january 2010 general meeting 2010 r.-d. heuer january 2010

34
January 2010 General Meeting 2010 R.-D. Heuer January 2010

Upload: dustin-walters

Post on 17-Jan-2016

229 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

General Meeting 2010

R.-D. Heuer

January 2010

Page 2: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Meilleurs Vœux / Best Wishes

pour l’année/ for 2010

and many thanks for all YOUR efforts / et merci beaucoup pour VOS efforts

in / en 2009

Page 3: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Looking back

- Highest priority: LHC physics in 2009- Increase diversity of the scientific program- Prepare for future projects- Establish open and direct communication- Prepare CERN towards a global laboratory- Increase Consolidation efforts- Financial situation: tight- Knowledge and Technology Transfer: proactive- Contract Policy and Internal Mobility: lessons learned

Key messages January 2009

Page 4: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

LHC 2009

- Excellent performance of the collider Highest energy proton-proton collisions ever produced

- Excellent readiness of the experiments  High data taking efficiency, fast turn-around for results

- Some 50 publications submitted to journals during 2009

- Over 800 conference contributions by the experiments during 2009

Page 5: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

LHC 2009

 

I’d like to express my heartfelt thanks and congratulations

to everybody from CERN and from all from partner labs and institutes around the world. Without these combined efforts we would today not be where we are. It has been a huge effort: repair; consolidation; hardware commissioning; preparing for beam; operation.

In addition to the accelerator sector and PH, all other CERN services have come together to make things work: the GS department for access and safety systems; IT for the smooth running of all computing services; HR and FP for showing great flexibility in time of need; SC for diligently ensuring that all safety aspects are fully covered; and the media service for well serving the journalists.

Page 6: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Looking forward

- Physics: - Highest priority: LHC - Increase diversity of the scientific program - Prepare for future projects- Keep open and direct communication- Prepare CERN towards a global laboratory- Continue consolidation efforts- Financial situation: tight- Knowledge and Technology Transfer: proactive- Contract Policy and Internal Mobility: improve implementation

- Safety at CERN: highest priority- Situation of the Pension Fund: need to approach full funding

Key messages January 2010

Page 7: January 2010 General Meeting 2010 R.-D. Heuer January 2010

SAFETY IS OF HIGHEST PRIORITYOur success can only be built on a strong & pro-active Safety culture in all areas of the Organization’s life

– The new Safety Policy Committee reflects all areas of the Organisation

– A first step was made to formalise the integration of Safety in the approval process for experiments at CERN

– The Head of the Safety Commission participates in the extended directorate meetings

– In view of the LHC era the operational radiation protection was significantly enforced in terms of manpower and budget

– …

Safety Matters (I)

Page 8: January 2010 General Meeting 2010 R.-D. Heuer January 2010

COMPUTER SECURITY IS OF HIGHEST PRIORITY

– Aspects of Computer Security are rather similar to those of Safety

– Security of Web applications and of Computers is still far from ideal

– CERN and the experiments are often targets, this can damage our reputation

– It is YOUR responsibility to comply with the rules

Safety Matters (II)

Page 9: January 2010 General Meeting 2010 R.-D. Heuer January 2010

• Safety follow-up of 19th Sept. ‘08 – “Safety Task Force” (SC, TE, BE, EN, PH, Staff Ass.):

All recommendations endorsed by directorate[TF reports CERN-ATS-2009-002 /003]

– All safety measures required for 2010physics run implemented

– Emergency preparedness• Plan d’urgence CERN (PUC) revised

• Crises management structure and procedures defined

• Respective Infrastructure and training to be done

Safety Matters (III)

Page 10: January 2010 General Meeting 2010 R.-D. Heuer January 2010

Tripartite agreement on radiation safety & radiation protection

• Technical agreement, reached with ASN (F) & OFSP (CH), is now with the respective governmental departments (CERN: Safety Commission & Legal Service, Directorate)

• One CERN domain only in a tri-partite approach recognizing CERN particularities

• Facilitates e.g. CERN’s radioactive waste management

inter-site transport of radioactive material

• all facilities treated the same way

Page 11: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Physics 2010

Objectives 2010 for Physics

- LHC physics at 7 TeV (pp and Heavy Ion), higher energy to be decided during the run

- Establish LPCC (LHC Physics Centre at CERN) (cooperation experiments and theory, for staff and users)

- Provide for adequate TIER0 capacity

- Fixed Target program in full swing but expectations of experiments on proton delivery exceed possibilities although (because?) 2009 was one of the best years for FT physics, proton delivery to the various experiments exceeded promise of Jan 09 OPERA should meanwhile have tau-candidate(s) in their sample

Page 12: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Physics beyond 2010

Objectives beyond 2010 for Physics

- LHC energy and luminosity increase

- R&D for New Initiatives ongoing

- Increase Diversification of CERN physics program (NA62, HIE-Isolde approved by Research Bord)) shape future non-LHC accelerator based program using outcome of strategy workshop May 2009 and of neutrino workshop October 2009

Page 13: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Expect LHC operation for at least 15 years, i.e. far beyond 2020

Strategy: Maximize useable integrated luminosity for physics key parameters: peak luminosity, luminosity lifetime, efficiency, data quality (pile-up, radiation). . .

