LAHORE DEVELOPMENT AUTHORITY (LDA), LAHORE WATER AND SANITATION AGENCY (WASA) CONSTRUCTION OF MINERAL / BOTTLED WATER PLANTS FOR SUPPLYING CHEMICAL & BIOLOGICAL CONTAMINATION FREE DRINKING WATER in M.A. JOHAR TOWN & TAJPURA, LAHORE Pre-qualification Documents of Firms / Joint Ventures (JVs) August, 2017

Upload: lekhanh

Post on 29-Apr-2018

219 views

Category:

Documents


5 download

TRANSCRIPT

LAHORE DEVELOPMENT AUTHORITY (LDA), LAHORE

WATER AND SANITATION AGENCY (WASA)

CONSTRUCTION OF MINERAL / BOTTLED WATER PLANTS FOR

SUPPLYING CHEMICAL & BIOLOGICAL CONTAMINATION FREE

DRINKING WATER in M.A. JOHAR TOWN & TAJPURA, LAHORE

Pre-qualification Documents of Firms / Joint Ventures (JVs)

August, 2017

(i)

CONSTRUCTION OF MINERAL WATER BOTTLING PLANTS

PRE-QUALIFICATION DOCUMENTS

TABLE OF CONTENTS

SR. NO. DESCRIPTION PAGE NO.

1.

GENERAL

1

2. PURPOSE OF THIS DOCUMENT 1

3. PROJECT AREA 1

4. TECHNOLOGY 1

5. BRIEF SCOPE OF WORK 1

6. FEE OF THE PRE-QUALIFICATION DOCUMENTS 2

7. INSTRUCTIONS TO APPLICANTS 2

7.1 Submission of Application 2

7.2 Qualification Criteria 3

7.2.1 General 3

7.2.2 General Experience 3

7.2.3 Personnel Capabilities 4

7.2.4 Equipment Capabilities 4

7.2.5 Financial Position 5

7.2.6 In-house Assembling Facility 5

7.2.7 Litigation History 5

7.3 Joint Venture (JV) 5

7.3.1 Joint Venture must comply with the following requirements 5

7.4 Updating Prequalification Information 6

7.5 Other Factors 6

8. EVALUATION CRITERIA 7

9. ADDITIONAL CLAUSES 7

A.

LETTER OF APPLICATION

FORMS

9

FORM A-1: GENERAL INFORMATION

FORM A-2: GENERAL EXPERIENCE RECORD

FORM A-3: JOINT VENTURE SUMMARY

FORM A-4: PARTICULAR EXPERIENCE RECORD

FORM A-5: DETAILS OF CONTRACTS OF SIMILAR

NATURE AND COMPLEXITY

(ii)

SR. NO. DESCRIPTION PAGE NO.

FORM A-6: CURRENT CONTRACT COMMITMENTS /

WORKS IN PROGRESS FORM A-7: PERSONNEL CAPABILITIES FORM A-8: CANDIDATES SUMMARY FORM A-9: EQUIPMENT CAPABILITIES FORM A-10: FINANCIAL CAPABILITY FORM A-11: LITIGATION HISTORY

Annexure-I Evaluation Criteria

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

Pre-Qualification of Firms/Joint Ventures (JVs)

CONSTRUCTION OF MINERAL WATER BOTTLING PLANT 1. GENERAL

Water and Sanitation Agency (WASA), Lahore, under the direction of Government of Punjab, intends to install Mineral Water Bottling Plants (2 Nos.) of 20,000 liter/hour capacity (output).

This plants shall reduce the Arsenic concentration maximum to the level of standard guideline values. In addition, the plant shall also remove microbiological contamination (if any) from the water through RO Units, so that the people get the clean water for drinking purpose, which shall meet the bottled water standards available in the market.

2. PURPOSE OF THIS DOCUMENT

The purpose of this document is to shortlist / pre-qualify experienced Firms/ Joint Venture (JV), capable of supplying and installing, complete water filtration plants on turnkey basis including Civil, Mechanical, Electrical and all allied works as well as operate and maintain these plants for three (03) years.

3. PROJECT AREA

Under this Contract, the plants shall be installed in the premises provided by WASA, Lahore located in Johar Town and Tajpura Scheme, Lahore.

