKA

PNCRU

TMBUN

TYGRI

4x60 MVA

PDKLP

2x30 MVA

100 MVA

PNYNG

TLJBE

2X60 MVA

3x60 MVA

TSMYA

CIKRG

2x60 MVA

FJSWA

KTT

1X117 MVA1X144 MVA

CKLSD

KTT

60 MW

3 x 60 MVA

2x2,2 MW2x2,4 MW

PRKAN

25 MVAR

T. 4

60 MVA

3x60 MVA

20 MVA

3x60

MVA

4x60 MVA

PWKTA

4R2

I II

DGPKR

2x60 MVA

HKOOK

5

I

CIBNG

4x175 MW

SGLNG

B

3 41A

II

2

5

3x300 MW

IDBRUB

3 41

A

2

BRBES 1-2

BKPWR

40 MVA

HONDA

2x30 MVA

60 MVA

660 MW

CEPWR

31 2

2x60 MVA

IDMYU

2x30 MVA

2x60 MVA

JTBRG

JTBRG

100 MVA

100 MVA

118MW

T. 1&3

2x30 MVA

6

JUSHN

I Trf.2-3-4

TTJBR

CBTRU

2x60 MVA

2x60 MVA

PTUHA

~

LBSTU

MDRCN

UNGRN

A

B

MDRCN

2x500 MVA

2X60 MVA

60 MVA

2x500 MVA

B

A1 2

KRNGL

30 MVA

CAMIS

2X60 MVA

1X30 MVA

TSBRU

2x500 MVA

Page 4: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 162

LAMPIRAN – 9

BAWEN

SYUNG

KUDUS

PWRDI KDNBO

1

PYUNG

SLIMA

KLSRIKRAPKRDRUTKLNGU

PDLAM

WLERIBTANG

JELOK

SGRAHSCANG

TMGNG

WSOBO

SRDOL

PKLON

PMLNG

KBSEN

BMAYU

BRBES

DIENG

GARNG

KLBKL

BRNGI MJNGO

BDONO

PALUR

WSARI

PEDAN

JAJAR

MDARI

KNTUG

GDEAN

MKRAN

SLBRU

WNGRI

MNANG

MRICA

GBONG

PWRJO

WATESPJKLN

WBJAN

GJYAN

WALIN

G

1

KRIAN

PLSDO

G

KANCI

Banjar

Ngawi

KONFIGURASI JARINGAN SUB SISTEM JAWA TENGAH & DIY RENCANA 2015

TAMBAKLOROK

~ KTNGR

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

~

TIMO

SMPOR

KLATN

~~

~ ~~

BANTL

I

II

I

II

I

II

I

II

KDIRI

JPARA

SMANU

TJATI

1

G

PATIJKULO

CEPU

BLORA

KBMEN

GITET/PLTU

TJATI 4 X 660 MW

TASIK

RBANG

G

G

PP. WNGRI

G

G

G G

G

BJGRO

SRAGN

PBLNGMSRAN

~ ~~ ~ ~ ~ ~ ~ ~ ~ ~

MDCAN

UNGAR

BSBRU

RWALO

PLTU CLCAP

STARA

G

A

B

1

LMNIS

PLTG CLCAP

customer

G

MRGEN

GG

RBKIT

G G

G

BLPLG

NGTDI

GDRJO

KSGHN

G

PCKIT

Npctn

Page 5: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 163

LAMPIRAN – 9

“ RENEV APB JATIM ” (revisi Oktober 2014)

KONFIGURASI SUBSISTEM JAWA TIMUR 2015

SST 2 Ke Blok 2-3

154/6.3 kV 24-30

BLOK 1PLTGU500/150 kV

1 = 500 MVABLOK 2

PLTG

1x20, 2x20.1,

1x21, 1x21.35

PLTU

2x100 MW

2x200 MWKe PLGU Blok I

SST 1 154/6.3 kV-24-30

SST

1 154/4.16 kV

1X13 & 1X20

GRSIK 7

GRSIK 5GLTMR

1 = 10

2 = 10

BKLAN1 = 20

2 = 30

1 = 20

2 = 60

SAMPG PKSAN1 = 60

2 = 30

SMNEP1 = 30

2 = 60

PLTU2 x 50 MW PERAK

TNDES

1&2 = 50

3 = 60

4 = 10

5 = 60

SWHAN1 = 50

3 = 60

KPANG

1 = 60

2 = 60

KRBAN1 = 50

2 = 50

3 = 60

UDAAN

1 = 60

DARMO

1 = 50

2 = 60

3 = 60

ISPDO1&2 = 50

3 = 60

4&5 = 50

RNKUT

NGGEL1 = 20

2 = 60

1 = 50

2 = 50SIMPG

WKRMO1 = 60

2 = 60

KABEL TANAH

UJUNG1 = 30

2 = 30

WARU5150/70 kV

1 = 39

2 = 39

3&7 = 60

4&6 = 60

5 = 50

WARU41 =100

2 = 80

MPION

1 =17,5

2 = 17,5

3 = 30

150/70 kV

1 = 50

BDRAN5

BDRAN4AB

5 = 20

RJOSO1 = 21

2 = 21

3 = 21

GDTAN1 = 60

2 = 30

3 = 60

1 = 60GRATI5

GRATI7

BLOK .IIBLOK .I3 x 127.5 MW

Ke SST.2

150/6.3 kV

2 x 24-30

GDING1 = 20

2 = 20

1 = 30

2 = 60KRSAN

PITON7

PLTU2 x 400 MW

Ke SST 1.2.7.8

150/10 kV

2 x 30-40-60

BNGIL5

150/70 kV

1 = 60

2 = 50

3 = 60

4 = 20

BCKRO1 = 50

2 = 60

3 = 60

SKRJO

1 = 30

PDAAN1 = 30

2 = 20

3 = 30

1 = 50

2 = 60PIER PBLGO

1 = 20

2 = 60

3 = 50

BNDWS

1 = 30

2 = 20

1 = 60

2 = 60

LJANG

TGGUL

1 = 30

2 = 60

SVC

+ 50 MVAr

- 25 MVAr

JMBER

1 = 60

2 = 20

3 = 60

4 = 60

2 = 60

1 = 50

2 = 60

3 = 60

GTENG

BWNGI

KABEL

LAUT1 = 10

2 = 10

GLNUK

1 = 15

2 = 15

PLTG

1 x 140 MW

NGARANSDUA

1 = 30

2 = 20

3 = 30

Trf Mobil = 20

KAPALPSGRN

1 = 20

2 = 20

3 = 60

4 = 60

PLTD/G

D 75.834 MW

G 125.45 MW

MSC

5 x 10 MVARASARI

1 = 10

2 = 10

1 = 30

2 = 30

3 = 60

4 = 60

5 = 60

BRITI

1 = 16

PMRON

1 = 30

2 = 30

GNYAR

1 = 60

2 = 30

1 = 20

2 = 20

3 = 60

STBDO

AMPRA

SANUR1 = 30

2 = 60

3 = 60

1 = 20

2 = 30

KLANG

1 = 50

2 = 50

KRIAN 7 SBRAT5

1 = 60

2 = 60

500/150/66 kV

BUS A

1&2 = 500 MVA

BUS B

3&4= 500 MVA

ALTAP1 = 30

2 = 60

KJTIM1 = 50

2 = 60

CERME

1 = 30

SGMDU5

SGMDU4150/70 kV

1 = 50 MVA

PKMIA

1 = 30

2 = 50

3 = 60

KTT.= 25

SMSIK

1 = 20

2 = 20

3 = 30

BRATA

LNGAN1 = 30

2 = 30

3 = 60

BABAT

1 = 30

2 = 30

BJGRO1 = 20

2 = 60

3 = 60

Ke CEPU

TUBAN

1 = 30

2 = 60KEREK

1 = 50

2 = 50

3 = 50

TUBAN III (KONS)1 = 50

2 = 50

3 = 50

MLWNG

1 = 60

2 = 40 (spare)

MNYAR2 = 60

3 = 60

1 = 50 MVA

4= 30 MVA

MSBAR

BBDAN1 = 50

2 = 50

150/70 kV

1 = 50

2 = 50

DRYJO5 DRYJO4

3 = 50

4 = 60

9 = 60

MIWON

8= 10

1 = 10

TARIK

BNGUN

1 = 14,4

2 = 14,4

3 = 10,4

SKTIH4SKTIH5

CKMIA1 = 60

2 = 60

AJMTO1 = 15

2 = 10

PLOSO

KTSNO

2x10 MVAR

150/70 kV

1&3 = 35

2 = 50

PLTA

A

1 = 30

2 = 30

BLTAR

1 = 30

2 = 30

PLTA

LDOYO1 x 4.5 MW

WLNGI4 WLNGI5150/70 kV

1 = 100

3 = 30

PLTA

2 x 27 MW

STAMI5

PLTA

3 x 35 MW

SIMANPLTA

3 x 3.6 MW

APLTA

MDLAN1 x 5.6 MW

3 x 5.8 MW

SKLNG

3 = 30

4 = 60

1 = 6

PLTA

SLRJO1x 4.48 MW

KKTES

1 = 30

KBAGN

GPGAN

1 = 20

PLHAN1 = 30

2 = 20

3 = 30

PAKIS

1 = 30

2 = 60

LWANG

1 = 60

2 = 30

1 = 60

2 = 30

PNMAS

BLBNGB A

1 = 20

2 = 30

PLTU

TANJ. AWAR-2

3 = 10

KE UNGARAN

2 = 60

3 = 60

4 = 60

BLBND

1 = 30

2 = 10

SYZAG

1 = 10

2 = 31

A

B

2 = 20

CRBAN1 = 20

2 = 30Ke SRGEN

NGAWI

1 = 60

2 = 60

MNRJO

25 MVAr

BSCU

5 x 10 MVAR

PNRGO

PCTAN

1 = 20

2 = 30

MRGEN1 = 30

2 = 10

MGTAN

KABEL TANAH

Jumper

T. 42

2 = 35

3 = 35

5 = 50

6 = 60

2 x 10 MVAR

10 MVAr1 = 30

1x25 MVAR

PBIAN

1 = 60

2 = 60

3 = 60

JKTAS1 = 60

1 = 6

PLTA

2 x 14.5 MW

SGRUH

1 = 30

TUREN

1 = 30

2 = 20

3 = 30

2

1KE PEDAN

500/150/66 kV

A(1,2)& B(3) =500 MVA

KDIRI7

2

1

PLTG

2 x 40

MW

1 = 30

PNGAN 1 = 60

150/70 kV

1 x 100 MVA

100 MVAR

100 MVAR

100 MVAR

2 x 100 MVAR

BNGIL4

Semen Tuban (KONS)

2x25 MVAR

25 MVAr

25 MVAr

25 MVAr

SBSEL

1 = 60

1 = 60

PKLOD

DLOPO

1 = 10

PLTA

MADIUN

6.1 MW

2 = 20

A

SUBSISTEM

KEDIRI

SUBSISTEM

PAITON & GRATI

1 2

3 = 60

1 = 20

2 = 20PRONG

2 = 602

1

1 = 60

500/150/66 kV

1 = 500 MVA

2 = 500 MVA

NBANG 1 = 50

2 = 60 3 = 60

A B SLILO

KABEL LAUT(Gangguan)

SUBSISTEM

NGIMBANG

AB

3 = 30

1 = 60

SUBSISTEM

KRIAN (IBT 3)

SUBSISTEM

KRIAN & GRESIK

BNRAN54 = 30

BNRAN41 = 12.5

2 = 12.5

3 = 12.51 = 20

2 = 20

GGRAM

500/150 kV

1,2 = 500 MVA500/150/66 kV

2x500 MVA

PLTGU

NTLAG

1 = 60

NWLGI

KSARI

1 = 60

NJBNG

1 = 60

PCRAN

PLTU

PCTAN

150/70

1 = 60

2 = 30

150/70 kV

1 = 50

2 = 35

3 = 100

4 = 60

5 = 30

6 = 60

KJRAN

1 = 50

2 = 50

3 = 60

B

A

SDATI

PWSRI

HOLCM (KONS)

MSTEL

NEW

Ke NGTDI

NEW

SUBSISTEM

BALI

KDDNG

SMOGNSMREP

1= 60

1 = 60

2 = 60

1= 60

1= 60

1= 60

1 = 60

2 = 60

1 = 60

2 = 60 (Mobile)

B

PLTGU

3.1 & 3.2

2x127.5 MW

2 = 60

3 = 60

1 = 20

2 = 20

PLTU

2x300 MW

PLTGU 3.3

1x127.5 MW

BLOK 3

1 = 20

1 = 20

3 = 30

B

1= 30

2= 30

3= 20

A

NGJUK

CJI (KONS)SDRJO

NEW

1= 60

1= 60

PRONG

1x10 MVAR

2 = 10

JSTEL

1.= 80

1 = 20

150/70 kV

3 = 100

GRLMA

AB

1 = 60

2 = 60

3 = 60

1 = 6

2 = 50

3 = 50

NGORO

B

HJAYA1.= 75

2 = 75

1 2

3 4

NEW

150/70 kV

1 = 100

A

B

NEW

NEW

NEW

NEW

NEW

NEW

1 = 60

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

1 = 60

ISM (Kons)

NEW

25 MVAr

NEW

25 MVAr

NEW

AB1 = 30

3 = 30

NEW

500 kV 150 kV 70 kV RENCANA

Unit 1 Unit 2

B A

1 = 40

PITON5AB

500/150 kV

3 = 500 MVA

NEW

A

A

6 = 60

7 = 30

8 = 60

150/70 kV

1 = 35 2 = 39

3 = 50 4 = 35

5 = 50

MJGNG

1&2 = 30

3 = 60

150/70 kV

6 = 60

B

5 = 60

KDIRI 5B

1 = 20

2 = 30

B

PARE

A

4 = 20

2 x 18 MW

TLGNG

TLGPA1 = 30

TGLEK10 MVAr

BAB

Page 6: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 164

LAMPIRAN – 9

KONFIGURASI JARINGAN SUBSISTEM AREA BALI

A

B

PLTG

2x48MW

A

B

A

B

A

B

GI GLNUK

GI PMRON

GI BTRTI

GI ASARI

A

B

A

B

GI KAPAL

GI PYGAN

GI NGARAGI GNYAR

A

B

GI AMPRA

GI SANUR

GI PBIAN

Trf.1

20

MVA

Trf 2

30 MVA

Trf.3

60 MVA

Trf.4

60 MVA

1

2

T-1

20MVA

Trf.2

30 MVA

SC1

SC-1

25MVAr

Trf.1

10 MVA

Trf.2

10 MVA

Trf.1

60 MVA

Trf.2

30 MVA

Trf.1

30 MVA

Trf.2

60MVA

Trf.3

60MVA

Trf.4

60MVA

1 2

Trf.1

30

MVA

Trf.2

30

MVA

Trf.1

16

MVA

Trf.1

30

MVA

Trf.1

15 MVA

Trf.1

30

MVA

Trf.2

30

MVA

PLTG

138 MW

Trf.1

60 MVATrf.2

60 MVA

1 2

1 21 2

2

1

21

Banyuwangi

OFC CU PIRELI

3X300 mm2 500 A ( 4,2 km )

OCR 600 A

OLS 560 A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(38.

04 k

ms)

OLS

= 60

0 A

OCR

= 72

0 A

ACSR HAWK 240 mm2

In: 645 A (38.04 kms)

OLS = 600 A

OCR = 720 A

ACSR HAWK 2x240 mm2

In: 1290 A (75.90 kms)

OCR = 1500 A OLS = 1280 A

1

2

TACS

R 16

0 m

m2

In:7

50 A

(75.

90 k

ms)

OC =

880

A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(33.

76 k

ms)

OCR

= 40

0 A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(33.

76 k

ms)

OCR

= 90

0 ATACSR 160 mm2

In:750 A (38.17 kms)

OCR = 880 A

TACSR 160 mm2

In:750 A (21.48 kms)

OCR = 800 A

ACSR HAWK 240 mm2

In: 645 A (44.40 kms)

OCR = 750 A OLS = 650 A

ACSR HAWK 240 mm2

In: 645 A (23.31 kms)

OCR = 700 A OLS = 650 A

ACSR HAWK 240 mm2

In: 645 A (19.21 kms)

OCR = 720 A

ACSR HAWK 240 mm2

In: 645 A (19.21 kms)

OCR = 720 A

ACSR

/ AS H

AWK

240 m

m2

In: 64

5 A (1

6.50 k

ms)

OCR

= 720

A

ACSR

HAW

K 24

0 mm2

In: 64

5 A (1

6.50 k

ms)

OCR

= 950

A

2. ACSR HAWK 240 mm2

In: 645 A (7.75 kms)

OCR = 950 A

1. ACSR PARTRIDGE 135 mm2

In: 400 A (7.75 kms)

OCR = 320 A

ACCC

LIS

BON

310

MM

In=1

231

(7,7

km)

OCR=

1331

A

MSC 5x10 Mvar

(Rusak)

XLPE

3x1

000m

m2

CCC=

973A

1500

m

TACS

R 16

0 m

m2

In:7

50 A

(75.

90 k

ms)

OCR

= 88

0 A

A

B

GI NSDUA

SC-1

25MVAr

Trf.1

60 MVA(SANDONG)

Trf.2

60 MVA

Trf.3

60 MVA

Trf Mobil

20 MVA

XLPE 3 x1000 mm2

CCC=973A

2090 m

Trf.2

30 MVA

A

B

GIS BANDARA(BY HITACHI)

TACSR HAWK 240 mm2

In: 973 A (8,5 km)

OCR = 990 A , OLS = BLOK

3

SC-1,

50MVAr

SC

25MVAr

SINGLE BALI 2014 (TW-3)

A4 PT PLN (PERSERO) P3B – APB BALIOKT

2014IKA

4

(BANYUWANGI 3 & 4)

3 x 300mm2, 500A

6.5km (SMC+UGC)

OLS 560A

Trf.2

15

MVA

TACSR 160 mm2

In:750 A (21.48 kms) OCR = 800 ATrf.2

30

MVA

SC

50MVAr

SC-2

25MVAr

T59

T60

T57

T58

SC-2

25MVAr

SC2

A

B

A

B

A

B

A

B

ACCC LISBON 310 MM

In=1231 (7,7km)

OCR=1331 A

ACCC LISBON 310 MM

In= 2x1231A

OCR 1500A, OLS = 1280A

XLPE 3 x1000 mm2

CCC=973A

2500 m

TACSR 240 mm2

CCC=973A (10,2 km)

OCR=990A

TACSR HAWK 240 mm2

In: 973 A (13.41 km)

OCR = 960 A , OLS = BLOK

1Trf.3

60 MVA2Trf.3

60 MVA

SC-2

,

50M

VAr

GI PKLOD

Trf.1

60 MVA

Trf.2

60 MVA

(SHANDONG)

SC

A

B

21

TRF

MOBIL 1

TRF

MOBIL 3

TRF

MOBIL 2

PLTD-

BOT

PLTG-

4

PLTG-

3

PLTG

-2

PLTG

-1 PLTMG 4

50 MW

GI PSGRN KONV

PLTD

-

BOO

SC-1

25MVAr

PLTD

-APE

C BL

OK- 1

(15M

W)

PLTD

-APE

C BL

OK-2

(15M

W)

PLTD

-APE

C BL

OK-3

(20M

W)

PLTD

-D (2

5 M

W)

PLTD

-D (2

0 M

W)

PLTD

-E (2

2 M

W)

PLTD

-E (2

3 M

W)

PLTD

-F (1

0MW

)

SC-1

BNDR

A-1

TRF-

2

BNDR

A-2

NSDU

A-2

TRF-

3

TRF-

5

TRF-

4 SC-2

PLTMG 3

50 MW

PLTMG 2

50 MWPLTMG 1

50 MW

GIS

PESANGGARAN

GT-1

130 MW

GT-2

125 MW

GT-3

125 MW

PS

TFT

60 MVA

ACSR HAWK 2x240 mm2

In: 1290 A (75.90 kms)

OCR = 1500 A OLS = 1280 A

TACS

R 2x

410

mm

2

In: 2

730

A (5

5 km

s)

TACS

R 2x

410

mm

2

In: 2

730

A (1

km

s)

TACS

R 2x

410

mm

2

In: 2

730

A (1

km

s)

Page 7: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 165

LAMPIRAN – 9

A

B

7 6 5 4 3

1

2 1

1236

SURALAYA

PENDO

21

2

4 5 7

1

SALIRA

MITSUI PENI

KRAKATAUDAYA LISTRIK

CILEGON

CILEGONBARU

SURALAYA BARU

1 2

1 2 PT1 PT2

MITSUBHISI

S/S SURALAYA

Page 8: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 166

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 4

S/S CILEGON

SLAYA/MITSUI

CILEGONBARU

123

PLTGU CLGON

A

B

STGT.1GT.2

KOPO

KRAKATAUDAYA LISTRIK

Suralaya.2/1

1 2

ALINDO

PT

1 2

PUNCAK AM

SERANG

1 2 3 4

A/B/C150/70 kV60 MVA

1

1 2

1 2

BUNAR CIKANDE

BALARAJA

BLJRU

1 2 3

234A

B

Cibinong

1 2PT PT

POLYPRIMA

0

ASAHIMAS

RANGKASBITUNG

Nkmas

Cikupa

1 2

ASST

GT.2GT.1

321B

4

SAKETIMENES BARU

Kracak

1 2

PLTU LABUAN

1 2

1 2

RANGKASBARU

INDAH KIAT

PT

GORDA

PT 60ASAHIMAS-2

1

Tb

CILEGON

2

2

1 2 3 4

SMTORPT30

POSCO

2x100

TJLESUNG

1 2

BUNAR1 2

Malimping

KOPEL.2

165 MVA

3

140 MW 140 MW 180 MW

300 MW 300 MW

1600A

1600A

1600A

1200A

1250A

540A

3456

A

1600

A

1600A

1600A

1600A

1600A

2200

A

2200A

2200A

1300A

2730

A

1620

A

700A

220A

200A

1600

A

CANDRA ASRI

CILEGON BARU-2 1

Page 9: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 167

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 5

S/S BALARAJA-LONTAR

BALARAJA A

4 3 2 1

SRLYA2/1

GNDUL2/1

2 1

B

TIGARAKSA

1 3

Ptkgn

SERPONG

BINTARO

1 2 3 4

CITRA HABITAT

NEW BALARAJA

1 2 3

LEGOK

1 3

LENGKONG

BALARAJA

1 21 2 3

Cikande

CIKUPA1 2 3

JATAKE

1 2 3 4

MAXIM

1 2 PT PT

CURUG / ALAM SUTERASS KEMBANGAN

1 2

1250

A

800A

580A

580A

2800A

1600A

1600A

900A

1600

A

1600

A

LAUTAN STEEL

1 2 3

TGBRU

CENGKARENG

1 2 3 4 5

TANGERANG

1 2 3 4

Jatake

1 2 3

U.1 U.2 U.3

SST

1 2 3 4

TELUK NAGA

1 2 3

SEPATAN

1 3PSR KEMIS

1 2 3

PLTU

Lontar

300 MW 300 MW 300 MW

900A

700A

780A

Page 10: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 168

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 6

S/S GANDUL1,2-MUARAKARANG

KARETBARU

1 2 3

Ancol

ANGKE

Ketapang

1 21 2

TGBRU

MKBRU MKLMA

7 6 5 4 3 2 187 6 5 4 3A

B

10 9

GT-2 GT-1ST 2.1ST 2.2ST 2.3PLTU 4PLTU 5GT1.1GT1.2GT1.3ST1.0

RAT 4 RAT 3

1 2 3 4

PETUKANGAN

BINTARO

CSW

3 2

SENAYAN

1 2 31 2 3

1 2 3

GANDUL

PONDOK INDAH

1 2

SERPONG

Lengkong

1 2 3 4

500 kV

A

B

1 2 3 4 5

Suralaya

Kmbng

Depok

KEMANG

1 2 3

BUDI KM

KEBON SIRIH

1 2 3

1 2

CENGKARENG

KEBONJERUK KARET LAMA

Mampang

1 2 3 4 5

1 2 3

Kembangan

2 1

GROGOL

1 2 3 1 2

DURIKOSAMBI

LMK

Kopel-1

Kopel -2

1 2 3 4 1 2

SST

TANGERANG

1 2 3 4

Jatake

1 2 3

U.1 U.2 U.3

SST

1 2 3 4

TELUK NAGA

1 2 3

SEPATAN

1 3PSRKEMIS

1 2 3

CIKUPA

1 2 3JatakeBalaraja Curug/Cledug (SS KMBNG)

PLTU

Lontar

AGP

1 2 3

Mampang Baru

DNYSA

1 2 3

Mampang Baru

1 2 3 4

BNTRU

1 2 3

150 MW 90 MW 90 MW 90 MW 162 MW 162 MW 70 MW 70 MW 70 MW 250 MW 250 MW

300 MW 300 MW 300 MW

1600

A

580A

580A

580A

900A

1560

A

1500

A

800A

700A

780A

1100

A

1500

A

1500

A

800A

1560A

800A

920A

800A73

5A

365A

735A

365A365A

365A

365A

1200

A

580A46

5A

4

Page 11: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 169

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 7

PETUKANGAN

IBT3 GANDUL

PONDOK INDAH

2 3

1 2 3 4

A

B

1 2 3 4 5

Suralaya

Kmbng DEPOK

KEMANG

1 2 3

S/S GANDUL3

Page 12: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 170

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 8

S/S KEMBANGAN

KEMBANGAN

B

A

12

GANDUL

1 2 3

NEW SENAYAN

1 2 3

CURUG

CILEDUG

1 2

1 2 3

Balaraja

CIKUPA

1 2 3

Tangerang

JATAKE

1 2 3 4

MAXIM

1 2 PT1 PT2

KBRJK

PLTU

Lontar /

U.1 U.2 U.3

SST

1 2 3 4

PSRKEMIS

1 2 3

TELUK NAGA

1 2 3

TANGERANG BARU

SEPATAN

GROGOL

1 2 3

DURIKOSAMBI

LMK

Kopel-1

1 2 3 4

MKBRU MKLMA

PTKGNCENGKARENG

1 3

300 MW 300 MW 300 MW

1600A

900A

3120A

2500

A31

20A

900A

1600

A

1600A

2800

A

400A

920A

920A

ALAM SUTRA

1 2

3120A

Page 13: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 171

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 9

S/S BEKASI1,2-PRIOK

PR BARAT

7 6 5 4 3 2 18

PDK KLAPA

2 12 1

Kopel-1

Tambun

1 2 3

PENGGILINGAN

1 3

PRIOK TIMUR

A

B

5 4 3 2 1

U-3 U-4

PLUMPANG

ANCOL

ANGKE

1 2 3

BEKASI MRNDA

1 2 3

Mkrng

2 1

CONV

PULOGADUNG

GIS

PT.KESA5 9 8 6 7

TANAHTINGGI

KDSPI

KEMAYORANMANGGABESAR

1 3

KTPNG

1 2 3

1 2 4

40 kA 20 kA

12

Tsn-2

Tsn-1WGHNL

GDPLA

1 2 3

1 2 3

1 2

GBBRU

1 2 3

PGSAN

PT1 PT2 PT3

P.KARANG

KLPGD

Kosambi

Cwang

A

B

31 2 4

Cibinong

WH-1 WH-2

4 3 2 1

1 3

JATIRANGON

1 2 3 4

MANGGARAI

1 3

Cipinang/

PULOMAS

1 2 3

GIS GAMBIR

1 2 3

1 2

1 2 3 4

Cbing

1

2

ST2.0ST1.0GT2.3GT2.2GT2.1 GT1.3GT1.2GT1.1

KARET LAMA

1 2

CSW

3 2

MPANG

MNTUR

ST3.0GT3.2

21

3 4

120MW 120MW 120MW 171MW 171MW 120MW 120MW 120MW

GT3.1250MW 250MW 240MW

1560

A

1600

A

850A

800A

400A

800A

800A

1500

A

1500A

1500A

400A

135A

400A

1000A

1500A 1600A

1500

A

400A1000

A

1000A

500A

1100

A

1560

A16

20A

1100A

365A

365A

1200

A

920A

1200A1 2

HARAPANINDAH

Page 14: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 172

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

|

S/S BEKASI3,4

10

PDK KLAPA

Kopel-1

Tambun

1 2 3

PENGGILINGAN

BEKASI MRNDA

1 2 3

PLPNG / KDSPI

KSBRU CIBNG

A

B

31 2 4

JATIRANGON

Cibinong

1 2 3

4 3 1 2

MINIATUR

1 2

CWANG

1 2 3

1560

A

1560A 1560A

1620

A

850A

Page 15: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 173

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 11

S/S CIBINONG

KEDUNGBADAK

JATIRANGON

CILEUNGSI ASPEX P

PT SEMEN

SEMEN BARU

ITP

Rangkasbitung

BUNAR

MNTUR/PDKLP

CIBINONGA

B

1 2 3 4 5Cilegon

Depok

Saguling

12

MtwarBkasi

SENTUL

CIMANGGIS

1 2 3

CIBINONG

3 6

4150/70 kV100 MVA

2 4 3

KRACAK

1 2

1 2

1150/70 kV100 MVA

1150/70 kV

60 MVA

PT-1

150/33 kV80 MVA

GDRIA

1

70 kV

1 2 3 4 2 5

SALAK BARUSALAK LAMA

CIBADAKBARU

UBRUG

PELABUHANRATU

LEMBURSITU

BOGORBARU

Cianjur

3 4 5 6

1 2 3

1 2

1 2 3

2 3 10 1 2

1 2

150/70 kV60 MVA

1 2 3 Cwng

Cianjur

CIAWI

LBSTU

MBL

1 2

1 2

Cianjur

1 2 3 4 5

U1 U3U2SST1 SST2

T1

PLTU PELABUHANRATU

A

B

1 2

18,9 MW

18,36 MW

56MW 56MW 56MW

61MW 61MW 61MW

300 MW 300 MW 300 MW

1200A1600A

600A

1600A

1200

A

1200

A

580A

3120A 400A

375A

380A

3120

A

750A 440A 40

0A

780A

495A

210A

440A

1560A 1230

A

2 1 PT-2

150/33 kV80 MVA

1

BAYAH

Page 16: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 174

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 12

Mtwar /

Bekasi

B

A

21

2 1CAWANGBARU

Cawang(SS DEPOK)

1

KARET LAMA

MAMPANG BARU

1 2

DUREN TIGA

TAMANRASUNA

1 2

CIPINANG

1 3

SENAYAN

Petukangan

1 2 3

1 2 3

CSW Angke

1 2

AGP

1 2 3

DNYSA

1 2 3

MPDUA PULOMAS

1 2 3

GIS GAMBIR

1 2 3

MANGGARAI

1 3

Pegangsan

SS Bekasi

1 2 3

KEMANG

GANDUL

GIS TANAH TINGGI

1 2

1550

A

1550

A

1600

A

1500

A

365A365A

365A365A

580A

460A

920A

1550

A

1550

A46

5A

1200

A

1200

A

1200

A

960A

S/S CAWANG

Page 17: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 175

LAMPIRAN – 9

E L E C T R I C I T Y F O R A B E T T E R L I F E

| 13

SETIABUDI

CAWANG

DUKUH ATAS

Gandul

A

B1 2 3 4

Tasik

Cibinong

DEPOK

1 2 3

1

1 2

GANDARIA

Cibng

1 2 3 4

1 3

DEPOK BARU

1 2 3

2

Trafo mobil

CIPINANG

1 3

Mtwar /

Bekasi

B

A

21

2 1

1

Duren Tiga

PULOMAS

CAWANG BARU

Kedungbadak

1 2

BOGOR KOTA

1 2

440A

500A

1550

A

1550

A

1230

A

735A

365A

S/S DEPOK

Page 18: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 176

LAMPIRAN – 9

BDSLN7

IBT-1 IBT-2

~ ~

~

KMJNG

DRJAT

WYWDU

CKSKA

RCKEK

KRCDG

BDUTR

UBRNG

CGRLG

PNSIA

CNJUR

LGDAR

SRAGI

GARUT

LBSTU5

CBREM

MJLYA

BDTMR

CKLNG

LMJAN

SMDRA

SNTSA

~

SMDNG

MLBNG

PRKAN

~

~

~

~ ~

~

~

U1

U3

RCKBA

U4 (PGE)

U1

SNTSA

PMPEK

PDLRG

KDPTN

WYWDU

Chevron

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

BDSLN5

IBT-1

GITET NUBRG7DGPKR

~U2

BRAGA

SUBSISTEM BANDUNG SELATAN

BGBRU

U2 U3U1 U2

Page 19: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 177

LAMPIRAN – 9

CRATA7

IBT-1

CBBAT

BDUTR

LGDAR

CGRLG

PBRAN CKMPY

~

CURUG

PDLRG

CRATA 4

PWKTA

IBT-1

IDRMA

SPFICIDBRT

IBT-2

KSBRU5

IBT -4

SBANG

IBT-2

CGNEA INDCI

CNJUR

BDSLNJTLHR

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

CRATA 5

PNDLI RDLOK

CBREM

NEW IDRMA

NEW CBBAT

DGPKR

PTUHA

SUBSISTEM CIRATA

TTJBR

IBT -1

Page 20: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 178

LAMPIRAN – 9

CBATU

IBT-2IBT-1

GDMKR

JBBKA

FJSWA

CIKRG

MKSRI

PNYNG

PRURI

IBT-3

TMBUN

PDKLP

(APB 1)

TYGRIPCBRU

IBT

IBT -4

~

CLNDOPNCOL

TGHRG

PRMYA

TLJBE

MLIGI

KRPYG

DWUAN

KTMKR

SUBSISTEM CIBATUPT. PLN (PERSERO) P3B JBAPB JAWA BARAT

HKOOK

~

BKPWR

KSBRU

PLTU

IDMYU

TTJBR

BKASI

JSHIN

CLGSI

ILBTY

SUZUKI

HONDA

Page 21: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 179

LAMPIRAN – 9

MDRCN7

IBT-1IBT-2

SKMDI

BRBES

(APB-3)

IDMYU

CKRNG

ARJWN

KDPTN

~

PLTU IDMYU

660 MW~

HRGLS

JTBRG4

SRAGI4

SRAGI5

PLTU KANCI

(CEP)

JTBRG5

3 x 330 MW

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

SEMENBBKAN

KNGAN

RCKEK

(SS BDSLN)

IBT-1 IBT-2IBT-5IBT-1

MDRCN5

KSBRU

(SS KRWNG)

PRKAN

CKDNG

SUBSISTEM MANDIRANCAN

Page 22: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 180

LAMPIRAN – 9

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

TSBRU

IBT I

TSMYA

GARUT

DRJAT

CAMIS

BNJAR~

KMJNG

(SS BDSLN)

MNANG

(APB-3)~

PNDRN

PRKAN

MLBNG

U-1

~KDPTN

SMDNG

IBT I

IBT I

U-3

~U-2

KRNGL

SUBSISTEM TASIKMALAYA

IBT 2

Page 23: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 181

LAMPIRAN – 9

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

MRGEN

BAWEN

SCANG

MDARI

SGRAH

KNTUG

BANTL

TMGNG

WSOBO

DIENG

KLBKL

WALING

GJYAN

WBJAN

PEDAN

SMANU

~

BNJAR

KANCI

GDEAN

PWRJO

WATESKBMEN

GBONG

MNANG G

STARALMNIS

RWALO

BLPLG

KBSEN

PMLNG

BMAYU

BRBES

CLCAP

G

PBLGA

G

GARNG

MRICAPKLON

BTANGWLERI

KLNGURDRUT

UNGAR7

IBT-2

UNGAR5

IBT-1 IBT-3

KSGHN

Dipasok dari PLTU CEP

Subsistem TJATI /PEDAN

SUBSISTEM UNGARAN

TBROKPYUNG JELOK

PLSDO

KTNGR

G

G G

G

KLATN

JELOK

KRAPK

TBROK / KLSRI

SRNDL

BSBRU

PEDAN

PLTGU

BLOK II

PLTGU

BLOK I

SYUNG

KUDUSTBROK

Page 24: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 182

LAMPIRAN – 9

SUBSISTEM TANJUNG JATIPT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

TJATI7

IBT-2

TJATI5

IBT-1

WLERI

CEPU

PWDDIPDLAM

BAWEN

BJGRO

KRAPK

KLSRI

SRDOL

SYUNG

BLORA

RBANG

G

RBKIT

PATI

JKULOKUDUS

JPARA

MRGEN

G

TBROK

PYUNG

UNGAR7

IBT-2

UNGAR5

IBT-1 IBT-3

KDNBO

SLIMA

G

SCANG/

SGRAHKLATN

G

G G

Subsistem UNGAR /PEDAN

GTIMO

G

MJNGO

BRNGI

BDONO

JAJAR

PEDAN

GDRJO

MKRAN

JELOK

SGRAH

RDRUT

KLNGU

Page 25: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 183

LAMPIRAN – 9

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

PEDAN7

IBT-2

PEDAN5

IBT-1

KLATN

MKRAN

WBJAN

PNRGO

SMANU

JAJAR

GDRJO

SLBRU

WSARI

WNGRI

NGTDIPLTU PCTAN NEW PCTAN

G

WATES /PWRJO

SUBSISTEM PEDAN

KNTUG

BANTL

SGRAH /

MDARI

GDEAN

GJYAN

MJNGO

BAWEN

Subsistem UNGAR /TJATI

PALUR

SRAGN

MSRAN

NGAWI

G

U1 U2

BDONO

Page 26: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 184

LAMPIRAN – 9

KONFIGURASI SUBSISTEM KRIAN - GRESIK

500 kV6 5 4 3 2 1

~~ ~

4 3 2 1

~

~~~

~~~ ~ ~~ ~ ~ ~

SGMDUPKMIA

KLANG

ALTAP

1 2 3 4 5 6

KRIAN

SBRAT

~ ~

NgimbangUngaran

Grati

DARMO

TNDES

KPANG

ISPDO

SWHAN

UDAAN

SIMPG

WARU RNKUT SLILO

WKRMO

SBSEL

KRBAN

PERAK

UJUNG

NGAGL KJRAN

GLTMR

BKLAN

SAMPG

=

PMKSN

SMNEP

BBDANDRYJO

MIWON

TARIK BNGUN

Bus Tie

GRLMA

BDRAN

MPION

GRBRU

PLTG

1.1

BLOCK 1

GT.

