lake conroe dam spillway and service outlet … · project involved five dam tainter gates and...

1
Blastco 16201 Wood Drive Channelview, TX 77530 281-590-3200 Blastco 11905 Regentview Ave. Downey, CA 90241 562-231-5400 YOUR SINGLE SOURCE SOLUTION www.tfwarren.com Field applicators of protective coatings and linings San Jacinto River Authority awarded Blastco a lump sum contract to rehab the structure of Lake Conroe’s dam gates and to replace the 15 year old coatings and anodes for rust prevention. The turnkey project involved five dam tainter gates and three service gates. The scope of work included labor, equipment, and materials for the construction of improvements to the San Jacinto River Authority Lake Conroe Dam Spillway and Service Outlet. Work included replacement of seals and associated hardware for spillway gates and sluice gate stoplogs. Blastco blasted and recoated spillway gates, stoplogs, monorail system, hoist system components, and service outlet stoplogs. Crews also repaired the spillway ogee crest and installed new gate hoist ropes and associated hardware. New rubber seals, fasteners, guide rollers, roller assemblies, bumper blocks, and cathodic protection were installed on the spillway gates. Additionally, three new service outlet sluice gates with new stem guides and access ladders were installed. Blastco crews were able to work around the dam’s water release schedule to complete the project on time and within budget. C061307 LAKE CONROE DAM SPILLWAY AND SERVICE OUTLET REFURBISHMENT CONROE, TEXAS

Upload: ngonhi

Post on 27-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LAKE CONROE DAM SPILLWAY AND SERVICE OUTLET … · project involved five dam tainter gates and three service gates. The scope of work included labor, ... associated hardware for spillway

Blastco 16201 Wood DriveChannelview, TX 77530 281-590-3200

Blastco 11905 Regentview Ave. Downey, CA 90241 562-231-5400

YOUR SINGLE SOURCE

SOLUTIONwww.tfwarren.com

Field applicators of protective coatings and linings

San Jacinto River Authority awarded Blastco a lump sum contract to rehab the structure of Lake Conroe’s dam gates and to replace the 15 year old coatings and anodes for rust prevention. The turnkey project involved five dam tainter gates and three service gates. The scope of work included labor, equipment, and materials for the construction of improvements to the San Jacinto River Authority Lake Conroe Dam Spillway and Service Outlet. Work included replacement of seals and associated hardware for spillway gates and sluice gate stoplogs. Blastco blasted and recoated spillway gates, stoplogs, monorail system, hoist system components, and service outlet stoplogs. Crews also repaired the spillway ogee crest and installed new gate hoist ropes and associated hardware. New rubber seals, fasteners, guide rollers, roller assemblies, bumper blocks, and cathodic protection were installed on the spillway gates. Additionally, three new service outlet sluice gates with new stem guides and access ladders were installed. Blastco crews were able to work around the dam’s water release schedule to complete the project on time and within budget.

C061307

LAKE CONROE DAM SPILLWAY AND SERVICE OUTLET REFURBISHMENT

CONROE, TEXAS