4. TECHNOLOGY

The raw water from the tube well, to be constructed by the firm under the same contract package, shall be treated by Reverse Osmosis (RO) or Nano-filtration technology to remove excess or unwanted materials and biological contaminants before rinsing, filling, capping, sealing and packaging 19 liter bottles as desired under the contract.

5. BRIEF SCOPE OF WORK

The Brief Scope of Work is given in this section. The detailed scope will be mentioned in the Bidding Documents.

1. The plants will be supplied and installed on turnkey basis, and will be

operated and maintained for three (03) years after commissioning.

2. The RO membrane shall be of NSF certified manufacturer.

3. The capacity of the plants will be 20,000 liters/hour (output).

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

4. The plant must be capable of removing bacteria upto 99.9999% and virus up to 99.999%. In addit ion, i t must be capable of removing turbidity, suspended material, and contaminations such as arsenic, fluoride, nitrate and hardness etc., depending upon the feed water quality.

5. The specific plant components must be certified by an international product

certifier, such as NSF.

6. This contract shall include all related civil, electrical and mechanical and chemical works to complete the bottling plant in all respects.

7. To establish a dedicated chemical laboratory with all appurtenances and

consumables.

8. To provide and install standby generator of suitable capacity with operation and maintenance of the same.

9. To train the WASA staff to operate and maintain the installed plants.

10. To prepare training manual for the operating staff.

11. To ensure continuous availability of safe drinking water as per International

Bottling Plant Association Standards and as per standard of available brands available in local market.

12. Bottling Plant shall be PLC operated.

13. The Firms/JVs shall be solely responsible for the satisfactory performance

of bottling plant for continued supply of bottled water at all times during O&M period.

6. FEE OF THE PRE-QUALIFICATION DOUCMENTS

The pre-qualification documents will be issued to the interested firms on payments of non-refundable fee of Rs. 1000 /- from the office of Director Procurement & Stores, 59-F Gulshan e Ravi, Lahore.

7. INSTRUCTIONS TO APPLICANTS

7.1 Submission of Application

The blank forms attached with this document are to be filled by the applicants who apply for prequalification. One original and two printed and two soft copies should be submitted separately in sealed envelopes to the Director Procurement & Stores, 59-F Gulshan e Ravi, Lahore, not later than ………………….(Date) clearly marked “Applications for Prequalification for Construction of Mineral Water Bottling Plant.

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

The applications are to be prepared in English language. Response to all questions should be provided complete along with supporting documents and certified copies of Registration with Pakistan Engineering Council. No column is

to be left blank. Applicants may request to Deputy Managing Director (Engg), WASA, Lahore, for the clarification about the Project or the Pre-qualification during office hours before the deadline for submission but no document will be received/considered after the due date. All documents submitted by the firms should preferably be delivered in one packet/parcel for case of handling and to avoid loss of documents.

7.2 Qualification Criteria

7.2.1 General

Pre-qualification will be based on all the criterion given in succeeding Paras regarding the Applicant’s Experience Record, Personnel Capabilities, Equipment Capabilities and Financial Soundness etc. as demonstrated by the Applicant’s responses in the forms given in this document. The WASA reserves the right to waive minor deviations, if these don’t materially affect the capability of an applicant to perform the contract. Sub-contractor’s experience and resources shall not be taken into account in determining the Applicant’s compliance with the qualifying criteria. The Applicant shall be registered in C-3 category along with specialization in CE-09, CE-10, ME-06, EE-04 & EE-05 of Pakistan Engineering Council and registered with HUD & PHED, PRA and FBR. However, Joint Venture experience & resources shall be considered. The following criterion is evolved keeping in view the complexity of the project.

Sr.

No.

Category Weightage/Marks

1. Experience Record 35

2. Personnel Capabilities 20

3. Equipment Capabilities 15

4. Financial Soundness 30 Total: 100

7.2.2 General Experience

Credit marks for experience shall be awarded on the basis of following qualifications:

Sr.No. Description Maximum

Points 1. Projects of similar nature undertaken in last

10 years. 15

2. In hand, mineral water bottling plants to be supplied, installed and maintained on membrane technology

10

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

3. In-house facility for assembling, installing and testing of mineral water bottling plant components including workshop premises

2.5

4 Business Association with an international NSF certified membrane manufacturers

2.5

5. Status of enlistment with PEC, Government Organizations and other agencies.

5

Sub-Total: 35

7.2.3 Personnel Capabilities

The applicant must have in his employment suitably qualified personnel with relevant experience. Credit marks shall be awarded under this category using following criteria.