1.21.31.0

ST. PLTU.

4 3 2 1 1 2

2.1

BLOCK 2

GT.

2.22.32.0

ST.

BLOCK 3

GT.

3.33.0

ST.

PLTU

3 4

~

3.2

~

3.1

PLTGU

IBT-3 IBT-2 IBT-1

IBT-1

A

B

B

A

PLTGU

PRONG

OPEN

OPEN

OPEN

OPEN

A

B

C

D

B

A

OPEN

AB

JSTEL HJAYANEW NEW

NEWNEW

NEW

SDRJO

Prong Bngil

SDATINEW

ISM

NEW

IBT-4

NEW

Page 27: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 185

LAMPIRAN – 9

KONFIGURASI SUBSISTEM PAITON - GRATI

500 kV 500/150 kV3x500 MVA

7R2

35 150 kV2 16 4

7R1 1

~

8

~

7

~

6

~

5

~

3

~

2

~

1

2 3SST 1-2SST 5-6SST 7-8

SST 3

KRSAN STBND

PBLGO

LMJNG

GDING

8 7 6 5 4 3 2 1

TNGUL

BWNGI

BNDWS

JMBER

GTENG

6 5 4 3 2 1

~~~

1.21.3 1.1

BLOCK 1

1.0

ST.

7

~

GT.

35 2 16 4

1 2~~~

2.22.3 2.1

GT.

SST 1 SST 2

~

9

RJOSO

SKRJO

=

~

SGRUH

KKTES

~~

LDOYO

BLTAR

TLGNGWLNGI

MDLAN

~

TUREN

GPGAN

STAMI

SLRJO

SKLNG

LWANG

BLKDN BNGIL

PDAANPIER

PAKIS

BLBNG

PLHAN

BCKRO

KRIAN

GRATI

GDTAN

PITON

KDIRI

PWSRI

GLMNK

BLOCK 2

=

OPEN

1 2 3 4

OPEN

=

NEW

Page 28: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 186

LAMPIRAN – 9

KONFIGURASI SUBSISTEM KEDIRI

BNRAN

KDIRI

Pedan Paiton

JAKER

Sekarputih

=

PLOSO

NGJUK

CRBAN

SYZAG

Bus Tie

MRGEN

TGLEK

PNRGO

PCTAN

MNRJO

NGAWI

25 kVPLTA

GlangGrngnNgbel

~

DLOPO

1 2 3 4

~ ~

PLTUPCTAN

Sragen

Nguntoronadi

=

KTSNO

MGTAN

=

=

=

1 2 3 4

IBT-1 IBT-2

IBT-2

IBT-3IBT-1

OPEN

OPEN

OPEN

OPEN

A

B

Unit-2Unit-1

A

B

OPEN

Trf-2 Trf-1

Trf-3

NEW

IBT-3

NEW

OPEN

Mjgng

NJBNG

NEW

Blitar

TLGPA

~

OPENB

Ggram

Pare

TLGNG

Page 29: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 187

LAMPIRAN – 9

KONFIGURASI IBT-3,4 KRIAN & IBT-3 KEDIRI

KRIAN

Grati Gresik

Ungaran

Ngimbang

2 13

AJMTOSIMAN

KTSNO

CKMIA

MDLAN

Sengkaling

7R

BLBND

SKTIH

TARIK

SBRAT

4R

~

~

1 2 3 4 5 6

OPEN

OPEN

NGORO

NGJUK

A

B

A

B

OPEN

4NEW

CERME

Msbar(KTT)

MNYAR

AB

NEW

A

GGRAM

BNRAN

PARE

MJAGN

KDIRI

Pedan Paiton1 2 3 4

IBT-1 IBT-2

OPEN

A

B

IBT-3

NEW

KJTIM

Tlgng

Page 30: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 188

LAMPIRAN – 9

UngaranKrian

Unit-10 MW

TUBAN

SST

B

A

5B4

5A4

5AB4

5B3

5A3

5AB3

5B2

5A2

5AB2

5B1

5A1

5AB1

4 3 2 1

KEREK BJGRO

PCRAN

PLTU

TAWAR

BABAT LNGAN

SGMDU

PKMIA

TBAN3

Grlma

AltapBus TieCepu

Jateng

SUBSISTEM

KRIAN - GRESIK

SMSIK

BRATA

HOLCM1 2

A

B

7B1

7A1

7AB1

7B2

7A2

7AB2 NBANG

MLWNG

Unit-20 MW

KONFIGURASI SUBSISTEM NGIMBANG

A

BOPEN

=NEW

IBT-1 IBT-2

NEW

Page 31: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 189

LAMPIRAN – 10

Island Cilegon – PLTGU Cilegon – PLTU Labuan 2015

SLAYA/MITSUI

CILEGONBARU

123

PLTGU CLGON A

B

STGT.1GT.2

KOPO

KRAKATAUDAYA LISTRIK

Suralaya.2/1

2

PUNCAK AMSERANG

CIKANDE

1 2 3

234A

B

Cibinong

ALINDO

PT

1 2

PT PTPOLYPRIMA

0

ASAHIMAS

Nkmas

SAKETI

MENES BARU

1 2

RANGKASBITUNG

BUNAR

1 2

Kracak

1 2

PLTU LABUAN

1

A

SST

GT.2GT.1

321B 4

RANGKASBITUNG

INDAH KIAT

PT

GORDA

CHANDRA ASRI

1

1 2 3 4

CILEGON

2 1 2

1 2

1 2 3 4

POSCO

2x100

1 2

BUNAR

TJLESUNG

MALIMPING

KOPEL.2

165 MVA

BALARAJA

BLJRU

1 2 3

Cikupa

1 2

PT 60

SMTOR

PT 30

1

= UFR 48,3 Hz

= UFR 48,1 Hz

Page 32: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 190

LAMPIRAN – 10

KOMPOSISI BEBAN ISLAND CILEGON– PLTGU CILEGON – PLTU LABUAN

NO GI TRAFOBEBAN (MW) UFR

Beban Island

(Beban-UFR Tahapan)

UFR 48,3 UFR 48,1

Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

1 Cilegon Baru 2 24,56 27,92 9,52 12,14 15,04 15,78 15,04 15,78 15,04 15,78

2 Serang

1 19,23 19,06

56,46 70,91 36,67 46,24 36,67 46,24 36,67 46,242 25,36 28,09

3 30,54 42,00

4 18,00 28,00

3 Rangkasbitung 70 kV 1 13,71 21,47 7,61 11,33 6,10 10,14 6,10 10,14 0,00 0,00

4 Bunar 1 16,20 24,75 13,14 14,77 3,06 9,98 3,06 9,98 0,00 0,00

5 Cikande1 35,48 39,86

49,71 51,91 18,57 21,01 18,57 21,01 18,57 21,012 32,80 33,06

6 Pucam

1 41,00 39,86

83,23 93,97 47,52 48,92 47,52 48,92 47,52 48,922 35,62 43,65

3 29,96 34,28

4 24,17 25,10

7 Balaraja

1 41,18 46,32

12,42 16,81 109,95 96,93 109,95 96,93 0,00 0,002 44,35 37,41

3 36,84 30,01

8 Nikomas PT 38,24 28,66 0,00 0,00 38,24 28,66 38,24 28,66 38,24 28,66

9 Indah Kiat PT 31,06 33,07 0,00 0,00 31,06 33,07 31,06 33,07 31,06 33,07

10 Asahimas

1 40,82 44,25

32,60 38,69 211,12 217,21 211,12 217,21 174,80 175,832 36,32 41,38

PT-1 54,80 57,80

PT-2 111,78 112,47

11 Polyprima PT 23,53 23,56 0,00 0,00 23,53 23,56 23,53 23,56 23,53 23,56

12 Rangkasbitung Baru 150 kV 2 24,80 32,92 24,80 32,92 0,00 0,00 0,00 0,00 0,00 0,00

13 Menes Baru1 12,56 24,24

14,90 20,41 4,18 14,81 4,18 14,81 4,18 14,812 6,52 10,98

14 Saketi 1 25,74 38,11 12,51 21,06 13,23 17,05 13,23 17,05 13,23 17,05

15 Kopo1 29,06 27,38

24,33 29,84 13,83 7,99 13,83 7,99 13,83 7,992 9,10 10,45

16 Chandra Asri PT 7,39 11,53 0,00 0,00 7,39 11,53 7,39 11,53 7,39 11,53

17 Gorda Prima PT 0,10 0,49 0,00 0,00 0,10 0,49 0,10 0,49 0,10 0,49

18 Samator PT 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

19 PLTU LabuanPS-1 12,00 12,00 0,00 0,00 12,00 12,00 12,00 12,00 12,00 12,00

PS-2 14,00 14,00 0,00 0,00 14,00 14,00 14,00 14,00 14,00 14,00

TOTAL 946,82 1044,13 341,24 414,76 605,58 629,37 605,58 629,37 450,15 470,94

UNIT TOTAL : 660

PLTGU CILEGON BARU

UNIT 1 230

UNIT 2 0

ST 110

TOTAL 340

PLTU LABUAN

UNIT 1 (Run Back 50%) 160

UNIT 2 (Run Back 50%) 160

UNIT 3 0

TOTAL 320

Page 33: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 191

LAMPIRAN – 10

Island Gandul-Muarakarang 2015

KARETBARU

1 2 3

ANGKE

1 21 2

TGBRU

MKBRUMKLMA

7 6 5 4 3 2 187 6 5 4 3A

B

10 9

GT-2 GT-1ST 2.1ST 2.2ST 2.3PLTU 4PLTU 5GT

1.1

GT

1.2

GT

1.3

ST

1.0

RAT 4 RAT 3

1 2 3 4

PETUKANGAN

BINTARO

CSW

3 2

SENAYAN

1 2 31 2 3

1 2 3

GANDUL

PONDOK INDAH

1 2

SERPONG

Lengkong

1 2 3 4

500 kV

A

B

1 2 3 4 5

Balaraja

Kmbng

Depok

KEMANG

1 2 3

BUDI KM

KEBON SIRIH

1 2 3

Ancol1 2

CENGKARENG KEBONJERUK KARET

Mampang

1 2 3 4 5 1 2 3

Kembangan

2 1

GROGOL

1 2 3 1 2

DURIKOSAMBI

LMK

Kopel-1

Kopel -2

1 2

SST

TANGERANG

1 2 3 4

Jatake

AGP

1 2 3

Mampang Baru

DNYSA

1 2 3

Mampang Baru

1 2 3 4

BNTRU

1 2

1 2 3 4

3 2 1

1 2

= UFR 48,3 Hz

= UFR 48,1 Hz

PIK

Ketapang

Page 34: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 192

LAMPIRAN – 10

KOMPOSISI BEBAN ISLAND GANDUL - MUARAKARANG

UNIT TOTAL 1045

PLTGU Muarakarang BLOK 1

UNIT 1 89

UNIT 2 89

UNIT 3 0

SST 152

TOTAL 330

PLTGU 4,5 Muarakarang

UNIT 4 165

UNIT 5 0

TOTAL 165

PLTGU Muarakarang BLOK 2

UNIT 1 210

UNIT 2 210

SST 1 40

SST 2 50

SST 3 40

TOTAL 550

NO GI TRAFOBEBAN (MW) UFR

Beban Island (Beban-UFR Tahapan)

UFR 48,3 UFR 48,1

Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

1 Cengkareng1 43,40 40,62

7,81 11,21 61,47 54,81 61,47 54,81 61,47 54,812 25,88 25,4

2 Durikosambi

1 46,14 43,18

52,98 50,89 90,74 85,39 37,14 38,28 37,14 38,282 42,78 41,59

3 47,23 42,81

4 53,71 51,88

3 Muarakarang Baru

1 40,11 39,24

48,28 50,41 62,46 57,33 62,46 57,33 62,46 57,332 35,63 36,06

3 35,00 32,44

4 Budi Kemulyaan

1 43,66 36,44

0,00 0,00 111,24 97,16 111,24 97,16 111,24 97,162 30,40 25,6

3 37,18 35,12

5 Kebon Sirih1 30,44 29,86

0,00 0,00 60,79 60,12 60,79 60,12 60,79 60,123 30,35 30,26

6 Kebun Jeruk

1 42,52 42,86

64,75 71,08 53,09 44,18 53,09 44,18 0,00 0,002 40,58 38,68

3 34,74 33,72

7 Karet Baru

1 32,57 32,09

0,00 0,00 91,36 89,32 91,36 89,32 0,00 0,002 24,10 26,73

3 34,69 30,5

8 Angke3 43,44 41,93

10,42 17,47 77,15 61,30 77,15 61,30 77,15 61,304 44,13 36,84

9 Petukangan

1 35,75 45,02

55,42 71,11 50,13 50,53 50,13 50,53 50,13 50,532 29,18 35,05

3 40,62 41,57

10 Senayan

1 40,39 46,17

0,00 0,00 123,12 102,87 123,12 102,87 123,12 102,872 38,36 29,66

3 44,37 27,04

11 Bintaro

1 44,68 45,14

14,79 20,98 113,75 111,74 0,00 0,00 0,00 0,002 44,14 41,24

3 39,72 46,34

12 Ketapang

1 34,54 31,94

16,50 20,50 77,62 72,44 77,62 72,44 77,62 72,442 33,40 35,18

3 26,18 25,82

13 Danayasa2 33,14 32,42

0,00 0,00 58,72 57,12 58,72 57,12 0,00 0,003 25,58 24,7

14 Abadi Guna Papan2 37,52 32,78

0,00 0,00 61,17 56,62 61,17 56,62 0,00 0,003 23,65 23,84

15 Grogol

1 31,80 40,06

30,53 31,80 71,06 74,85 71,06 74,85 71,06 74,852 45,26 42,62

3 24,53 23,97

16 Kembangan1 37,48 43,79

42,48 49,12 42,38 43,46 0,00 0,00 0,00 0,002 47,38 48,79

TOTAL 1596,35 1556,99 343,96 394,58 1206,25 1119,23 996,52 916,92 732,17 669,68

Page 35: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 193

LAMPIRAN – 10

Island Bekasi – Priok 2015

Subsistem Bekasi IBT 1&2

PR BARAT

7 6 5 4 3 2 18

PDK KLAPA

2 12 1

Kopel-1

Tambun1 2 3

PENGGILINGAN

1 3

PRIOK TIMUR

A

B

5 4 3 2 1

U-3 U-4

PLUMPANG

ANCOL

ANGKE

1 2 3

BEKASI MRNDA

1 2 3

Mkrng

2 1

CONV

PULOGADUNG

GIS

PT.KESA5 9 8 6 7

TANAHTINGGI

KDSPI

KEMAYORANMANGGABESAR

1 3

KTPNG

1 2 3

1 2 4

40 kA 20 kA

12

Tsn-2

Tsn-1WGHNL

GDPLA

1 2 3

1 2 3 1 2

GBBRU

1 2 3

PGSAN

PT1 PT2 PT3

P.KARANG

KLPGD

Kosambi

Cwang

A

B

31 2 4

Cibinong

WH-1 WH-2

4 3 2 1

1 3

JATIRANGON

1 2 3

MANGGARAI

1 3

Cipinang/

PULOMAS

1 2 3

GIS GAMBIR

1 2 3

4 3 2 1

Cbing

12

ST2.0 ST1.0GT2.3 GT2.2 GT2.1 GT1.3 GT1.2 GT1.1

KARET LAMA

1 2

CSW

3 2

MPANG

MNTUR

STGT32

21

1 2 3 4

= UFR 48,3 Hz

= UFR 48,1 Hz

Page 36: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 194

LAMPIRAN – 10

KOMPOSISI BEBAN ISLAND BEKASI – PRIOK

UNIT TOTAL 1196

PLTGU PRIOK BLOK 1

UNIT 1 98

UNIT 2 90

UNIT 3 0

SST 100

TOTAL 288

PLTGU PRIOK BLOK 2

UNIT 1 98

UNIT 2 90

UNIT 3 0

SST 100

TOTAL 288

PLTGU PRIOK BLOK 3

UNIT 1 200

UNIT 2 200

SST 220

TOTAL 620

PLTU PRIOK

UNIT 1 0

UNIT 2 0

TOTAL 0

NO GI TRAFOBEBAN (MW) UFR

Beban Island (Beban-UFR Tahapan)

UFR 48,3 UFR 48,1

Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

1 Angke1 43,61 42,72

54,49 57,18 35,80 29,65 35,80 29,65 0,00 0,002 46,68 44,11

2 Kandang Sapi1 36,42 27,26

8,71 18,28 53,09 31,75 53,09 31,75 53,09 31,752 25,38 22,77

3 Plumpang

1 44,64 44,18

41,47 1,17 121,50 148,63 121,50 148,63 121,50 148,632 44,49 36,863 33,20 32,284 40,64 36,48

4 Gambir Baru1 25,35 24,78

4,50 37,65 80,57 39,31 80,57 39,31 80,57 39,312 37,98 31,523 21,74 20,66

5 Gedung Pola1 16,50 16,72

0,00 0,00 50,46 51,58 50,46 51,58 50,46 51,582 12,56 14,163 21,40 20,70

6 Pangeran Karang PT 36,30 39,09 0,00 0,00 36,30 39,09 36,30 39,09 0,00 0,00

7 Pegangsaan1 40,01 36,88

12,24 15,17 91,89 83,56 91,89 83,56 91,89 83,562 33,96 33,233 30,16 28,62

8 Kelapa Gading2 17,37 17,13

20,50 19,61 17,37 17,13 17,37 17,13 17,37 17,133 20,50 19,61

9 TosanPT-1 33,46 35,14

0,00 0,00 70,86 73,94 70,86 73,94 0,00 0,00PT-2 37,40 38,80

10 Wahana PT 0,57 0,09 0,00 0,00 0,57 0,09 0,57 0,09 0,00 0,00

11 Penggilingan1 32,44 28,28

11,65 15,62 57,57 52,02 0,00 0,00 0,00 0,003 36,78 39,36

12 Pulogadung

5 48,92 45,21

4,17 8,00 164,91 147,37 164,91 147,37 115,99 102,166 24,85 26,327 0,00 0,008 47,19 41,359 48,12 42,49

13 Kesa PT 45,52 37,95 0,00 0,00 45,52 37,95 0,00 0,00 0,00 0,00

14 Kemayoran1 37,00 36,72

8,00 10,00 107,72 106,22 107,72 106,22 107,72 106,222 29,10 29,924 49,62 49,58

15 Mangga Besar1 42,12 41,02

2,67 3,00 86,32 82,63 86,32 82,63 0,00 0,002 7,47 9,193 39,40 35,42

16 Bekasi1 40,74 38,65

34,84 42,98 56,25 43,48 56,25 43,48 56,25 43,482 50,35 47,81

17 Marunda1 41,94 44,76

19,88 28,80 88,76 87,26 88,76 87,26 88,76 87,262 31,72 35,703 34,98 35,60

18 Ancol1 40,46 41,82

44,29 48,18 70,01 63,72 70,01 63,72 70,01 63,722 37,50 35,113 36,34 34,97

19 Karet Lama1 49,61 43,31

0,00 0,00 94,08 77,21 0,00 0,00 0,00 0,002 44,47 33,90

20 CSW2 47,25 45,32

0,00 0,00 77,24 76,59 0,00 0,00 0,00 0,003 29,99 31,27

21 Priok Timur 1 3,16 3,04 0,00 0,00 3,16 3,04 3,16 3,04 3,16 3,04

22 Pulomas1 38,97 41,77

12,50 15,33 71,14 65,42 0,00 0,00 0,00 0,002 0,00 0,003 44,67 38,98

TOTAL 1761,00 1678,61 279,91 320,97 1481,09 1357,64 1135,54 1048,45 856,77 777,84

Page 37: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 195

LAMPIRAN – 10

Island Cibinong – Salak – Pelabuhan Ratu 2015

CILEUNGSIASPEX P

PT SEMEN

Cilegon

CIBINONG

A

B

1 2 3 4 5

Depok

Saguling

12

MtwarBkasi

2

4150/70 kV100 MVA

KEDUNG BADAK

1150/70 kV100 MVA

1150/70 kV60 MVA

SEMENBARU

ITP

PT150/33 kV2x80 MVA

KRACAK

2

1 6 3

SALAK BARUSALAK LAMA

CIBADAKBARU

UBRUG

PELABUHAN RATU

BOGORBARU

Cianjur

SENTUL

1 2 3

3 4 5 6

1 2

2 3 10 1 2

1 2

150/70 kV60 MVA

CIAWI

LBSTU

GDRIA

1 2 3 Cwbru

1 2

1 2

Cianjur

1 2 3 4 5

U1 U3U2

SST1 SST2

T1

PLTU PELABUHANRATU

A

B

1

Rangkasbitung

BUNAR

1 2

CIMANGGIS

1 2 3

5

JATIRANGON

MNTUR/PDKLP

1 2 3

2

= UFR 48,3 Hz

= UFR 48,1 Hz

Page 38: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 196

LAMPIRAN – 10

KOMPOSISI BEBAN ISLAND CIBINONG – SALAK – PELABUHAN RATU

UNIT TOTAL : 700 MW

PLTU PRATU

UNIT 1 250 MW

UNIT 2 250 MW

UNIT 3 0 MW

TOTAL 500 MW

PLTP SALAK LAMA

UNIT 1 50 MW

UNIT 2 50 MW

UNIT 3 0 MW

TOTAL 100 MW

PLTP SALAK BARU

UNIT 4 50 MW

UNIT 5 50 MW

UNIT 6 0 MW

TOTAL 100 MW

NO GI TRAFOBEBAN (MW) UFR

Beban Island (Beban-UFR

Tahapan)UFR 48,3 UFR 48,1

Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

1 Bunar1 0 0

10,0464 10,7328 14,1036 8,6772 0 0 0 02 24,15 19,41

2 Cibinong

2 41,32 43,26

23,09124 26,8929 18,22876 16,36709 18,22876 16,3670918,22876 16,367093 0 0

5 0 0

6 0 0

3 Semen 150 kV PT 70,06 36,57 0 0 70,06 36,57 70,06 36,57 70,06 36,57

4 ITP 1 119,56 87,97 0 0 119,56 87,97 119,56 87,97 119,56 87,97

5 Semen 70 kV PT 26,1 21,75 0 0 26,1 21,75 26,1 21,75 0 0

6 Gandaria

1 21,33 22,46

28,43 29,722 15,09 15,908 15,09 15,908 0 02 0 0

3 22,19 23,17

7 Sentul

1 26,56 25,48

21,50735 28,2616 84,30265 72,78839 84,30265 72,7883984,30265 72,788392 26,38 25,47

3 52,87 50,1

8 Bogorbaru

3 27,38 25,02

89,80417 92,341 59,68583 54,25904 59,68583 54,2590459,68583 54,259044 44,04 42,64

5 41,9 43,26

6 36,17 35,68

9 Kracak1 6,46 7,85

11,5648 12,02 0,0952 1,05 0,0952 1,05 0,0952 1,052 5,2 5,22

10 Cibadak Baru2 32,06 32,46

52,7444 53,0592 25,5756 24,1608 25,5756 24,1608 25,5756 24,16083 46,26 44,76

11 Pelabuhan ratu1 14,3 14,06

10 12 4,3 2,06 4,3 2,06 0 02 0 0

12 Pelabuhan Ratu 150 1 14,08 14,81 0 0 14,08 14,81 14,08 14,81 14,08 14,81

13 Lembursitu 1501 49,81 45,04

29,9872 38,0688 55,0328 42,1812 55,0328 42,1812 55,0328 42,18122 35,21 35,21

14 Semen Baru 1 45,99 41,33 6 16,7667 39,99 24,56327 39,99 24,56327 39,99 24,56327

15 Ciawi 150 kV1 31,8 33,1

26,07687 34,3083 42,77313 36,02166 42,77313 36,0216642,77313 36,021662 37,05 37,23

16 Cianjur1 35 35

0 0 70 70 70 70 0 02 35 35

TOTAL 968,23 883,31 309,2524 354,173 658,9776 529,1366 644,874 520,4594 529,384 410,7414

Page 39: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 197

LAMPIRAN – 10

Island Balaraja – Lontar 2015

SEPATAN

2 3

TIGARAKSA

1 3

Ptkgn

SERPONG

BINTARO

1 2 3

CITRAHABITAT

1 2 3

LEGOK

1 3

LENGKONG

1 2

TELUK NAGA

1 2 3

CIKUPA

CURUG / CILEDUKSS KEMBANGAN

1 2 3

JATAKE

PASAR KEMIS

1 2 3

1 2

NEW BALARAJABALARAJA

1 2 3

CIKANDEBALARAJA

A

4 3 2 1

SRLYA 2/1

GNDUL 2/12 1

B

PLTU

Lontar /

U.3 U.2 U.1

SST

4 3 2 1

TGBRU

TANGERANG

DRKBI

CENGKARENG

1 2 3 4 5

1 2 3

1 3 2 4

JATAKE

= UFR 48,3 Hz

= UFR 48,1 Hz

Page 40: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 198

LAMPIRAN – 10

KOMPOSISI BEBAN ISLAND BALARAJA - LONTAR

UNIT TOTAL : 464 MW

PLTU LONTAR

UNIT 1 232 MW

UNIT 2 232 MW

UNIT 3 0

TOTAL 464 MW

NO GI TRAFOBEBAN (MW) TOTAL UFR

Beban Island

(Beban-UFR Tahapan)UFR 48,3 UFR 48,1

Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

1 Citra Habitat

1 40,60 41,98

118,61 131,36 13,63 20,14 104,98 111,22 0,00 0,00 0,00 0,002 31,79 42,60

3 46,22 46,78

2 Tigaraksa1 40,26 42,70

70,64 72,40 4,00 4,00 66,64 68,40 0,00 0,00 0,00 0,003 30,38 29,70

3 Legok1 31,04 28,59

51,90 52,25 14,00 21,88 37,90 30,37 0,00 0,00 0,00 0,003 20,86 23,66

4 Lengkong

1 42,93 38,36

73,34 50,60 11,73 13,85 61,61 36,75 0,00 0,00 0,00 0,002 6,00 8,59

3 24,41 3,65

5 Serpong

1 48,46 48,01

137,21 136,51 70,04 77,40 67,17 59,11 0,00 0,00 0,00 0,002 46,83 43,90

3 41,92 44,60

6 Cikupa

1 44,28 37,80

84,94 77,76 0,67 1,00 84,27 76,76 0,00 0,00 0,00 0,002 40,66 39,96

3 0,00 0,00

7 Pasar Kemis

1 48,69 46,51

132,55 124,08 5,76 8,35 126,79 115,73 126,79 126,79 0,00 0,002 39,58 45,77

3 44,28 31,8

8 Sepatan

1 40,66 39,96

48,88 49,16 40,66 39,96 8,22 9,20 8,22 8,22 0,00 0,002 0,00 0,00

3 8,22 9,20

9 Teluk Naga

1 49,29 47,46

111,38 107,98 12,33 13,00 99,05 94,98 99,05 99,05 44,35 54,702 44,35 42,42

3 17,74 18,10

10 Tangerang Baru

1 49,61 43,40

134,38 129,53 0,00 0,00 134,38 129,53 134,38 134,38 134,38 129,532 34,72 38,04

3 50,05 48,09

11 Cengkareng

3 49,30 47,60

98,97 88,67 5,73 5,41 93,24 83,26 0,00 0,00 0,00 0,004 0,00 0,00

5 49,67 41,07

12 Balaraja Baru1 37,24 35,11

65,46 65,73 4,00 4,00 61,46 61,73 0,00 0,00 0,00 0,002 28,22 30,62

13 Tangerang Lama

2 42,82 43,32

54,39 54,99 8,69 10,79 45,70 44,20 0,00 0,00 0,00 0,003 0,00 0,00

4 11,57 11,67

TOTAL 1182,65 1141,02 1182,65 1141,02 191,24 219,78 991,41 921,24 368,44 368,44 178,73 184,23

Page 41: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 199

LAMPIRAN – 10

BDUTR

PDLRG

REL-IA

BDSLN

WYWDU

KRCDG

UBRNGRCKBA

CKSKA

RCKEK

SRAGI

CVRON

DRJAT

PNSIAIBT-1 IBT-2

REL-IB

REL-II AB

REL-I

REL-II

REL-I

REL-II

REL-I

REL-II

REL-I

REL-II

REL-I

REL-II

REL-I

REL-IIREL-I

REL-II

REL-I

REL-II

Unit-1

110 MW

Unit-1

53 MW

Unit-2

92 MW

~

~

Unit-3

110 MW

~

NO

~

REL-I

REL-II

ISLAND OPERATION KAMOJANG-DARAJAT-WYWDU

NO

BDTMR SMDNG

CGRLG Trf-2

Trf-1

Trf-4

Trf-1 Trf-4

Trf-1

Trf-4

Trf-3 Trf-1

Trf-3Trf-2

Trf-5 Trf-3

Trf-3

Trf-3

Trf-1

Trf-2

Trf-2

Trf-7

Trf-2

KMJNG

Unit-1

29 MWUnit-2

53 MW

Unit-3

53 MW

~~~

Unit-4

60 MW

~

GARUT

Keterangan :

: UFR 48,3 Hz

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

~

Unit-2

115 MW

Trf-3

Trf-1

Trf-3

Page 42: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 200

LAMPIRAN – 10

UNIT : TOTAL 565 MW

KMJNG

UNIT-1 29 MW

UNIT-2 53 MW

UNIT-3 53 MW

UNIT-4 60 MW

TOTAL 195 MW

DARAJAT

UNIT-1 53 MW

UNIT-2 92 MW

WYWDU

UNIT-1 110 MW

UNIT-2 115 MW

BEBAN TRAFO

NO GI TRAFOBEBAN

SIANG MALAM

1 BDSLN 2 36,3 40

2 KRCDG 1 34,1 47

3 46,3 47

3 KMJNG 7 7,7 12,7

4 CKSKA 1 24,5 20,3

2 27,1 35

3 13,2 13,1

5 RCKBA 1 43,1 39,9

2 39,9 35,9

3 19,2 26,3

6 RCKEK 1 50,4 49,9

2 36,7 35,5

3 42,8 38,2

4 19,4 19,2

TOTAL 441 460

UFR TAHAP 1-7

NO GI SIANG MALAM

1 BDSLN (T2) 3,53 3,38

2 KRCDG (T1,2,3) 49,94 60,00

3 CKSKA (T2) 4,00 6,47

TOTAL 57,5 69,9

BEBAN ISLAND

UNITBEBAN (MW) UFR TAHAP 1-7 BEBAN ISLAND FAKTOR BEBAN

SIANG MALAM SIANG MALAM SIANG MALAM SIANG MALAM

565 441 460 57,5 69,9 383,5 390,1 67,9% 69%

KOMPOSISI BEBAN ISLAND KAMOJANG-DARAJAT-WAYANGWINDU

Page 43: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 201

LAMPIRAN – 10

~

MKSRI

PNYGN

PRURI

TGHRG

~

PRMYA

TLJBE

KSBRU

DWUAN

SKMDI

BKASI JTLHR

MLIGI

KRPYG

KTMKR

PLTU IDMYU

(3 x 330 MW)

~

CBATU

IBT-4IBT-3

MDRCN

IBT-2IBT-1

HRGLS

JTBRG

SRAGI

RCKEK

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT ISLAND OPERATION PLTU INDRAMAYU & PLTU CIREBON

(Tahap-1 = 48,3 Hz)

Keterangan :

: UFR seting 48.3 Hz

PLTU

CEP

BREBES

TAHAP-1

f = 48,3 Hz

Page 44: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 202

LAMPIRAN – 10

KOMPOSISI BEBAN ISLAND INDRAMAYU & CIREBON(TAHAP-1 = 48,3 HZ)

UNIT TOTAL = 1515 MW

PLTU IDMYU

UNIT 1 285

UNIT 2 285

UNIT 3 285

PLTU CEP

UNIT 1 660

BEBAN

NO GI TRAFOBEBAN

SIANG MALAM

1 PRMYA 1 36 29

2 13 7

2 TLJBE 1 38 36

2 48 45

3 16 13

3 KTMKR 1 34 7

4 MLIGI 1 31 33

2 0 0

5 KRPYG 1 20 17

2 0 0

6 KSBRU IBT 4 63 89

5 35 28

6 41 59

7 0 0

7 DWUAN 1 35 55

2 45 36

3 43 36

KTT 2 2

8 IDMYU5 1 14 21

BEBAN

NO GI TRAFOBEBAN

SIANG MALAM

9 SKMDI 1 18 27

2 26 37

10 HRGLS 1 19 32

2 11 17

11 JTBRG IBT 1 60 75

2 24 33

3 14 5

12 MDRCN 1 25 35

2 4 4

13 SRAGI IBT 1 56 86

IBT 2 25 49

4 31 35

IBT 5 60 89

6 38 53

7 27 27

TOTAL 953 1119

BEBAN ISLAND

UNITBEBAN (MW) UFR TAHAP 1-7 BEBAN ISLAND FAKTOR BEBAN

SIANG MALAM SIANG MALAM SIANG MALAM SIANG MALAM

1515 953 1119 259 362 694 757 45,8% 50%

Page 45: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 203

LAMPIRAN – 10

~

MKSRI

PNYGN

PRURI

TGHRG

~

PRMYA

TLJBE

KSBRU

DWUAN

SKMDI

BKASI JTLHR

MLIGI

KRPYG

KTMKR

PLTU IDMYU

(3 x 330 MW)

~

CBATU

IBT-4IBT-3

MDRCN

IBT-2IBT-1

HRGLS

JTBRG

SRAGI

RCKEK

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT ISLAND OPERATION PLTU INDRAMAYU & PLTU CIREBON

(Tahap-2 = 48,2 Hz)

Keterangan :