1) Determine length of running periods and shutdowns along this strategy - coordinate shutdown activities planned by accelerator and experiments - optimize length of running periods planning within two-year cycles

2) Upgrade Phase I LINAC4 and Inner Triplet construction as foreseen ready for earliest installation end 2014

LHC beyond 2010

Important: international collaboration

Page 14: January 2010 General Meeting 2010 R.-D. Heuer January 2010

LHC beyond 2015LHC beyond 2015

• Several upgrade scenarios under discussion– Injector chain

• Ageing accelerators operating far beyond original design• Main limitation is space charge at injection in PSB and PS

– Higher injection energies and better beam quality through the chain» LINAC4» Superconducting Proton Linac (SPL)» PS2

– Consolidation and improvement of existing injector chain (PSB, PS, SPS)

– β* and Final Focusing• IR upgrade in Point 1 (ATLAS) and Point 5 (CMS)

– Allows to reach β* =0.3m from nominal β* =0.55m

– In addition• Crab cavities• Luminosity leveling• Lower emittance (from injector upgrades)

Taking into account the

non-LHC physics

Important: international collaboration

Page 15: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Strategy and Objectives for CERN

1) Preparations for a Linear Collider CLIC study and increasing CLIC/ILC collaboration aims: (different types of) design reports 2010/12

2) Detector R&D for energy frontier experiments sLHC Detector R&D (within PH LHC teams) LC Detector R&D Project (in PH)

New Initiatives beyond 2010

Important: international collaboration

Page 16: January 2010 General Meeting 2010 R.-D. Heuer January 2010

Linear Collider Detector project @ CERN

t-tbar event at 3 TeV (CLIC_ILD)

Forward detector region with final focus elements

LCD@CERN: Linear collider physics and detector studies, currently focusing on preparing physics/detector CDR for CLIC

Main progress so far:•Set up full detector simulations•Starting a hardware R&D program•Set up fruitful collaboration with ILC detector concepts and with ILC detector technology collaborations

www.cern.ch/lcd

heavy HA higgs doublet event at 3 TeV(CLIC-SiD)

Page 17: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Strategy and Objectives for CERN

1) Preparations for a Linear Collider CLIC study and increasing CLIC/ILC collaboration aims: (different types of) design reports 2010/12

2) Detector R&D for energy frontier experiments sLHC Detector R&D (within PH LHC teams) LC Detector R&D Project (in PH)

3) Excellent non-LHC accelerator based program beyond 2011 outcome of strategy workshops decisive

4) Closer cooperation with astroparticle physics

New Initiatives beyond 2010

Important: international collaboration

Page 18: January 2010 General Meeting 2010 R.-D. Heuer January 2010

many interesting ideas to follow upmany interesting ideas to follow up expect a few LoI or proposals soon to Sc.Comm’s

running experiments have plans to continuerunning experiments have plans to continue proposed upgrades in infrastructure need proposed upgrades in infrastructure need

discussion and commitments discussion and commitments

strong need for test beams will continuestrong need for test beams will continue more synergies with astroparticle community more synergies with astroparticle community

being pursued.being pursued.

18S.Bertolucci, RB189, September 2, 2009

Page 19: January 2010 General Meeting 2010 R.-D. Heuer January 2010

specific (@CERN) Specify the LHC injector

consolidation/upgrade and its coupling to roadmap

Increase support for coordinated R&D, within reality

An oscillation experiment/R&D at PS? LOI being submitted shortly to the SPSC A possible way to attract local physicists?

Keep working on accelerator R&D, contributing to the world effort

S. Bertolucci, European Strategy for Future ν Physics 19

Page 20: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Physics roadmap beyond 2010

Roadmap beyond 2010

- LHC results will indicate the way to proceed at the energy frontier

- hope for first discoveries at LHC around 2010/12

- T2K, D-Chooz, Daya-Bay, . . will have first results on (limits of) Θ13 around same time scale, as input to the roadmap for neutrino phsycs

- R&D on new projects ongoing world wide

time window for decision on next project(s) 2011/2012

Page 21: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Memorandum of Understanding betweenCERN, Cern Council, European Commissionsigned June 2009

CERN and CERN Council equal partners of EC responsible for Particle Physics Roadmap in Europe

Opens door to much closer cooperation

Concrete Steps initiated

Involved in mid-term evaluation of FP7 program Involved in defining program for FP8

European Collaboration

Page 22: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Strategy and Objectives at CERN for the next year(s)

CERN transformation towards global laboratory

Important Role:- CERN Coordinator for External Relations- Council Working Group for the Scientific and Geographical Enlargement of CERN

Important steps by Council in Dec.09: - emerging consensus on the principle of global opening for Full and Associate Membership - Associate Membership criteria to be revisedWithout prejudice to final decisions on global opening: - Technical Evaluation Group set up for the five applications received

Hope to conclude on geographical enlargement Summer 2010

Global Collaboration

Page 23: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Financial Situation

Budget 2010:

Budget (in 2009 figures) approved in JuneIndexation 1.16% as calculated, approved in December(Indexation for Personnel salaries: 1.6%) But:economical and financial situation in member states difficult serious concern, in particular for the following years

Need:Even more proactive in promoting CERN’s achievements/possibilitiesin all areas (research, technology, education, training, . . .)