Sr.No. Description Maximum

Points 1. Graduate Engineers Registered with PEC

a) Number of Engineers b) Experience of Engineers in number

of years

8 4

2. Number of Diploma Engineers in Employment of the Firm

a) Number of Diploma Engineers b) Experience of Diploma Engineers in

number of Years.

6 2

Sub-Total: 20

7.2.4 Equipment Capabilities

Credit Marks shall be granted on the basis of the following criteria for various kinds of equipment relevant for the Project:

Sr.No. Equipment Type and

Characteristics

Maximum

Marks 1. 2. 3. 4. 5. 6. 7. 8 9.

10.

Fork Lift Concrete mixer Concrete vibrators Steel cutting and welding machine Mobile Cranes Trucks Electric Generators Pressure test Personal Protection Equipment’s First aid boxes

1 2 1 2 1 2 1 2 2 1

Sub-Total: 15

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

7.2.5 Financial Position

Credit marks will be awarded on the basis of following:

Sr.

No.

Description

Maximum

Marks 1. Available Bank Credit Line 10

000

2. Annual Turnover in last 5 years. 10

3. Registration with Income Tax Department 5

4. Litigation History where decision went against the Firm.

2.5

5. Blacklisting from any Agency 2.5 Sub-Total: 30

The applicant shall meet not less than 50% percent of all qualifying criteria given in paras heretofore and minimum overall score shall not be less than 70%.

7.2.6 In-house Assembling Facility

The applicant firm/ joint venture must have the indigenous facility with relevant assembling capability.

7.2.7 Litigation History

The applicant and partners of a Joint Venture should provide accurate information on any litigation or arbitration resulting from contracts completed or under execution over the last five years. A consistent history of litigations against the applicant or any partner of a joint venture may result in rejection of the application.

7.3 Joint Venture (JV)

7.3.1 Joint Venture must comply with the following requirements:-

a) Following are minimum qualification requirements:-

i) The lead partner shall meet not less than 50% percent of

all qualifying criteria given in paras heretofore. Lead Partner share shall be minimum 70%.

ii) Each of the partners shall meet not less than 25% percent of

all the qualifying criteria given in paras heretofore.

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

iii) The joint venture must collectively satisfy the criteria of paras heretofore, for which purpose the relevant figures for each of the partners shall be added together to arrive at the JV’s total capacity. Individual members must satisfy each of the requirements of paras given in the document.

b) Any change in a prequalified JV after prequalification, shall be subject to the written approval of the WASA prior to the deadline for submission of bids. Such approval may be denied if:-

i) Partner(s) withdraw from a JV and remaining partners do not

meet the qualifying requirements;

ii) The new partners to a JV are not qualified individually or as another JV; or

iii) In the opinion of the WASA, a substantial reduction in

competition would result.

c) Bid shall be signed by all members in the JV so as to legally bind all partners, jointly and severally, and any bid shall be submitted with a copy of the JV agreement providing the joint and several liabilities with respect to the contract.

7.3.2 The prequalification of a JV does not necessarily prequalify any of

its partners individually or as a partner in any other JV or association. In case of dissolution of a JV, each one of the constituent firms may prequalify if they meet all the prequalification requirements and any partner of J.V has requested/shall request for the same and then his prequalification shall be subject to the written approval of the WASA.

7.4 Updating Prequalification Information

7.4.1 Bidders shall be required to update the financial, personnel and

equipment information used for prequalification at the time of submitting their bids, to confirm their continued compliance with the qualification criteria and verification of the information provided at the time of prequalification. A bid shall be rejected if the Applicant’s qualification thresholds are no longer met at the time of bidding.

7.5 Other Factors

7.5.1 Only firms and JVs that have been prequalified under this procedure

shall be invited to bid. A qualified firm or a qualified JV may participate only in one bid for the contract. If a firm submits more than one bid, singly or as a JV, all bids including that bidder will be rejected. This rule will not apply in respect of bids which include specialist sub-contractors who are used by more than one bidder.