: UFR 48.3 Hz

: UFR 48.2 Hz

: UFR 48.1 Hz

PLTU

CEP

BREBES

TAHAP-2

f = 48,2 Hz

Page 46: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 204

LAMPIRAN – 10

KOMPOSISI BEBAN ISLAND INDRAMAYU & CIREBON(TAHAP-2 = 48,2 HZ)

UNIT TOTAL = 1515 MW

PLTU IDMYU

UNIT 1 285

UNIT 2 285

UNIT 3 285

PLTU CEP

UNIT 1 660

BEBAN TRAFO

NO GI TRAFOBEBAN

SIANG MALAM

1 PRMYA 1 36 29

2 13 7

2 TLJBE 1 38 36

2 48 45

3 16 13

3 KTMKR 1 34 7

4 MLIGI 1 31 33

2 0 0

5 KRPYG 1 20 17

2 0 0

6 KSBRU IBT 4 63 89

5 35 28

6 41 59

7 0 0

7 DWUAN 1 35 55

2 45 36

3 43 36

KTT 2 2

8 IDMYU5 1 14 21

TOTAL 515 514

BEBAN TRAFO

NO GI TRAFOBEBAN

SIANG MALAM

1 SKMDI 1 18 27

2 26 37

2 HRGLS 1 19 32

2 11 17

3 JTBRG IBT 1 60 75

2 24 33

3 14 5

4 MDRCN 1 25 35

2 4 4

5 SRAGI IBT 1 56 86

IBT 2 25 49

4 31 35

IBT 5 60 89

6 38 53

7 27 27

TOTAL 438 605

BEBAN ISLAND INDRAMAYU

UNITBEBAN (MW) UFR TAHAP 1-7 BEBAN ISLAND

FAKTOR BEBAN (%)

SIANG MLM SIANG MLM SIANG MLM SIANG MLM

570-855

515 514 98 115 417 399 73 – 49 70 – 47

BEBAN ISLAND CIREBON

UNITBEBAN (MW)

UFR TAHAP 1-7

BEBAN ISLAND

FAKTORBEBAN (%)

SIANG MLM SIANG MLM SIANG MLM SIANG MLM

660 438 605 165 255 273 350 41 53

Page 47: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 205

LAMPIRAN – 10

MDCAN

JABAR

JATIM

KEDIRI

TASIK

BANJAR

SAMUDRA INDONESIA

LAUT JAWA

KDNBO

KLSRI

KRAPK

RWALO

KLNGU

WLERI

PDADI

DIENG

TMGNG

KUDUS

PATI

RBANG

BLORA

CEPU

NGAWI

MKRAN

BNTUL

WATES

PWRJO

WALIN

PLTU CLCAP

KLBKL

BRBES KBSEN

PMLNG

MNANG

BMAYU

LMNIS

GBONG

WSARI

SLBRU

SLIMA

RDRUT

JKULO

WBJANGDEAN

KNTUG

MDARI

GRUNG

BAWEN JELOK

BRNGI

MJNGO

BDONO

MRICA

WNGRI

TBROK

SRAGN

KRIAN

BJGRO

SRAGI

WSOBO

PALURJAJAR

TJATI

SMANU

BTANG

PKLON

STARA

KBMEN

SYUNG

PEDAN

SCANG

SGRAH

PDLAM

PYUNG

JPARA

SRDOL

UNGAR

GJYAN

PBLGA

KLATN

MRGENBSBRU

PCTAN

MSRAN

PLTU RBANG

TOPOLOGI ISLAND THP 1-48,3 HZ

BLPLG

NGTRDI

PT PLN (PERSERO) P3B JBAPB JAWA TENGAH & DIY

Page 48: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 206

LAMPIRAN – 10

MDCAN

JABAR

JATIM

KEDIRI

TASIK

BANJAR

SAMUDRA INDONESIA

LAUT JAWA

KDNBO

KLSRI

KRAPK

RWALO

KLNGU

WLERI

PDADI

DIENG

TMGNG

KUDUS

PATI

RBANG

BLORA

CEPU

NGAWI

MKRAN

BNTUL

WATES

PWRJO

WALIN

PLTU CLCAP

KLBKL

BRBES KBSEN

PMLNG

MNANG

BMAYU

LMNIS

GBONG

WSARI

SLBRU

SLIMA

RDRUT

JKULO

WBJANGDEAN

KNTUG

MDARI

GRUNG

BAWEN JELOK

BRNGI

MJNGO

BDONO

MRICA

WNGRI

TBROK

SRAGN

KRIAN

BJGRO

SRAGI

WSOBO

PALURJAJAR

TJATI

SMANU

BTANG

PKLON

STARA

KBMEN

SYUNG

PEDAN

SCANG

SGRAH

PDLAM

PYUNG

JPARA

SRDOL

UNGAR

GJYAN

PBLGA

KLATN

MRGENBSBRU

PCTAN

MSRAN

PLTU RBANG

TOPOLOGI ISLAND THP 2-48,2 HZ

BLPLG

NGTRDI

PT PLN (PERSERO) P3B JBAPB JAWA TENGAH & DIY

Page 49: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 207

LAMPIRAN – 10

MDCAN

JABAR

JATIM

KEDIRI

TASIK

BANJAR

SAMUDRA INDONESIA

LAUT JAWA

KDNBO

KLSRI

KRAPK

RWALO

KLNGU

WLERI

PDADI

DIENG

TMGNG

KUDUS

PATI

RBANG

BLORA

CEPU

NGAWI

MKRAN

BNTUL

WATES

PWRJO

WALIN

PLTU CLCAP

KLBKL

BRBES KBSEN

PMLNG

MNANG

BMAYU

LMNIS

GBONG

WSARI

SLBRU

SLIMA

RDRUT

JKULO

WBJANGDEAN

KNTUG

MDARI

GRUNG

BAWEN JELOK

BRNGI

MJNGO

BDONO

MRICA

WNGRI

TBROK

SRAGN

KRIAN

BJGRO

SRAGI

WSOBO

PALURJAJAR

TJATI

SMANU

BTANG

PKLON

STARA

KBMEN

SYUNG

PEDAN

SCANG

SGRAH

PDLAM

PYUNG

JPARA

SRDOL

UNGAR

GJYAN

PBLGA

KLATN

MRGENBSBRU

PCTAN

MSRAN

PLTU RBANG

TOPOLOGI ISLAND THP 3-48,1 HZ

BLPLG

NGTRDI

PT PLN (PERSERO) P3B JBAPB JAWA TENGAH & DIY

Page 50: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 208

LAMPIRAN – 10

1 21 21 2

I

II

A2 A3 A4 A5 A9A7

AB2 AB3 AB4

~

A10 A11 A12 A13 A14 A15 A16 A17

AB5 AB6

~ ~ ~ ~~ ~U.1

AUX

B2 B3 B4 B5 B6 B7 B8

AB7 AB8

B9 B10 B11 B12 B13 B14 B15 B16

AB9 AB10 AB11 AB12 AB13 AB14 AB15 AB16

~ ~ ~ ~AUX

20MVA

A

B

TAMBAKLOROK

BB1.1 BB2.1

AA2.1AA1.1

U.2 U.3

2X12,5MVA

ST1.0 GT1.3 GT1.2 GT1.1 ST2.0 GT2.3 GT2.2 GT2.1

1 2

RBKIT

~U 2

~U 1

A1

AB1

B1

A

B

AB2

B2

AB3

B3

A4

AB4

B4

MRICA

B1

A1

AB1

~ ~~30

U 3

A

U 2 U 1

B

A5

AB5

12

30MVA

AB4

B4 B3 B2

A2A3A4

AB3 AB2

PLTUCLCAP

AB1

A1 A2

B3B2B1

AB2 AB3

B4

A4

AB4

B

A

UNGAR

2

15 60

3

I

II

105

MX

105

MX

IBT-2 IBT-1

RWALO, LMNIS, STARA, PBLGA,

GBONG, KBMEN,

KLBKL

JELOK

BRNGI

SCANG

SGRAH

3 4

MDARI

1 2

WALIN

~

BAWEN

PWRDI

KLATN

MRGEN

Tahap 1 – 48,3 hzIsland Rembang, Cilacap & Mrica/

Dieng

105

MX

IBT-3

2 31

MNANG

BANJR

PATI

KUDUSKDMBO

JPARA

JKULO

SYUNG

TJJTB

BMAYU

BLPLG

GARNG, DIENG, WALIN,

WSOBO

TGUNG

PWRJO

WATES

1 2

BANTUL

KNTUG

SRDOLMVA

31,5

I

II

2

1

PDLAM

1

1

1 2

2 4

PEDAN

GJYAN

GDEAN

1 2

1 3

WBJAN

SMANU

1 2

KLATN

CEPU

1 2

I

II

RDRUT

KLNGU

I

II

1

KRAPK

BSBRU

PT PLN (PERSERO) P3B JBAPB JAWA TENGAH & DIY

REMBANG, BLORA

1 2

KLSRI

PYUNG

WLERI

BTANG

PLSDO

BJGRO

Page 51: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 209

LAMPIRAN – 10

1 21 21 2

I

II

A2 A3 A4 A5 A9A7

AB2 AB3 AB4

~

A10 A11 A12 A13 A14 A15 A16 A17

AB5 AB6

~ ~ ~ ~~ ~U.1

AUX

B2 B3 B4 B5 B6 B7 B8

AB7 AB8

B9 B10 B11 B12 B13 B14 B15 B16

AB9 AB10 AB11 AB12 AB13 AB14 AB15 AB16

~ ~ ~ ~AUX

20MVA

A

B

TAMBAKLOROK

BB1.1 BB2.1

AA2.1AA1.1

U.2 U.3

2X12,5MVA

ST1.0 GT1.3 GT1.2 GT1.1 ST2.0 GT2.3 GT2.2 GT2.1

1 2

RBKIT

~U 2

~U 1

A1

AB1

B1

A

B

AB2

B2

AB3

B3

A4

AB4

B4

MRICA

B1

A1

AB1

~ ~~30

U 3

A

U 2 U 1

B

A5

AB5

12

30MVA

AB4

B4 B3 B2

A2A3A4

AB3 AB2

PLTUCLCAP

AB1

A1 A2

B3B2B1

AB2 AB3

B4

A4

AB4

B

A

UNGAR

2

15 60

3

I

II

105

MX

105

MX

IBT-2 IBT-1

RWALO, LMNIS, STARA, PBLGA,

GBONG, KBMEN,

KLBKL

JELOK

BRNGI

SCANG

SGRAH

3 4

MDARI

1 2

WALIN

~

BAWEN

PWRDI

KLATN

MRGEN

Island Rembang, Cilacap & Mrica/

Dieng

105

MX

IBT-3

2 31

MNANG

PATI

KUDUSKDMBO

JPARA

JKULO

SYUNG

TJJTB

BMAYU

BLPLG

GARNG, DIENG, WALIN,

WSOBO

TGUNG

PWRJO

WATES

1 2

BANTUL

KNTUG

SRDOLMVA

31,5

I

II

2

1

PDLAM

1

1

1 2

2 4

PEDAN

GJYAN

GDEAN

1 2

1 3

WBJAN

SMANU

1 2

KLATN

1 2

I

II

RDRUT

KLNGU

I

II

1

KRAPK

BSBRU

PT PLN (PERSERO) P3B JBAPB JAWA TENGAH & DIY

KLSRI

PYUNG

WLERI

BTANG

PLSDO

Tahap 2 – 48,2 hz

CEPU

REMBANG, BLORA

1 2

BJGRO

BANJR

Page 52: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 210

LAMPIRAN – 10

1 21 21 2

A2 A3 A4 A5 A9A7

AB2 AB3 AB4

~

A10 A11 A12 A13 A14 A15 A16 A17

AB5 AB6

~ ~ ~ ~~ ~U.1

AUX

B2 B3 B4 B5 B6 B7 B8

AB7 AB8

B9 B10 B11 B12 B13 B14 B15 B16

AB9 AB10 AB11 AB12 AB13 AB14 AB15 AB16

~ ~ ~ ~AUX

20MVA

A

B

TAMBAKLOROK

BB1.1 BB2.1

AA2.1AA1.1

U.2 U.3

2X12,5MVA

ST1.0 GT1.3 GT1.2 GT1.1 ST2.0 GT2.3 GT2.2 GT2.1

1 2

RBKIT

~U 2

~U 1

A1

AB1

B1

A

B

AB2

B2

AB3

B3

A4

AB4

B4

UNGAR

2

15 60

3

I

II

105

MX

105

MX

IBT-2 IBT-1

JELOK

BRNGI

SCANG

SGRAH

3 4

MDARI

BAWEN

PWRDI

KLATN

MRGEN

Island Rembang, Cilacap & Mrica/

Dieng

105

MX

IBT-3

2 31

SYUNG

TJJTB

BANTUL

KNTUG

SRDOLMVA

31,5

I

II

2

1

PDLAM

1

2 4

PEDAN

GJYAN

GDEAN

1 2

1 3

WBJAN

SMANU

1 2

KLATN

1 2

I

II

RDRUT

KLNGU

I

II

1

KRAPK

BSBRU

PT PLN (PERSERO) P3B JBAPB JAWA TENGAH & DIY

KLSRI

PYUNG

WLERI

BTANG

PLSDO

Tahap 3 – 48,1 hz

KUDUSI

II

PATI

JKULO

KDNBO

1 2

RBANG

BLORA,CEPU

WALIN

MRICA

B1

A1

AB1

~ ~~30

U 3

A

U 2 U 1

B

A5

AB5

12

30MVA

AB4

B4 B3 B2

A2A3A4

AB3 AB2

1 2

WALIN

~

GARNG, DIENG, WALIN,

WSOBO

TGUNG

2

KLBKL

1

I

II

MNANG

PLTUCLCAP

1 2

16 30

MVA

20

MVA

30

MVA

1

2

I

II

STARA

60

MV

A

~ ~

LMNIS

~

MVA20

U1 U 2

30

~

1 3 PLTG

CLCAP

I

II

Cust

I

II

U1 U 2

B

A

SST

40MVA

RWALO

1 2

60 MVA

I

II

PBLGA

B4

AB4

A4

B2

AB2

A2

B1

AB1

A1

B3

AB3

WATES

1 2

GOMBONG,

KBMEN

I

II

BMAYU

BLPLG

BANJR

PWRJO

Page 53: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 211

LAMPIRAN – 10

Tidak Operasi

6 5 4 3 2 1

~~ ~

4 3 2 1

~

~~~

~~~ ~ ~~ ~ ~ ~

SGMDUPKMIA

KLANG

ALTAP

1 2 3 4 5 6

KRIAN

SBRAT

~ ~

Ngimbang

Ungaran

Grati

DARMO

KPANG

ISPDO

SWHAN

UDAAN

SIMPG

WARURNKUT SLILO

WKRMO

SBSEL

KRBAN

PERAK

UJUNG

NGAGL KJRAN

GLTMR

BKLAN

SAMPG

=

PMKSN

SMNEP

BBDANDRYJO

MIWON

TARIK BNGUN

Bus Tie

GRLMA

BDRAN MPION

GRBRU

PLTG

1.1

BLOCK 1

GT.

1.21.31.0

ST. PLTU.

4 3 2 1 1 2

2.1

BLOCK 2

GT.

2.22.32.0

ST.

BLOCK 3

GT.

3.33.0

ST.

PLTU

3 4

~

3.2

~

3.1

PLTGU

IBT-3 IBT-2 IBT-1

A

B

B

A

PLTGU

PRONG

A

B

C

D

B

A

CERME

Msbar

(KTT)

MNYAR

KJTIMA

OPEN

OPEN

OPEN

OPEN

OPEN

HANIL

JSTEL

48,3 Hz

48,3 Hz

48,3 Hz

48,3 Hz

48,3 Hz 48,3 Hz

IBT-1

TNDES

LWBP WBP

Kapasitas Pembangkit 1172,00 1172,00

Distribusi 799,70 884,10

Frekwensi 48,3 HzBeban (MW)

OPEN

OPEN OPEN

Page 54: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 212

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Gresik PS 34,00 34,00 - - 34,00 34,00

GT. 1.1 100,00 Altaprima 1,2 14,30 23,00 10,00 10,60 4,30 12,40

GT. 1.2 100,00 Surabaya Barat 1,2 71,10 77,20 - - 71,10 77,20

GT. 1.3 100,00 Tandes 1,2,3,4,5 93,70 130,20 39,80 16,20 53,90 114,00

ST. 1.0 180,00 Sawahan 1,3 43,00 38,60 5,10 5,50 37,90 33,10

Darmogrande 1,2 80,10 71,00 - - 80,10 71,00

Unit 1 80,00 Kupang 1,2 42,50 36,90 - - 42,50 36,90

Unit 2 80,00 Karangpilang 1,2 57,70 58,80 - - 57,70 58,80

Unit 3 166,00 Waru 3,4,5,6,7 101,50 112,00 8,30 6,20 93,20 105,80

Unit 4 166,00 Rungkut 1,2,3,4,5 119,30 126,80 - - 119,30 126,80

GT. 3.1 100,00 Sukolilo 1,2,3 81,10 82,20 11,30 8,80 69,80 73,40

GT. 3.2 100,00 Ngagel 1,2 17,60 18,80 - - 17,60 18,80

Simpang 1,2 41,30 29,60 - - 41,30 29,60

Kenjeran 1,2 63,20 67,10 18,80 8,90 44,40 58,20

Ujung 1,2 22,60 24,20 - - 22,60 24,20

Perak 1 10,00 9,90 - - 10,00 9,90

1.172,00 893,00 940,30 93,30 56,20 799,70 884,10

MATRIK KOMPOSISI BEBAN ISLAND GRESIK FREQUENCY 48,3 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,3 Hz (MW)

GRESIK BARU BLOK 1

PLTGU

GRESIK LAMA

PLTU

PLTGU

TOTAL PEMBANGKIT TOTAL BEBAN

Page 55: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 213

LAMPIRAN – 10

Tidak Operasi

6 5 4 3 2 1

~~ ~

4 3 2 1

~

~~~

~~~ ~ ~~ ~ ~ ~

SGMDUPKMIA

KLANG

ALTAP

1 2 3 4 5 6

KRIAN

SBRAT

~ ~

Ngimbang

Ungaran

Grati

DARMO

KPANG

ISPDO

SWHAN

UDAAN

SIMPG

WARURNKUT SLILO

WKRMO

SBSEL

KRBAN

PERAK

UJUNG

NGAGL KJRAN

GLTMR

BKLAN

SAMPG

=

PMKSN

SMNEP

BBDANDRYJO

MIWON

TARIK BNGUN

Bus Tie

GRLMA

BDRAN MPION

GRBRU

PLTG

1.1

BLOCK 1

GT.

1.21.31.0

ST. PLTU.

4 3 2 1 1 2

2.1

BLOCK 2

GT.

2.22.32.0

ST.

BLOCK 3

GT.

3.33.0

ST.

PLTU

3 4

~

3.2

~

3.1

PLTGU

IBT-3 IBT-2 IBT-1

A

B

B

A

PLTGU

PRONG

A

B

C

D

B

A

CERME

Msbar

(KTT)

MNYAR

KJTIMA

OPEN

OPEN

OPEN

OPEN

OPEN

HANIL

JSTEL

48,3 Hz

48,3 Hz

48,3 Hz

48,3 Hz

48,3 Hz 48,3 Hz

IBT-1

TNDES

48,2 Hz

48,2 Hz

LWBP WBP

Kapasitas Pembangkit 826,00 826,00

Distribusi 682,20 791,80

Frekwensi 48,2 HzBeban (MW)

OPEN

OPEN OPEN

Page 56: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 214

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Gresik PS 34,00 34,00 - - 34,00 34,00

GT. 1.1 100,00 Altaprima 1,2 14,30 23,00 10,00 10,60 4,30 12,40

GT. 1.2 100,00 Surabaya Barat 1,2 71,10 77,20 - - 71,10 77,20

GT. 1.3 100,00 Tandes 1,2,3,4,5 93,70 130,20 39,80 16,20 53,90 114,00

ST. 1.0 180,00 Sawahan 1,3 43,00 38,60 5,10 5,50 37,90 33,10

Darmogrande 1,2 80,10 71,00 - - 80,10 71,00

Unit 1 80,00 Karangpilang 1,2 57,70 58,80 - - 57,70 58,80

Unit 2 - Waru 3,4,5,6,7 101,50 112,00 8,30 6,20 93,20 105,80

Unit 3 - Rungkut 1,2,3,4,5 119,30 126,80 40,50 - 78,80 126,80

Unit 4 166,00 Sukolilo 1,2,3 81,10 82,20 11,30 8,80 69,80 73,40

GT. 3.1 100,00 Ngagel 1,2 17,60 18,80 - - 17,60 18,80

GT. 3.2 - Simpang 1,2 41,30 29,60 - - 41,30 29,60

Kupang 1,2 42,50 36,90 - - 42,50 36,90

826,00 797,20 839,10 115,00 47,30 682,20 791,80

MATRIK KOMPOSISI BEBAN ISLAND GRESIK FREQUENCY 48,2 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,2 Hz (MW)

GRESIK BARU BLOK 1

PLTGU

GRESIK LAMA

PLTU

PLTGU

TOTAL PEMBANGKIT TOTAL BEBAN

Page 57: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 215

LAMPIRAN – 10

Tidak Operasi

6 5 4 3 2 1

~~ ~

4 3 2 1

~

~~~

~~~ ~ ~~ ~ ~ ~

SGMDUPKMIA

KLANG

ALTAP

1 2 3 4 5 6

KRIAN

SBRAT

~ ~

Ngimbang

Ungaran

Grati

DARMO

KPANG

ISPDO

SWHAN

UDAAN

SIMPG

WARURNKUT SLILO

WKRMO

SBSEL

KRBAN

PERAK

UJUNG

NGAGL KJRAN

GLTMR

BKLAN

SAMPG

=

PMKSN

SMNEP

BBDANDRYJO

MIWON

TARIK BNGUN

Bus Tie

GRLMA

BDRAN MPION

GRBRU

PLTG

1.1

BLOCK 1

GT.

1.21.31.0

ST. PLTU.

4 3 2 1 1 2

2.1

BLOCK 2

GT.

2.22.32.0

ST.

BLOCK 3

GT.

3.33.0

ST.

PLTU

3 4

~

3.2

~

3.1

PLTGU

IBT-3 IBT-2 IBT-1

A

B

B

A

PLTGU

PRONG

A

B

C

D

B

A

CERME

Msbar

(KTT)

MNYAR

KJTIMA

OPEN

OPEN

OPEN

OPEN

OPEN

HANIL

JSTEL

48,3 Hz

48,3 Hz

48,3 Hz

48,3 Hz

48,3 Hz 48,3 Hz

IBT-1

TNDES

48,2 Hz

48,2 Hz

48,1 Hz

LWBP WBP

Kapasitas Pembangkit 757,00 757,00

Distribusi 639,70 754,90

Frekwensi 48,1 HzBeban (MW)

OPEN

OPEN OPEN

Page 58: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 216

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Gresik PS 34,00 34,00 - - 34,00 34,00

GT. 1.1 75,00 Altaprima 1,2 14,30 23,00 10,00 10,60 4,30 12,40

GT. 1.2 75,00 Surabaya Barat 1,2 71,10 77,20 - - 71,10 77,20

GT. 1.3 75,00 Tandes 1,2,3,4,5 93,70 130,20 39,80 16,20 53,90 114,00

ST. 1.0 100,00 Sawahan 1,3 43,00 38,60 5,10 5,50 37,90 33,10

Darmogrande 1,2 80,10 71,00 - - 80,10 71,00

Unit 1 - Karangpilang 1,2 57,70 58,80 - - 57,70 58,80

Unit 2 - Waru 3,4,5,6,7 101,50 112,00 8,30 6,20 93,20 105,80

Unit 3 166,00 Rungkut 1,2,3,4,5 119,30 126,80 40,50 - 78,80 126,80

Unit 4 166,00 Sukolilo 1,2,3 81,10 82,20 11,30 8,80 69,80 73,40

GT. 3.1 100,00 Ngagel 1,2 17,60 18,80 - - 17,60 18,80

GT. 3.2 - Simpang 1,2 41,30 29,60 - - 41,30 29,60

757,00 754,70 802,20 115,00 47,30 639,70 754,90

MATRIK KOMPOSISI BEBAN ISLAND GRESIK FREQUENCY 48,1 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,2 Hz (MW)

GRESIK BARU BLOK 1

PLTGU

GRESIK LAMA

PLTU

PLTGU

TOTAL PEMBANGKIT TOTAL BEBAN

Page 59: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 217

LAMPIRAN – 10

8 7

B

A

7AB8 7AB7

6 5

7A6

7AB6

7A5

7AB5

KRSAN

A

B

PITON4

7B4

7A4

7AB4

Kediri

II

3

7A3

7AB3

Grati

II

7B57B8

6 5

B

A

5AB6 5AB5

4 3

5A4

5AB4

5A3

5AB3

5B35B55B6

5A6 5A5

5B4

PJB6

A

B

BWNGI

A

B

GDING

STBDOGondangwetan

Bali

48,3 Hz

8

7A8 7A7

7

7B6

5

7B3

2

7B2

7A2

7AB2

1

7A1

7AB1

7B1

123

9

Grati

I

Kediri

I2 1

5A2

5AB2

5A1

5AB1

5B15B2

SST 3

SST 7-8 SST 5-6 SST 1-2

Jawa PowerPEC

A

B

A

B

A

B

A

B

PBLGO

LMJNG

TNGULJMBER

GTENG

BDWSO

48,3 Hz

OPEN

LWBP WBP

Kapasitas Pembangkit 740,00 740,00

Distribusi 489,10 500,20

Frekwensi 48,3 HzBeban (MW)

OPEN

Page 60: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 218

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Paiton 1 11,70 18,50 1,70 4,60 10,00 13,90

1 370,00 Kraksaan 1,2 26,80 38,80 3,80 1,90 23,00 36,90

2 370,00 Probolinggo 1,2,3 34,20 44,50 15,00 19,40 19,20 25,10

Lumajang 1,2 46,00 60,30 5,80 9,50 40,20 50,80

Situbondo 1,2,3 21,50 30,40 4,80 12,70 16,70 17,70

Bondowoso 1,2 18,70 26,60 5,10 16,90 13,60 9,70

Tanggul 1,2 26,50 42,90 19,00 22,10 7,50 20,80

Jember 1,2,3,4 71,20 62,90 38,00 34,50 33,20 28,40

Genteng 1,2 51,90 53,70 27,00 40,90 24,90 12,80

Banyuwangi 1,2,3 40,00 38,00 7,30 12,90 32,70 25,10

Bali SKLT 268,10 259,00 - - 268,10 259,00

740,00 616,60 675,60 127,50 175,40 489,10 500,20

BEBAN ISLAND

48,3 Hz (MW)

PAITON

PLTU

TOTAL PEMBANGKIT TOTAL BEBAN

MATRIK KOMPOSISI BEBAN ISLAND PAITON FREQUENCY 48,3 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

Page 61: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 219

LAMPIRAN – 10

8 7

B

A

7AB8 7AB7

6 5

7A6

7AB6

7A5

7AB5

KRSAN

A

B

PITON4

7B4

7A4

7AB4

Kediri

II

3

7A3

7AB3

Grati

II

7B57B8

6 5

B

A

5AB6 5AB5

4 3

5A4

5AB4

5A3

5AB3

5B35B55B6

5A6 5A5

5B4

PJB6

A

B

BWNGI

A

B

GDING

STBDOGondangwetan

Bali

48,3 Hz

8

7A8 7A7

7

7B6

5

7B3

2

7B2

7A2

7AB2

1

7A1

7AB1

7B1

123

9

Grati

I

Kediri

I2 1

5A2

5AB2

5A1

5AB1

5B15B2

SST 3

SST 7-8 SST 5-6 SST 1-2

Jawa PowerPEC

A

B

A

B

A

B

A

B

PBLGO

LMJNG

TNGULJMBER

GTENG

BDWSO

48,3 Hz

OPEN

48,1 Hz

LWBP WBP

Kapasitas Pembangkit 370,00 370,00

Distribusi 221,00 241,20

Frekwensi 48,1 HzBeban (MW)

OPEN

Page 62: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 220

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Paiton 1 11,70 18,50 1,70 4,60 10,00 13,90

1 370,00 Kraksaan 1,2 26,80 38,80 3,80 1,90 23,00 36,90

2 - Probolinggo 1,2,3 34,20 44,50 15,00 19,40 19,20 25,10

Lumajang 1,2 46,00 60,30 5,80 9,50 40,20 50,80

Situbondo 1,2,3 21,50 30,40 4,80 12,70 16,70 17,70

Bondowoso 1,2 18,70 26,60 5,10 16,90 13,60 9,70

Tanggul 1,2 26,50 42,90 19,00 22,10 7,50 20,80

Jember 1,2,3,4 71,20 62,90 38,00 34,50 33,20 28,40

Genteng 1,2 51,90 53,70 27,00 40,90 24,90 12,80

Banyuwangi 1,2,3 40,00 38,00 7,30 12,90 32,70 25,10

370,00 348,50 416,60 127,50 175,40 221,00 241,20

DAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

MATRIK KOMPOSISI BEBAN ISLAND PAITON FREQUENCY 48,1 Hz

TOTAL PEMBANGKIT TOTAL BEBAN

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,1 Hz (MW)

PAITON

PLTU

KIT UNIT

Page 63: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 221

LAMPIRAN – 10

GDTAN

7 6

B

A

7AB7 7AB6

5 4

7A5

7AB5

7A4

7AB4

Paiton

IIPaiton

I

PIER

A

B

A

B

GRATI

A

B

OPEN

3

7B3

7A3

7AB3

Krian

I

2

7A2

7AB2

Krian

II

7B4

1

7A1

7B67B4

6 5

B

A

5AB6 5AB5

4 3

5A4

5AB4

5A3

5AB3

2

5A2

5B35B55B6

5A6 5A5

5B4

PLTG BLOK 2

GT. 2.3

GT. 2.2 GT. 2.1

PLTGU BLOK 1GT. 1.0 GT. 1.3 GT. 1.2 GT. 1.1

A

B

RJOSOBCKRO

A

B

PWSRI

A

B

A

B

A

B

A

B

LWANG

PAKIS

PDAANBLBNG

BNGIL

A

B

Probolinggo

Kebonagung

BLKDN

SKRJO

Kebonagung

48,3 Hz

SST 1 SST 2

48,3 Hz

48,3 Hz

LWBP WBP

Kapasitas Pembangkit 300,00 300,00

Distribusi 284,16 292,70

Frekwensi 48,3 HzBeban (MW)

OPEN

Page 64: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 222

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Grati 1 11,40 10,40 2,20 3,90 9,20 6,50

GT. 2.1 100,00 Gondangwetan 1,2,3 53,80 61,60 - - 53,80 61,60

GT. 2.2 100,00 Pier 1 28,10 22,60 - - 28,10 22,60

GT. 2.3 100,00 Bangil 3,4 13,40 12,90 3,50 0,90 9,90 12,00

Bulukandang 1,2 33,15 30,80 7,67 11,70 25,48 19,10

Lawang 1,2 21,10 31,80 20,00 15,90 1,10 15,90

Purwosari 1,2 20,40 22,40 - - 20,40 22,40

Pakis 1,2 21,80 29,50 2,30 4,00 19,50 25,50

Bumicokro 1,2 69,20 68,30 - - 69,20 68,30

Pandaan 1,2,3 46,90 39,70 12,72 14,60 34,18 25,10

Sukorejo 1 13,30 13,70 - - 13,30 13,70

300,00 332,55 343,70 48,39 51,00 284,16 292,70

BEBAN ISLAND

48,3 Hz (MW)

GRATI BLOK 2

PLTGU

TOTAL PEMBANGKIT TOTAL BEBAN

MATRIK KOMPOSISI BEBAN ISLAND GRATI FREQUENCY 48,3 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

Page 65: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 223

LAMPIRAN – 10

GDTAN

7 6

B

A

7AB7 7AB6

5 4

7A5

7AB5

7A4

7AB4

Paiton

IIPaiton

I

PIER

A

B

A

B

GRATI

A

B

OPEN

3

7B3

7A3

7AB3

Krian

I

2

7A2

7AB2

Krian

II

7B4

1

7A1

7B67B4

6 5

B

A

5AB6 5AB5

4 3

5A4

5AB4

5A3

5AB3

2

5A2

5B35B55B6

5A6 5A5

5B4

PLTG BLOK 2

GT. 2.3

GT. 2.2 GT. 2.1

PLTGU BLOK 1GT. 1.0 GT. 1.3 GT. 1.2 GT. 1.1

A

B

RJOSOBCKRO

A

B

PWSRI

A

B

A

B

A

B

A

B

LWANG

PAKIS

PDAANBLBNG

BNGIL

A

B

Probolinggo

Kebonagung

BLKDN

SKRJO

Kebonagung

48,3 Hz

SST 1 SST 2

48,3 Hz

48,3 Hz

48,2 Hz

LWBP WBP

Kapasitas Pembangkit 200,00 200,00

Distribusi 167,48 185,60

Frekwensi 48,2 HzBeban (MW)

OPEN

Page 66: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 224

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Grati 1 11,40 10,40 2,20 3,90 9,20 6,50

GT. 2.1 100,00 Gondangwetan 1,2,3 53,80 61,60 - - 53,80 61,60

GT. 2.2 100,00 Pier 1 28,10 22,60 - - 28,10 22,60

GT. 2.3 - Bangil 3,4 13,40 12,90 3,50 0,90 9,90 12,00

Bulukandang 1,2 33,15 30,80 7,67 11,70 25,48 19,10

Lawang 1,2 21,10 31,80 20,00 15,90 1,10 15,90

Purwosari 1,2 20,40 22,40 - - 20,40 22,40

Pakis 1,2 21,80 29,50 2,30 4,00 19,50 25,50

200,00 203,15 222,00 35,67 36,40 167,48 185,60

MATRIK KOMPOSISI BEBAN ISLAND GRATI FREQUENCY 48,2 Hz

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,2 Hz (MW)

GRATI BLOK 2

PLTGU

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL PEMBANGKIT TOTAL BEBAN

Page 67: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 225

LAMPIRAN – 10

GDTAN

7 6

B

A

7AB7 7AB6

5 4

7A5

7AB5

7A4

7AB4

Paiton

IIPaiton

I

PIER

A

B

A

B

GRATI

A

B

OPEN

3

7B3

7A3

7AB3

Krian

I

2

7A2

7AB2

Krian

II

7B4

1

7A1

7B67B4

6 5

B

A

5AB6 5AB5

4 3

5A4

5AB4

5A3

5AB3

2

5A2

5B35B55B6

5A6 5A5

5B4

PLTG BLOK 2

GT. 2.3

GT. 2.2 GT. 2.1

PLTGU BLOK 1GT. 1.0 GT. 1.3 GT. 1.2 GT. 1.1

A

B

RJOSOBCKRO

A

B

PWSRI

A

B

A

B

A

B

A

B

LWANG

PAKIS

PDAANBLBNG

BNGIL

A

B

Probolinggo

Kebonagung

BLKDN

SKRJO

Kebonagung

48,3 Hz

SST 1 SST 2

48,3 Hz

48,3 Hz

48,2 Hz

48,1 Hz

LWBP WBP

Kapasitas Pembangkit 150,00 150,00

Distribusi 127,58 137,70

Frekwensi 48,1 HzBeban (MW)

OPEN

Page 68: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 226

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Grati 1 11,40 10,40 2,20 3,90 9,20 6,50

GT. 2.1 75,00 Gondangwetan 1,2,3 53,80 61,60 - - 53,80 61,60

GT. 2.2 - Pier 1 28,10 22,60 - - 28,10 22,60

GT. 2.3 75,00 Bangil 3,4 13,40 12,90 3,50 0,90 9,90 12,00

Bulukandang 1,2 33,15 30,80 7,67 11,70 25,48 19,10

Lawang 1,2 21,10 31,80 20,00 15,90 1,10 15,90

150,00 160,95 170,10 33,37 32,40 127,58 137,70

MATRIK KOMPOSISI BEBAN ISLAND GRATI FREQUENCY 48,1 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,1 Hz (MW)

