The share of civil works in GDP
100,0% 107,8%121,0%
136,2% 149,8%154,9% 167,4%
181,7%
0,0%
20,0%
40,0%
60,0%
80,0%
100,0%
120,0%
140,0%
160,0%
180,0%
200,0%
2005 2006 2007 2008 2009 2010 2011 2012
Dynamics of volume building materials production
2012
100%
11,2%
2
Growth rates of indicators in the investment sphere
(in the comparable prices in % to previous year)
№ Indicators 2008 2009 2010 2011 2012
Mid-annual growth rates
Growth rates
In 2003-2012
1 GDP 109,5 109,0 108,0 108,5 108,3 108,2 188,3
2Investment to economy
123,0 128,3 128,3 109,2 107,9 116,3 327,0
3 Investment to industry 116,1 123,7 118,1 109,8 106,3 114.6 293,7
4Investment to building materials industry
133,8 153,6 176,8 141,3 111,9 153,6 2815,2
5Construction and insulation works (civil works)
115,7 103,8 133,5 108,1 108,5 112,8 255,8
3
SUCCESSFUL PROJECTSSUCCESSFUL PROJECTS
“Organization of ceramic tiles at JV “PENG SHENG”
Cost of project – 20 mln. USD Project capacity – 4,0 mln.sq.m Beginning of production – in 2010. Location – Sirdarya regionForeign investor – “Wenzhou Jinsheng Trade Co., Ltd” (China)
SUCCESSFUL PROJECTSSUCCESSFUL PROJECTS
5
“Organization of production Dry Mix”Cost of project – 1.5 mln. USD Project capacity - 48000 tons Beginning of production – in 2010.
“Organization of production gypsum board”Cost of project – 51.5 mln. USD Project capacity – 20 mln.sq.m Beginning of production – in 2011.
Location – Bukhara regionForeign investor – “KNAUF” (Germany)
successful PROJECTS
“Construction of cement grinding station for processing of the clinker of production JSC Bekabadcement” Cost of project – 33,2 mln. USD Project capacity – 1 mln.tons Location - Yangiyul district, Tashkent region
“Construction of the new line production of cement clinker by dry way at JSC “Bekabadcement”Cost of project – 63,0 mln. USD Project capacity – 0,85 mln.tons Location - Bekabad district, Tashkent region
Beginning of production – in 2013Foreign investor – “Caspian recourses Ltd”
INVESTMENT OFFERSINVESTMENT OFFERS
in the spherein the sphere of of building building
material productionmaterial production
88
““PRODUCTION OF ARCHITECTURAL PRODUCTION OF ARCHITECTURAL GLASSGLASS””
9
Annual capacity - 600 tones per day (18 million sq.m, 4 mm calc) Cost of project - 120 mln. USD Payback period – 6 years Target markets – Uzbekistan, Central Asian countries and Afghanistan
FLAT GLASS MARKET OF FLAT GLASS MARKET OF UZBEKISTANUZBEKISTAN
Production in Uzbekistan: 2 producers (Kvartz and Gazalkent plants) about 6 mln.sq.m per year country is the biggest regional glass producer with strong domestic market and expansion opportunities
Imports: above 5 mln.sq.m year imports have doubled in past 5 years
Market size: more than 12 mln.sq.m in 2012 (excluding uncovered demand)
including up to 3 mln.sq.m for automotive industry by 2016 consumption of flat glass in Uzbekistan will increase to 18.5
mln.sq.m. by 2020 consumption of flat glass in Uzbekistan will increase to 24.8
mln.sq.m.
11
RAW MATERIALRAW MATERIALSS
Raw material type
Deposit nameApproved deposits
(million tones)
Provision(years)
Quartz sand Djeroy 205 over 50
Limestone Urgaz 96.6 over 100
Dolomite Dehkanabad 2.6 over 50
Calcium sodaKungrad soda
plant production 0.1
per a year
Feldspar Karichsay 24,3 over 50
12
““PRODUCTION OF PORCELAIN STONE PRODUCTION OF PORCELAIN STONE WAREWARE ””
Annual capacity - 2 mln.sq.m
Cost of project - 16 mln. USD Location – SIZ “Jizzakh” Payback period – 4 years Target markets – Uzbekistan, Central Asian countries and
Afghanistan
13
IMPORT AND DEMAND FOR IMPORT AND DEMAND FOR PORCELAIN PORCELAIN
STONE WARESTONE WARE
For the last 5 years import of porcelain stoneware in Uzbekistan was more than 1180 ths.sq.m
108,2
155,8
317,8
250
0
50
100
150
200
250
300
350
2008 2009 2010 2011
thous.m2
Demand for porcelain stone ware in the short term will make about 1,2 mln.sq.m per annum.
14
At present there is no porcelain stone ware plant with modernized production facilities in Central Asian countries
RAW MATERIALRAW MATERIALSS
The name of raw material
Deposit nameThe authorized
stocks (million tons)
Provision(Years)
Kaolin Altin tay 5,4 over 50
Quartz sand Djeroy 205,0 over 100
Feldspar Lyangar 27.8 over 50
Dolomite Dehkanabad 2.6 over 50
16
““PRODUCTION OF SANITARY WARE PRODUCTION OF SANITARY WARE CERAMICSCERAMICS ””
17
Annual capacity - 510 ths items (toilet bowl, wash bowl, tanks, bidet, etc. )
Cost of project - 20 mln. USD Location – SIZ “Jizzakh” Payback period – 3,5 years Target markets – Uzbekistan, Central Asian countries and Afghanistan
Product Unit Production Consumption Gap
Sanitary ware ceramics
thousand pieces
0 350 - 350
IMPORT AND DEMAND FOR SANITARY IMPORT AND DEMAND FOR SANITARY WAREWARE
At present, there are sanitary ware plant with modernized production facilities in CIS countries
The volume of import to Uzbekistan 2009 – 140 000 items
2010 – 205 000items2011 – 228 000 items2012 – 337 000 items
18
RAW MATERIALRAW MATERIALSS
The name of raw material
Deposit nameThe authorized
stocks (million tons)
Provision(Years)
Kaolin Altin tay 5,4 over 50
Quartz sand Djeroy 205,0 over 100
Feldspar Lyangar 27.8 over 50
Dolomite Dehkanabad 2.6 over 50
19
““PRODUCTION OF ITEMS FROM PRODUCTION OF ITEMS FROM NATURAL STONES (MARBLE)”NATURAL STONES (MARBLE)”
20
Annual capacity - 30 ths.sq.m Cost of project – 2 mln. USD Location – SIZ “Jizzakh” Payback period – 4 years Export markets – Central Asian
countries and Afghanistan