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

7.5.2 a) The scope of work mentioned under Section-5 is provisional and WASA reserves the right to amend it in the Bidding Documents

b) Cancel the prequalification process and reject all applications.

The WASA shall neither be liable for any such actions nor be under any obligation to inform the Applicant of the grounds for rejection, however, may be debriefed if solicited.

7.5.3 Only Prequalified Firms/Applicants will be informed in writing by fax

or mail. The WASA may also choose to inform the firms not prequalified for this particular project. However, on the request of firms the result of their applications may be debriefed.

8. EVALUATION CRITERIA

Applicants meeting the minimum requirements mentioned in Para 7.2 besides other factors shall be considered for pre-qualification. No compromise shall be made on minimum requirements of 50% score in each category and 70% overall score.

9. ADDITIONAL CLAUSES

9.1 Answers must be given to all questions in the attached Forms. If

necessary, additional sheets may be attached. Failure to provide complete information may result in disqualification.

9.2 Each sheet shall be duly signed by the applicant or by the duly

authorized representative of the applicant. Such authorization shall be indicated by a written power of attorney which shall be attached with the application.

9.3 All the documents submitted by the applicants shall be treated as

confidential and shall not be returned.

9.4 If necessary, additional sheets may be added to the Forms. Each page of each Form shall be clearly marked in the right top corner as follows: Form I, Page 1 of 1, Form I, Page 1 of 1 etc.

9.5 Only those Pakistani Firms/JVs can apply or participate in Joint

Ventures for the purpose of pre-qualification who have valid registration in “C-3 CATEGORY and/ or above" with the Pakistan Engineering Council.

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

9.6 The Firms/JVs must provide clear evidence through documentations that their Manufacturer has the requisite capacity, expertise and specialized technology for Water Filtration Plants.

9.7 All the forms given in the documents shall be completely filled in

Application Form A-1. ....................................................... General Information

Application Form A-2. .............................................General Experience Record

Application Form A-3. ...................................................Joint Venture Summary

Application Form A-4. .......................................... Particular Experience Record

Application Form A-5. Details of Contracts of Similar Nature and Complexity

Application Form A-6. ......Current Contract Commitments/ Works in Progress

Application Form A-7. .................................................... Personnel Capabilities

Application Form A-8. ....................................................... Candidate Summary

Application Form A-9. .................................................. Equipment Capabilities

Application Form A-10. ...................................................... Financial Capability

Application Form A-11. .......................................................... Litigation History

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

Letter of Application

[Letterhead paper of the Applicant, or partner

responsible for a joint venture, including full postal

address, telephone no., fax no., telex no., cable and

e-mail address]

Date:................................

To: Deputy Managing Director (Engg) WASA (LDA), Lahore

Dear Sir,

1. Being duly authorized to represent and act on behalf of ................................... (hereinafter

“the Applicant”), and having reviewed and fully understood all the prequalification

information provided, the undersigned hereby apply to be prequalified as a bidder for the

“Construction of Mineral Water Bottling Plant

2. Attached to this letter are copies of original documents:

(a) the Applicant's legal status;

(b) the principal place of business; and

(c) the place of incorporation (for applicants who are corporations); or

the place of registration and the nationality of the owners (for applicants who are

partnerships or individually-owned firms).

(d) Registration with Pakistan Engineering Council

3. The Deputy Managing Director (Engg.), WASA and its authorized representatives are

hereby authorized to conduct any inquiries or investigations to verify the statements,

documents, and information submitted in connection with this application, and to seek

clarification from our bankers and clients regarding any financial and technical aspects.

This Letter of Application will also serve as authorization to any individual or authorized

representative of any institution referred to in the supporting information, to provide such

information deemed necessary and requested by The Deputy Managing Director (Engg.),

WASA or the authorized representative to verify statements and information provided in

this application, or with regard to the resources, experience, and competence of the

applicant.

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

4. The Deputy Managing Director (Engg.), WASA and its authorized representatives may

contact the following persons for further information1, if needed.