GRATI BLOK 2

PLTGU

TOTAL PEMBANGKIT TOTAL BEBAN

Page 69: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 227

LAMPIRAN – 10

PLHAN

A

B

A

B

SGRUH

KBAGN

Pakis

Lawang

Sengkaling

A

B

A

BOPEN

BLBNG

A

B

KKTES

GPGAN

TUREN

STAMI

WLNGIA

B

OPEN

BLTARTLGNG

LDOYO

48,3 Hz

LWBP WBP

Kapasitas Pembangkit 186,00 186,00

Distribusi 93,81 135,50

Frekwensi 48,3 HzBeban (MW)

OPEN

Page 70: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 228

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Sutami PS 0,20 0,20 - - 0,20 0,20

1 34,00 Wlingi 3 14,00 24,00 7,20 11,40 6,80 12,60

2 34,00 Blitar 1,2 34,00 50,00 19,70 29,90 14,30 20,10

3 34,00 Kebonagung 4,5 34,60 43,70 - - 34,60 43,70

Turen 1,2,3 23,80 36,70 7,20 12,20 16,60 24,50

1 26,00 Sengguruh 1 15,60 19,40 4,70 15,10 10,90 4,30

2 26,00 Karangkates 1 9,40 14,80 2,80 7,30 6,60 7,50

Polehan 1,2,3 8,10 19,40 7,40 8,10 0,70 11,30

1 14,00 Blimbing 3 15,21 11,30 12,10 - 3,11 11,30

2 14,00

PLTA 1 4,00

186,00 154,91 219,50 61,10 84,00 93,81 135,50

PLTA

LODOYO

TOTAL PEMBANGKIT TOTAL BEBAN

BEBAN ISLAND

48,3 Hz (MW)

SUTAMI

PLTA

WLINGI

PLTA

SENGGURUH

MATRIK KOMPOSISI BEBAN ISLAND SUTAMI FREQUENCY 48,3 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

Page 71: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 229

LAMPIRAN – 10

PLHAN

A

B

A

B

SGRUH

KBAGN

Pakis

Lawang

Sengkaling

A

B

A

BOPEN

BLBNG

A

B

KKTES

GPGAN

TUREN

STAMI

WLNGIA

B

OPEN

BLTARTLGNG

LDOYO

48,3 Hz

48,2 Hz

LWBP WBP

Kapasitas Pembangkit 142,00 142,00

Distribusi 90,00 112,90

Frekwensi 48,2 HzBeban (MW)

OPEN

Page 72: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 230

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Sutami PS 0,20 0,20 - - 0,20 0,20

1 34,00 Wlingi 3 14,00 24,00 7,20 11,40 6,80 12,60

2 34,00 Blitar 1,2 34,00 50,00 19,70 29,90 14,30 20,10

3 34,00 Kebonagung 4,5 34,60 43,70 - - 34,60 43,70

Turen 1,2,3 23,80 36,70 7,20 12,20 16,60 24,50

1 26,00 Sengguruh 1 15,60 19,40 4,70 15,10 10,90 4,30

2 - Karangkates 1 9,40 14,80 2,80 7,30 6,60 7,50

1 14,00

2 -

PLTA 1 -

142,00 131,60 188,80 41,60 75,90 90,00 112,90

MATRIK KOMPOSISI BEBAN ISLAND SUTAMI FREQUENCY 48,2 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,2 Hz (MW)

SUTAMI

PLTA

WLINGI

PLTA

SENGGURUH

PLTA

LODOYO

TOTAL PEMBANGKIT TOTAL BEBAN

Page 73: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 231

LAMPIRAN – 10

PLHAN

A

B

A

B

SGRUH

KBAGN

Pakis

Lawang

Sengkaling

A

B

A

BOPEN

BLBNG

A

B

KKTES

GPGAN

TUREN

STAMI

WLNGIA

B

OPEN

BLTARTLGNG

LDOYO

48,3 Hz

48,2 Hz

48,1 Hz

LWBP WBP

Kapasitas Pembangkit 34,00 34,00

Distribusi 21,30 32,90

Frekwensi 48,1 HzBeban (MW)

OPEN

Page 74: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 232

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Sutami PS 0,20 0,20 - - 0,20 0,20

1 34,00 Wlingi 3 14,00 24,00 7,20 11,40 6,80 12,60

2 - Blitar 1,2 34,00 50,00 19,70 29,90 14,30 20,10

3 -

1 -

2 -

1 -

2 -

PLTA 1 -

34,00 48,20 74,20 26,90 41,30 21,30 32,90

PLTA

SENGGURUH

PLTA

LODOYO

TOTAL PEMBANGKIT TOTAL BEBAN

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,1 Hz (MW)

SUTAMI

PLTA

WLINGI

MATRIK KOMPOSISI BEBAN ISLAND SUTAMI FREQUENCY 48,1 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

Page 75: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 233

LAMPIRAN – 10

UngaranKrian

280 MW

SST

B

A

5B4

5A4

5AB4

5B3

5A3

5AB3

5B2

5A2

5AB2

5B1

5A1

5AB1

4 3 2 1

KEREK BJGRO

PCRAN

PLTU

TAWAR

BABAT LNGAN

SGMDU

PKMIA

TBAN3

Grlma

AltapBus TieCepu

Jateng

SUBSISTEM

KRIAN - GRESIK

SMSIK

BRATA

HOLCM1 2

A

B

7A1

7B1

7AB1

7A2

7B2

7AB2 NBANG

MLWNG

280 MW

OPEN

OPEN

48,3 Hz

TUBAN

LWBP WBP

Kapasitas Pembangkit 560,00 560,00

Distribusi 362,40 421,60

Frekwensi 48,3 HzBeban (MW)

Page 76: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 234

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Tanjung Awar awar PS 25,00 25,00 - - 25,00 25,00

1 280,00 Ngimbang 1 5,10 6,00 - - 5,10 6,00

2 280,00 Babat 1,2 28,50 41,00 22,00 22,20 6,50 18,80

Lamongan 1,2 28,80 43,90 19,90 18,00 8,90 25,90

Paciran 1 27,50 36,10 - - 27,50 36,10

Segoromadu 2,3 90,10 90,40 - - 90,10 90,40

Semen Gresik KTT 5,20 7,00 - - 5,20 7,00

Barata KTT 2,80 1,10 - - 2,80 1,10

Bojonegoro 1,2 45,30 61,20 28,40 42,50 16,90 18,70

Tuban 1,2 39,40 56,40 25,00 26,50 14,40 29,90

Kerek Bus Tie 76,50 74,90 - - 76,50 74,90

Semen Tuban KTT 68,30 67,80 - - 68,30 67,80

Mliwang 1 6,60 17,00 3,40 5,00 3,20 12,00

Holcim KTT 12,00 8,00 - - 12,00 8,00

560,00 461,10 535,80 98,70 114,20 362,40 421,60

BEBAN ISLAND

48,3 Hz (MW)

TANJUNG AWAR AWAR

PLTU

TOTAL PEMBANGKIT TOTAL BEBAN

MATRIK KOMPOSISI BEBAN ISLAND TANJUNG AWAR AWAR FREQUENCY 48,3 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

Page 77: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 235

LAMPIRAN – 10

UngaranKrian

280 MW

SST

B

A

5B4

5A4

5AB4

5B3

5A3

5AB3

5B2

5A2

5AB2

5B1

5A1

5AB1

4 3 2 1

KEREK BJGRO

PCRAN

PLTU

TAWAR

BABAT LNGAN

SGMDU

PKMIA

TBAN3

Grlma

AltapBus TieCepu

Jateng

SUBSISTEM

KRIAN - GRESIK

SMSIK

BRATA

HOLCM1 2

A

B

7A1

7B1

7AB1

7A2

7B2

7AB2 NBANG

MLWNG

280 MW

OPEN

OPEN

48,3 Hz

TUBAN

48,1 Hz

LWBP WBP

Kapasitas Pembangkit 280,00 280,00

Distribusi 188,00 229,00

Frekwensi 48,1 HzBeban (MW)

Page 78: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 236

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

Tanjung Awar awar PS 25,00 25,00 - - 25,00 25,00

1 280,00 Ngimbang 1 5,10 6,00 - - 5,10 6,00

2 - Babat 1,2 28,50 41,00 22,00 22,20 6,50 18,80

Lamongan 1,2 28,80 43,90 19,90 18,00 8,90 25,90

Paciran 1 27,50 36,10 - - 27,50 36,10

Segoromadu 2,3 90,10 90,40 - - 90,10 90,40

Semen Gresik KTT 5,20 7,00 - - 5,20 7,00

Barata KTT 2,80 1,10 - - 2,80 1,10

Bojonegoro 1,2 45,30 61,20 28,40 42,50 16,90 18,70

280,00 258,30 311,70 70,30 82,70 188,00 229,00

DAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

MATRIK KOMPOSISI BEBAN ISLAND TANJUNG AWAR AWAR FREQUENCY 48,1 Hz

TOTAL PEMBANGKIT TOTAL BEBAN

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,1 Hz (MW)

TANJUNG AWAR AWAR

PLTU

KIT UNIT

Page 79: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 237

LAMPIRAN – 10

NGTDI(Jateng)

Unit-2280 MW

SST

B

A

5B1

5A1

5AB1

5B2

5A2

5AB2

5B3

5A3

5AB3

5B4

5A4

5AB4

1 2 3 4

PLTU

PCTANUnit-1

280 MW

Wonogiri

Jateng

PNRGO

Sragen

Jateng

MNRJO

Pedan

I

1 2A

B

7A1

7B1

7AB1

7A2

7B2

7AB2

3 4

7B3

7AB3

7B4

7AB4

Pedan

II

Paiton

II

Paiton

I

BNRAN

Tulungagung

Gudang GaramPareMranggen

Magetan

Caruban

Nganjuk

Trenggalek

Dolopo

PCTAN

Ploso

Nganjuk

A

B

A

B

A

B

A

B

A

B

A

B

A

B

Bus Tie

KDIRI

SYZAG

A

B

A

B

Sekarputih

A

B

A

B

MJAGN Sekarputih

A

B

JKTAS

KTSNO

A

B

NGAWI

48,3 Hz

48,3 Hz

48,3 Hz

OPEN

OPEN

LWBP WBP

Kapasitas Pembangkit 601,40 601,40

Distribusi 385,39 529,10

Frekwensi 48,3 HzBeban (MW)

Page 80: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 238

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

PLTU Pacitan PS 40,00 40,00 - - 40,00 40,00

1 280,00 Pacitan 1 24,90 40,60 2,60 4,50 22,30 36,10

2 280,00 Ponorogo 1,2 32,30 35,30 18,70 24,40 13,60 10,90

Dolopo 2 11,70 13,20 3,80 3,70 7,90 9,50

1 17,00 Trenggalek 1,2 16,80 25,40 7,00 11,80 9,80 13,60

2 17,00 Manisrejo 5,6 27,70 38,50 0,96 1,80 26,74 36,70

Ngawi 1,2 49,30 52,70 9,93 32,10 39,37 20,60

1 0,90 Banaran 4,5 57,60 65,10 40,00 5,00 17,60 60,10

2 0,90 Kediri 2 14,40 38,90 5,70 7,50 8,70 31,40

3 0,90 Surya Zigzag KTT 20,80 20,40 - - 20,80 20,40

Mranggen 1,2 11,40 18,40 6,00 6,40 5,40 12,00

1 0,90 Magetan 1,2 21,50 31,20 7,90 12,50 13,60 18,70

2 0,90 Caruban 1,2 13,10 27,90 9,00 7,90 4,10 20,00

3 0,90 Kertosono 2 31,20 36,70 3,20 8,50 28,00 28,20

Ploso 1,2,3 56,90 50,90 20,90 14,70 36,00 36,20

PLTA 1 2,00 Nganjuk 2 8,58 10,90 5,70 4,70 2,88 6,20

Mojoagung 1,2 39,00 40,30 18,00 12,50 21,00 27,80

Pare 1,2 17,80 32,50 2,60 2,90 15,20 29,60

Gudang Garam KTT 12,30 14,40 - - 12,30 14,40

Tulungagung 1,2,4 46,00 68,00 21,10 31,20 24,90 36,80

PLTA Tulungagung 1 15,20 19,90 - - 15,20 19,90

601,40 568,48 721,20 183,09 192,10 385,39 529,10

MATRIK KOMPOSISI BEBAN ISLAND PACITAN FREQUENCY 48,3 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,3 Hz (MW)

PACITAN

PLTU

TULUNGAGUNG

PLTA

GOLANG

PLTA

GIRINGAN

PLTA

NGEBEL

TOTAL PEMBANGKIT TOTAL BEBAN

Page 81: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 239

LAMPIRAN – 10

NGTDI(Jateng)

Unit-2280 MW

SST

B

A

5B1

5A1

5AB1

5B2

5A2

5AB2

5B3

5A3

5AB3

5B4

5A4

5AB4

1 2 3 4

PLTU

PCTANUnit-1

280 MW

Wonogiri

Jateng

PNRGO

Sragen

Jateng

MNRJO

Pedan

I

1 2A

B

7A1

7B1

7AB1

7A2

7B2

7AB2

3 4

7B3

7AB3

7B4

7AB4

Pedan

II

Paiton

II

Paiton

I

BNRAN

Tulungagung

Gudang GaramPareMranggen

Magetan

Caruban

Nganjuk

Trenggalek

Dolopo

PCTAN

Ploso

Nganjuk

A

B

A

B

A

B

A

B

A

B

A

B

A

B

Bus Tie

KDIRI

SYZAG

A

B

A

B

Sekarputih

A

B

A

B

MJAGN Sekarputih

A

B

JKTAS

KTSNO

A

B

NGAWI

48,3 Hz

48,3 Hz

48,3 Hz

OPEN

OPEN

48,1 Hz

LWBP WBP

Kapasitas Pembangkit 284,70 284,70

Distribusi 206,81 279,30

Frekwensi 48,1 HzBeban (MW)

Page 82: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 240

LAMPIRAN – 10

LWBP WBP LWBP WBP LWBP WBP

PLTU Pacitan PS 40,00 40,00 - - 40,00 40,00

1 - Pacitan 1 24,90 40,60 2,60 4,50 22,30 36,10

2 280,00 Ponorogo 1,2 32,30 35,30 18,70 24,40 13,60 10,90

Dolopo 2 11,70 13,20 3,80 3,70 7,90 9,50

1 - Trenggalek 1,2 16,80 25,40 7,00 11,80 9,80 13,60

2 - Manisrejo 5,6 27,70 38,50 0,96 1,80 26,74 36,70

Ngawi 1,2 49,30 52,70 9,93 32,10 39,37 20,60

1 0,90 Banaran 4,5 57,60 65,10 40,00 5,00 17,60 60,10

2 0,90 Kediri 2 14,40 38,90 5,70 7,50 8,70 31,40

3 - Surya Zigzag KTT 20,80 20,40 - - 20,80 20,40

1 0,90

2 -

3 -

PLTA 1 2,00

284,70 295,50 370,10 88,69 90,80 206,81 279,30

MATRIK KOMPOSISI BEBAN ISLAND PACITAN FREQUENCY 48,1 Hz

KIT UNITDAYA

(MW)

GARDU INDUK/

PEMBANGKIT

NO

TRAFO

BEBAN TERTINGGI

(MW)

TOTAL BEBAN UFR

TAHAP 1 s.d 7 (MW)

BEBAN ISLAND

48,1 Hz (MW)

PACITAN

PLTU

TULUNGAGUNG

PLTA

GOLANG

PLTA

GIRINGAN

PLTA

NGEBEL

TOTAL PEMBANGKIT TOTAL BEBAN

Page 83: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 241

LAMPIRAN – 10

A

B

PLTG

2x48MW

A

B

A

B

A

B

GI GLNUK GI PMRON

GI BTRTI

GI ASARI

A

B

A

B

GI KAPAL

GI PYGAN

GI NGARAGI GNYAR

A

B

GI AMPRA

GI SANUR

GI PBIAN

Trf.1

20

MVA

Trf 2

30 MVA

Trf.3

60 MVA

Trf.4

60 MVA

1

2

T-1

20MVA

Trf.2

30 MVA

SC1

SC-1

25MVAr

Trf.1

10 MVA

Trf.2

10 MVA

Trf.1

60 MVA

Trf.2

30 MVA

Trf.1

30 MVA

Trf.2

60MVA

Trf.3

60MVA

Trf.4

60MVA

1 2

Trf.1

30

MVA

Trf.2

30

MVA

Trf.1

16

MVA

Trf.1

30

MVA

Trf.1

15 MVA

Trf.1

30

MVA

Trf.2

30

MVA

PLTG

138 MW

Trf.1

60 MVATrf.2

60 MVA

1 2

1 2

2

1

1 2

2

1

21

Banyuwangi

OFC CU PIRELI

3X300 mm2 500 A ( 4,2 km )

OCR 600 A

OLS 560 A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(38.

04 k

ms)

OLS

= 60

0 A

OCR

= 72

0 A

ACSR HAWK 240 mm2

In: 645 A (38.04 kms)

OLS = 600 A

OCR = 720 A

ACSR HAWK 2x240 mm2

In: 1290 A (75.90 kms)

OCR = 1500 A OLS = 1280 A

1

2

TACS

R 16

0 m

m2

In:7

50 A

(75.

90 k

ms)

OC =

880

A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(33.

76 k

ms)

OCR

= 40

0 A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(33.

76 k

ms)

OCR

= 90

0 ATACSR 160 mm2

In:750 A (38.17 kms)

OCR = 880 A

TACSR 160 mm2

In:750 A (16.26 kms)

OCR = 800 A

ACSR 240 mm2

In:645 A (5.22 kms)

OCR = 800 A

ACSR HAWK 240 mm2

In: 645 A (44.40 kms)

OCR = 750 A OLS = 650 A

ACSR HAWK 240 mm2

In: 645 A (44.40 kms)

OCR = 750 A OLS = 650 A

ACSR HAWK 240 mm2

In: 645 A (23.31 kms)

OCR = 700 A OLS = 650 A

ACSR HAWK 240 mm2

In: 645 A (19.21 kms)

OCR = 720 A

ACSR HAWK 240 mm2

In: 645 A (19.21 kms)

OCR = 720 A

ACSR

/ AS H

AWK

240 m

m2

In: 64

5 A (1

6.50 k

ms)

OCR

= 720

A

ACSR

HAW

K 24

0 mm2

In: 64

5 A (1

6.50 k

ms)

OCR

= 950

A

2. ACSR HAWK 240 mm2

In: 645 A (7.75 kms)

OCR = 950 A

1. ACSR PARTRIDGE 135 mm2

In: 400 A (7.75 kms)

OCR = 320 A

ACCC

LIS

BON

310

MM

In=1

231

(7,7

km)

OCR=

1331

A

MSC 5x10 Mvar

(Rusak)

XLPE

3x1

000m

m2

CCC=

973A

1500

m

TACS

R 16

0 m

m2

In:7

50 A

(75.

90 k

ms)

OCR

= 88

0 A

A

B

GI NSDUA

SC-1

25MVAr

Trf.1

60 MVA(SANDONG)

Trf.2

60 MVA

Trf.3

60 MVA

Trf Mobil

20 MVA

XLPE 3 x1000 mm2

CCC=973A

2090 m

Trf.2

30 MVA

A

B

GIS BANDARA(BY HITACHI)

TACSR HAWK 240 mm2

In: 973 A (8,5 km)

OCR = 990 A , OLS = BLOK

3

SC-1,

50MVAr

SC

25MVAr

SINGLE BALI 2014 (TW-2)

A4 PT PLN (PERSERO) P3B – APB BALIJUN

2014IKA

4

(BANYUWANGI 3 & 4)

3 x 300mm2, 500A

6.5km (SMC+UGC)

OLS 560A

T151

Lokasi Renc

Double PHI ke

PLTU

PLTD

SEWA

84 MW

PLTD

SEWA

45 MW

Trf.2

15

MVA

TACSR 160 mm2

In:750 A (16.26 kms) OCR = 800 ATrf.2

30

MVA

SC

50MVAr

SC-2

25MVAr

T59

T60

T57

T58

SC-2

25MVAr

TRF-5

PLTD-BOT PLTG-4 PLTG-3

PLTG

-2

PLTG

-1

PLTD-

10, 11

GI PSGRN KONV

TRF-3

PLTD

-BOOTRF-2

SC-1

25MVAr

SC-2

25MVAr

SC2

A

B

ACSR 240 mm2

In:645 A (5.22 kms)

OCR = 800 A

A

B

A

B

A

B

ACCC LISBON 310 MM

In=1231 (7,7km)

OCR=1331 A

ACCC LISBON 310 MM

In= 2x1231A

OCR 1500A, OLS = 1280A

XLPE 3 x1000 mm2

CCC=973A

2500 m

TACSR 240 mm2

CCC=973A (10,2 km)

OCR=990A

TACSR HAWK 240 mm2

In: 973 A (13.41 km)

OCR = 960 A , OLS = BLOK

1Trf.3

60 MVA

2Trf.3

60 MVA

PLTD

-APE

C BL

OK- 1

(15M

W)

PLTD

-APE

C BL

OK-2

(15M

W)

PLTD

-APE

C BL

OK-3

(20M

W)

SC-2

,

50M

VAr

KOPEL-14

KOPEL-15

GI PKLOD

Trf.1

60 MVA

Trf.2

60 MVA

(SHANDONG)

SC

A

B

21

B

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(38.

04 k

ms)

OLS

= 60

0 A

OCR

= 72

0 A

PLTD

-D (2

5 M

W)

TRF-4

PLTD

-D (2

0 M

W)

TRAF

O M

OBIL

E-1,

30

MVA

TRAF

O M

OBIL

E-3,

30

MVA

TRAF

O M

OBIL

E-2,

30

MVA

PLTD

-E (2

2 M

W)

PLTD

-E (2

3 M

W)

PLTD

-F (1

0MW

)

9595

95

95

95

95

ISLAND PESANGGARAN SIANG FREQ = 48,6 HZ

Page 84: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 242

LAMPIRAN – 10

ISLAND PESANGGARAN MALAM FREQ = 48,6 HZ

A

B

PLTG

2x48MW

A

B

A

B

A

B

GI GLNUK GI PMRON

GI BTRTI

GI ASARI

A

B

A

B

GI KAPAL

GI PYGAN

GI NGARAGI GNYAR

A

B

GI AMPRA

GI SANUR

GI PBIAN

Trf.1

20

MVA

Trf 2

30 MVA

Trf.3

60 MVA

Trf.4

60 MVA

1

2

T-1

20MVA

Trf.2

30 MVA

SC1

SC-1

25MVAr

Trf.1

10 MVA

Trf.2

10 MVA

Trf.1

60 MVA

Trf.2

30 MVA

Trf.1

30 MVA

Trf.2

60MVA

Trf.3

60MVA

Trf.4

60MVA

1 2

Trf.1

30

MVA

Trf.2

30

MVA

Trf.1

16

MVA

Trf.1

30

MVA

Trf.1

15 MVA

Trf.1

30

MVA

Trf.2

30

MVA

PLTG

138 MW

Trf.1

60 MVATrf.2

60 MVA

1 2

1 2

2

1

1 2

2

1

21

Banyuwangi

OFC CU PIRELI

3X300 mm2 500 A ( 4,2 km )

OCR 600 A

OLS 560 A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(38.

04 k

ms)

OLS

= 60

0 A

OCR

= 72

0 A

ACSR HAWK 240 mm2

In: 645 A (38.04 kms)

OLS = 600 A

OCR = 720 A

ACSR HAWK 2x240 mm2

In: 1290 A (75.90 kms)

OCR = 1500 A OLS = 1280 A

1

2

TACS

R 16

0 m

m2

In:7

50 A

(75.

90 k

ms)

OC =

880

A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(33.

76 k

ms)

OCR

= 40

0 A

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(33.

76 k

ms)

OCR

= 90

0 ATACSR 160 mm2

In:750 A (38.17 kms)

OCR = 880 A

TACSR 160 mm2

In:750 A (16.26 kms)

OCR = 800 A

ACSR 240 mm2

In:645 A (5.22 kms)

OCR = 800 A

ACSR HAWK 240 mm2

In: 645 A (44.40 kms)

OCR = 750 A OLS = 650 A

ACSR HAWK 240 mm2

In: 645 A (44.40 kms)

OCR = 750 A OLS = 650 A

ACSR HAWK 240 mm2

In: 645 A (23.31 kms)

OCR = 700 A OLS = 650 A

ACSR HAWK 240 mm2

In: 645 A (19.21 kms)

OCR = 720 A

ACSR HAWK 240 mm2

In: 645 A (19.21 kms)

OCR = 720 A

ACSR

/ AS H

AWK

240 m

m2

In: 64

5 A (1

6.50 k

ms)

OCR

= 720

A

ACSR

HAW

K 24

0 mm2

In: 64

5 A (1

6.50 k

ms)

OCR

= 950

A

2. ACSR HAWK 240 mm2

In: 645 A (7.75 kms)

OCR = 950 A

1. ACSR PARTRIDGE 135 mm2

In: 400 A (7.75 kms)

OCR = 320 A

ACCC

LIS

BON

310

MM

In=1

231

(7,7

km)

OCR=

1331

A

MSC 5x10 Mvar

(Rusak)

XLPE

3x1

000m

m2

CCC=

973A

1500

m

TACS

R 16

0 m

m2

In:7

50 A

(75.

90 k

ms)

OCR

= 88

0 A

A

B

GI NSDUA

SC-1

25MVAr

Trf.1

60 MVA(SANDONG)

Trf.2

60 MVA

Trf.3

60 MVA

Trf Mobil

20 MVA

XLPE 3 x1000 mm2

CCC=973A

2090 m

Trf.2

30 MVA

A

B

GIS BANDARA(BY HITACHI)

TACSR HAWK 240 mm2

In: 973 A (8,5 km)

OCR = 990 A , OLS = BLOK

3

SC-1,

50MVAr

SC

25MVAr

SINGLE BALI 2014 (TW-2)

A4 PT PLN (PERSERO) P3B – APB BALIJUN

2014IKA

4

(BANYUWANGI 3 & 4)

3 x 300mm2, 500A

6.5km (SMC+UGC)

OLS 560A

T151

Lokasi Renc

Double PHI ke

PLTU

PLTD

SEWA

84 MW

PLTD

SEWA

45 MW

Trf.2

15

MVA

TACSR 160 mm2

In:750 A (16.26 kms) OCR = 800 ATrf.2

30

MVA

SC

50MVAr

SC-2

25MVAr

T59

T60

T57

T58

SC-2

25MVAr

TRF-5

PLTD-BOT PLTG-4 PLTG-3

PLTG

-2

PLTG

-1

PLTD-

10, 11

GI PSGRN KONV

TRF-3

PLTD

-BOOTRF-2

SC-1

25MVAr

SC-2

25MVAr

SC2

A

B

ACSR 240 mm2

In:645 A (5.22 kms)

OCR = 800 A

A

B

A

B

A

B

ACCC LISBON 310 MM

In=1231 (7,7km)

OCR=1331 A

ACCC LISBON 310 MM

In= 2x1231A

OCR 1500A, OLS = 1280A

XLPE 3 x1000 mm2

CCC=973A

2500 m

TACSR 240 mm2

CCC=973A (10,2 km)

OCR=990A

TACSR HAWK 240 mm2

In: 973 A (13.41 km)

OCR = 960 A , OLS = BLOK

1Trf.3

60 MVA

2Trf.3

60 MVA

PLTD

-APE

C BL

OK- 1

(15M

W)

PLTD

-APE

C BL

OK-2

(15M

W)

PLTD

-APE

C BL

OK-3

(20M

W)

SC-2

,

50M

VAr

KOPEL-14

KOPEL-15

GI PKLOD

Trf.1

60 MVA

Trf.2

60 MVA

(SHANDONG)

SC

A

B

21

B

ACSR

HAW

K 24

0 m

m2

In: 6

45 A

(38.

04 k

ms)

OLS

= 60

0 A

OCR

= 72

0 A

PLTD

-D (2

5 M

W)

TRF-4

PLTD

-D (2

0 M

W)

TRAF

O M

OBIL

E-1,

30

MVA

TRAF

O M

OBIL

E-3,

30

MVA

TRAF

O M

OBIL

E-2,

30

MVA

PLTD

-E (2

2 M

W)

PLTD

-E (2

3 M

W)

PLTD

-F (1

0MW

)

95

95

95

95

95

95

Page 85: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 243

LAMPIRAN – 11

II 250

MVA

U1 400 MW

U6600 MW

U5600 MW

U4 400 MW

7 6 5

U3 400 MW

U2400 MW

4 3 2 1 I

250MVA

A

B

U7600 MW

1 2

U8 600 MW

A

B

NEW

SRLYABLRJA

1 2 3 4

A

B

21

1 2 3 4 5

B

GNDUL

2 1 3

A

A

B

CLGON

4 3 2

2 1

B

21

A

CIBNG

1 2 3 4 5

Tahap I

I = 2400 A t = 5 dt

Skema Trip:

PLTU Suralaya 5/6/7/8

Tahap II

I = 2400 A t = 10 dt

Skema Trip:

PLTU Suralaya 1/2/3/4

Ratio CT = 2000/1

SETTING OGS: SUTET SRLYA-

BLRJA & SUTET BLRJA-GNDUL

Tahap 15 dt

Tahap 210 dt

Iset2.4 kA

Iset2.4 kA

Iset2.4 kA

GT1GT2ST

PLTGU

CLGON

SKEMA OGS PLTU SURALAYA

Tahap I

I = 2400 A t = 5 dt

Skema Trip:

PLTU Suralaya 5/6/7/8

Tahap II

I = 2400 A t = 10 dt

Skema Trip:

PLTGU Cilegon ST1.0

Ratio CT = 2000/1

SETTING OGS: SUTET CIBNG-

CLGON

Page 86: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 244

LAMPIRAN – 11

Tahap I

I = 2500 A t = 0,5 dt

Skema:

Alarm

Tahap II

I = 2750 A t = 5 dt

Skema Trip:

PLTU Tanjung Jati 1/2/3/4

Ratio CT = 3000/1

SETTING OGS: SUTET TJATI-

UNGRN

SKEMA OGS PLTU TANJUNG JATI

A

B

1 2 3 4 5

UNGARAN

100

MVAR

6

2 31

TJATIA

B

II

500

MVA

I

500

MVA

D

C

1 2

U1 U2 U3 U4

3 4

Tahap 25 dt

Tahap 10,5 dt

ALARM

Iset2.5 kA

Iset2.75 kA

Page 87: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 245

LAMPIRAN – 11

E L E C T R I C I T Y F O R A B E T T E R L I F E

|

SKEMA OGS PEMBANGKITAN PRIOK TIMUR BARU (BLOK-3)

