The preferred partner to our underground mining and tunneling customers in delivering safe, integrated solutions that continuously improve the processes for efficient and effective excavation, maintenance and operation of underground mines and tunnels to the benefit of our clients and society.

Normet Company Presentation March 2014

NORMET VISION

2

Page 3: Kuulumisia, Normet  Oy

We are committed to developing and supporting robust, sustainable solutions for the underground mining and tunneling industries that enable our clients to excel with:

Improved safety.Increased productivity and faster cycle times.

We achieve that by:Employing people with industry-leading skills who actively listen to our clients' needs and are passionate and inspired about our work.Continuously seeking to improve the processes of our customers.Caring for our clients by providing local, hands-on support.Rolling our sleeves up to solve problems, optimize processes and maximize productivity and safety.Developing innovative, quality products which enable the industry to work harder and smarter.

Normet Company Presentation March 2014

NORMET MISSION - Our activities and offering

3

Page 4: Kuulumisia, Normet  Oy

Demanding solutions for selected customer processes in underground mining and tunnelling.

Fulfill our customers’ needs by exceeding their expectations.

Over 50 years of experience in the industry.

Over 10,000 delivered machines.

Services throughout the entire lifecycle of our products.

Global operation with over 900 business professionals.

Normet Group‘s 2013 turnover EUR >210 Mio.

Normet Company Presentation March 2014

NORMET IN A NUTSHELL

4

Page 5: Kuulumisia, Normet  Oy

Normet Company Presentation March 2014

NET SALES

5

Page 6: Kuulumisia, Normet  Oy

One-stop-shop for our customers

Normet Company Presentation March 2014

SOLUTIONS OFFERING – with added value to our customers

6

Page 7: Kuulumisia, Normet  Oy

UK – Project success – CrossrailLouhinta‐ ja Kalliotekniikkapäivät 9‐10.10.2014

7

Page 8: Kuulumisia, Normet  Oy

8

Crossrail Overview

Page 9: Kuulumisia, Normet  Oy

› Big train set, not a metro› £14.8bn construction cost› 2018 planned opening date› 42km main Crossrail tunnels› 8 underground stations, 5 in sprayed concrete (270,000m3)› 4,500,000t of excavated material

9

Crossrail ‐ London

Page 10: Kuulumisia, Normet  Oy

Crossrail Details

› The tunnels will weave their way between existing underground lines, sewers, tunnels and building foundations from station to station at depths of up to 36m.

› Two different techniques  Tunnel Boring Machines – 6.6m diameter tunnels  Sprayed Concrete Lining ‐ larger platform tunnels at stations

› C300 ‐ Royal Oak to Farringdon (2 x 6.2km)› 7.2m OD TBM, 6.6m ID Segments› ~ 50,000 m3 backfill grout› Sprayed concrete works› Injection and repair works

10

Page 11: Kuulumisia, Normet  Oy

Normet UK Crossrail Activities

11

Sprayed concrete works

Page 12: Kuulumisia, Normet  Oy

We are proud to provide 60% of the SCL solutions

12

C300 – TBM drives X (BFG)C410 – Bond Street & TCR Stations (SCL)C435 – Farringdon Station (SCL)C310 – TBM Tunnel Crosspasages (SCL)

Page 13: Kuulumisia, Normet  Oy

The important balancing act

Safe ground support Durability

Fast setting to build thick layers

Rapid early strength development for stability

Continuous strength development after 28 days

Robust mix design

As economical as possible

Achieve permanent load case material strengths

Be chemically stable

Have a low permeability

Low/no shrinkage cracking

Good surface finish to receive spray membrane

A balance between performance and cost

Aesthetics

Page 14: Kuulumisia, Normet  Oy

Normet Support and problem solving forCROSSRAIL C410 and C435: BFK JV SCL – Layering issue in flexural strength test panels

14

Problem solving

Kuvaa ei voi näyttää nyt.

Page 15: Kuulumisia, Normet  Oy

Normet Spraymec 8100 – Cut panels

15

Kuvaa ei voi näyttää nyt.

Normet Spraymec 8100 machine at Fisher Street tests:J2 achieved with 6% (left) and 10% (below) accelerator. Small Stripe shown on 10% panel, but otherwise all panels showed marked improvement.

Kuvaa ei voi näyttää nyt.

Page 16: Kuulumisia, Normet  Oy

Trials and Application at Fisher Street site

16

TamSeal 800

Kuvaa ei voi näyttää nyt.

Page 17: Kuulumisia, Normet  Oy

Crossrail and other important projects

17

Injection and ground engineeringKuvaa ei voi näyttää nyt.

Page 18: Kuulumisia, Normet  Oy

Crossrail BFKPre Cast Segment repairs & Leak Sealing. Damp Patches & cracks in SCLMaterial Supplied:TamPur 150TamAcryl 2000TamRez 220TamRez 310

18

Kuvaa ei voi näyttää nyt.

Injection and ground engineering

Page 19: Kuulumisia, Normet  Oy

CrossRail ‐ Dragados Sisk JVMajor leak washed 100 cube of sand from under tunnel 2 weeks injection work to stop water, we opened especially on Sundays to supply material Value approx. £30,000Following on from this Tempo PCE have now secured all injection work on C305 (started yesterday)

19

Kuvaa ei voi näyttää nyt.

Injection and ground engineering

Page 20: Kuulumisia, Normet  Oy

Kuvaa ei voi näyttää nyt.

TITRITamPur 130TamAcryl 2000

TITRITamPur 100

TITRITamPur150

TamRez 220TamPur 150

TITRITamRez 210TamPur 170

Crossrail Station Boxes

TITRITamPur 130

TITRITITRI

TamPur 100TamPur 125TamPur 150

TamPur 100TamAcryl2000

Page 21: Kuulumisia, Normet  Oy

Kuvaa ei voi näyttää nyt.

Connaught TunnelForming part of CrossrailMaterials used:RI Injection TubeMFCTamPur 100TamPur 150TamCrete 40HBContractors Supplied:Joseph GallagherFreyssinetJ Coffey(Should hear tomorrow on I Gap system for repairs to bomb damaged section  £20,000 of TamPur 150)

21

Rehabilitation & Maintenance

Page 22: Kuulumisia, Normet  Oy

Thank youKuvaa ei voi näyttää nyt.