General and Managerial Inquiries

Contact 1

Telephone 1

Contact 2

Telephone 2

Personnel Inquiries

Contact 1

Telephone 1

Contact 2

Telephone 2

Technical Inquiries

Contact 1

Telephone 1

Contact 2

Telephone 2

Financial Inquiries

Contact 1

Telephone 1

Contact 2

Telephone 2

5. This application is made with the full understanding that:

(a) Bids by prequalified applicants will be subject to verification of all information

submitted for prequalification at the time of bidding;

(b) The Deputy Managing Director (Engg.), WASA reserves the right to:

(i) Amend the scope and value of any contract under this project; in such event

bids will only be called from prequalified bidders who meet the revised

requirements; and

(ii) Reject or accept all application, cancel the prequalification process.

Application by joint ventures should provide information on separate sheet information for each party to the application.

(ii)

Construction of Mineral Water Bottling Plant

Pre-Qualification of Firms/JVs

(c) The Deputy Managing Director (Engg.), WASA shall not be liable for any such

actions and shall be under no obligation to inform the Applicant of the grounds for

actions at 5(b) here above.

(d) The Deputy Managing Director (Engg.), WASA shall not be liable for consequence

of, and shall be under no obligation to inform the Applicant of the grounds for

actions at 5(b) here above.

Applicants who are not joint ventures should delete para 6&7 and initial the

deletions.

6. Appended to this application, we give details of the participation of each party, including

capital contribution and profit/loss agreements, to the joint venture or association. We also

specify the financial commitment in terms of the percentage of the value of the (each)

contract, and the responsibilities for execution of the (each) contract. 7. We confirm that in the event that we bid, that bid as well as any resulting contract will be:

(a) Signed so as to legally bind all partners, jointly and severally; and

(b) Submitted with a Joint Venture agreement providing the joint and several liability of all partners in the event the contract is awarded to us.

8. The undersigned declare that the statements made and the information provided in the duly

completed application are complete, true, and correct in every detail.

a)

Signature

b)

Name (For and on behalf of)

c)

Designation

d)

Seal

Note: In case of joint venture/ other partners, also give their particulars mentioned under 8 (a-d)

above.

Application Form A-1 Page of Pages

General Information

All individual firms and each partner of a joint venture applying for prequalification are

requested to complete the information in this form. Nationality information is also to be provided

for foreign owners or applicants who are forming part of the Joint Ventures as required under the

PEC Bye-Laws as a Partnership/Joint Venture.

Where the Applicant proposes to use named subcontractors for critical components of the works,

or for work contents in excess of 10 percent of the value of the whole works, the following

information should also be supplied for the specialist subcontractor(s).

1.

Name of Firm

2.

Head Office Address

3.

Telephone

Contact Person:

Name:

Title:

4.

Fax

Telex

5.

Place of Incorporation/Registration

Year of incorporation/registration

NATIONALITY OF OWNERS

NAME

NATIONALITY

1.

2.

3.

4.

5.

Application Form A-1 Page of Pages

(1)

General Experience Record

Name of Applicant or partner of a joint venture

All individual firms and all partners of a joint venture are requested to complete the information

in this form. The information supplied should be the annual turnover of the Applicant (or each

member of a joint venture), in terms of the amounts billed to clients for each year for work in

progress or completed over the past five years.

Use a separate sheet for each partner of a joint venture.

Annual Turnover (Construction only)

Year

Turnover

(in actual currency)

Equivalent Rupees in

Millions.

1.

2.

3.

4.

5.

(2)

Application Form A-3 Page of Pages

Joint Venture Summary

Names of all Partners of a Joint Venture

1. Lead Partner

2. Partner

3. Partner

4. Partner

5. Partner

6. Partner

Total value of annual construction turnover, in terms of work billed to clients,

Annual Turnover Data (Construction only; Equivalent in Pak Rupees, Millions)

Partner

Form A-2 Page No.

Year 1

Year 2

Year 3

Year 4

Year 5

1. Lead Partner

2. Partner

3. Partner

4. Partner

5. Partner

6. Partner

Total:

(4)

Application Form A-4 Page of Pages

Particular Experience Record

Name of Applicant or partner of a joint venture

To prequalify, the Applicant shall be required to pass the specified requirements applicable to this

form, as set out in the : Instructions to Applicants”.