1

~~~

GI PLUMPANGGI PRIOK TIMUR

A

B

GT.2 GT.1 ST

4 3 2 1

Tahap-1SET OGS=2500 A

SPAR

E

OGS GIS PRIOK

TIMUR BARU

Catatan:

Skema OGS disiapkan pada

Konfigurasi SKTT 150 kV Priok Barat-Priok

Timur di-open (bertujuan untuk

menurunkan rating arus hubung singkat di

subsistem Priok-Bekasi)

SETTING OCR

I = 1,2 x In tms = 0,357 (SI)

= 3000 A

SETTING OGS

Tahap I

I = 2500A t = 3 dt (Definite)

SKEMA TRIP

PMT 150 kV A1 & AB1 (PMT Pengapit ST)

Ratio CT = 2500/1 A

SUTT 150 kV Priok Timur Baru – Plumpang

Page 88: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 246

LAMPIRAN – 11

E L E C T R I C I T Y F O R A B E T T E R L I F E

|

2

SKEMA OGS PEMBANGKITAN PRATU

Cilegon

CIBINONG

A

B

1 2 3 4 5

Depok

Saguling

12

Mtwar

Bkasi

CIBINONG

SALAK BARU SALAK LAMA

CIBADAKBARU

UBRUG

SENTUL

1 2

3 4 5 6

2 3

150/70 kV60 MVA

CIAWI

LBSTU

1 2

1 2

Cianjur

1 2 3 4 5

U1 U3U2

SST1 SST2

T1

PLTU PELABUHANRATU

A

B

SET OGS = 1408 A

SET OGS = 1408 A

SETTING OCR

I = 1616 A tms = 0,34 (SI)

SETTING OGS

Tahap I

I = 1408 A t = 3 dt

SKEMA TRIP

PMT 150 kV A1 & AB1 Pratu #1

Ratio CT = 1600/5 A

AutoReclose = 1 dt

SETTING OCR

I = 1616 A tms = 0,34 (SI)

SETTING OGS

Tahap I

I = 1408 A t = 3 dt

SKEMA TRIP

PMT 150 kV Salak Lama #1PMT 150 kV Salak Baru #5

Ratio CT= 1600/1 A

AutoReclose = 1 dt

SUTT 150 kV Bogor Baru – Sentul

SUTT 150 kV Sentul – Cibinong

BOGOR BARU

1 2

Page 89: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 247

LAMPIRAN – 11

G1 G2 G1

KSBRU SKMDI

SKEMA OGS PLTU INDRAMAYU

Tahap-1 = 4 dt

- Surat No.0065/151/APBJBR/2012- Aktif tanggal 24 oktober 2013

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

OLS Iset.A= 1,1 X In A

I = 1920 A tms=0,1 SI

Tahap I

I = 1760 A t= 4 dt

Skema Trip:

Pmt 150 kV UNIT 2 (300 MW)

Nominal CCT= 1620 A

Nominal CT = 3000/1 A

SETTING OCR

SETTING OGS

Page 90: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 248

LAMPIRAN – 11

~ ~ ~~~

~

~~

BDSLN

WYWDU

KMJNG

DRJAT

KRCDG RCKBA CKSKA

RCKEKUBRNG

CGRLG

DGPKR SRAGI

TP

OLR

SKEMA OGS PLTP DARAJATPT. PLN (PERSERO) P3B JBAPB JAWA BARAT

T = 4 s

Surat No.0096/151/APBJBR/2013Tanggal 06 september 2013, Aktif tanggal 27 Januari 2014

I = 960 A tms=0,2 SI

Tahap I

I = 858 A t= 4 dt

Skema Trip:

Pmt 150 kV KMJNG - DRJAT 1&2 (150 MW)

Nominal CCT= 780 A

Nominal CT = 800/1 A

SETTING OCR

SETTING OGS

Page 91: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 249

LAMPIRAN – 11

PT. PLN (PERSERO) P3B JB

APB BALI

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR AMPRA

SANUR

PBIAN

PKLOD

PSGRN

TAHAP 1

4 Sec

17 Peny Trf 2 , 3, 4

OLS – OGS SUTT 150 kV Pemaron – Baturiti – Payangan – Kapal Tahap 1

TP

OLS 640 A,

OLS 700 A

TP

TP

OLS 800 A,

OLS 800 A

TP

= PLC

= Fibre Optic

BWANGI

Pemaron - Baturiti 1 I > = 880 A tms = 0,3 SI

Pemaron - Baturiti 2 I > = 900 A tms = 0,3 SI

Baturiti - Kapal I > = 600 A tms = 0,3 SI

Baturiti - Payangan I > = 600 A tms = 0,325 SI

Pemaron - Baturiti 1 I > = 800 A t = 2 sec

Pemaron - Baturiti 2 I > = 880 A t = 2 sec

Baturiti - Kapal I > = 880 A t = 2 sec

Baturiti - Payangan I > = 880 A t = 2 sec

Pmt 20 kV Incoming Trf 2 GI Kapal PLTD Sewa Pemaron Blok 1 = 22,5 MW

Pmt 20 kV Incoming Trf 3 GI Kapal PLTD Sewa Pemaron Blok 2 = 22,5 MW

Pmt 20 kV Tangeb Trf 4 GI Kapal PLTD Sewa Pemaron Blok 3 = 10 MW

Total = 55 MW

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap I ( 4 detik )

NSDUA

BNDRA

Load Shedding

Tahap 1 = 45 MW

1. TRF-2 KAPAL = 19 MW

2. TRF-3 KAPAL = 23 MW

3. TRF-4 KAPAL = 3 MW

Page 92: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 250

LAMPIRAN – 11

PT. PLN (PERSERO) P3B JB

APB BALI

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR AMPRA

SANUR

PBIANPKLOD

PSGRN

TAHAP 2

4,5 Sec

TPTP

3 peny Trf 3

TP

OLS 640 A,

OLS 700 A

TP

OLS 800 A,

OLS 800 A

TP

TP

= PLC

= Fibre Optic

BWANGI

OLS – OGS SUTT 150 kV Pemaron – Baturiti – Payangan – Kapal Tahap 2

Pemaron - Baturiti 1 I > = 880 A tms = 0,3 SI

Pemaron - Baturiti 2 I > = 900 A tms = 0,3 SI

Baturiti - Kapal I > = 600 A tms = 0,3 SI

Baturiti - Payangan I > = 600 A tms = 0,325 SI

Pemaron - Baturiti 1 I > = 800 A t = 2 sec

Pemaron - Baturiti 2 I > = 880 A t = 2 sec

Baturiti - Kapal I > = 880 A t = 2 sec

Baturiti - Payangan I > = 880 A t = 2 sec

Pmt 20 kV Kampus Trf 3 GI Nusa Dua PLTD Sewa Pemaron Blok 7

Pmt 20 kV Mumbul Trf 3 GI Nusa Dua PLTD Sewa Pemaron Blok 8

Pmt 20 kV Kedonganan Trf 3 GI Nusa Dua

Pmt 20 kV Sidakarya Trf 3 GI Pesanggaran Total = 45 MW

Pmt 20 kV Pegok Trf 3 GI Pesanggaran

Pmt 20 kV Serangan Trf 3 GI Pesanggaran

Pmt 20 kV Pedungan Trf 4 GI Pesanggaran

Pmt 20 kV Palapa Trf 4 GI Pesanggaran

Pmt 20 kV Banteng Trf 5 GI Pesanggaran

Pmt 20 kV Reagen Trf 5 GI Pesanggaran

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap II ( 4,5 detik )

7 peny Trf 3,4,5

NSDUA

BNDRA

Load Shedding

Tahap II = 45 MW

1. TRF-3 NSDUA = 19 MW

2. TRF-3 PSGRN = 14 MW

3. TRF-4 PSGRN = 6 MW

4. TRF-5 PSGRN = 6 MW

Page 93: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 251

LAMPIRAN – 11

PT. PLN (PERSERO) P3B JB

APB BALI

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR

AMPRA

SANUR

PBIANPKLOD

PSGRN

TAHAP 3

5 Sec

TP

TP

TPTP

2 Peny Trf 1,2

2 Peny Trf 1

5 Peny Trf 1

7 Peny Trf 1,2,3

3 Peny Trf 1

TP

TP

= PLC

= Fibre Optic

TP

OLS 640 A,

OLS 700 A

TP

TP

OLS 800 A,

OLS 800 ABWANGI

OLS – OGS SUTT 150 kV Pemaron – Baturiti – Payangan – Kapal Tahap 3

Pemaron - Baturiti 1 I > = 880 A tms = 0,3 SI

Pemaron - Baturiti 2 I > = 900 A tms = 0,3 SI

Baturiti - Kapal I > = 600 A tms = 0,3 SI

Baturiti - Payangan I > = 600 A tms = 0,325 SI

Pemaron - Baturiti 1 I > = 800 A t = 2 sec

Pemaron - Baturiti 2 I > = 880 A t = 2 sec

Baturiti - Kapal I > = 880 A t = 2 sec

Baturiti - Payangan I > = 880 A t = 2 sec

Pmt 20 kV Menjangan Trf 2 GI Gilimanuk PLTD Sewa Pemaron Blok 4 = 10 MW

Pmt 20 kV Melaya Trf 1 GI Gilimanuk PLTD Sewa Pemaron Blok 5 = 7,5 MW

Pmt 20 kV Berambang Trf 1 GI Negara PLTD Sewa Pemaron Blok 6 = 7,5 MW

Pmt 20 kV Pulukan Trf 1 GI Negara

Pmt 20 kV Duda Trf 1 GI Amlapura Total = 25 MW

Pmt 20 kV Subagan Trf 1 GI Amlapura

Pmt 20 kV Tenganan Trf 1 GI Amlapura

Pmt 20 kV Sulahan Trf 1 GI Gianyar

Pmt 20 kV Bukit Jati Trf 1 GI Gianyar

Pmt 20 kV Blahbatuh Trf 1 GI Gianyar

Pmt 20 kV Saba Trf 1 GI Gianyar

Pmt 20 kV Goa Lawah Trf 1 GI Gianyar

Pmt 20 kV Teuku Umar Trf 1 GI Sanur

Pmt 20 kV Padang Galak Trf 1 GI Sanur

Pmt 20 kV Sudirman Galak Trf 2 GI Sanur

Pmt 20 kV Renon Trf 3 GI Sanur

Pmt 20 kV Ida Bagus Mantra Trf 3 GI Sanur

Pmt 20 kV Buruan Trf 3 GI Sanur

Pmt 20 kV Sedap Malam Trf 3 GI Sanur

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap III ( 5 detik )

NSDUA

BNDRA

Load Shedding

Tahap III = 55 MW

1. TRF-1 GLNUK = 3 MW

2. TRF-2 GLNUK = 3 MW

3. TRF-1 NGARA = 5 MW

4. TRF-1 AMPRA = 7 MW

5. TRF-1 GNYAR = 12 MW

6. TRF-2 SANUR = 7 MW

7. TRF-3 SANUR = 18 MW

Page 94: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 252

LAMPIRAN – 11

PT. PLN (PERSERO) P3B JB

APB BALI

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR

AMPRA

SANUR

PBIANPKLOD

PSGRN

TAHAP 4

5,5 Sec

TP

TP

5 Peny Trf 1

9 Peny Trf 1,2

5 Peny Trf 1

2 Peny Trf 1

TP

TP

TP

= PLC

= Fibre Optic

TP

OLS 640 A,

OLS 700 AOLS 800 A,

OLS 800 ABWANGI

OLS – OGS SUTT 150 kV Pemaron – Baturiti – Payangan – Kapal Tahap 4

3 Peny Trf 1,4

TP

1 Peny Trf 2

NSDUA

BNDRA

Load Shedding

Tahap IV = 80 MW

1. TRF-1 ASARI = 7.4 MW

2. TRF-1 BTRTI = 4.7 MW

3. TRF-1 PYGAN = 6 MW

4. TRF-1 KAPAL = 6 MW

5. TRF-4 KAPAL = 5.7 MW

6. TRF-2 GNYAR = 5.7 MW

7. TRF-1 PBIAN = 28.5 MW

8. TRF-2 PBIAN = 16 MW

Pemaron - Baturiti 1 I > = 880 A tms = 0,3 SI

Pemaron - Baturiti 2 I > = 900 A tms = 0,3 SI

Baturiti - Kapal I > = 600 A tms = 0,3 SI

Baturiti - Payangan I > = 600 A tms = 0,325 SI

Pemaron - Baturiti 1 I > = 800 A t = 2 sec

Pemaron - Baturiti 2 I > = 880 A t = 2 sec

Baturiti - Kapal I > = 880 A t = 2 sec

Baturiti - Payangan I > = 880 A t = 2 sec

Pmt 20 kV Kerambitan Trf 1 GI Antosari

Pmt 20 kV Belimbing Trf 1 GI Antosari

Pmt 20 kV Bajera Trf 1 GI Antosari

Pmt 20 kV Sanda Trf 1 GI Antosari

Pmt 20 kV Suraberata Trf 1 GI Antosari

Pmt 20 kV Baturiti Trf 1 GI Baturiti

Pmt 20 kV Taman Tanda Trf 1 GI Baturiti

Pmt 20 kV Wanagiri Trf 1 GI Baturiti

Pmt 20 kV Pancasari Trf 1 GI Baturiti

Pmt 20 kV Jati Luwih Trf 1 GI Baturiti

Pmt 20 kV Buahan Trf 1 GI Payangan

Pmt 20 kV Kedisan Trf 1 GI Payangan

Pmt 20 kV Mambal Trf 4 GI Kapal

Pmt 20 kV Tabanan Trf 1 GI Kapal

Pmt 20 kV Panglan Trf 4 GI Kapal

Pmt 20 kV Wibrata Trf 2 GI Gianyar

Pmt 20 kV Padang Sambian Trf 1 GI Padang Sambian

Pmt 20 kV Kerobokan Trf 1 GI Padang Sambian

Pmt 20 kV Imam Bonjol Trf 1 GI Padang Sambian

Pmt 20 kV Abian Timbul Trf 1 GI Padang Sambian

Pmt 20 kV Buagan Trf 2 GI Padang Sambian

Pmt 20 kV Gunung Agung Trf 2 GI Padang Sambian

Pmt 20 kV Tegal Lantang Trf 1 GI Padang Sambian

Pmt 20 kV Batu Belig Trf 2 GI Padang Sambian

Pmt 20 kV Uma Alas Trf 1 GI Padang Sambian

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap IV( 5,5 detik )

Page 95: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 253

LAMPIRAN – 12

Tahap-15 dt

KandangSapi

3 421

PLUMPANGPENGGILINGAN

GIS PULOGADUNG

8 95

2 1 3

GAMBIR BARU

GEDUNG POLA

PEGANGSAAN

3 2 1

1 3

6 7

CIPINANG1

1 3PULOMAS2 1

2 31

DRTGA

MAMPANG

2 3

MGRAI

1

PGSAN1 3

2 1 1 2

KARET

DNYSA AGP

SNYAN

CAWANG BEKASI

MUARATAWAR

CIBINONG

I set2 kA

I set2 kA

Tahap-210 dt

Tahap-315 dt

TRSNA

1 4 2 3

OLS SUTET MUARATAWAR-CAWANG & BEKASI-CIBINONG

Tahap I

I = 2000 t = 5 dt

Skema trip:

Pmt 150 kV Trafo-2,3,4 Plumpang

Pmt 150 kV Trafo-2 DurenTiga

Pmt 150 kV Pht.Tmn.Rasuna 1,2 GI DurenTiga

Tahap II

I = 2000 t = 10 dt

Skema trip:

Pmt 150 kV Trafo-1,3 GambirBaru

Pmt 150 kV Trafo-8,9 Pulogadung

Pmt 150 kV Trafo-1 Penggilingan

Pmt 150 kV Pht.Cipinang 1,2 GI Cawang

Pmt 150 kV Trafo-2,3 Mampang

Tahap III

I = 2000 t = 15 dt

Skema trip:

Pmt 150 kV Trafo-6,7 GIS Pulogadung

Pmt 150 kV Trafo-1,4 Bekasi

Pmt 150 kV Pht.AGP GI Cawang

Pmt 150 kV Pht.Mampang GI Cawang

Nominal SUTET

2,32 kA

2,4 kA

Ratio CT = 2000/1

SETTING OLS

Mtawar-Cawang =

Bekasi-Cibinong =

Page 96: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 254

LAMPIRAN – 12

IBT-1 IBT-2

SURALAYA

SALIRA INDAHPENDOMCCI

MITSUI

PENI

CILEGON LAMA

CILEGON BARU

SURALAYA 500 kV

IBT-3

Iset OLS = 900 A

If CB Open

SURALAYAI = 1250 A tms = 0,3

Tahap I

I = 900 A t = 2,5 dt

Skema Trip:

PMT 150 kV Trafo 1&2 GI Peni

IF CB OPEN di GI Cilegon Baru :

Tahap I

Skema Trip:

PMT 150 kV Trafo-1 GI Cilegon Baru

PMT 150 kV Trafo-1 GI Cilegon Lama

PMT 150 kV Alindo di GI Cilegon Baru

Beban POSCO turun ke 100 MW

Ratio CT = 1250/1

Tahap-1 28 MW

SETTING OCR

SETTING OLS

GI Suralaya

ALINDOTRF-1

POSCO (Turun ke 100 MW)

1 2

1 2

Instant

Skema Defense Scheme SS Suralaya Looping Dengan IBT-3 Cilegon Baru

Alindo1

1

Page 97: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 255

LAMPIRAN – 12

OLS IBT 500/150 kV CILEGON BARU 2014

(Revisi Jan 14)

CILEGONBARU

Alindo

I Set

OLS 1875 A

IBT-1 IBT-2

Rele

MCGG 22

2 1

3 2 1

GT.2 GT.1 STM

A

B

PLTGU CILEGON

SERANG

RKBTG

1 2 3 4 TP

POLYPRIMA

1 ASAHIMAS

PT1 1 2

2c 2b 2a

MENES

1 2

1 2 3 4

SST GT.1 GT.2

A

B

PLTU LABUAN

SAKETI

2 RKBTG

1

CILEGON

1 2

TP

Tahap 2

2 dt

Tahap 3

2,5 dt

1 2 3 4

PUCAM

KOPO

1 2

2 1

2 3

NIKOMAS

PT

CKANDE

BLRJA

Tahap 1

1,5 dt

TP

TP

TP

I = 1250 A tms = 0,3

Tahap I

I = 1875 A t = 1,5 dt

Skema Trip:

PMT 150 kV Trafo-3,4 GI Serang

PMT 150 kV Trafo-3,4 GI PAM

PMT 150 kV Trafo-1 GI Menes

Tahap II

I = 1875 A t = 2 dt

PMT 150 kV Trafo-2 GI Serang

PMT 150 kV Trafo-1 GI kopo

PMT 150 kV Trafo-2 GI PAM

PMT 150 kV Trafo-2 Cilegon Lama

PMT 150 kV Trafo-2 GI Asahimas

(PMT 150 kV B2, AB2)

Tahap III

I = 1875 A t = 2,5 dt

PMT 150 kV Alindo di GI Cilegon Baru

PMT 150 kV Trafo-PT1 GI Asahimas

Ratio CT = 1250/1

Tahap-1 184 MW

Tahap-2 198 MW

Tahap-3 88 MW

SETTING OCR

SETTING OLS

GI Suralaya

Page 98: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 256

LAMPIRAN – 12

I = 2125 A tms = 0,325

Tahap I

I = 1875 A t = 2 dt

Skema Trip:

PMT 150 kV Senayan Baru 1,2 di GI Kembangan

PMT 150 kV Trf 1 GI Curug

PMT 150 kV Trf 4 GI Jatake

Tahap 2

I = 1875 A t = 2,5 dt

Skema Trip:

PMT 150 kV Trf 1 GI Ciledug

PMT 150 kV Trf 2 GI Cikupa

PMT 150 kV Trf 3 GI Jatake

Tahap 3

I = 1875 A t = 3 dt

Skema Trip:

PMT 150 kV Trf 1 GI Jatake

Ratio CT = 2500/1

Tahap-1 148 MW

Tahap-2 144 MW

Tahap-3 43 MW

SETTING OCR

SETTING OLS

OLS IBT 500/150 kV KEMBANGAN 2014 (Revisi Maret 14)

KEMBANGAN

I Set OLS 1875 A

1 2

SENAYAN BARU CILEDUG

2 11

CURUG

CIKUPA

TGRNG

1 3BALARAJAPASAR

KEMIS

3

DRKBI

Tahap-22,5 dt

2 1

MKRNG

1 2 3

DRKBI

Tahap-12 dt

GROGOL

1 2 3 4

JATAKE

TP

2

1 3 4 2

Tahap-33 dt

TP

TP

TP

MAXMANGANDO

Page 99: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 257

LAMPIRAN – 12

OLS IBT 500/150 kV GANDUL 2014 (Revisi Feb 14)

I = 2000 A tms = 0,4

Tahap I

I = 1900 A t = 3 dt

Skema Trip :

Pmt 150 kV Trafo-1&3 Petukangan

Pmt 150 kV Trafo-1&2 Kebon Jeruk

Pmt 150 kV Trafo-3 Durikosambi

Tahap II

I = 1900 A t= 3,5 dt

Skema Trip:

Pmt 150 kV Trafo-2 Durikosambi

Pmt 150 kV Petukangan-Bintaro-Serpong

Nominal IBT = 1718 A

Ratio CT = 2000/1

Tahap-1 212 MW

Tahap-2 127 MW

SETTING OCR

SETTING OLSGANDUL

I Set OLS 1900 A

Kemang

PTKGN

Tahap-13 dt

KBJRK

DURIKOSAMBI

TP3 2 1

1 2 3 1 3 2

TP

Tahap-23,5 dt

1 2 3 4

Bintaro /Serpong

CENGKARENG

5 1 2 4 3

TGRMA

TPTP

TP

Page 100: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 258

LAMPIRAN – 12

OLS IBT 1,2 500/150 kV BEKASI 2014 (Revisi Maret 2014)

I = 2000 A tms = 0,4

Tahap I

I = 1900 t = 2,5 dt

Skema trip:

Pmt 150 kV Trafo-2,3,&4 Plumpang

Pmt 150 kV Trafo-2&3 Pegangsaan

Tahap II

I = 1900 t = 3 dt

Skema trip:

Pmt 150 kV Trafo-8&9 Pulogadung

Pmt 150 kV Trafo-1 Penggilingan

Pmt 150 kV Trafo-1 Kandang Sapi

Tahap III

I = 1900

Skema trip: t = 3,5 dt

Pmt 150 kV Trafo-6&7 GIS Pulogadung

Pmt 150 kV Marunda 1,2 di GI Bekasi

Nominal IBT = 1718 A

Ratio CT = 2000/1

Tahap-1 192 MW

Tahap-2 159 MW

Tahap-3 179 MW

SETTING OCR

SETTING OLS

BEKASI

I Set OLS 1900 A

Tahap-23 dt

3 421

PLUMPANGPENGGILINGAN

GIS PULOGADUNG

8 95

Tahap-12.5 dt

2 1 3

GAMBIR BARU

GEDUNG POLA

PEGANGSAAN

1 2 3

1 3

TP

Tahap-33.5 dt

6 7

1 2

TP

KANDANG SAPI

TP

TP

TP

TP

MARUNDA

Page 101: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 259

LAMPIRAN – 12

OLS IBT 3,4 500/150 kV BEKASI 2014(Revisi Des 13)

BEKASI

I Set OLS 1900 A

Tahap-33,5 dt

43

MARUNDA

2 31

PLMPG/KDSPI

1 24 1

JTRGN

CIBINONG

PDKLP

32 1

MINIATUR

TAMBUN

2 1

I = 2000 A tms = 0,4

Tahap I

I = 1900 t = 2,5 dt

Skema trip:

Pmt 150 kV Marunda 1,2 di GI Bekasi

Pmt 150 kV Trafo-3&4 GI Bekasi

Tahap II

I = 1900 t = 3 dt

Skema trip:

Pmt 150 kV Trafo-2 GI Pondok Kelapa

Pmt 150 kV Trafo-1 GI Bekasi

Tahap III

I = 1900 t = 3,5 dt

Skema trip:

Pmt 150 kV Cibinong 1,2 di GI Jatirangon

Nominal IBT =

Ratio CT =

Tahap-1 214 MW

Tahap-2 100 MW

Tahap-3 91 MW

SETTING OCR

SETTING OLS

Tahap-12,5 dt

2

Tahap-23 dt

TP

TP

Page 102: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 260

LAMPIRAN – 12

OLS IBT 500/150 kV BALARAJA 2014(Revisi Feb 14)

I = 2300 A tms = 0,325

Tahap I

I = 1900 A t= 2 dt

Skema Trip:

Tahap II

I = 1900 A t=2.5 dt

Skema Trip:

Tahap-1 274 MW

Tahap-2 126 MW

Pmt 150 kV Citra Habitat-Tigaraksa 1&2

Pmt 150 kV Trafo-1 GI Cikupa

Pmt 150 kV Trafo-3 GI Tangerang Baru

SETTING OLS

SETTING OCR

Pmt 150 kV Trafo-2&3 Citra Habitat

Pmt 150 kV Trafo-1 GI Sepatan

Pmt 150 kV Trafo-1 GI Pasar Kemis

Pmt 150 kV Trafo-2 GI Teluk Naga

BALARAJA

I Set OLS A

BALARAJALAMA

CIKUPA

BALARAJAPASAR KEMIS

CENGKARENG

PASAR KEMIS

SEPATAN

TELUK NAGA

3 2 1

2 1

3 1 2

CITRAHABITAT

LEGOK

LENGKONG

SERPONG

2 1

3 2 1

BINTARO/PETUKANGAN

3 1

TIGARAKSA

1 2 3 4 A

B

2 1

3 2 1

1 2 3

TANGERANGBARU

Tahap-2dt

TP

TP

TP

TP

TPTP

Tahap-1dt

TP

Page 103: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 261

LAMPIRAN – 12

OLS IBT 500/150 kV DEPOK (Revisi Jan 14)

I = 2300 A tms = 0,33

Tahap I

I = 1900 A t= 2 dt

Skema Trip:

Pmt 150 kV kedung Badak 1,2 di GI Depok

Tahap II

I = 1900 A t= 2,5 dt

Skema Trip:

Pmt 150 kV Trafo-2 GI Depok

Tahap-1 79 MW

Tahap-2 25 MW

SETTING OLS

SETTING OCR

DEPOKI Set

OLS A

1

150 kV

500 kV

Cawang Baru

Cawang Lama

1 2

Setia Budi

Kedung Badak

2

Tahap-12 dt

Tahap-22,5 dt

Page 104: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 262

LAMPIRAN – 12

OLS IBT 500/150 kV CIBINONG 2014(Revisi Jan 14)

I = 2000 A tms = 0,4

Tahap I

I = 1900 A t= 2,5 dt

Skema Trip:

Pmt 150kV Trafo-5 Cibinong

Pmt 150 kV Trafo-5 Bogor Baru

Pmt 150 kV Trafo-2 Ciawi

Tahap II

I = 1900 A t = 3 dt

Skema Trip:

Pmt 150 kV Cianjur 1&2

Pmt 150 kV Trafo-2 Cibadak Baru

Tahap-1 117 MW

Tahap-2 113 MW

SETTING OCR

SETTING OLSCIBINONG

I Set OLS 1900 A

5 32 6SemenCibinong

2

BOGOR BARU

CIMANGGIS

1 2

5Cianjur

1

2123

JTRNG

SENTUL

CIAWICIBADAK BARU

SALAK BARU

Tahap-23 dt

Tahap-12,5 dt

1 2

Page 105: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 263

LAMPIRAN – 12

OLS IBT 150/70 kV CAWANG

I = 1000 tms = 0,6

Tahap I

I = 900 t= 4 dt

Skema Trip:

Pmt 70 kV Gandaria 1&2

Nominal IBT = 825 A

Ratio CT = 1000/5

Ket : OCR & OLS beda rele

Tahap-1 66 MW

SETTING OCR

SETTING OLS

I Set OLS 900 A

CAWANG

1 2

5 6

2 4 3 1

GANDARIA

CIBINONG

Tahap-14 dt

TP

DEPOK

Page 106: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 264

LAMPIRAN – 12

OLS SUTT 150 kV MUARAKARANG– ANGKE

I = 1440 A tms= 0.6

Tahap I

I = 1320 A t= 7 dt

Skema Trip:

Pmt 150 kV Trafo-1 GI ANGKE

Pmt 150 kV Trafo-2 GI ANGKE

Tahap II

I = 1320 t= 7.5 dt

Skema Trip:

Pmt 150kV Trafo-4 GI ANGKE

Nominal SUTT = A

Ratio CT =

AutoReclose = det

Tahap-1 87 MW

Tahap-2 40 MW

SETTING OCR

SETTING OLS

ANGKE

4 2 1

Muarakarang

KETAPANG

Ancol

3

OLS A

KARET

1 2

2 3

MampangCSW

Tahap-2det

Tahap-1det

1 2 3

Page 107: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 265

LAMPIRAN – 12

OLS SUTT 150 kV BALARAJA BARU - CITRA HABITAT

I = 1920A tms =0,3

Tahap I

I = 1,1 (1760A) t= 2 dt

Skema Trip:

Pmt 150 kV Trafo-3 CITRA

Tahap II

I = 1,1 (1760A) t= 2,5 dt

Skema Trip:

Pmt 150 kV Trafo-1 CITRA

Tahap III

I = 1,1 (1760A) t= 3 dt

Skema Trip:

Pmt 150 kV Tigaraksa 1,2 di GI Citrahabitat

Nominal SUTT = 1620A

Ratio CT = 1600/1

Trip time (2xIs OLS)= 3 detik

Tahap-1 50 MW

Tahap-2 48 MW

Tahap-3 75 MW

SETTING OCR

SETTING OLS

I Set OLS 1760 A

31

BALARAJA BARU

CITRA HABITAT

Tahap-12 dt

TigaraksaLegok Tahap-2

2,5 dt

Tahap-3dt

Page 108: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 266

LAMPIRAN – 12

OLS SUTT 150 kV DEPOK - CAWANG LAMA

I = 1320 A tms = 0,5

Tahap I

I = 1200 A t= 3 dt

Skema Trip:

Pmt 70 kV Depok 1&2

Tahap II

I = 640 t=3,5 dt

Skema Trip:

Pmt 150 kV Trafo-2 Cawang Lama

Nominal SUTT =

Ratio CT = 1200 A

Ket : OCR dan OLS beda rele

Tahap-1 60 MW

Tahap-2 37 MW

SETTING OCR

SETTING OLS

I Set OLS 1200 A

165

GandariaDepok

DEPOK

CAWANG LAMA

Tahap-23 dt

Tahap-13,5 dt

2

Page 109: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 267

LAMPIRAN – 12

OLS SUTT 150 kV CAWANG – DURENTIGAEKSISTING

I Set OLS 1600 A

CWBRU

DRNTG

KRLMA

21

MMPNG

3

Tahap-11.5 det

2 1

Tahap-22 det

I = 1872 A tms = 0,25

Tahap 2

I = 1600 A t= 2 dt

Skema Trip:

Pmt 150 kV Trafo 1 Durentiga

Tahap I

I = 1600 A t= 1,5 dt

Skema Trip:

Pmt 150 kV Trafo 2 Durentiga

Nominal SUTT = 1560 A

Ratio CT = 1600/5

Tahap-1 47 MW

Tahap-2 40 MW

SETTING OLS

SETTING OCR

Page 110: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 268

LAMPIRAN – 12

OLS SUTT 150 kV PRIOKBARAT-KEMAYORAN

I = 1920 A tms = 0.4

Tahap I

I = 1760 A t1= 3,5 dt

Skema Trip:

Pmt 150kV Trafo-1 Kemayoran

Tahap II

I = 1760 A t1= 4 dt

Skema Trip:

Pmt 150kV Trafo-1 Ancol

Nominal SUTT = 1620 A

Ratio CT = 1600/1

Tahap-1 33 MW

Tahap-2 45 MW

SETTING OCR

SETTING OLS

KMYRN

2 1

Tahap-13,5 dt

PRBRT

ANCOL

3

MGBSR

1

Tahap-24 dt

TP

OLS 1760A

1 2 3

ANGKE

Priok Timur1

Page 111: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 269

LAMPIRAN – 12

SUTT 150 kV Bekasi – Penggilingan – Plumpang – Kandang Sapi(Revisi Maret 2014)

I = 2000 A tms = 0,4

Tahap I

I = 1900 t = 2,5 dt

Skema trip:

Pmt 150 kV Trafo-2,3,&4 Plumpang

Pmt 150 kV Trafo-2&3 Pegangsaan

Tahap II

I = 1900 t = 3 dt

Skema trip:

Pmt 150 kV Trafo-8&9 Pulogadung

Tahap III

I = 1900

Skema trip: t = 3,5 dt

Pmt 150 kV Trafo-6&7 GIS Pulogadung

Pmt 150 kV Trafo-1 Penggilingan

Pmt 150 kV Trafo-1 Kandang Sapi

Nominal IBT = 1718 A

Ratio CT = 2000/1

Tahap-1 192 MW

Tahap-2 77 MW

Tahap-3 133 MW

SETTING OCR

SETTING OLS

BEKASI

I Set OLS 1900 A

Tahap-23 dt

3 421

PLUMPANGPENGGILINGAN

GIS PULOGADUNG

8 95

Tahap-12.5 dt

2 1 3

GAMBIR BARU

GEDUNG POLA

PEGANGSAAN

1 2 3

1 3

TP

Tahap-33.5 dt

6 7

1 2

TP

KANDANG SAPI

TP

TP

TP

TP

Page 112: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 270

LAMPIRAN – 12

SUTT 150 kV BEKASI – PENGGILINGAN

I = A tms =

Tahap I

I = A t= dt

Skema Trip:

Pmt 150 kV Trafo-1 GI Penggilingan

Pmt 150 kV Trafo 9 GIS Pulogadung

Tahap II

I = A t= dt

Skema Trip:

Pmt 150 kV Trafo 8 GIS Pulogadung

Ratio CT = 1000/5 A

AutoReclose = 1 det

Tahap-1 80 MW

Tahap-2 31 MW

SETTING OCR

SETTING OLS

OLS A

Tahap-1dt

Bekasi

Penggilingan

3 1

5 6 7 8 9

Pegangsaan

Pulogadung GISPylogadung Konv

PT. KesaPriok Barat

TP

Tahap-2dt

TP

RENCANA

Page 113: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 271

LAMPIRAN – 12

SUTT 150 kV CENGKARENG – TANGERANG LAMAEKSISTING

I = 950 A tms = 0,56

Tahap I

I = 880 A t= 4,5 dt

Skema Trip:

Pmt 150 kV Trafo 1 Tangerang Lama

Ratio CT = 1000/5 A

AutoReclose = 4 det

Tahap-1 11 MW

SETTING OCR

SETTING OLSOLS

880 A

Tahap-14,5 dt

Cengkareng

Tangerang Lama

3 2 1

Jatake

Page 114: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 272

LAMPIRAN – 12

SUTT 150 kV JATAKE – CIKUPAIMPLEMENTASI BARU DES 2013

I = 1440 A tms =

Tahap I

I = 1320 A t= 2,5 dt

Skema Trip:

Pmt 150 kV Trafo 4 Jatake

Tahap II

I = 1320 A t= 3 dt

Skema Trip:

Pmt 150 kV Trafo 3 Jatake

Ratio CT = A

AutoReclose = det

Tahap-1 45 MW

Tahap-2 40 MW

SETTING OCR

SETTING OLS

OLS 1320 A

Tahap-12,5 dt

Cikupa

Jatake

1 2 3 4

MAXIMANGANDO

Tahap-23 dt

Page 115: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 273

LAMPIRAN – 12

OLS SUTT 70 kV KRACAK- BUNAR

I = 250 A tms = 0,25

Tahap 1

I = 225 A t=2,5 dt

Skema Trip:

Pmt 70 kV Trafo-1 GI Bunar

Nominal SUTT = 230 A

Ratio CT = 300/5

Trip time2xIs OLS= 2,9 det

AutoReclose = 1+2 det

Ket : OCR & OLS beda rele

Tahap-1

SETTING OCR

SETTING OLS

24 MW

BUNAR

Kracak

1 2

Tahap-12,5 det

OLS225 A

Page 116: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 274

LAMPIRAN – 12

OLS SUTT 70 KV CIANJUR – LEMBURSITU

LBRST

Cianjur

2 3

P. Takokak

1

P. Situ endah

OLS 420 A

Tahap-13 det

Tahap-23,5 det

I = 450 A tms = 0,3

Tahap 1

I = 420 A t= 3 dt

Skema Trip:

Pmt 70 kV Trafo-3 GI Lembursitu

Tahap 2

I = 420 A t= 3,5 dt

Skema Trip:

Pmt 20 kV Penyulang Situ Endah

Pmt 20 kV Penyulang Takokak

Nominal SUTT = 380 A

Ratio CT = 600/5

Trip time 2xls OLS = 2,9 det

Autoreclose = 1+2 det

Tahap-1 41 MW

Tahap-2 MW

SETTING OLS

SETTING OCR

Page 117: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 275

LAMPIRAN – 12

OLS SUTT 70 kV CAWANG LAMA – DEPOK

I = 525 A tms = 0,7

Tahap I

I = 400 A t= 3,5 dt

Skema Trip:

Pmt 70 kV Trafo-3 GI Depok Baru

Tahap-1 18 MW

SETTING OCR

SETTING OLSI Set

OLS A

Cawang Lama

DEPOK

Tahap-1dt

Gandaria

1 2 3

Page 118: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 276

LAMPIRAN – 12

SUTT 70 kV CIBINONG – CILEUNGSI

OLS 660 A

Cibinong

Cileungsi

2 1

Tahap-13,5 dt

PT. ASPEK PAPER

I = 1000 A tms = 0,52

Tahap I

I = 660 A t= 3,5 dt

Skema Trip:

Pmt 70 kV Trafo-1 GI Cileungsi

Ratio CT = 1000/5 A

AutoReclose = det

Tahap-1 26 MW

SETTING OCR

SETTING OLS

Page 119: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 277

LAMPIRAN – 12

SUTT 70 kV CIBINONG – GANDARIA

OLS 330 A

Cibinong

Gandaria

1 2 3

Tahap-14,5 dt

CAWANG

Tahap-25,5 dt

Tahap I

I = 330 A t = 4.5 dt

Skema Trip :

Pmt 70 kV Trafo-3 Gandaria

Tahap II

I = 330 A t = 5.5 dt

Skema Trip :

Pmt 70 kV Trafo-1 Gandaria

Ratio CT = 600/5 A

AutoReclose = Gandaria : 4 dt

(Resetting) Cibinong : 3 dt

SETTING OLS

Tahap-1

Tahap-2

22 MW

21 MW

Page 120: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 278

LAMPIRAN – 12

OLS SKTT 150 kV DURIKOSAMBI – KEBON JERUK

I = 1000 A tms = 0,3

Tahap I

I = 900 A t= 2 dt

Skema Trip:

Pmt 150kV Trafo-1 Kebon Jeruk

Tahap 2

I = 900 A t= 2,5 dt

Skema Trip:

Pmt 150kV Trafo-2 Kebon Jeruk

Nominal SKTT = 920 A

Ratio CT =

Tahap-1 40 MW

Tahap-2 35 MW

SETTING OCR

SETTING OLS

OLS 900 A

3 2 1

KARET BARU

DURIKOSAMBI

Tahap-12 dt

KEBON JERUK

Tahap-22,5 dt