Page 24: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Knowledge and Technology Transfer

Strategy

KTT driver: make a significant impact on global and societal issues Revenue considerations subordinate to this priority Raise awareness inside CERN of the importance of KTT activities Incentives will be put in place using KTT income

manage more partnerships and networking activities with companies and research institutes Set up an Alumni scheme for former CERN personnel CERN Global Network to be released before 3/10

Page 25: January 2010 General Meeting 2010 R.-D. Heuer January 2010

Communication fast and direct information flow established close contact to and better information for neighbours

Outreach/Education teachers program: 830 participants in 2009 (at the limit of present capability) Visit service: 40,000 (25,000) visitors in 2009 (2008), still many more requests permanent exhibition in the Globe: opening May/June

Despite the already strong engagement (to be acknowledged in the MARS exercise!)from many of you: Need more “guides, presenters, explainers”

“Guide recruitment campaign”

Communication/Outreach

January 2010

Page 26: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

Infrastructure

Consolidation program continues, ongoing activities include renovation of sanitary premises, roofs, facades, windows, etc… Additional measures taken according to priorities of staff and users

New measures 2010 - refurbishment of several buildings (e.g. 102) - extension of Restaurant 1 plus: total surface of the terrace enlarged new trees will be planted (Council agreed to plant 20 trees. . . ) - Proposal for a new building (close to build. 33) with offices, meeting rooms and a large auditorium (~1000 seats) to be presented soon to FIPOI

General StrategyDevelopment of a master plan (urban plan) on CERN facilities, land use, environment, logistics, services, etc….

Page 27: January 2010 General Meeting 2010 R.-D. Heuer January 2010

HR matters

Develop integrated approach to HR matters throughout CERN

First ever staff survey launched 3/2009, presented 11/09

New Contract Policy approved 6/09, implemented 9/09, first LD to IC exercise finished 12/09, implementation being evaluated

Record breaking number of applications and appointments across Fellows & Students programs (e.g. today >360 Fellows (was <300))

New Graduate Engineering Training Program introduced 12/09 (modeled along Fellows program)

January 2010

Page 28: January 2010 General Meeting 2010 R.-D. Heuer January 2010

The LHC restart impact on E-Recruitment (e-RT)

Page 29: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

- continue to ensure EO across gender, age, nationalities, etc in recruitment and career advancement - extend Diversity Policy in actively improving procedures and habits establish Strategy by EOAP by mid 2010 - recognize importance of respect and dignity at work through awareness raising and prevention first outline of code of conduct: Dec 2009, finalize by mid 2010

Equal Opportunity/Diversity

Code of Conduct (HR and EO):- Reinforces the values and key principles that should govern (professional) behavior at CERN- Provides guidance and is complementary to the rules and regulations- Applies to all members of personnel (incl. users) and contractors

Page 30: January 2010 General Meeting 2010 R.-D. Heuer January 2010

CERN Pension Fund

Characteristics– Defined benefit scheme– Pensions guaranteed by Member States

Governance– CERN PF is operationally independent and

autonomous– Managed by PFGB with external experts– PFGB reports to Council

Key figures– Assets: 4 bn CHF– Performance in 2009: 11% (estimate)– Performance last 5 years: 3% p.a. (estimate)

January 2010

Page 31: January 2010 General Meeting 2010 R.-D. Heuer January 2010

PF: Funding Situation – WG2 report

Objective of the report– Define full funding– Reach full funding in 2033

Findings– Underfunding: 2 bn CHF– Current cash flow from contributions below cost of

pension benefit earned– Supplementary funding needed

Status– Submitted to FC and Council– Ongoing discussions at FC

January 2010

Page 32: January 2010 General Meeting 2010 R.-D. Heuer January 2010

PF: Next steps

• Strengthening of CERN PF Unit initiated (more resources)

• Funding situation on Council agenda

• Strong commitment from stakeholders

• The challenge is now known

Pension Fund matters are very long term in nature and require measured approachJanuary 2010

Page 33: January 2010 General Meeting 2010 R.-D. Heuer January 2010

- LHC operation and physics run highest scientific priority- LHC will operate beyond 2020 requires large part of the yearly budget

- Non-LHC program to be strengthened (diversity with excellent and unique experiments)

- LHC results should enable decisions at the energy frontier 2011/2012 - Other facilities’ results should enable decision on neutrino road map

- R&D for New Projects going on

- Consolidation program during the next (at least) 4 years continuing

Summary

January 2010

Page 34: January 2010 General Meeting 2010 R.-D. Heuer January 2010

January 2010

• Look forward to physics at the LHC in 2010 lay the foundations for LHC upgrades and post-LHC era develop the role of CERN in global particle physics

• Requires continued level of commitment and support from member states and partners around the world

• Builds on YOUR commitment and dedication

I am optimistic and confident

Summary