On a separate page, using the format of Application Form A-5, each applicant or partner of a

Joint Venture is required to list all contracts of a value equivalent to Pak Rs.-(User/Employer to

provide the amount) million, of a similar nature and complexity to the contract for which the

Applicant wishes to qualify, undertaken during the last five years1. The information is to be

summarized, using Application Form A-5, for each contract completed or under execution by the

Applicant or by each partner of a Joint Venture.

Where the Applicant proposes to use named subcontractor(s) for critical components of the

works, or for work contents in excess of 10 percent of the value of the whole works, the

information in the afore-mentioned forms should also be supplied for each specialist

subcontractor.

1

Where applications are being invited for a number of contracts, suitable wording should be introduced, to

allow applicants to apply for individual contracts or groups of contracts (slice and package contracts).

Application Form A-4 Page of Pages

(4)

Details of Contracts of Similar Nature and Complexity

Name of Applicant or partner of a joint venture

Use a separate sheet for each contract.

1.

Name of Contract

Country

2.

Name of Employer

3.

Employer Address

....................................................................................................................

4.

Nature of works and special features relevant to the contract for which the Applicant wishes to

prequalify

.................................................................................................................... ....................................................................................................................

5.

Contract Role (Tick One)

(a) Sole Contractor (b) Sub- Contractor (c) Partner in a Joint Venture

6.

Value of the total contract (in specified currencies) at completion, or at date of award for current contract

Currency…………. Currency…………… Currency…………………….

7.

Equivalent in Pak/Rs.

8.

Date of Award

9.

Date of Completion

10.

Contract Duration (Years and Months)

Years Months

11.

Specified Requirements1

.............................................................................................................................................................. .............................................................................................................................................................. .................................................................................................................

1

Insert any specific criteria required for particular operations, such as annual volume of

earthmoving, underground excavation, or placing concrete etc.

(5)

Application Form A-6 Page of Pages

Summary Sheet: Current Contract Commitments/Works in

Progress

Name of Applicant or partner of a joint venture

Applicants and each partner to an application should provide information on their current

commitments on all contracts that have been awarded, or for which a letter of intent or

acceptance has been received, or for contracts approaching completion, but for which substantial

Completion Certificate has yet to be issued.

Name of Contract

Value of Outstanding

work (Equivalent Pak Rs.

Millions)

Estimated

Completion Date

1.

2.

3.

4.

5.

6.

(6)

Application Form A-7 Page of Pages

Personnel Capabilities

Name of Applicant

For specific positions essential to contract implementation, Applicants should provide the names

of at least two candidates qualified to meet the specified requirements stated for each position.

The data on their experience should be supplied on separate sheets using one Form for each

candidate (Application Form A-8).

1.

Title of Position

Name of Prime Candidate

Name of Alternate Candidate

2.

Title of Position

Name of Prime Candidate

Name of Alternate Candidate

3.

Title of Position

Name of Prime Candidate

Name of Alternate Candidate

4.

Title of Position

Name of Prime Candidate

Name of Alternate Candidate

(7)

Application Form A-8 Page of Pages

Candidate Summary

Name of Applicant

Position

Candidate [Tick appropriate one]

Prime Alternate

Candidate information

1. Name of Candidate

2. Date of Birth

3. Professional Qualification

Present employment

4. Name of employer

Address of employer

Telephone

Contact (manager/personnel officer)

Fax

Telex

Job title of candidate

Years with present employer

Summarize professional experience over the last 20 years, in reverse chronological order.

Indicate particular technical and managerial experience relevant to the Project.

Month/

Dates/Years

Company / Project / Position / Relevant technical and management experience

From

To

(8)

Application Form A-9 Page of Pages

Equipment Capabilities

Name of Applicant

The Applicant shall provide adequate information to demonstrate clearly that he has the

capability to meet the requirements for each and all items of equipment listed in the Instructions

to Applicants. A separate Form shall be prepared for each item of equipment listed in para 3.2.4

of the Instructions to Applicants, or for alternative equipment proposed by the Applicant.

Item of Equipment

Equipment

information

1. Name of manufacturer

2. Model and power rating

3. Capacity

4. Year of manufacture

Current

status

5. Current location

6. Details of current commitments

Source

7. Indicate source of the equipment

Owned Rented Leased

Omit the following information if it is owned by the Applicant or partner.