Page 121: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 279

LAMPIRAN – 12

OLS SKTT 150 kV PLUMPANG – GAMBIRBARU

GBBRU

1 2 3

Tahap-22 dt

Plumpang

Tahap-11,5 dt

Rusak

GDPLA

1 2 3

1

2

3I = 700 tms = 0,45

Tahap I

I = 550 t= 1,5 dt

Skema Trip:

Pmt 150 kV Trafo-1 Gambir Baru

Tahap II

I = 550 t=2 dt

Skema Trip:

Pmt 150 kV Trafo-3 Gambir Baru

Nominal SKTT = 575 A

Ratio CT = 1000/5

Ket : OCR dan OLS beda rele

Tahap-1 25 MW

Tahap-2 24 MW

SETTING OCR

SETTING OLSOLS

550 A

Page 122: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 280

LAMPIRAN – 12

OLS SKTT 150 kV MAMPANG-DANAYASA

I = 350 A tms = 0,6

Tahap I

I = 500 A t= 6 dt

Skema Trip:

Pmt 150 kV Trafo-2 Danayasa

Nominal SKTT =

Ratio CT = 500/5

Trip time (2xIs OLS)=

Tahap-1 44 MW

SETTING OCR

SETTING OLSI Set

OLS 500 A

21

MAMPANG

DANAYASATahap-1

6 det

SNYAN

3

Page 123: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 281

LAMPIRAN – 12

OLS SKTT 150 kV MAMPANG - ABADI GUNA PAPAN

I = 350 A tms = 0,6

Tahap I

I = 500 A t= 6 dt

Skema Trip:

Pmt 150 kV Trafo-2 ABDGP

Nominal SKTT =

Ratio CT = 500/1

Trip time (2xIs OLS)=

Tahap-1 30 MW

SETTING OCR

SETTING OLS

I Set OLS 500 A

21

MAMPANG

ABDGP Tahap-16 det

SNYAN

1

Page 124: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 282

LAMPIRAN – 12

SKTT 150 kV JATAKE – MAXIMANGANDO

I = 550 A tms = 0,3

Tahap I

I = 475 A t= 2 dt

Skema Trip:

Pmt 150 kV Trafo 2 Maximangando

Ratio CT = 500/5 A

AutoReclose = det

Tahap-1 50 MW

SETTING OCR

SETTING OLS

OLS 475 A

Tahap-12 dt

Jatake

Maximangando

PT 2 1

Page 125: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 283

LAMPIRAN – 12

SKTT 150 kV ANGKE – KETAPANG

OLS 1000 A

Angke

Ketapang

1 2 3

Tahap-12,5 dt

I = 1200 A tms = 0,3

Tahap I

I = 1000 A t= 2,5 dt

Skema Trip:

Pmt 150 kV Trafo 3 Ketapang

Ratio CT = 1200/5 A

AutoReclose = det

Tahap-1 25 MW

SETTING OCR

SETTING OLS

Page 126: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 284

LAMPIRAN – 12

OLS SKTT 150 kV PETUKANGAN – SENAYAN

SENAYAN

1 2 3

Tahap-2dt

Tahap-1dt

DANAYASA

3 2 1

1

2

I = 900 A tms = 0.3

Tahap I

I = 900 A t= 4.5 dt

Skema Trip:

Pmt 150 kV AGP 1,2 di GI Senayan

Tahap II

I = 900 t=4.8 dt

Skema Trip:

Pmt 150 kV Trafo-3 Senayan

Nominal SKTT = A

Ratio CT =

Ket : OCR dan OLS beda rele

Tahap-1 59 MW

Tahap-2 37 MW

SETTING OCR

SETTING OLS

OLSA

2 3 1

PETUKANGAN

AGP

Page 127: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 285

LAMPIRAN – 12

SKEMA OLS IBT 1 & 2 BANDUNG SELATAN

OLS Iset = 1900 A

BDSLN

RCKEK

DGPKR

KRCDG

CGRLG

PNSIA

WWNDU

MJLYA

TRF 6

TRF 3

Tahap-2 = 3,5 dt

TRF 3 & 5

TP

TRF 1

CNJUR

BOGOR

LBSTU

LGDAR

TP

UBRNG

Tahap-1 = 3 dt

TP

TRF 3

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

Keterangan : Dilakukan penambahan target (surat tgl 22 oktober 2013)- Trf-3 dan Pht BGBRU 1-2 di GI Cianjur aktif tgl 6 Des’13- UBRNG-DGPKR 1-2 aktif tgl 13 Mei ‘14

I = 2400 A tms=0,4

Tahap I

I = 1900 A t= 3 dt

Skema Trip:

Pmt 150 kV TRF-3 BDSLN (27 MW)

Pmt 150 kV BDSLN - PNSIA 1&2

Pmt 150 kV TRF-3 UBRNG (45 MW)

Pmt 150 kV TRF-5 UBRNG (33 MW)

Pmt 150 kV UBRNG-DGPKR 1&2 (128 MW)

Pmt 70 kV CGRLG-MJLYA 1&2 (32 MW)

Tahap II

I = 1900 A t= 3.5 dt

Skema Trip:

Pmt 150 kV TRF-6 CGRLG (52 MW)

Pmt 150 kV TRF-1 BDSLN (45 MW)

Pmt 70 kV CNJUR - LBSTU 1&2 (0 MW)

Pmt 150 kV CNJUR - BGBRU 1&2 (0 MW)

Pmt 150 kV TRF-3 CNJUR (44 MW)

Nominal IBT= 1718 A

Nominal CT = 2000 A

SETTING OCR

SETTING OLS

Page 128: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 286

LAMPIRAN – 12

CRATA

IBT 1 IBT 2

LGDAR

BDUTR

PBRAN CKPAY

Trf-2 Trf-4

PDLRG

CRLMA

PWKTAIBT 1

IDRMA

SBANG JTLHR

T-1 &3IBT 2

OLS 1900 A

CBBAT

SPFICT-1 & 2

KSBRU

CGRLG

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

T-7,9, 10

KSBRU

~

Trf-2

Tahap-2 = 4 dtTahap-1 = 3 dt

Keterangan :Dilakukan penambahan target (Surat tgl 27-02-2013)- Trafo-2 GI Lagadar aktif tanggal 21 Mei ‘13

SKEMA OLS IBT 1 & 2 CIRATA

I = 2000 A tms=0,32 dt

Tahap I

I = 1900 A t= 3 dt

Skema Trip:

Pmt 150 kV CRATA - CKMPY (144 MW)

pmt 150 kV PWKTA - CKMPY (53 MW)

Pmt 70 kV PWKTA - KSBRU (0 MW)

Pmt 70 kV PWKTA - SPFIC (0 MW)

Pmt 70/20 kV PWKTA - SBANG 1&2 (53 MW)

Tahap II

I = 1900 A t= 4 dt

Skema Trip:

Pmt 150/20 kV Trafo 1 PDLRG (22 MW)

Pmt 150/20 kV Trafo 3 PDLRG (25 MW)

Pmt 150 kV LGDAR - CGRLG 1&2 (96 MW)

Pmt 150 kV Trafo-2 LGDAR (31 MW)

Nominal IBT = 1718 A

Nominal CT = 2500 A

SETTING OCR

SETTING OLS

Page 129: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 287

LAMPIRAN – 12

IBT II

OLS Iset = 1900 A

GDMKR

JBBKA

PDKLP (APB-1)

IBT

IBT I

CBATU

TMBUN

PCBRU

TRF 1 TRF 2

TRF 1, 2, 3

TRF 1 & 2

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

TRF 1,2,3,4

Tahap-1 = 3 dt

HKOOK

~FJSWA CLNDO

CKRNG

SKEMA OLS IBT 1 & 2 CIBATU

Tahap-2 = 4 dt

TRF 2 & 5

Keterangan :Dilakukan penambahan target (Surat tgl 30 Mei 2013) :- Trafo-2 TMBUN aktif tgl 19 Juni ‘13, Trafo-1 GDMKR aktif tgl 20 Juni ‘13- Tahap 2 (Trf-2 & 5 GI CKRNG) aktif tgl 22 Nov’13

I = 2125 A tms=0,4

Tahap I

I = 1900 A t= 3 dt

Skema Trip:

Pmt 150 kV Trafo-1 GI GDMKR (49 MW)

Pmt 150 kV Trafo-2 GI GDMKR (51 MW)

Pmt 150 kV Trafo-1 GI TAMBUN (41 MW)

Pmt 150 kV Trafo-2 GI TAMBUN (53 MW)

Pmt 150 kV Trafo-3 GI TAMBUN (50 MW)

Pmt 150 kV TMBUN - PDKLP 1&2 (0 MW)

Pmt 150 kV TMBUN - PCBRU 1&2 (161 MW)

Tahap II

I = 1900 A t= 4 dt

Skema Trip:

Pmt 150 kV Trafo-2&5 GI CIKRG (50 & 77 MW)

Nominal IBT = 1718 A

Nominal CT = 2500 A

SETTING OCR

SETTING OLS

Page 130: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 288

LAMPIRAN – 12

OLS Iset = 1890 A

SKEMA OLS IBT 3 & 4 CIBATURevisi/Penambahan Target

Surat no : 0092/151/APBJBR/2014 tgl 29 Sept. 2014 CBATU

MKSRIPNYNGTGHRG

PRURI

KTMKR

MLIGI

KRPYG

BKASI

IBT IV

TLJBE

KSBRU

PRMYA

IBT III

Tahap-1 = 3 s

TRF-5TRF-6JTLHR

IDMYU

Tahap-2 = 4 s

TRF-1

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

T 1, 2 T 1, 2

T 1

I = 2100 A tms=0,35

Tahap I

I = 1890 A t= 3 dt

Skema Trip:

Pmt 150 kV PRMYA - KTMKR (183 MW)

Pmt 150 kV PRMYA - MLIGI (183 MW)

Tahap II

I = 1890 A t= 4 dt

Skema Trip:

Pmt 150 kV TRF-1 TGHRG (48 MW)

Pmt 150 kV TRF 2 TGHRG (37 MW)

Pmt 150 kV TRF 1 MKSRI (35 MW)

Pmt 150 kV TRF 2 MKSRI (29 MW)

Pmt 150 kV TRF-1 CBATU (44 MW)

Pmt 150 KV PRMYA - TLJBE 1&2 (119 MW)

Nominal IBT= 1718 A

SETTING OCR

SETTING OLS

Tahap-2 = 4 s

Keterangan :- Revisi/Perubahan target (surat tgl 17 Mei 2013)- Tahap-1 aktif tgl 28 Mei 2013- Tahap-2 (Trf-1 & 2 MKSRI & Trf-1 & 2 TGHRG) aktif tgl 25 Okt ‘2013- Target Trafo-1 CBATU (dari IBT 4) aktif tgl 26 Juni 2014- Penambahan target tahap 2 : PMT 150 kV TLJBE 1 2 GI PRMYA (aktif tgl 07 Okt 2014)

Page 131: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 289

LAMPIRAN – 12

SKEMA OLS IBT 1 & 2 MANDIRANCAN

OLS Iset = 1900 A

MDRCN

RCKEK

HRGLS

~

MDRCN

JTBRG

JTBRG

ARJWN

TRF 1,2,3

SEMEN

KNGANBBKAN

CKRNG

SRAGI

Tahap-1 = 3 dt

IBT 1 TRF 2 & 3

PLTU CEP

~

BREBES

IBT-2

TRF 1&2

KDPTN

Tahap-2 = 4 dt

Keterangan :- Revisi/Perubahan target (surat tgl 28 Februari 2013)- Aktif tgl 06 Maret 2013

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

I = 2125 A tms=0,325

Tahap I

I = 1900 A t= 3 dt

Skema Trip:

Pmt 150 kV JTBRG - HRGLS 1&2 (133 MW)

Pmt 150 kV IBT-1 JTBRG (80 MW)

Pmt 150 kV PLTU CEP-BRBES 1&2 (164 MW)

Pmt 150 kV SRAGI - RCKEK 1&2 (90 MW)

Pmt 70 kV SRAGI - BBKAN 1&2 (40 MW)

Tahap II

I = 1900 A t= 4 dt

Skema Trip:

Pmt 150 kV IBT-2 SRAGI (51 MW)

Nominal IBT= 1718 A

Nominal CT = 2500 A

SETTING OCR

SETTING OLS

Page 132: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 290

LAMPIRAN – 12

SKEMA OLS IBT 2 & 3 CIGERELENG

CGRLG

IBT-1

MJLYA

BDTMR

IBT 2-3

CKLNG

~

1

2

Trf-6Trf-7

Tahap-1 = 3 dt

Trf-9

OLS Iset = 281.6 A

Trf-1 Trf-2 Trf-3

Dilakukan pemasangan OLS baru surat tgl 10 mei 2012Aktif tanggal 21 Desember 2012

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

I = 360 A tms=0,5

Tahap I

I = 281.6 A t= 3 dt

Skema Trip:

Pmt 70 kV CGRLG - MJLYA 1&2 (32 MW)

Nominal IBT= 256 A

Nominal CT = 300 A

SETTING OCR

SETTING OLS

Page 133: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 291

LAMPIRAN – 12

SKEMA OLS IBT 1 & 2 PURWAKARTA

OLS Iset = 910 A

Tahap-2 = 5 dtTahap-1= 4 dt

PURWAKARTA

SUBANG

1 & 2

SOUTH PACIFIC

INDO BHARAT

INDO RAMA

CURUG LIMA

PINDODELI

Trf-4

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

I = 1000 A tms=0,32

Tahap I

I = 910 A t= 4 dt

Skema Trip:

Pmt 70 kV PWKTA - SBANG 1&2 (53 MW)

Tahap II

I = 910 A t= 5 dt

Skema Trip:

Pmt 70 kV TRF-4 PWKTA (17 MW)

Nominal IBT= 825 A

Nominal CT = 1000 A

SETTING OCR

SETTING OLS

Page 134: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 292

LAMPIRAN – 12

SKEMA OLS IBT 1 & 5 SUNYARAGIRevisi / Penambahan target

Surat no : 0093/151/APBJBR/2014 tgl 29 Sept. 2014

OLS Iset = 910 A

Tahap-1 = 3 dt

RCKEK

~ ~

KNGANCKRNG

SRAGI

TRF 3TRF 2TRF 1

TRF 2TRF 1

ARJWNBBKANJTBRG

Tahap-2 = 4 dt

IDMYU

ARJWN KDPTN

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

I = 1000 A tms=0,4

Tahap I

I = 910 A t= 3 dt

Skema Trip:

Pmt 70 kV ARJWN - KDPTN 1&2 (44 MW)

Tahap II

I = 910 A t= 4 dt

Skema Trip:

Pmt 70 kV SRAGI - BBKAN 1&2 (40 MW)

Pmt 70 kV TRAFO 3 ARJWN (26 MW)

Nominal IBT= 825 A

Nominal CT = 1000 A

SETTING OCR

SETTING OLS

Tahap-2 = 4 dt

Keterangan : Target tahap-2 Trafo 3 ARJWN telah aktif tgl 16 Oktober 2014

Page 135: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 293

LAMPIRAN – 12

SKEMA OLS IBT 1 & 2 UJUNGBERUNG(EXISTING)

OLS Iset = 544.5 A

UJBRG

SMDNG

TRF 1 TRF 2TRF 3

PRKAN

BDUTR

RCKEK

BDTMR

Tahap-2 = 4 dt

Tahap-1 = 3 dt

PT. PLN (PERSERO) P3B JBAPB JAWA BARAT

- Revisi target surat tgl 0052/151/APBJBR/2013 Tgl 22 Mei 2013- Telah aktif Tgl 27-08-13

I = 300 A tms=0,45

Tahap I

I = 545 A t= 3 dt

Skema Trip:

Pmt 70 kV UBRNG - BDTMR 1&2 (30 MW)

Tahap II

I = 545 A t= 4 dt

Skema Trip:

Pmt 70 kV SMDNG - PRKAN 1&2 (42 MW)

Nominal CCC= 495 A

Nominal CT = 600 A

SETTING OCR

SETTING OLS

Page 136: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 294

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT

KRAPK

SRDOL

G

OLS 1900 A

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

OLS IBT 1 & 2 UNGARAN

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

Tahap 12 detik

TP

Tahap 34 detik

1 3

TP

Tahap 23 detik

TP

PEDAN

SETTING OCR

I = 2125 A tms = 0,4

KERJA OLS

Tahap I (346 MW)

I=1900 A t= 2 dtSkema Trip :

GI PMLNG : Pmt 150 kV KOPEL

GI KRAPK : Pmt 150 kV RDRUT 1,2

Tahap II (298 MW)

I=1900 A t= 3 dt

Skema Trip :GI BANTL : Pmt 150 kV WATES

: Pmt 150 kV PWRJO

GI KLBKL : Pmt 150 kV BMAYU

1,2

: Pmt 150 kV Trafo 3

: Pmt 150 kV Trafo 4

GI RWALO: Pmt 150 kV GBONG

1,2

Tahap III (349 MW)

I=1900 A t= 4 dt

Skema Trip :GI SGRAH : Pmt 150 kV MDARI

: Pmt 150 kV KNTUG

GI BANTL : Pmt 150 kV KNTUG

: Pmt 150 kV GDEAN

: Pmt 150 kV SMANU

1,2: Pmt 150 kV Trafo 1

GI RWALO : Pmt 150 kV MRICA

: Pmt 150 kV PBLGA

Nominal IBT = 1718 A

Ratio CT = 2000 /1A

1 2 1 21 2

1 2

1 2 31 2 3

1 3 4

1 21 2

1 2 1 2

1 2

1 21 2 1 2 1 2

1 2

1 2

1 2 3 4

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

BSBRU

1 21 2

PT.STARA

3 4

PROSES TAMBAH

TAHAP 2 & 3

Page 137: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 295

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

TJATI7

IBT-2

TJATI5

IBT-1

PWDDIPDLAM

BAWEN

KRAPK

KLSRI

SRDOL

SYUNG

CEPU

BJGRO

BLORA

RBANG

PATI

JKULO

KUDUS

JPARA

MRGEN

G

TBROK

UNGAR7

IBT-2

UNGAR5

IBT-1 IBT-3

KDNBO

PYUNG

SLIMA

G

SCANG/SGRAH

KLATN

G

RBKIT

G

G G

MJNGO

BRNGI

BDONO

JAJAR

PEDAN

GDRJO

MKRAN

JELOK

RDRUT

BSBRU

OLS 1918 A

OLS IBT 3 UNGARAN

G

TIMOG

Tahap 23 detik

SGRAH

SETTING OCR

I = 2125A tms=0,4

KERJA OLS

Tahap I (219 MW)

I=1918A t=2,05 dtSkema Trip :

GI JELOK : Pmt 150kV BRNGI 1,2

: Pmt 150kV SGRAH 1,2

Tahap II (105 MW)

I=1918A t=3,05 dtSkema Trip :

GI UNGAR: Pmt 150kV PYUNG 1,2

Tahap III

I=1918A t=4,05 dt

Skema Trip :

GI UNGAR: Pmt 150kV MRGEN 1,2

Nominal IBT = 1718 A

Ratio CT = 2000A/1

default ke

ss ungaran

1 21 2

1 2

3

2 3

1 2 3

1 2 3

1 2

1 2

1 2

1 2 3

1 2

1 2

Tahap 34 detik

Tahap 12 detik

TP

1 3 4

1 2

1 2

1 2

1 2 3

1 2

1 2

1 2

1 2

1 2

1 2 3

Page 138: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 296

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

PEDAN7

IBT-2

PEDAN5

IBT-1

KLATN

MKRAN

JAJAR

GDRJO

PALUR

SLBRU

WSARI

SRAGN

MSRAN

WNGRI

NGTDI

KNTUG

BDONO

BAWEN

OLS 1885 A TPTahap 12 detik

OLS IBT PEDAN

NGAWI

PNRGO

PLTU PCTAN NEW PCTAN

GG

U1 U2

MJNGO

Tahap 35 detik

Tahap 24 detik

TP

SETTING OCR

I = 2125 A tms=0,3

KERJA OLS

Tahap I (139 MW)

I=1885 A t= 2 dt

Skema Trip :

GI JAJAR : Pmt 150 kV MJNGO

: Pmt 150 kV BDONO: Pmt 150 kV TRAFO 2

: Pmt 150 kV MKRAN 1,2

Tahap II (259 MW)

I=1885 A t= 4 dt

Skema Trip:GI PALUR : Pmt 150 kV MSRAN

: Pmt 150 kV SRAGN

GI PEDAN : Pmt 150 kV KNTUG 1,2

: Pmt 150 kV KLATN 1,2

Tahap III (89 MW)

I=1885 A t= 5 dt

Skema Trip :

GI PALUR : Pmt 150 kV Trafo 2

: Pmt 150 kV Trafo 3

GI NGTDI : Pmt 150 kV PCTAN 1,2*

Nominal IBT = 1718 A

Ratio CT = 2500A/1A

TP1 2

1 2

2 3

1 2

1

1 2

1 2

1 2

GDEAN

1 2

1 2

WBJAN

SMANU

WATES /

PWRJO

BANTL

1 3

1 2 3

SGRAH /MDARI

GJYAN

2 4

1 2 3

1 2 3

Page 139: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 297

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

OLS : PHT 150 KV RANDUGARUT - KRAPYAK

SETTING OCR

I = 1200 A tms = 0,4

KERJA OLS

Tahap I (110 MW)

I= 992 A t= 2 dt

Skema Trip :

GI PMLNG : Pmt 150 kV KOPEL

: Pmt 150 kV Trafo 2GI PKLON : Pmt 150 kV Trafo 2

GI BTANG: Pmt 150 kV Trafo 2

Tahap II (23 MW)

I= 1008 A t= 4 dt

Skema Trip:

GI WLERI : Pmt 150 kV Trafo 2

Nominal IBT = 900 A

Ratio CT = 1600 /1A

OLS 992 A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Tahap 12 detik

TP

Tahap 24 detik

TP

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

1 2 1 2

1 2

1 2

1 21 2 1 3 4

1 2 1 21 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

3 4

1 2

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

Page 140: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 298

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI

KLNGU

TBROK

KLSRI/TBROK

PLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

SETTING OCR

I = 1200 A tms = 0,4

KERJA OLS

Tahap I (78 MW)

I= 992 A t= 2 dt

Skema Trip :

GI PMLNG : Pmt 150 kV KOPEL: Pmt 150 kV Trafo 2

GI PKLON : Pmt 150 kV Trafo 2

Tahap II (32 MW)

I= 1008 A t= 4 dt

Skema Trip:GI WLERI : Pmt 150 kV Trafo 2

Nominal IBT = 900 A

Ratio CT = 1600 /1A

OLS 992 A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Tahap 12 detik

TP

Tahap 24 detik

TP

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

OLS : PHT 150 KV RANDUGARUT – KALIWUNGU

1 21 2

1 2 1 2

1 21 2

1 2 1 21 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2 1 3 4

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

Page 141: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 299

LAMPIRAN – 12

OLS 696 A

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON

WLERI

KLNGU

TBROK

KLSRI/TBROK

PLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT

KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

SETTING OCR

I = 720 A tms = 0,32

KERJA OLS

Tahap I (78 MW)

I= 696 A t= 2.008 dt

Skema Trip :

GI PMLNG : Pmt 150 kV KOPEL

: Pmt 150 kV Trafo 2

GI PKLON : Pmt 150 kV Trafo 3

Tahap II (32 MW)I= 696 A t= 4 dt

Skema Trip :

GI BTANG : Pmt 150 kV Trafo 2

Nominal IBT = 600 ARatio CT = 1200 /1A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Tahap 12 detik

TP

Tahap 24 detikTP

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

OLS : PHT 150 KV WELERI - KALIWUNGU

1 2

1 21 2

1 21 2

1 2

1 21 21 21 2

1 2

1 2

1 3 4

1 2

1 2

3 4

1 2

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

1 2

Page 142: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 300

LAMPIRAN – 12

OLS 670 A

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON

WLERI

KLNGU

TBROK

KLSRI/TBROK

PLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT

KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

SETTING OCR

I = 725 A tms = 0,32

KERJA OLS

Tahap I (71 MW)

I= 670 A t= 2 ,22dtSkema Trip :

GI PMLNG : Pmt 150 kV KOPEL

GI PKLON : Pmt 150 kV Trafo 2

Tahap II (32 MW)

I= 670 A t= 4,036 dt

Skema Trip :

GI BTANG : Pmt 150 kV Trafo 2

Nominal IBT = 600 A

Ratio CT = 1000 /1A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Tahap 12 detik

TP

Tahap 24 detik

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

OLS : PHT 150 KV BATANG - WELERI

3 4

1 2

BSBRU

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 21 21 2

1 21 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

PT.STARA

1 2

Page 143: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 301

LAMPIRAN – 12

OLS 672 A

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON

WLERI

KLNGU

TBROK

KLSRI/TBROK

PLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT

KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

SETTING OCR

I = 725 A tms = 0,3

KERJA OLS

Tahap I (36 MW)I= 672 A t= 2 dt

Skema Trip :

GI PKLON : Pmt 150 kV Trafo 2

Tahap II (54 MW)

I= 672 A t= 4 dt

Skema Trip :GI PKLON : Pmt 150 kV Trafo 1

Nominal IBT = 600 A

Ratio CT = 600 /1A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

OLS : PHT 150 KV PEKALONGAN - BATANG

Tahap 12 detik

Tahap 24 detik

3 4

1 2

BSBRU

1 2

PT.STARA

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2 1 2 1 2

1 2

1 2

1 2

1 21 2

1 2

1 2

1 2

1 3 4

Page 144: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 302

LAMPIRAN – 12

OLS 664 A

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON

WLERI

KLNGU

TBROK

KLSRI/TBROK

PLSDO

KTNGR

G

G G

G

PLTUCLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT

KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

SETTING OCR

I = 660 A tms = 0,3

KERJA OLSTahap I (15 MW)

I= 664 A t= 2 dt

Skema Trip :

GI KBSEN : Pmt 150 kV PMLNG 1,2

GI BMAYU : Pmt 150 kV Trafo 2

Nominal IBT = 600 A

Ratio CT = 600 / 5A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Dipasok dari PLTU CEP

Subsistem TJATI /PEDAN

Pmt dilepas pengaturan

OLS : PHT 150 KV BUMIAYU – KALIBAKAL

1 2

Tahap 12 detik

TP

3 4

1 2

BSBRU

1 2

PT.STARA

1 2

1 2

1 2

1 2

1 2

1 2 1 2

1 2

1 2

1 2 1 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 3 4

Page 145: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 303

LAMPIRAN – 12

OLS 660 A

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON

WLERI

KLNGU

TBROK

KLSRI/TBROK

PLSDO

KTNGR

G

G G

G

PLTUCLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT

KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

SETTING OCR

I = 720 A tms = 0,3

KERJA OLS

Tahap I (split)I= 660 A t= 2 dt

Skema Trip :

GI KBSEN : Pmt 150 kV PMLNG 1,2

Nominal IBT = 600 A

Ratio CT = 600 / 5A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Dipasok dari PLTU CEP

Subsistem TJATI /PEDAN

Pmt dilepas pengaturan

1 2

Tahap 12 detik

OLS : PHT 150 KV KEBASEN – BUMIAYU

3 4

1 2

BSBRU

1 2

PT.STARA

1 21 2

1 2

1 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 3 4

1 2 1 2

1 2

1 2

1 21 2

1 2

1 2

Page 146: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 304

LAMPIRAN – 12

OLS 660 A

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON

WLERI

KLNGU

TBROK

KLSRI/TBROK

PLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT

KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

SETTING OCRI = 720 A tms = 0,3

KERJA OLS

Tahap I (split)

I= 660 A t= 2 dt

Skema Trip :GI KBSEN : Pmt 150 kV PMLNG 1,2

Nominal IBT = 600 A

Ratio CT = 600 / 5A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Dipasok dari PLTU CEP

Subsistem TJATI /PEDAN

Pmt dilepas pengaturan

1 2

Tahap 12 detik

OLS : PHT 150 KV KEBASEN – BALAPULANG

3 4

1 2

BSBRU

1 2

PT.STARA

1 3 4

1 21 2

1 2

1 2

1 2

1 2

1 2

1 2 1 2

1 2

1 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

Page 147: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 305

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

OLS 660

A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

2 detik

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

1 2 1 2

1 2

1 2

1 21 2 1 3 4

1 2 1 21 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

3 4

1 2

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

SETTING OCR

I = 720 A tms=0,36

KERJA OLS(split)

I= 660 A t=2,08 dt

Skema Trip :

GI KNTUG : Pmt 150 kV KOPEL

: Pmt 150 kV GDEAN

: Pmt 150 kV BANTL

Nominal SUTT = 600 A

Ratio CT = 1000 /1A

OLS : PHT 150 KV KENTUNGAN – SANGGRAHAN

Page 148: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 306

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT

KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

OLS SUTT 150 KV UNGARAN – BAWEN

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1

TP

PEDAN

SETTING OCR

I = A tms =

KERJA OLS

Tahap I (80 MW)

I=1760 A t= 2 dt

Skema Trip :

GI SGRAH : Pmt 150 kV MDARI

: Pmt 150 kV KNTUG

GI BANTL : Pmt 150 kV KNTUG: Pmt 150 kV GDEAN

: Pmt 150 kV SMANU 1,2

: Pmt 150 kV Trafo 1

Nominal SUTT = 1600 A

Ratio CT = 2000 /1A

1 2 1 21 2

1 2

1 2 31 2 3

1 3 4

1 21 2

1 2 1 2

1 2

1 21 2 1 2 1 2

1 2

1 2

1 2 3 4

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

BSBRU

1 21 2

PT.STARA

3 4

OLS

1760A

2 detik

3

USULAN BARU

Page 149: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 307

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

OLS

1320 A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Tahap 12 detik

TP

Tahap 24 detik

TP

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

1 2 1 2

1 2

1 2

1 21 2 1 3 4

1 2 1 21 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

3 4

1 2

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

OLS : PHT 150 KV KRAPYAK – UNGARAN

SETTING OCR

I = A tms=

KERJA OLS

Tahap I (110 MW)

I=1320 A t=2 dt

Skema Trip:

GI PMLNG : Pmt 150 kV KOPEL: Pmt 150 kV Trafo 2

GI PKLON : Pmt 150 kV Trafo 2

GI BTANG : Pmt 150 kV Trafo 2

Tahap II (23 MW)

I=1320 A t=4 dtSkema Trip :

GI WLERI : Pmt 150 kV Trafo 2

Nominal SUTT = 1200 A

Ratio CT = 1600 /1A

Page 150: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 308

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

OLS

1320 A1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

Tahap 12 detik

TP

Tahap 24 detik

TP

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

1 2 1 2

1 2

1 2

1 21 2 1 3 4

1 2 1 21 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

3 4

1 2

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

OLS : PHT 150 KV BSBRU – UNGARAN

SETTING OCR

I = 1440 A tms=0,43

KERJA OLSTahap I (110 MW)

I=1320 A t=2 dt

Skema Trip :

GI PMLNG : Pmt 150 kV KOPEL

: Pmt 150 kV Trafo 2

GI PKLON : Pmt 150 kV Trafo 2

GI BTANG : Pmt 150 kV Trafo 2

Tahap II (23 MW)

I=1320 A t=4 dt

Skema Trip:GI WLERI : Pmt 150 kV Trafo 2

Nominal SUTT = 1200 A

Ratio CT = 1600 /1A

Page 151: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 309

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

OLS 660

A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

2 detik

TP

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

1 2 1 2

1 2

1 2

1 21 2 1 3 4

1 2 1 21 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

3 4

1 2

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

SETTING OCR

I = 720 A tms=0,36

KERJA OLS (split)

I= 660 A t=2 dt

Skema Trip :

GI KNTUG : Pmt 150 kV KOPEL: Pmt 150 kV GDEAN

: Pmt 150 kV BANTL

Nominal SUTT = 600 A

Ratio CT = 1000 /1A

OLS : PHT 150 KV MEDARI– SANGGRAHAN

Page 152: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 310

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

OLS

660A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

2 detik

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

1 2 1 2

1 2

1 2

1 21 2 1 3 4

1 2 1 21 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

3 4

1 2

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

SETTING OCR

I = A tms=

KERJA OLS (split)

I= 660 A t=2 dt

Skema Trip :

GI MNANG : Pmt 150 kV BNJAR 1 & 2

Nominal SUTT = 600 A

Ratio CT =

OLS : PHT 150 KV MAJENANG – BANJAR

USULAN BARU

Page 153: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 311

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

BAWEN

SCANG

MDARI

SGRAH

BANTL

TMGNG

DIENG

SMANU

~

WSOBO

WALING

WBJAN

PWRJOKBMENGBONG

RWALO

G

G

GARNG

MRICA

PKLON WLERI KLNGU

TBROK

KLSRI/TBROKPLSDO

KTNGR

G

G G

G

PLTU

CLCAP

KNTUG

PEDAN

GDEAN

GJYAN

KLATN

JELOK

RDRUT KRAPK

SRDOL

G

MRGEN

UNGAR7

IBT-2IBT-1 IBT-3

TBROK

PYUNGJELOK

PLTU

CEP

KBSEN

BRBES

G

PMLNG

BTANG

BLPLG

BMAYU

KLBKL

MNANG

LMNIS

KSGHN

STARA

PBLGA

WATES

BANJR

1 3

PEDAN

OLS

660

A

1 21 21 21 2 3

1 2 3 4

1 2 3

1 2

2 detik

Dipasok dari PLTU CEP

Subsistem TJATI / PEDAN

Pmt dilepas pengaturan

1 2 1 2

1 2

1 2

1 21 2 1 3 4