Owner

8. Name of owner

9. Address of owner

Telephone

Contact name and title

Fax

Telex

Agreement

Details of rental/lease specific to the Project.

(9)

Application Form A-10 Page of Pages

Financial Capability

Name of Applicant or Partner of a Joint Venture

Applicants, including each partner of a joint venture, should provide financial information to

demonstrate that they meet the requirements stated in the Instructions to Applicants. Each

applicant or partner of a joint venture must fill-in this form. If necessary, use separate sheets to

provide complete banker information. A copy of the audited balance sheets should be attached.

Banker

Name of banker

Address of banker

Telephone

Contact name and title

Fax

Telex

Summarize actual assets and liabilities in Pak Rupees (Equivalent at the current rate of exchange

at the end of each year) for the previous five years, based upon known commitments, projected

assets and liabilities in Pak Rupees equivalent for the next two years.

Financial

information in

Pak Rs.

or equivalent

Actual:

previous five year

Projected:

next two years

1

2

3

4

5

6

7

1. Total assets

2. Current assets

3. Total liabilities

4. Current liabilities

5. Profits before taxes

6. Profits after

taxes

(10)

Specific proposed sources of financing to meet the cash flow of the Project, net of current

commitments (Instructions to Applicants, para 3.2.5).

Source of financing

Amount

(Pak Rs. or equivalent)

1.

2.

3.

4.

Attach audited financial statements for the last five years (for individual applicant or each

partner of joint venture).

Firms owned by individuals, and partnerships, may submit their balance sheets certified by a

registered accountant, and supported by copies of tax returns, if audits are not required by the

laws of their countries of origin in case of foreign firms.

(11)

Application Form A-11 Page of Pages

Litigation History

Name of Applicant or Partner of a Joint Venture

Applicants, including each of the partners of a joint venture, should provide information on any

history of litigation or arbitration resulting from contracts executed in the last five years or

currently under execution (Instructions to Applicants, para 3.2.6). A separate sheet should be

used for each partner of joint venture.

Year

Award FOR

or

AGAINST

Applicant

Name of client, cause of litigation, and

matter in dispute

Disputed

amount

(current value

Pak Rs.

or equivalent)

D:pec-standards guidelines for Prequalification of Constructors

Construction Of Mineral Water Bottling Plant Pre-Qualification of Firms/Joint Ventures (JVs)

ANNEXURE-I

Evaluation Criteria

The firms / JV will be evaluated on the following criteria:

Sr.

No.

Description Marks

Assigned

Explanation for Marks Obtained

A-TECHNICAL

1 EPC Projects of similar nature with related civil works undertaken in last 10 years in water treatment business

10

5

5 Marks will be given if the contractor has completed at least 2 projects of similar nature in last ten years.

For only one project only two marks

will be given.

For more than 2 projects but less than 5 projects completed, the following weightage will be used.

5+ (A/5) x 5

Full Marks will be given in case of 5

projects or more.

A = No of projects of similar nature

Completed in last five years

1 mark for related civil works of similar Projects

2 In hand, similar projects (Mineral Water Bottling Plant) with related civil works to be supplied and installed on membrane technology

10 6 Marks will be given if the contractor has at least 2 plants of similar nature in hand.

For one project in hand , only 2 marks will be given.

For more than 2 plants but less than 5 plants the following weightage will be used.

6 + (A/5) x 4

Full Marks will be given in case of 5 plants or more.

A = No of plants of similar nature in hand.

3 In-house facility for assembling, installing and testing of mineral water bottling plant components including workshop premises

2.5 2.5 marks will be given if available and no mark will be given if the facility is not available.

4 Business Association with an international NSF certified membrane manufacturers

2.5 2.5 marks will be given on providing documentary evidence regarding business association with NSF certified membrane manufacturer and no marks will be given on non-compliance.

5 Enlistment record with PEC, Govt. Organizations and other

5 Two (02) marks for PEC registration and one (01) mark for each enlistment upto

Construction Of Mineral Water Bottling Plant Pre-Qualification of Firms/Joint Ventures (JVs)

ANNEXURE-I

Sr. No.

Description Marks Assigned

Explanation for Marks Obtained

agencies max. of three (03).