1 2 1 21 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

3 4

1 2

1 2

1 2

1 2

BSBRU

1 2

PT.STARA

SETTING OCR

I = A tms=

KERJA OLS (split)

I= 660 A t=2 dt

Skema Trip :

GI BRBES : Pmt 150 kV KBSEN 1 & 2

Nominal SUTT = 600 ARatio CT =

OLS : PHT 150 KV BREBES – CIREBON ELECTRIC POWER

USULAN BARU

Page 154: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 312

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

TJATI7

IBT-2

TJATI5

IBT-1

PWDDIPDLAM

BAWEN

KRAPK

KLSRI

SRDOL

SYUNG

CEPU

BJGRO

BLORA

RBANG

PATI

JKULO

KUDUS

JPARA

MRGEN

G

TBROK

UNGAR7

IBT-2

UNGAR5

IBT-1 IBT-3

KDNBO

PYUNG

SLIMA

G

SCANG/SGRAH

KLATN

G

RBKIT

G

G G

MJNGO

BRNGI

BDONO

JAJAR

PEDAN

GDRJO

MKRAN

JELOK

RDRUT

BSBRU

OLS 992 A

G

TIMOG

SGRAH

default ke

ss ungaran

1 21 2

1 2

3

2 3

1 2 3

1 2 3

1 2

1 2

1 2

1 2 3

1 2

1 2

1 3 4

1 2

1 2

1 2

1 2 3

1 2

1 2

1 2 3

1 2

1 2

1 2

OLS : PHT 150 KV JEPARA – TANJUNGJATI

SETTING OCR

I = 1440 A

tms=0,25

KERJA OLS

Tahap I (54 MW)

I= 992 A t=3 dt

Skema Trip :

GI KUDUS : Pmt 150kV SYUNG 1,2

GI JPARA : Pmt 150kV Trafo 1,2

Tahap II (split)

I= 992 A t=4 dt

Skema Trip :

GI KUDUS : Pmt 150kV PRWDI 1,2

Tahap III (112 MW)

I= 992 A t=5dt

Skema Trip :

GI RBANG : Pmt 150kV RBKIT 1,2

Nominal SUTT = 1200 A

Ratio CT = 1600A/1

TPTahap 35 detik

Tahap 13 detik

TP

Tahap 24 detikTP

12

Tahap 13 detik

Page 155: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 313

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

TJATI7

IBT-2

TJATI5

IBT-1

PWDDIPDLAM

BAWEN

KRAPK

KLSRI

SRDOL

SYUNG

CEPU

BJGRO

BLORA

RBANG

PATI

JKULO

KUDUS

JPARA

MRGEN

G

TBROK

UNGAR7

IBT-2

UNGAR5

IBT-1 IBT-3

KDNBO

PYUNG

SLIMA

G

SCANG/SGRAH

KLATN

G

RBKIT

G

G G

MJNGO

BRNGI

BDONO

JAJAR

PEDAN

GDRJO

MKRAN

JELOK

RDRUT

BSBRU

OLS 1.320 A

G

TIMOG

SGRAH

default ke

ss ungaran

1 21 2

1 2

3

2 3

1 2 3

1 2 3

1 2

1 2

1 2

1 2 3

1 2

1 2

1 3 4

1 2

1 2

1 2

1 2 3

1 2

1 2

1 2 3

1 2

1 2

1 2

SETTING OCR

I = 1440 A

tms=0,4

KERJA OLSTahap I

I= 1.320 A t=3 dt

Skema Trip :

GI KUDUS : Pmt 150kV SYUNG

1,2

Tahap II (split)

I= 992 A t=4 dt

Skema Trip :

GI KUDUS : Pmt 150kV PRWDI

1,2

Tahap III (112 MW)

I= 992 A t=5dt

Skema Trip :

GI RBANG : Pmt 150kV RBKIT

1,2

Nominal SUTT = 1200 A

Ratio CT = 1600A/1

OLS : PHT 150 KV KUDUS – JEPARA

Tahap 24 detik

Tahap 35 detik

Tahap 13 detik

TP

Page 156: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 314

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

TJATI7

IBT-2

TJATI5

IBT-1

PWDDIPDLAM

BAWEN

KRAPK

KLSRI

SRDOL

SYUNG

CEPU

BJGRO

BLORA

RBANG

PATI

JKULO

KUDUS

JPARA

MRGEN

G

TBROK

UNGAR7

IBT-2

UNGAR5

IBT-1 IBT-3

KDNBO

PYUNG

SLIMA

G

SCANG/SGRAH

KLATN

G

RBKIT

G

G G

MJNGO

BRNGI

BDONO

JAJAR

PEDAN

GDRJO

MKRAN

JELOK

RDRUT

BSBRU

OLS 660 A

G

TIMOG

SGRAH

default ke

ss ungaran

1 21 2

1 2

3

2 3

1 2 3

1 2 3

1 2

1 2

1 2

1 2 3

1 2

1 2

1 3 4

1 2

1 2

1 2

1 2 3

1 2

1 2

1 2 3

1 2

1 2

1 2

OLS : PHT 150 KV BRINGIN – JELOK

2 detik

TP

SETTING OCR

I = 720 A tms=0,4

KERJA OLS (70 MW)

I=660 A t=2,034 dtSkema Trip :

GI BRNGI : Pmt 150 kV Trafo 1

GI MJNGO : Pmt 150 kV Trafo 2

GI JAJAR : Pmt 150 kV MJNGO

: Pmt 150 kV BDONO

Nominal SUTT = 600 A

Ratio CT = 600 /1A

Page 157: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 315

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

TJATI7

IBT-2

TJATI5

IBT-1

PWDDIPDLAM

BAWEN

KRAPK

KLSRI

SRDOL

SYUNG

CEPU

BJGRO

BLORA

RBANG

PATI

JKULO

KUDUS

JPARA

MRGEN

G

TBROK

UNGAR7

IBT-2

UNGAR5

IBT-1 IBT-3

KDNBO

PYUNG

SLIMA

G

SCANG/SGRAH

KLATN

G

RBKIT

G

G G

MJNGO

BRNGI

BDONO

JAJAR

PEDAN

GDRJO

MKRAN

JELOK

RDRUT

BSBRU

OLS 880 A

G

TIMOG

SGRAH

default ke

ss ungaran

1 21 2

1 2

3

2 3

1 2 3

1 2 3

1 2

1 2

1 2

1 2 3

1 2

1 2

1 3 4

1 2

1 2

1 2

1 2 3

1 2

1 2

1 2 3

1 2

1 2

1 2

SETTING OCR

I = 1120 A tms=0,4

KERJA OLS

Tahap I (219 MW)

I= 880 A t= 2 dt

Skema Trip :

GI SYUNG : Pmt 150kV TBROK 1,2 GI UNGAR : Pmt 150kV PRWDI 1,2

GI JELOK : Pmt 150kV BRNGI 1,2

: Pmt 150kV SGRAH 1,2

Nominal SUTT = 1200 A

Ratio CT = 1600A/1

OLS : PHT 150 KV SAYUNG – TAMBAKLOROK

Tahap 12 detik

TP

USULAN BARU

Page 158: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 316

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

TJATI7

IBT-2

TJATI5

IBT-1

PWDDIPDLAM

BAWEN

KRAPK

KLSRI

SRDOL

SYUNG

CEPU

BJGRO

BLORA

RBANG

PATI

JKULO

KUDUS

JPARA

MRGEN

G

TBROK

UNGAR7IBT-2

UNGAR5

IBT-1 IBT-3

KDNBO

PYUNG

SLIMA

G

SCANG/SGRAH

KLATN

G

RBKIT

G

G G

MJNGO

BRNGI

BDONO

JAJAR

PEDAN

GDRJO

MKRAN

JELOK

RDRUT

BSBRU

OLS 1320 A

G

TIMOG

SGRAH

default ke

ss ungaran

1 21 2

1 2

3

2 3

1 2 3

1 2 3

1 2

1 2

1 2

1 2 3

1 2

1 2

1 3 4

1 2

1 2

1 2

1 2 3

1 2

1 2

1 2 3

1 2

1 2

1 2SETTING OCR

I = 1120 A tms=0,4

KERJA OLS

Tahap I (219 MW)

I= 1320 A t= 2 dtSkema Trip :

GI SYUNG : Pmt 150kV TBROK 1,2

GI UNGAR : Pmt 150kV PRWDI 1,2

GI JELOK : Pmt 150kV BRNGI 1,2

: Pmt 150kV SGRAH 1,2

Nominal SUTT = 1200 A

Ratio CT = 1600A/1

OLS : PHT 150 KV SAYUNG – KUDUS

Tahap 12 detik

TP

USULAN BARU

Page 159: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 317

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

TJATI7

IBT-2

TJATI5

IBT-1

PWDDIPDLAM

BAWEN

KRAPK

KLSRI

SRDOL

SYUNG

CEPU

BJGRO

BLORA

RBANG

PATI

JKULO

KUDUS

JPARA

MRGEN

G

TBROK

UNGAR7

IBT-2

UNGAR5

IBT-1 IBT-3

KDNBO

PYUNG

SLIMA

G

SCANG/SGRAH

KLATN

G

RBKIT

G

G G

MJNGO

BRNGI

BDONO

JAJAR

PEDAN

GDRJO

MKRAN

JELOK

RDRUT

BSBRU

OLS 990 A

G

TIMOG

SGRAH

default ke

ss ungaran

1 21 2

1 2

3

2 3

1 2 3

1 2 3

1 2

1 2

1 2

1 2 3

1 2

1 2

1 3 4

1 2

1 2

1 2

1 2 3

1 2

1 2

1 2 3

1 2

1 2

1 2

OLS : PHT 150 KV JELOK – UNGARAN

Tahap 12 detik

TP

SETTING OCR

I = 1200 A tms=2

KERJA OLS

(160 MW)

I=990 A t=2 dt

Skema Trip :

GI JELOK : Pmt 150 kV SGRAH 1,2

GI JAJAR : Pmt 150 kV MJNGO: Pmt 150 kV BDONO

GI BRNGI : Pmt 150 kV Trafo 1

GI MJNGO : Pmt 150 kV Trafo 2

Nominal SUTT = 900 A

Ratio CT = 1200 /1A

USULAN BARU

Page 160: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 318

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

PEDAN7

IBT-2

PEDAN5

IBT-1

KLATN

MKRAN

JAJAR

GDRJO

PALUR

SLBRU

WSARI

SRAGN

MSRAN

WNGRI

NGTDI

KNTUG

BDONO

BAWEN

OLS 660A

Tahap 12 detik

NGAWI

PNRGO

PLTU PCTAN NEW PCTAN

GG

U1 U2

MJNGO

Tahap 34 detik

TP

TP

1 2

1 2

2 3

1 2

1

1 2

1 2

1 2

GDEAN

1 2

1 2

WBJAN

SMANU

WATES /

PWRJO

BANTL

1 3

1 2 3

SGRAH /MDARI

GJYAN

2 4

1 2 3

1 2 3

OLS : PHT 150 KV WONOSARI – PEDAN

SETTING OCR

I = 720 A tms=0,43

SETTING OLS

TahapI (77 MW)I=660 A t=2 dt

Skema Trip :GI PALUR : Pmt 150 kV Trafo 1 & 3

TahapII (split)I=660 A t=3 dt

Skema Trip :GI NGTDI : Pmt 150 kV PCTAN 1,2

GI PALUR : Pmt 150 kV SLBRU 1,2TahapIII (57 MW)

I=660 A t=4 dtSkema Trip :

GI WSARI : Pmt 150 kV SLBRU 1,2

Nominal SUTT = 600 A

Ratio CT = 800 /1A

Tahap 23 detik

Tahap 23 detik

PROSES REVISI

Page 161: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 319

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

PEDAN7

IBT-2

PEDAN5

IBT-1

KLATN

MKRAN

JAJAR

GDRJO

PALUR

SLBRU

WSARI

SRAGN

MSRAN

WNGRI

NGTDI

KNTUG

BDONO

BAWEN

OLS 680A

2 detik

NGAWI

PNRGO

PLTU PCTAN NEW PCTAN

GG

U1 U2

MJNGO

TP

1 2

1 2

2 3

1 2

1

1 2

1 2

1 2

GDEAN

1 2

1 2

WBJAN

SMANU

WATES /

PWRJO

BANTL

1 3

1 2 3

SGRAH /MDARI

GJYAN

2 4

1 2 3

1 2 3

OLS : PHT 150 KV JAJAR - GONDANGREJO

SETTING OCR

I = 690 A

tms=0,44

KERJA OLS

Tahap I (133 MW)I=660 A t=2 dt

Skema Trip :

GI PALUR : Pmt 150 kV MSRAN

Pmt 150 kV SRAGN

Nominal SUTT = 600 ARatio CT = 1000 /1A

Page 162: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 320

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

PEDAN7

IBT-2

PEDAN5

IBT-1

KLATN

MKRAN

JAJAR

GDRJO

PALUR

SLBRU

WSARI

SRAGN

MSRAN

WNGRI

NGTDI

KNTUG

BDONO

BAWEN

OLS 696A

NGAWI

PNRGO

PLTU PCTAN NEW PCTAN

GG

U1 U2

MJNGO

1 2

1 2

2 3

1 2

1

1 2

1 2

1 2

GDEAN

1 2

1 2

WBJAN

SMANU

WATES /

PWRJO

BANTL

1 3

1 2 3

SGRAH /MDARI

GJYAN

2 4

1 2 3

1 2 3

OLS : PHT 150 KV PALUR - GONDANGREJO

SETTING OCR

I = 720 A tms=0,45

KERJA OLS

TAHAP I (15 MW)

I= 696 A t=2,01 dt

Skema Trip :

GI SRAGN : Pmt 150kV NGAWI 1,2

: Pmt 150kV Trafo2

TAHAP II (118 MW)

I= 696 A t=4 dt

Skema Trip :

GI PALUR : Pmt 150kV MSRAN

: Pmt 150kV SRGEN

Nominal SUTT = 600 A

Ratio CT = 600 /1A

Tahap 12 detik

Tahap 24 detik

Page 163: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 321

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

PEDAN7

IBT-2

PEDAN5

IBT-1

KLATN

MKRAN

JAJAR

GDRJO

PALUR

SLBRU

WSARI

SRAGN

MSRAN

WNGRI

NGTDI

KNTUG

BDONO

BAWEN

OLS 400A

NGAWI

PNRGO

PLTU PCTAN NEW PCTAN

GG

U1 U2

MJNGO

1 2

1 2

2 3

1 2

1

1 2

1 2

1 2

GDEAN

1 2

1 2

WBJAN

SMANU

WATES /

PWRJO

BANTL

1 3

1 2 3

SGRAH /MDARI

GJYAN

2 4

1 2 3

1 2 3

OLS : PHT 150 KV MASARAN - PALUR

SETTING OCR

I = 720 A tms=0,5

KERJA OLS

Tahap I (15 MW)

I= 400 A t=2 dt

Skema Trip :

GI SRAGN : Pmt 150 kV NGAWI 1,2

GI SRAGN : Pmt 150 kV Trafo 2

Nominal SUTT = 600 A

Ratio CT = 600 /1A

2 detik

TP

Page 164: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 322

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

PEDAN7

IBT-2

PEDAN5

IBT-1

KLATN

MKRAN

JAJAR

GDRJO

PALUR

SLBRU

WSARI

SRAGN

MSRAN

WNGRI

NGTDI

KNTUG

BDONO

BAWENOLS 690A

NGAWI

PNRGO

PLTU PCTAN NEW PCTAN

GG

U1 U2

MJNGO

1 2

1 2

2 3

1 2

1

1 2

1 2

1 2

GDEAN

1 2

1 2

WBJAN

SMANU

WATES /

PWRJO

BANTL

1 3

1 2 3

SGRAH /MDARI

GJYAN

2 4

1 2 3

1 2 3

OLS : PHT 150 KV SRAGEN - PALUR

Tahap 12 detik

Tahap 24 detik

SETTING OCR

I = 720 A tms=0,35

KERJA OLS (15 MW)

I=690 A t=2 dt

Skema Trip :

GI SRAGN : Pmt 150kV NGAWI 1,2

: Pmt 150kV Trafo 2

Nominal SUTT = 600 A

Ratio CT = 600 /1A

Page 165: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 323

LAMPIRAN – 12

PT.PLN (PERSERO) P3BAPB JAWA TENGAH & DIY

PEDAN7

IBT-2

PEDAN5

IBT-1

KLATN

MKRAN

JAJAR

GDRJO

PALUR

SLBRU

WSARI

SRAGN

MSRAN

WNGRI

NGTDI

KNTUG

BDONO

BAWEN

OLS 1320A

NGAWI

PNRGO

PLTU PCTAN NEW PCTAN

GG

U1 U2

MJNGO

1 2

1 2

2 3

1 2

1

1 2

1 2

1 2

GDEAN

1 2

1 2

WBJAN

SMANU

WATES /

PWRJO

BANTL

1 3

1 2 3

SGRAH /MDARI

GJYAN

2 4

1 2 3

1 2 3

OLS : PHT 150 KV JAJAR – PEDAN

SETTING OCR

I = A tms=

KERJA OLS

Tahap I (133 MW)

I=1320 A t=2 dt

Skema Trip :

GI JAJAR : Pmt 150 kV MSRAN

Pmt 150 kV SRAGN

Tahap II (49 MW)

I=1320 A t=4 dt

Skema Trip :

GI JAJAR : Pmt 150 kV BDONO

Pmt 150 kV MJNGO

Nominal SUTT = 600 A

Ratio CT = 1000 /1A

TP

Tahap 12 detik

Tahap 24 detik

USULAN BARU

Page 166: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 324

LAMPIRAN – 12

OLS IBT 1, 2 500/150 KV – 500 MVA GITET KRIAN

KETERANGAN

GITET KRIAN

IBT 1 500/150 KV - 500 MVA

Nom : 1718 A

CT : 2000 A

Setting OCR : 2000 A

Setting OLS : 2000 A

IBT 2 500/150 KV - 500 MVA

Nom : 1718 A

CT : 2000 A

Setting OCR : 2000 A

Setting OLS : 1900 A

Skema Trip

Tahap 1 t : 3.0 Sec

GI. Surabaya Barat

Pmt 150 kV Pht Driyorejo

Pmt 150 kV Pht Babadan

GI. Tandes

Pmt 20 kV Trafo 2 150/20 kV = 29,67 MW

Pmt 20 kV Trafo 3 150/20 kV = 10,89 MW

Tahap 2 t : 5.0 Sec

GI. Surabaya Barat

Pmt 150 kV Trafo 2 150/20 kV = 39,89 MW

500 kV

IBT. 1,2

1 x 50 MVA

1 x 50 MVA

DYRJO150 KV

T. 4 T. 9 BBDAN

T. 1 T. 2

Island 70 kV

Driyorejo

T. 3

TNDES 150 KVA

B

T. 2 T. 3

A

B

A

B

150 KV

150 KV

GITET KRIAN7

IBT-3

500 MVA

B

A

IBT-1

500 MVA

T. 1 T. 2

IBT-2

500 MVA

A

B

OLS

Normaly Open

SURABAYA BARAT

Tahap 1

Tahap 2

Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STRATEGI OPSIS APB JTM

= 259,5 MW

Page 167: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 325

LAMPIRAN – 12

OLS IBT 1, 2, 3 500/150 KV – 500 MVA GITET PAITON

KETERANGAN

GITET PAITON

IBT 1, 2, 3 – 500 MVA

Nom : 1718 A

CT : 2000 A

Setting OCR : 2030 A

Setting OLS : 1900 A

Skema Trip

Tahap 1 t : 3.0 Sec

GI. Banyuwangi

Pmt 20 kV Trf 2 150/20 kV=21,25MW

Pmt 20 kV Trf 3 150/20 kV=22,62MW

GI. Situbondo

Pmt 20 kV Trf 2 150/20 kV=16,05MW

Tahap 2 t : 4.0 Sec

GI. Jember

Pmt 20 kV Trf 3 150/20 kV=41,41MW

GI. Bondowoso

Pmt 20 kV Trf 1 150/20 KV=14,92MW

Tahap3 t : 5.0 Sec

GI. Jember

Pmt 20 kV Trf 4 150/20 kV=37,25MW

GI. Genteng

Pmt 20 kV Trf 2 150/20 kV=38,84MW

GI. Probolinggo.

Pmt 20 kV Trf 3 150/20 kV=28,29MW

GI. Lumajang.

Pmt 20 kV Trf 2 150/20 KV=21,70MW

GI. Tanggul

Pmt 20 kV Trf 2 150/20 KV=18,65MW

STBDO

A

B

PAITON

OLS

A

B

T. 2

T. 1

A

B

T. 4

BDNSO

JMBERA

B

GTENG

A

B

BWNGI

T. 2 T. 3

T. 3

A

B

T. 2

LJANG

T. 3

PBLGO

A

B

T. 2

I II

I II

I II

I II

A

B

IBT 2

500MVA

IBT 3

500MVA

IBT 1

500MVA

150 KV

150 KV

150 KV

150 KV

150 KV150 KV

150 KV

150 KV

T.2

TGGUL150 KV

Tahap 1

Tahap 2

Tahap 3

Tahap 3

Tahap 3Tahap 3

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Tahap 2

Di gamb : Winarto

Page 168: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 326

LAMPIRAN – 12

KETERANGAN

GITET GRATI

IBT 1 500/150 KV – 500 MVA

Nom : 1924 A

CT : 2500 A

Setting OCR : 2050 A

Setting OLS : 1900 A

IBT 2 500/150 KV – 500 MVA

Nom : 1924 A

CT : 2000 A

Setting OCR : 2320 A

Setting OLS : 1900 A

Skema Trip

Tahap 1 t : 1.5 Sec

GI. Bangil

Pmt 150 kV IBT 1, 2 150/70 kV=41,41MW

Pmt 150 kV Pht Bumicokro 1 = 39,9MW

Pmt 150 kV Pht Bumicokro 2 = 39,9 MW

Tahap 2 t : 2 Sec

Pmt 150 kV Pht Bulukandang

Pmt 150 kV Pht Lawang

GI. Kebonagung

Pmt 150 kV Kopel Bus A-B

Total Tahap 2 = 220,97 MW

OLS IBT 1 & 2 500/150 KV - 500 MVA GITET GRATI

A

B

GRATI

IBT 1

500MVAIBT 2

500MVA

GDTAN

I II

OLS

T.1

A

B

BLKDG

BNGIL

A

B

A

B

T.2

T.4

LWANG

STAMI

PAKIS

SKLNG IBT. 1,2,3

PBLGO

A

B

A

B

A

B

I II

I III II

BCKRO

Tahap 1

Tahap 2

150 KV

KBAGN

150 KV

150 KV

150 KV

150 KV

150 KV

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 169: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 327

LAMPIRAN – 12

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

KETERANGAN

GITET KRIAN

IBT 3 500/150 KV - 500 MVA

Nom : 1718 A

CT : 2000 A

Setting OCR : 2061 A

Setting OLS : 1900 A

Skema Trip

Tahap 1 t : 3 Sec

GI. Manyar

Pmt 20 kV Trafo 2 150/20 KV = 36,77 MW

Tahap 2 t : 5 Sec

GI. Surabaya Barat

Pmt 20 kV Trafo 3 Manyar = 37,63 MW

OLS IBT 3 500/150 KV – 500 MVA GITET KRIAN

GITET KRIAN

IBT-1

500 MVA

500 kVB

A

IBT-2

500 MVA

CERME

T. 1

Normaly open

IBT-3

500 MVA

A

B

A

B

150 KV

150 KV

OLS

Tahap 1

MNYAR

Island 70 KvManyar

150 KVA

B

KSJTM

T. 1

A

B

T. 2T. 3

T. 4T. 1

Tahap 2

Di gamb : Winarto

Page 170: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 328

LAMPIRAN – 12

OLS IBT 1& 2 500/150 KV – 500 MVA GITET NGIMBANG

KETERANGAN

GITET NGIMBANGIBT 1 500/150 KV – 500 MVANom : 1924 ACT : 2500 A Setting OCR : 2300 ASetting OLS : 2000 A

IBT 2 500/150 KV – 500 MVANom : 1924 ACT : 2500 A Setting OCR : 2300 ASetting OLS : 2000 A

Skema Trip.Tahap 1 t = 3.0 Sec

GI BabatPmt 20 KV Trafo 1 150/20KV- 30 MVA = 25,57 MWGI BojonegoroPmt 150 KV Pht Cepu 1, 2 (usulan)

Tahap 2 t = 5.0 SecGI BojonegoroPmt 20 KV Trafo 3 150/20KV- 60 MVA (usulan)GI LamonganPmt 20 KV Trafo 2 150/20KV- 30 MVA = 24,57 MWGI. Tuban.Pmt 20 KV Trafo 1 150/20KV- 30 MVA = 19,12 MW

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

500 kV

NGBNG5

A

B

150 KV

GITET NGIMBANG7

B

A

IBT-1500 MVA

BABAT

A

B

150 KV

150 KVA

B

TUBAN

T. 2

A

B

LNGAN

T. 1

T. 1

OLS

I II

I II

I

II

Tahap 2

Tahap 1 Tahap 2

150 KV

IBT-2500 MVA

T. 3

A

BBJGRO

150 KV

ArahCEPU

Tahap 2

Tahap 1

23.6 MW 16.1 MW

16.9 MW

30 MW

Di gamb : Winarto

Page 171: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 329

LAMPIRAN – 12

~

TNDES

A

B

SWHAN

PLTGU GRESIK500 KV

BLOK 2 & 3

IBT-1500 MVA

150 KV

BLOK 1

KPANG MKBANUDAAN

150 KV

T. 2 T. 3

OLS SUTT 150 KV GRESIK – TANDES 1, 2

KETERANGAN

SUTT 150 KV GRESIK – TANDES 1, 2

Nom : 3892 A

CT : 3150 ASetting OCR : 3465 A

Setting OLS : 3000 A

Skema Trip

Tahap 1 t : 2.0 Sec

GI. TandesPmt 20 KV Trafo 2 150/20 KV = 29,67 MW

Pmt 20 KV Trafo 3 150/20 KV = 10,89 MW

GI. Sawahan

Pmt 20 KV Trafo 1 150/20 KV = 20,80 MW

Pmt 150 kV Pht Kupang 1, 2 = 49,73 MW

Pmt 150 kV Pht Undaan 1, 2 = 33,15 MW

Tahap 2 t : 3.0 Sec

GI. Sawahan

Pmt 150 kV Pht Morokrembangan 1, 2 = 134,75MW

OLS

T. 1

150 KVA

B

~

I II

I

II

I II I II I II

Tahap 2Tahap 1

Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STRATEGI OPSIS APB JTM

Page 172: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 330

LAMPIRAN – 12

KETERANGAN

SUTT 150 KV GRESIK – TANDES 1, 2

Nom : 3892 A

CT : 3150 AOCR : 3465 A

Skema Trip

GI TANDES

Pmt 150 KV Pht Perak 1

Pmt 150 KV Pht Perak 2

GI Yang Padam = 217,98 MW

GI Perak

GI Ujung

GI Kenjeran Bus AGI Gilitimur

GI Bangkalan

GI Sampang

GI Pamekasan

GI Sumenep

Inter tripping

INTER TRIPPING SUTT 150 KV GRESIK – TANDES 1, 2

~

TNDESA

B

PLTGU GRESIK500 KV

BLOK 2 & 3

IBT-1500 MVA

150 KV

BLOK 1

150 KV

~

Arah Radial ke :

GI. PerakGI. Ujung

GI. Kjran Bus AGI. GlmurGI. Bklan

GI. SampgGI. PksanGI. Smnep

I II

I II

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STRATEGI OPSIS APB JTM

Page 173: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 331

LAMPIRAN – 12

OLS SUTT 150 kV WARU – RUNGKUT 1, 2

KETERANGAN

SUTT 150 KV WARU – RUNGKUT 1, 2

Nom : 1480 A

CT : 2000 A

Setting OCR : 1600 A

Setting OLS : 1500 A

Skema Trip

Tahap 1 t : 2.0 Sec

GI. Rungkut

Pmt 20 KV Trafo 3 150/20 KV = 19,63 MW

Pmt 20 KV Trafo 4 150/20 KV = 33, 53 MW

GI. Kenjeran

Pmt 20 kV Trafo 1 150/20 kV = 38.27 MW

Tahap 2 t : 3.0 SecGI. Sukolilo

Pmt 20 kV Trafo 2 150/20 kV = 33.53 MW

Tahap 3 t : 4.0 Sec

GI. Rungkut

Pmt 20 kV Trafo 2 150/20 kV = 40.52 MWGI. Sukolilo

Pmt 20 kV Trafo 1 150/20 kV = 20.93 MW

Tahap 4 t : 5.0 Sec

GI. Kenjeran

Pmt 150 kV Pht Glmur (OFF)

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STRATEGI OPSIS APB JTM

RUNGKUT

SUKOLILO

B

A

KENJERAN

I II

TP

OLS

WARU

T. 3 T. 4

T. 2 T. 1

I III

II

B

A

B

A

B

A

TP

Tahap 1

Tahap 2 Tahap 1

150 KV

150 KV

150 KV

150 KV

T. 1

T. 2

Tahap 3

Tahap 3

Tahap 4

Target OLS Tahap 4 Normaly OF danKondisi ON hanya saat dibutuhkanJika ada perubahan konfigurasi di Pulau Madura

KETERANGAN.

Normaly Off

Page 174: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 332

LAMPIRAN – 12

BKLAN

GLMUR

UJUNG

KETERANGAN

SUTT 150 KV UJUNG – PERAK 1. 2

Nom : 740 A

CT : 1000 A

Setting OCR : 960 A

Setting OLS : 800 A

Skema Trip

Tahap 1 t : 4.0 SecGI. Sampang

Pmt 20 KV Trafo 2 150/20 KV = 27,22 MW

Tahap 2 t : 5.0 Sec

GI. Bangkalan

Pmt 20 KV Trafo 2 150/20 KV = 23,83 MW

PERAK

DariTNDES

OLS SUTT 150 KV PERAK – UJUNG 1, 2

KJRAN

T. 2

SAMPG

T. 2

OLS

PKSAN

SMNEP

B

A

B

A

B

A

B

A

150 KV 150 KV

150 KV

150 KV

B

A150 KV

150 KV

I II

I II

Tahap 2 Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STRATEGI OPSIS APB JTM

Page 175: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 333

LAMPIRAN – 12

BKLAN

GLMUR

UJUNGKETERANGAN

SUTT 150 KV UJUNG – KJRAN

Nom : 740 A

CT : 1000 A

Setting OCR : 1250 A

Setting OLS : 700 A

SUTT 150 KV UJUNG – BKLAN

Nom : 740 A

CT : 1000 A

Setting OCR : 960 A

Setting OLS : 700 A

Skema Trip

Tahap 1 t : 4.0 Sec

GI. Sampang

Pmt 20 KV Trafo 2 150/20 KV = 27,22 MW

Tahap 2 t : 5.0 Sec

GI. Bangkalan

Pmt 20 KV Trafo 2 150/20 KV = 23,83 MW

PERAK

DariTNDES

OLS SUTT 150 KV UJUNG – KENJERAN & UJUNG - BANGKALAN

KJRAN

T. 2

SAMPG

T. 2

OLS

PKSAN

SMNEP

B

A

B

A

B

A

B

A

150 KV 150 KV

150 KV

150 KV

B

A150 KV

150 KV

I II

I II

Tahap 2 Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STRATEGI OPSIS APB JTM

Page 176: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 334

LAMPIRAN – 12

OLS SUTT 150 KV TANDES – PERAK 1, 2

KETERANGAN

SUTT 150 KV TANDES – PERAK 1, 2

Nom : 740 ACT : 1000 A

Setting OCR : 900 A

Setting OLS : 720 A

SUTT 150 KV PERAK – TNDES 1, 2

Nom : 740 ACT : 600 A

Setting OCR : 720 A

Setting OLS : 720 A

Skema Trip

Tahap 1 t : 4.0 Sec

GI. Sampang

Pmt 20 KV Trafo 2 150/20 KV = 27,22 MW

Tahap 2 t : 5 SecGI. Bangkalan

Pmt 20 KV Trafo 2 150/20 KV = 23,83 MW

Tahap Usulan

Tahap 3 t : Sec

GI Pamekasan

Pmt 20 KV Trafo 1 150/20 KV

GLMUR

UJUNGPERAK

KJRAN

TNDES

OLS

B

A

B

A150 KV

150 KV

B

A150 KV

150 KV

I II

BKLAN

T. 2

SAMPG

T. 2

SMNEP

B

A

B

A150 KV 150 KV

I II

Tahap 2 Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STRATEGI OPSIS APB JTM

PKSAN

T. 1

Tahap 3

Usulan

Target Tahap 3

( Januari 2014 )

Page 177: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 335

LAMPIRAN – 12

OLS DI SUTT 150 KV SBRAT – DRYJO DAN SBRAT - BBDAN

KETERANGAN

SUTT 150 KV SBRAT – DRYJO

Nom : 1000 A

CT : 2000 A

Setting OCR : 1200 A

Setting OLS : 1000 A

SUTT 150 KV SBRAT – BBDAN

Nom : 1200 A

CT : 2000 A

Setting OCR : 1950 A

Setting OLS : 800 A

Skema Trip

Tahap 1 t : 4.0 Sec

GI. Driyorejo

Pmt 20 KV Trafo 4 150/20 KV = 46,55 MW

Usulan Target Tambahan

Tahap 2 t : 5 Sec

GI. Babadan

Pmt 20 KV Trafo 1 150/20 KV

IBT-3

500 MVA

500 kV

IBT-1

500 MVA

T. 1 T. 2

IBT. 1,2

1 x 50 MVA

1 x 50 MVAT. 3

T. 2

Island 70 kV

Driyorejo

T. 9

IBT-2

500 MVA

OLS Normaly Open

T. 4

T. 1

Tahap 1

Tahap 2

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

DYRJO150 KV

BBDAN

150 KVA

B

A

B

150 KV

150 KV

GITET KRIAN7

A

B

SURABAYA BARAT

A

B

USULAN TAMBAHAN TARGETTRF 1 GI BBDAN( Pebruari 2013 )

STRATEGI OPSIS APB JTM

USULAN RESETTING OLSSBRAT - BBDAN( MARET 2014 )

Page 178: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 336

LAMPIRAN – 12

OLS SUTT 150 KV GRATI – GONDANGWETAN 1, 2

KETERANGAN

SUTT 150 KV GRATI-GDTAN 1, 2

Nom : 1620 A

CT : 2000 A

Setting OCR : 2000 A

Setting OLS : 2000 A

Skema Trip

Tahap 1 t : 4.0 Sec

GI. Bangil

Pmt 150 kV Pht Bumicokro 1,2 = 79,8 MW

Pmt 150 KV IBT 1 150/70 KV = 32,76 MW

Pmt 150 KV IBT 2 150/70 KV = 85,12 MW

Tahap 2 t : 4.5 Sec

Pmt 150 kV Pht Bulukandang

Pmt 150 kV Pht Lawang

GI. Kebonagung

Pmt 150 kV Kopel Bus A-B

Total Tahap 2 = 215,97 MW

A

B

IBT 1

500MVA

IBT 2

500MVA

GDTAN

I II

OLS

IBT. 1

BLKDG

BNGIL

T.4

LWANG

STAMI

PAKIS

SKLNG IBT. 1,2,3

PBLGO

I II

I III II

BCKRO

IBT. 2

Tahap 1

Tahap 2

GRATI

A

B

A

B

A

B

A

B

A

B

A

B

150 KV

150 KV

150 KV

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

KEBONAGUNG

Di gamb : Winarto

Page 179: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 337

LAMPIRAN – 12

OLS SUTT 150 KV PHT GONDANG WETAN – PROBOLINGGO 1, 2

KETERANGAN

SUTT 150 KV GDTAN-PBLGO

Nom : 740 A

CT : 1000 A

Setting OCR : 800 A

Setting OLS : 800 A

Skema Trip

Tahap 1 t : 1.5 Sec

GI. Bangil

Pmt 150 kV Pht Bumicokro 1,2 = 79.8MW

Pmt 150 KV IBT 1,2 150/70 KV=41.6MW

Tahap 2 t : 2.5 Sec

GI. Bngil

Pmt 150 kV Pht Bulukandang

Pmt 150 kV Pht Lawang

GI. Kebonagung

Pmt 150 kV Kopel Bus A-B

Total Tahap 2 = 215,97 MW

A

B

IBT 1

500MVA

IBT 2

500MVA

GDTAN

I II

IBT. 1

BLKDG

BNGIL

T.4

LWANG

STAMI

PAKIS

SKLNG IBT. 1,2,3

PBLGO

I II

I III II

BCKRO

IBT. 2

OLS

Tahap 1

Tahap 2

GRATI

A

B

A

B

A

B

A

B

A

B

A

B

150 KV

150 KV

150 KV

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 180: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 338

LAMPIRAN – 12

KETERANGAN

BNGIL – GDTAN 1, 2

Nom : 740 A

CT : 1000 A

Setting OCR : 800 A

Setting OLS : 800 A

Skema Trip

Tahap 1 t : 3.0 Sec

GI. Bangil

Pmt 150 kV Pht Bumicokro 1,2 = 79,80 MW

Pmt 150 KV IBT 1,2 150/70 KV = 41,66 MW

OLS SUTT 150 KV BNGIL – GONDANGWETAN 1, 2

GDTAN

IBT. 1

BNGIL

A

B

I II

I II

BCKRO

IBT. 2

OLS

LWANG

BLKNG

Tahap 1

150 KV

A

B

150 KV

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 181: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 339

LAMPIRAN – 12

OLS SUTT 150 KV PAITON – SITUBONDO 1, 2PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STBDO

A

B

PAITON

OLS

A

B

T. 2

T. 1

A

B

T. 4

BDNSO

JMBERA

B

GTENG

A

B

BWNGI

T. 2 T. 3

T. 3

A

B

T. 2

LJANG

T. 3

PBLGO

A

B

T. 2

I II

I II

I II

I II

A

B

IBT 2 500MVA

IBT 3 500MVA

IBT 1 500MVA

150 KV

150 KV

150 KV

150 KV

150 KV150 KV

150 KV

150 KV

Tahap 1

Tahap 2

Tahap 3

Tahap 3

Tahap 3

T.2

TGGUL150 KV

Tahap 2

50 MW

50 MW

BALI

SKLT1, 2, 3, 4

KETERANGAN

SUTT PITON – STBDO 1, 2

Nom : 1620 A

Ct : 2000 A

Setting OCR : 2000 A

Setting OLS : 1760 A

Skema Trip

Tahap 1 t : 3.0 Sec

GI. Banyuwangi

Pmt 20 kV Trf 2 150/20 kV = 22,42 MW

Pmt 20 kV Trf 3 150/20 kV = 20,81 MW

GI. Situbondo

Pmt 20 kV Trf 2 150/20 kV = 16,24 MW

Tahap 2 t : 4.0 Sec

GI. Jember

Pmt 20 kV Trf 3 150/20 kV = 43,20 MW

Pmt 20 kV Trf 4 150/20 kV = 31,32 MW

GI. Bondowoso

Pmt 20 kV Trf 1 150/20 Kv = 14,69 MW

GI. Genteng

Pmt 20 kV Trf 2 150/20 kV = 35,34 MW

Bali.

Shedding : 50 MW

Tahap 3 t : 5.0 Sec

GI. Probolinggo.

Pmt 20 kV Trf 3 150/20 kV = 26.35 MW

GI. Lumajang.

Pmt 20 kV Trf 2 150/20 KV = 26,04 MW

GI. Tanggul

Pmt 20 kV Trf 2 150/20 KV = 17,88 MW

Bali.

Shedding : 50 MW

Di gamb : Winarto

Page 182: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 340

LAMPIRAN – 12

PBLGO – LJANG 1

Nom : 1515 ACT : 2000 A

Setting OCR : 900 ASetting OLS : 800 A

PBLGO – LJANG 2

Nom : 1515 A

CT : 1600 ASetting OCR : 800 A

Setting OLS : 720 A

LJANG – PBLGO 1

Nom : 1515 ACT : 2000 A

Setting OCR : 900 ASetting OLS : 900 A

LJANG – PBLGO 2

Nom : 1515 A

CT : 1600 A

Setting OCR : 800 A

Setting OLS : 800 A

Skema Trip

Tahap 1 t : 3.0 Sec

GI. Banyuwangi

Pmt 20 kV Trf 2 150/20 kV = 22,42 MW

Pmt 20 kV Trf 3 150/20 kV = 20,81 MWGI. Situbondo

Pmt 20 kV Trf 2 150/20 kV = 16,24 MW

GI. Genteng

Pmt 20 kV Trf 2 150/20 kV = 38,67 MW

Tahap 2 t : 4.0 Sec

GI. Jember

Pmt 20 kV Trf 3 150/20 kV = 43,20 MWGI. Bondowoso

Pmt 20 kV Trf 1 150/20 KV = 14,69 MW

Pmt 20 kV Trf 2 150/20 KV = 15,65 MW

Tahap 3 t : 5.0 Sec

GI. Jember

Pmt 20 kV Trf 1 150/20 KV = 21,81 MWPmt 20 kV Trf 4 150/20 KV = 36,25 MW

GI. Lumajang.

Pmt 20 kV Trf 1 150/20 KV = 32,40 MW

Pmt 20 kV Trf 2 150/20 KV = 21,11 MW

GI. TanggulPmt 20 kV Trf 2 150/20 KV = 18,17 MW

OLS SUTT 150 KV PROBOLINGGO – LUMAJANG 1, 2

STBDO

A

B

PAITON

A

B

T. 2

T. 1 & 2

A

B

T. 1 & 4

BDNSO

JMBERA

B

GTENG

A

B

BWNGI

T. 2 T. 3

T. 3

A

B

T. 1 & 2

LJANG

PBLGO

A

B

T. 2

I II

I II

I II

I II

A

B

IBT 2 500MVA

IBT 3 500MVA

IBT 1 500MVA

150 KV

150 KV

150 KV

150 KV

150 KV150 KV

150 KV

150 KV

OLS

Tahap 1

Tahap 2

Tahap 1

Tahap 2Tahap 3

Tahap 3

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

T.2

TGGUL150 KV

Tahap 3

Tahap 1

Di gamb : Winarto

Page 183: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 341

LAMPIRAN – 12

OLS SUTT 150 KV GENTENG – JEMBER - BANYUWANGI

BWNGI 150 KVA

B

GTENG

JMBER

A

B

T. 1 T. 2

T. 1 T. 2

Tahap 1

Tahap 1

150 KVA

B

150 KVA

B

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

KETERANGAN

SUTT 150 KV GTENG - JMBER

Nom : 740 A

CT : 1000 A

Setting OCR : 800 A

Setting OLS : 800 A

Skema Trip

Tahap 1 t : 4.0 Sec

GI. Genteng

Pmt 20 kV Trf 1 150/20 kV

Pmt 20 kV Trf 2 150/20 kV

SUTT 150 KV BWNGI – GTENG

Nom : 740 A

CT : 1000 A

Setting OCR : 800 A

Setting OLS : 800 A

SUTT 150 KV BWNGI – JMBER

Nom : 740 A

CT : 800 A

Setting OCR : 800 A

Setting OLS : 800 A

Skema Trip

Tahap 1 t : 4.0 Sec

GI. Banyuwangi

Pmt 20 kV Trf 1 150/20 kV = 18,06 MW

Pmt 20 kV Trf 2 150/20 kV = 23,95 MW

GI. Genteng

Pmt 20 kV Trf 1 150/20 kV = 36,05 MW

Pmt 20 kV Trf 2 150/20 kV = 35,99 MW

Page 184: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 342

LAMPIRAN – 12

OLS SUTT 150 KV SITUBONDO – BANYUWANGI 1, 2PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

STBDO

A

B

PAITON

A

B

T. 2

T. 1

A

B

T. 4

BDNSO

JMBERA

B

GTENG

T. 3

A

B

T. 2

I II

I II

I II

IBT 2 500MVA

IBT 3 500MVA

IBT 1 500MVA

150 KV

150 KV150 KV

150 KV

150 KV

A

B

BWNGI

T. 2 T. 3

150 KV

Tahap 1

BALI

SKLT1, 2, 3, 4OLS

Dari

Ljang & Tggul

KETERANGAN

SUTT 150 KV STBDO-BWNGI 1, 2

Nom : 1600 A

CT : 1600 A

Setting OCR : 1600 A

Setting OLS : 1520 A

Skema Trip

Tahap 1 t : 3.0 Sec

GI. Banyuwangi

Pmt 20 kV Tarfo 2 150/20 KV = 22,43 MW

Pmt 20 kV Trafo 3 150/20 KV = 20,81 MW

Di gamb : Winarto

Page 185: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 343

LAMPIRAN – 12

KETERANGAN

GI. BANGIL

IBT 1 150/70 KV - 60 MVA

Nom : 495 A

CT : 800 A

Setting OCR : 600 A

Setting OLS : 440 A

IBT 2 150/70 KV - 50 MVA

NOM : 412 A

CT : 800 A

OCR : 600 A

SETT OLS : 440 A

Skema Trip :

Tahap 1 t = 2.5 Sec

GI BNGIL

Pmt 70 KV Pht Blimbing.

Pmt 70 KV Pht Sukorejo.

Total Tahap 1 = 18,59 MW

GI PANDAAN

Pmt 20 kV P. Trawas = 6,83 MW

OLS IBT 1, 2 - 150/70 KV BANGIL

A

B

BLBNG

I II

T. 3T. 1 T.2

70 KV

BNGIL5

150 kV

T.3

B

A

OLS

A

IBT-2

50 MVA

70 kVB

BNGIL4

70 KVA

B

SKRJO

T.1

A

B

PDAAN

T.1

IBT-1

60 MVA

P. 20 kV Trawas

T.2 T.3

70 KV

T.4

Normaly Open

Tahap 1

Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 186: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 344

LAMPIRAN – 12

KETERANGAN

SUTT 70 KV PDAAN- BNGIL

Nom : 425 A

CT : 800 A

Setting OCR : 528 A

Setting OLS : 480 A

Skema Trip

Tahap 1 t : 4.0 Sec

GI. Pandaan

Pmt 20 kV P. Trawas = 6,83 MW

OLS SUTT 70 KV PANDAAN – BANGIL 1, 2

A

B

BLBNG

I II

T. 3T. 1 T.2

70 KV

BANGIL5

150 kV

T.3

B

A

OLS

A

IBT-2

50 MVA

70 kVB

BANGIL4

70 KVA

B

SKRJO

T.1

A

B

PDAAN

T.1

IBT-1

60 MVA

P. 20 kV Trawas

T.2 T.3

70 KV

T.4

Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 187: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 345

LAMPIRAN – 12

OLS IBT 1 150/70 KV – 100 MVA GI WLINGI

WLNGI5

70 kV

IBT-1

100 MVA

70 kVB

A

70 kVB

A

T. 4T. 2 T.1

T. 1

T. 2

T. 2

PLTA

1&2

~

WLNGI4

BLTAR

TLAGN

150 kV

Tahap 1

OLS

1 2

1 2

Normaly Open

KETERANGAN

GI. WLINGI

IBT 1 150/70 KV - 100 MVA

Nom : 824 A

CT : 1000 A

Setting OCR : 1000 A

Setting OLS : 900 A

Skema Trip

Tahap 1 t : 3.0 Sec

GI. Blitar

Pmt 20 kV Trafo 2 70/20-30 MVA = 26,06 MW

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 188: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 346

LAMPIRAN – 12

OLS SUTT 150 KV SENGKALING – BLIMBING 1, 2

KETERANGAN

SUTT 70 KV SKLNG – BLBNG 1, 2

Nom : 277 A

CT : 400 A

Setting OCR : 368 A

Setting OLS : 280 A

Skema Trip

Tahap 1 t : 3.0 Sec

GI. Blimbing

Pmt 20 KV Trafo 1 70/20 kV = 12,34 MW

SKLNG5

I II

SLRJO

70 KV

MDLAN

MTR. 6.6 / 70 KV

70 KV

~PLTA

5.6 MVA

A

B 70 kV

IBT-1

60 MVA

B

A

T. 3 T. 4

150 kV

IBT-2

30 MVA

Normaly Open

SKLNG4

A

B

BLBNG

T. 3

T. 1

T. 2

70 KV

OLS

Polehan

1 2

Normaly Open

I II

Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 189: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 347

LAMPIRAN – 12

TUREN

SGRUH

GPNGN

T. 120 MVA

T. 130 MVA

PLTA 1, 2

T. 125 MVA

T. 220 MVA

KKTES

T. 120 MVA

70 KV 70 KV

70 KV

70 KV

OLS

OLS SUTT 70 KV KEBONAGUNG – TUREN DAN SENGGURUH

KETERANGAN

SUTT 70 KV KBAGN - SGRUH

Nom : 745 A

CT : 800 A

Setting OCR : 782 A

Setting OLS : 480 A

SUTT 70 KV PHT KBAGN - TUREN

Nom : 745 A

CT : 800 ASetting OCR : 780 A

Setting OLS : 480 A

Target Trip.

Tahap 1 : 4 SecGI Turen

Pmt 20 kV Trf 1 70/20 kV = 20,60 MW

Tahap 2 : 5 Sec

GI Karangkates

Pmt 20 kV Trf 1 70/20 kV = 15,17 MW

KBAGN5

IBT-1

50 MVA

150 kV

70 kV

B

A

IBT-2

35 MVA

IBT-3

100 MVA

B

A

~ ~

KBAGN4

Tahap 1

Tahap 2

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Usulan Resetting OLSDari 480 A menjadi 740 A

( Oktober 2014 )

Page 190: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 348

LAMPIRAN – 12

SUTT 150 KV WLINGI - SUTAMI

KETERANGAN

SUTT 150 KV WLNGI - STAMI

Nom : 435 A

CT : 600 A

Setting OCR : 480 A

Setting OLS : 480 A

Skema Trip

Tahap 1 t : 5.0 Sec

GI. Wlingi

Pmt 20 kV P. Sutojayan = 4,3 MW

Pmt 20 kV P. Panggungrejo = 7,2 MW

WLINGI

SUTAMI150 kV

PLTA

1,2&3

P. 20 kV Sutojayan

P. 20 kV PanggungrejoPLTA

1&2

IBT-1

100 MVA

70 kV

KBAGN

1 2

~ ~

T.3

OLS

Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

150 kV

Di gamb : Winarto

Page 191: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 349

LAMPIRAN – 12

KETERANGAN

SUTT 70 KV KBAGN – PLHAN 1, 2Nom : 440 ACT : 400 ASetting OCR : 480 A

Setting OLS : 480 A

Skema Trip.Tahap 1 t = 3.0 SecGI PLHANPmt 20 Kv Trafo 2 70/20 KV = 13,09 MW

USULAN OLS SUTT 70 KV KBAGN – PLHAN 1, 2

KBAGN

IBT-1

150/70kV50 MVA

IBT-3

150/70kV100MVA

70 KVA

B

B

B

A150 KV

IBT-2

150/70kV 35 MVA

OLS

PLHAN

T. 2

20 MVAT. 1

30 MVA

70 KV

70 KV

BLBNG

T. 3

30 MVA

A

B

Pmt Normaly Open

A

B

Tahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 192: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 350

LAMPIRAN – 12

OLS SUTT 70 KV BLITAR – WLINGI 1, 2

KETERANGAN

SUTT 70 KV BLTAR – WLNGI 1, 2Nom : 440 ACT : 400 A Setting OCR : 480 ASetting OLS : 440 A

Skema Trip.Tahap 1 t = 5.0 Sec

GI BlitarPmt 20 KV Trafo 2 70/20KV- 30 MVA = 29,06 MW

GI Tuluagung (Belum Terpasang)Pmt 20 KV Trafo 1 70/20KV- 30 MVA

70 KV

A

B

TLAGN

BLTAR

WLNGI

A

B

70 KV

70 KV

T. 2

T.4 T. 2

T. 1

T. 2

T. 1

I II

I IITahap 1

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

Page 193: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 351

LAMPIRAN – 12

SELOREJO

70 KV

MENDALAN

MTR. 6.6 / 70 KV

70 KV

~PLTA

5.6 MVA

A

B

T. 3

T. 1

70 KV

SENGKALING

T. 3 T. 4

IBT-1

60 MVA

150 kVB

A

IBT-2

30 MVA

Polehan

1 2

70 kV

BLIMBING

T. 2

A

B

II I

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

OLS

OLS IBT 2 150/70 KV – 30 MVA

KETERANGAN

GI SENGKALING

IBT 2 150/70 KV – 30 MVA

Nom : 247 A

CT : 400 A

Setting OCR : 300 A ( TD 0.4 SI )

Setting OLS : 304 A

Skema Trip

Tahap 1 t : 3 Sec

GI. Blimbing

Pmt 20 kV Trafo 1 70/20 KV = 12,34 MWDi gamb : Winarto

Page 194: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 352

LAMPIRAN – 12

OLS IBT 1, 2, 3 150/70 KV GI KEBONAGUNGPT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

KBAGN

PLHAN

IBT-150 MVA

150 kV

1 2

70 kV

OLS

B

A

IBT-235 MVA

IBT-3100 MVA

A

B

T. 2T.1

70 KV

Tahap 1

ArahSgruh

1 2

70 KV

TUREN

T. 2

T.1

Tahap 2

OLS KETERANGAN

GI KEBONAGUNG

IBT 1 150/70 KV – 50 MVA

Nom : 412 A

CT : 600 A

Setting OCR : 600 A

Setting OLS : 480 A

IBT 2 150/70 KV – 35 MVA

Nom : 289 A

CT : 400 A

Setting OCR : 320 A

Setting OLS : 320 A

IBT 3 150/70 KV – 100 MVA

Nom : 825 A

CT : 1000 A

Setting OCR : 1000 A

Setting OLS : 800 A

Skema Trip

Tahap 1 t : 5.0 Sec

GI. Kebonagung = 44,1 MW

Pmt 70 kV Pht Polehan 1

Pmt 70 KV Pht Polehan 2

Usulan Target

Tahap 2 t : …… Sec

GI. Turen

Pmt 20 KV Trafo 1 70/20 KV

Usulan Penambahan Target

Tahap 2

(September 2013)

Di gamb : Winarto

Page 195: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 353

LAMPIRAN – 12

OLS SUTT 150 KV LAMONGAN – SEGOROMADU 1, 2

KETERANGAN

SUTT 150 KV LNGAN – SGMDU 1, 2Nom : 973 A

CT : 1000 A Setting OCR : 1000 ASetting OLS : 1000 A

Skema Trip.Tahap 1 t = 3.0 SecGI Lamongan. (kondisi OFF)Pmt 20 kV Trafo 2 150/20KV - 30 MVAGI BabatPmt 20 kV Trafo 1 150/20KV-30 MVA=19,12MWGI TubanPmt 20 kV Trafo 1 150/20KV-30 MVA=25,57 MW

150 KV

A

B

BABAT

A

B

LNGAN

SGMDU

A

B

150 KV

TUBANA

B

KEREK

OLS

T. 2

T. 1 T. 1

CATATAN :

OLS Kondisi OFF apabila SS ngimbang disupplydari IBT Ngimbang Dan Posisi ON Apabila

SS Ngimbang disupply Dari SS Krian

I II

I II

I II

I

II

Tahap 1

Tahap 1

Tahap 1

150 KV

150 KV

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

Di gamb : Winarto

OLS OFF

Page 196: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 354

LAMPIRAN – 12

TARIK

T. 1 T.2

70 KV

T. 3

SEKAR PUTIH5

150 kV

B

A

IBT-1

70 kV

A

B

I II

KERTOSONO4

A

B

I II

I II

I II I II

OLS

NGANJUK

OLS

B

A

T. 3 T. 3

70 kV

A

B

2 3 4 5

SEKAR PUTIH4

70 KV

Tahap 1

Tahap 2

Tahap 3

Catatan :OLS Posisi ON Apabila

Beban Trf GI Ngjuk

dipasok dari Sktih

Normaly Open

Normaly Open

Normaly OpenOperasi Maret 2014

KETERANGAN

GI SEKARPUTIH

IBT 1 150/700 KV – 35 MVA

Nom : 288 A

CT : 400 A

Setting OCR : 320 A

Setting OLS : 317 A

IBT 2 150/70 KV – 39 MVA

Nom : 321 A

CT : 400 A

Setting OCR : 344 A

Setting OLS : 317 A

IBT 3 150/70 KV – 50 MVA

Nom : 412 A

CT : 400 A

Setting OCR : 480 A

Setting OLS : 453 A

IBT 4 150/70 KV – 35 MVA

Nom : 288 A

CT : 400 A

Setting OCR : 344 A

Setting OLS : 317 A

IBT 5 150/70 KV – 50 MVA

Nom : 412 A

CT : 400 A

Setting OCR : 480 A

Setting OLS : 453 A

Skema Trip

Tahap 1 t : 2 Sec

GI. Sekarputih

Pmt 70 KV Pht Ktsno 1, 2 = 31,98 MW

Tahap 2 t : 3 Sec

GI Tarik

Pmt 20 KV Trafo 1 70/20 KV = 15,68 MW

Tahap 3 t : 4 Sec

GI Tarik

Pmt 20 KV Trafo 2 70/20 KV = 17,74 MW

PT PLN (Persero)AREA PENGATUR BEBAN JAWA TIMUR

OLS IBT 1, 2, 3, 4, 5 150/70 KV – GI SEKARPUTIH

Di gamb : Winarto

Page 197: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 355

LAMPIRAN – 12

OLS 650 A

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR AMPRA

SANUR

PBIANPKLOD

PSGRN

OLS 640 A

TAHAP 1

4 Sec

17 Peny Trf 2 , 3, 4

TP

NSDUA

TP

OLS 600 AOLS 1280 A

Load Shedding

Tahap 1 = 45 MW

OLS SUTT 150 kV Kabel Laut – Gilimanuk – Negara – Antosari – Kapal Tahap 1

BNDRA

= PLC

= Fibre Optic

OLS 560 A

BWANGI

Gilimanuk - Banyuwangi 1 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 2 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 3 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 4 I > = 600 A tms = 0,425 SI

Gilimanuk - Negara 1 I > = 720 A tms = 0,55 SI

Gilimanuk - Negara 2 I > = 720 A tms = 0,55 SI

Gilimanuk - Pemaron 1 I > = 1500 A tms = 0,4 SI

Gilimanuk - Pemaron 2 I > = 1500 A tms = 0,4 SI

Antosari - Negara 1 I > = 750 A tms = 0,275 SI

Antosari - Negara 2 I > = 750 A tms = 0,40 SI

Antosari - Kapal 1 I > = 720 A tms = 0,325 SI

Antosari - Kapal 2 I > = 700 A tms = 0,40 SI

Gilimanuk - Banyuwangi 1 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 2 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 3 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 4 I > = 560 A t = 2 sec

Gilimanuk - Negara 1 I > = 600 A t = 2 sec

Gilimanuk - Negara 2 I > = 601 A t = 2 sec

Gilimanuk - Pemaron 1 I > = 1280 A t = 2 sec

Gilimanuk - Pemaron 2 I > = 1280 A t = 2 sec

Antosari - Negara 1 I > = 650 A t = 2 sec

Antosari - Negara 2 I > = 650 A t = 2 sec

Antosari - Kapal 1 I > = 640 A t = 2 sec

Antosari - Kapal 2 I > = 650 A t = 2 sec

Pmt 20 kV Incoming Trf 2 GI Kapal

Pmt 20 kV Incoming Trf 3 GI Kapal

Pmt 20 kV Tangeb Trf 4 GI Kapal

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap I ( 4 detik )

Page 198: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 356

LAMPIRAN – 12

OLS 650 A

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR AMPRA

SANUR

PBIAN

PKLOD

PSGRN

OLS 640 ATAHAP 2

4,5 Sec

TP

TP

TPTP

OLS 600 AOLS 1280 A

OLS SUTT 150 kV Kabel Laut – Gilimanuk – Negara – Antosari – Kapal Tahap 2

3 peny Trf 3

7 peny Trf 3,4,5

NSDUA

BNDRA

= PLC

= Fibre Optic

Load Shedding

Tahap 2 = 45 MW

OLS 560 A

BWANGI

Gilimanuk - Banyuwangi 1 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 2 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 3 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 4 I > = 600 A tms = 0,425 SI

Gilimanuk - Negara 1 I > = 720 A tms = 0,55 SI

Gilimanuk - Negara 2 I > = 720 A tms = 0,55 SI

Gilimanuk - Pemaron 1 I > = 1500 A tms = 0,4 SI

Gilimanuk - Pemaron 2 I > = 1500 A tms = 0,4 SI

Antosari - Negara 1 I > = 750 A tms = 0,275 SI

Antosari - Negara 2 I > = 750 A tms = 0,40 SI

Antosari - Kapal 1 I > = 720 A tms = 0,325 SI

Antosari - Kapal 2 I > = 700 A tms = 0,40 SI

Gilimanuk - Banyuwangi 1 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 2 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 3 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 4 I > = 560 A t = 2 sec

Gilimanuk - Negara 1 I > = 600 A t = 2 sec

Gilimanuk - Negara 2 I > = 601 A t = 2 sec

Gilimanuk - Pemaron 1 I > = 1280 A t = 2 sec

Gilimanuk - Pemaron 2 I > = 1280 A t = 2 sec

Antosari - Negara 1 I > = 650 A t = 2 sec

Antosari - Negara 2 I > = 650 A t = 2 sec

Antosari - Kapal 1 I > = 640 A t = 2 sec

Antosari - Kapal 2 I > = 650 A t = 2 sec

Target Trip Tahap II ( 4,5 detik )Pmt 20 kV Kampus Trf 3 GI Nusa Dua

Pmt 20 kV Mumbul Trf 3 GI Nusa Dua

Pmt 20 kV Kedonganan Trf 3 GI Nusa Dua

Pmt 20 kV Sidakarya Trf 3 GI Pesanggaran

Pmt 20 kV Pegok Trf 3 GI Pesanggaran

Pmt 20 kV Serangan Trf 3 GI Pesanggaran

Pmt 20 kV Pedungan Trf 4 GI Pesanggaran

Pmt 20 kV Palapa Trf 4 GI Pesanggaran

Pmt 20 kV Banteng Trf 5 GI Pesanggaran

Pmt 20 kV Reagen Trf 5 GI Pesanggaran

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Page 199: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 357

LAMPIRAN – 12

OLS 650 A

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR

AMPRA

SANUR

PBIANPKLOD

PSGRN

OLS 640 A

TAHAP 3

5 Sec

TP

TP

TPTP

2 Peny Trf 1,2

2 Peny Trf 1

3 Peny Trf 1

TP

TP

OLS 600 AOLS 1280 A

= PLC

= Fibre Optic

Load Shedding

Tahap 3 = 55 MW

OLS SUTT 150 kV Kabel Laut – Gilimanuk – Negara – Antosari – Kapal Tahap 3

5 Peny Trf 1

7 Peny Trf 1,2,3

NSDUA

BNDRA

OLS 560 A

BWANGI

Gilimanuk - Banyuwangi 1 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 2 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 3 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 4 I > = 600 A tms = 0,425 SI

Gilimanuk - Negara 1 I > = 720 A tms = 0,55 SI

Gilimanuk - Negara 2 I > = 720 A tms = 0,55 SI

Gilimanuk - Pemaron 1 I > = 1500 A tms = 0,4 SI

Gilimanuk - Pemaron 2 I > = 1500 A tms = 0,4 SI

Antosari - Negara 1 I > = 750 A tms = 0,275 SI

Antosari - Negara 2 I > = 750 A tms = 0,40 SI

Antosari - Kapal 1 I > = 720 A tms = 0,325 SI

Antosari - Kapal 2 I > = 700 A tms = 0,40 SI

Gilimanuk - Banyuwangi 1 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 2 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 3 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 4 I > = 560 A t = 2 sec

Gilimanuk - Negara 1 I > = 600 A t = 2 sec

Gilimanuk - Negara 2 I > = 601 A t = 2 sec

Gilimanuk - Pemaron 1 I > = 1280 A t = 2 sec

Gilimanuk - Pemaron 2 I > = 1280 A t = 2 sec

Antosari - Negara 1 I > = 650 A t = 2 sec

Antosari - Negara 2 I > = 650 A t = 2 sec

Antosari - Kapal 1 I > = 640 A t = 2 sec

Antosari - Kapal 2 I > = 650 A t = 2 sec

Target Trip Tahap III ( 5 detik )Pmt 20 kV Menjangan Trf 2 GI Gilimanuk

Pmt 20 kV Melaya Trf 1 GI Gilimanuk

Pmt 20 kV Berambang Trf 1 GI Negara

Pmt 20 kV Pulukan Trf 1 GI Negara

Pmt 20 kV Duda Trf 1 GI Amlapura

Pmt 20 kV Subagan Trf 1 GI Amlapura

Pmt 20 kV Tenganan Trf 1 GI Amlapura

Pmt 20 kV Sulahan Trf 1 GI Gianyar

Pmt 20 kV Bukit Jati Trf 1 GI Gianyar

Pmt 20 kV Blahbatuh Trf 1 GI Gianyar

Pmt 20 kV Saba Trf 1 GI Gianyar

Pmt 20 kV Goa Lawah Trf 1 GI Gianyar

Pmt 20 kV Teuku Umar Trf 1 GI Sanur

Pmt 20 kV Padang Galak Trf 1 GI Sanur

Pmt 20 kV Sudirman Galak Trf 2 GI Sanur

Pmt 20 kV Renon Trf 3 GI Sanur

Pmt 20 kV Ida Bagus Mantra Trf 3 GI Sanur

Pmt 20 kV Buruan Trf 3 GI Sanur

Pmt 20 kV Sedap Malam Trf 3 GI Sanur

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Page 200: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 358

LAMPIRAN – 12

OLS 560 A

OLS 650 A

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR

AMPRA

SANUR

PBIANPKLOD

PSGRN

OLS 640 A

TAHAP 4

5,5 Sec

TP

TPTP

5 Peny Trf 1

5 Peny Trf 1

TP TP

TP

OLS 600 AOLS 1280 A

= PLC

= Fibre Optic

Load Shedding

Tahap 4 = 80 MW

OLS SUTT 150 kV Kabel Laut – Gilimanuk – Negara – Antosari – Kapal Tahap 4

NSDUA

BNDRA

2 Peny Trf 1

3 Peny Trf 1,4

1 Peny Trf 2

TP

9 Peny Trf 1,2

BWANGI

Gilimanuk - Banyuwangi 1 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 2 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 3 I > = 600 A tms = 0,425 SI

Gilimanuk - Banyuwangi 4 I > = 600 A tms = 0,425 SI

Gilimanuk - Negara 1 I > = 720 A tms = 0,55 SI

Gilimanuk - Negara 2 I > = 720 A tms = 0,55 SI

Gilimanuk - Pemaron 1 I > = 1500 A tms = 0,4 SI

Gilimanuk - Pemaron 2 I > = 1500 A tms = 0,4 SI

Antosari - Negara 1 I > = 750 A tms = 0,275 SI

Antosari - Negara 2 I > = 750 A tms = 0,40 SI

Antosari - Kapal 1 I > = 720 A tms = 0,325 SI

Antosari - Kapal 2 I > = 700 A tms = 0,40 SI

Gilimanuk - Banyuwangi 1 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 2 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 3 I > = 560 A t = 2 sec

Gilimanuk - Banyuwangi 4 I > = 560 A t = 2 sec

Gilimanuk - Negara 1 I > = 600 A t = 2 sec

Gilimanuk - Negara 2 I > = 601 A t = 2 sec

Gilimanuk - Pemaron 1 I > = 1280 A t = 2 sec

Gilimanuk - Pemaron 2 I > = 1280 A t = 2 sec

Antosari - Negara 1 I > = 650 A t = 2 sec

Antosari - Negara 2 I > = 650 A t = 2 sec

Antosari - Kapal 1 I > = 640 A t = 2 sec

Antosari - Kapal 2 I > = 650 A t = 2 sec

Pmt 20 kV Kerambitan Trf 1 GI Antosari

Pmt 20 kV Belimbing Trf 1 GI Antosari

Pmt 20 kV Bajera Trf 1 GI Antosari

Pmt 20 kV Sanda Trf 1 GI Antosari

Pmt 20 kV Suraberata Trf 1 GI Antosari

Pmt 20 kV Baturiti Trf 1 GI Baturiti

Pmt 20 kV Taman Tanda Trf 1 GI Baturiti

Pmt 20 kV Wanagiri Trf 1 GI Baturiti

Pmt 20 kV Pancasari Trf 1 GI Baturiti

Pmt 20 kV Jati Luwih Trf 1 GI Baturiti

Pmt 20 kV Buahan Trf 1 GI Payangan

Pmt 20 kV Kedisan Trf 1 GI Payangan

Pmt 20 kV Mambal Trf 4 GI Kapal

Pmt 20 kV Tabanan Trf 1 GI Kapal

Pmt 20 kV Panglan Trf 4 GI Kapal

Pmt 20 kV Wibrata Trf 2 GI Gianyar

Pmt 20 kV Padang Sambian Trf 1 GI Padang Sambian

Pmt 20 kV Kerobokan Trf 1 GI Padang Sambian

Pmt 20 kV Imam Bonjol Trf 1 GI Padang Sambian

Pmt 20 kV Abian Timbul Trf 1 GI Padang Sambian

Pmt 20 kV Buagan Trf 2 GI Padang Sambian

Pmt 20 kV Gunung Agung Trf 2 GI Padang Sambian

Pmt 20 kV Tegal Lantang Trf 1 GI Padang Sambian

Pmt 20 kV Batu Belig Trf 2 GI Padang Sambian

Pmt 20 kV Uma Alas Trf 1 GI Padang Sambian

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap IV ( 5,5 detik )

Page 201: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 359

LAMPIRAN – 12

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR AMPRA

SANUR

PBIAN

PKLOD

PSGRN

TAHAP 1

4 Sec

17 Peny Trf 2 , 3, 4

OLS SUTT 150 kV Pemaron – Baturiti – Payangan – Kapal Tahap 1

TP

OLS 640 A,

OLS 700 A

TP

OLS 800 A,

OLS 800 A

TP

= PLC

= Fibre Optic

BWANGI

NSDUA

BNDRA

Load Shedding

Tahap 1 = 45 MW

Pemaron - Baturiti 1 I > = 880 A tms = 0,3 SI

Pemaron - Baturiti 2 I > = 900 A tms = 0,3 SI

Baturiti - Kapal I > = 880 A tms = 0,3 SI

Baturiti - Payangan I > = 840 A tms = 0,325 SI

Pemaron - Baturiti 1 I > = 800 A t = 2 sec

Pemaron - Baturiti 2 I > = 800 A t = 2 sec

Baturiti - Kapal I > = 800 A t = 2 sec

Baturiti - Payangan I > = 800 A t = 2 sec

Pmt 20 kV Incoming Trf 2 GI Kapal

Pmt 20 kV Incoming Trf 3 GI Kapal

Pmt 20 kV Tangeb Trf 4 GI Kapal

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap I ( 4 detik )

Page 202: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 360

LAMPIRAN – 12

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR AMPRA

SANUR

PBIANPKLOD

PSGRN

TAHAP 2

4,5 Sec

TPTP

3 peny Trf 3

TP

OLS 640 A,

OLS 700 AOLS 800 A,

OLS 800 A

TP

TP

= PLC

= Fibre Optic

BWANGI

OLS SUTT 150 kV Pemaron – Baturiti – Payangan – Kapal Tahap 2

7 peny Trf 3,4,5

NSDUA

BNDRA

Load Shedding

Tahap 2 = 45 MW

Pemaron - Baturiti 1 I > = 880 A tms = 0,3 SI

Pemaron - Baturiti 2 I > = 900 A tms = 0,3 SI

Baturiti - Kapal I > = 880 A tms = 0,3 SI

Baturiti - Payangan I > = 840 A tms = 0,325 SI

Pemaron - Baturiti 1 I > = 800 A t = 2 sec

Pemaron - Baturiti 2 I > = 800 A t = 2 sec

Baturiti - Kapal I > = 800 A t = 2 sec

Baturiti - Payangan I > = 800 A t = 2 sec

Pmt 20 kV Kampus Trf 3 GI Nusa Dua

Pmt 20 kV Mumbul Trf 3 GI Nusa Dua

Pmt 20 kV Kedonganan Trf 3 GI Nusa Dua

Pmt 20 kV Sidakarya Trf 3 GI Pesanggaran

Pmt 20 kV Pegok Trf 3 GI Pesanggaran

Pmt 20 kV Serangan Trf 3 GI Pesanggaran

Pmt 20 kV Pedungan Trf 4 GI Pesanggaran

Pmt 20 kV Palapa Trf 4 GI Pesanggaran

Pmt 20 kV Banteng Trf 5 GI Pesanggaran

Pmt 20 kV Reagen Trf 5 GI Pesanggaran

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap II ( 4,5 detik )

Page 203: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 361

LAMPIRAN – 12

GLMNK

NGARA

ASARI

KAPAL

PMRON BTRTI PYNGA

GNYAR

AMPRA

SANUR

PBIANPKLOD

PSGRN

TAHAP 3

5 Sec

TP

TP

TPTP

2 Peny Trf 1,2

2 Peny Trf 1

5 Peny Trf 1

7 Peny Trf 1,2,3

3 Peny Trf 1

TP

TP

= PLC

= Fibre Optic

TP

OLS 640 A,

OLS 700 A

TP

OLS 800 A,

OLS 800 ABWANGI

OLS SUTT 150 kV Pemaron – Baturiti – Payangan – Kapal Tahap 3

NSDUA

BNDRA

Load Shedding

Tahap 3 = 55 MW

Pemaron - Baturiti 1 I > = 880 A tms = 0,3 SI

Pemaron - Baturiti 2 I > = 900 A tms = 0,3 SI

Baturiti - Kapal I > = 880 A tms = 0,3 SI

Baturiti - Payangan I > = 840 A tms = 0,325 SI

Pemaron - Baturiti 1 I > = 800 A t = 2 sec

Pemaron - Baturiti 2 I > = 800 A t = 2 sec

Baturiti - Kapal I > = 800 A t = 2 sec

Baturiti - Payangan I > = 800 A t = 2 sec

Pmt 20 kV Menjangan Trf 2 GI Gilimanuk

Pmt 20 kV Melaya Trf 1 GI Gilimanuk

Pmt 20 kV Berambang Trf 1 GI Negara

Pmt 20 kV Pulukan Trf 1 GI Negara

Pmt 20 kV Duda Trf 1 GI Amlapura

Pmt 20 kV Subagan Trf 1 GI Amlapura

Pmt 20 kV Tenganan Trf 1 GI Amlapura

Pmt 20 kV Sulahan Trf 1 GI Gianyar

Pmt 20 kV Bukit Jati Trf 1 GI Gianyar

Pmt 20 kV Blahbatuh Trf 1 GI Gianyar

Pmt 20 kV Saba Trf 1 GI Gianyar

Pmt 20 kV Goa Lawah Trf 1 GI Gianyar

Pmt 20 kV Teuku Umar Trf 1 GI Sanur

Pmt 20 kV Padang Galak Trf 1 GI Sanur

Pmt 20 kV Sudirman Galak Trf 2 GI Sanur

Pmt 20 kV Renon Trf 3 GI Sanur

Pmt 20 kV Ida Bagus Mantra Trf 3 GI Sanur

Pmt 20 kV Buruan Trf 3 GI Sanur

Pmt 20 kV Sedap Malam Trf 3 GI Sanur

Setting OCR ( Over Current Relay )

Setting OLR ( Over Load Relay )

Target Trip Tahap III ( 5 detik )

Page 204: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 362

LAMPIRAN – 12

Page 205: Lampiran Rot 2015rev02

PT PLN (PERSERO) P3B JAWA BALI Cinere 16514 – Jakarta Selatan

No. Rekaman: 03/ROT/2015-001

Berlaku Efektif: 1 Januari 2015

Rencana Operasi 2015

Edisi : 01 Revisi : 00 Halaman : 363