Total Marks Allocated: 35

6 Professional Staff 12 Strength of Engineers (8 Marks)

8 Marks will be given if the total no. of B.Sc (Civil, Electrical & Mechanical) Engineers registered with PEC are 02 nos. or above.

For less than 02 no of B.Sc (Civil, Electrical & Mechanical) Engineers registered with PEC marks will be given as per following formulas: (A/2) x 8

A = No. of Engineers

Experience (4 Marks)

4 Marks will be given if the individual experience of 2 no. of B.Sc (Civil, Electrical & Mechanical) Engineers (professional) is equal to 10 years or above.

For less than 2 no. of B.Sc (Civil,

Electrical & Mechanical) Engineers

having individual experience of 10

years, marks will be given as per

following formulas: (A/2) x 4

A = No. of Engineers having individual experience of 10 years or above.

7 Para-Professional Staff 8 Strength of Associate Engineers (6 Marks)

6 Marks will be given if the total no. of Associate Engineers (DAE) are 3 nos. or above.

For less than 3 no. of Associate Engineers marks will be given as per following formulas: (A/3) x 6

A = No. of Associate Engineers

Experience (2 Marks)

2 Marks will be given if the individual experience of at least 2 no. of Associates Engineers (DAE) is equal to 5 years or above.

For less than 2 nos of Associates

Engineers (DAE) having individual

experience of 5 years, marks will be

given as per following formulas:

Construction Of Mineral Water Bottling Plant Pre-Qualification of Firms/Joint Ventures (JVs)

ANNEXURE-I

Sr. No.

Description Marks Assigned

Explanation for Marks Obtained

(A/2) x 2 A = No. of DAE Engineers.

Total Marks Allocated: 20

8 Equipment Capabilities Full marks will be given for the following provisions of equipment/

machines:

(a) Fork Lift 1 2 Nos.

(b) Drilling /Rig Machine 2 1 Nos.

(c) Concrete mixer 2 2 Nos.

(d) Concrete vibrators 1 3 Nos.

(e) Steel cutting and welding machine

1 2 Nos.

(f) Mobile cranes 1 1 No.

(g) Trucks 2 2 Nos.

(h) Electric generators 1 2 Nos.

(i) Pressure test equipment 2 2 Nos.

(j) Safety equipment 1 1 Complete set (minimum requirement)

(k) First aid box 1 1 No.

Total Marks Allocated: 15

Total Technical Marks (A): 70

B-FINANCIAL

10 Available Bank Credit Line 10 • 5 Marks will be given if the available bank credit line limit is equal to 60 Million.

• For limit less than 60 Million, following weightage will be used. 4 x (A/50)

• For the limit more than 60 million but less than 70 million, following weightage 3 + (A/50) x 2

A= Available Bank Credit Line Limit • Full Marks will be given in case of

limit is 70 million or more.

11 Certified Audit Reports of Last 5 years indicating total annual turnover.

10 • 5 Marks will be given if the available average annual turnover for last five years is equal to 150 Million.

• For the average annual turnover less than 150 million following weightage will be given in: 5 x (A/150)

• For the average annual turnover more

than 150 million but less than 200

million use following weightage: 5 + (A/150) x 5

A= Average annual turnover in last five

Construction Of Mineral Water Bottling Plant Pre-Qualification of Firms/Joint Ventures (JVs)

ANNEXURE-I

Sr. No.

Description Marks Assigned

Explanation for Marks Obtained

years. • Full Marks are given in case of limit

is 200 million or more.

12 Registration with income tax department

5 No points will be awarded if income tax certificate is not attached and 5 points will be awarded in case of valid certificate.

13 Litigation history in which decision has been given against the firm(s)

2.5 In case the firm is involved in any litigation, no marks will be awarded and 5 points will be awarded in case affidavit of no litigation is attached.

14 Blacklisting from any agency 2.5 In case the firm is blacklisted, no Marks will be awarded and 5 points will be awarded in case affidavit by the company that it has not been black listed is attached.

Total Marks Allocated (B): 30

Total Marks (A + B): 100

Note:

1. The Firms/JV securing 50% marks in each sector (Technical & Financial) and 70% overall

shall be considered qualified to participate in the bidding.

2. The Department/WASA reserve the right to verify the originality and authenticity of the

submitted documents, in case of defective information the firm/JV may be disqualified.