BUILDING SERVICES STUDY ON FIRE SERVICES… PRESENTED BY- Aiman Naseem Sundus Hussain M.Raghib Bilal Khan Hamzah Meraj

Post on 18-Oct-2014

313 views

Category:

Education


0 download

DESCRIPTION

fire services

TRANSCRIPT

Page 1: jamia polytechnique delhi

BUILDING SERVICES

STUDY ON FIRE SERVICES…PRESENTED BY-Aiman NaseemSundus HussainM.RaghibBilal KhanHamzah Meraj

Page 2: jamia polytechnique delhi

CONTENTS1. Introduction2. Floor plans3.Entrance4.Corridors5. Classrooms6.Lift7.Staircase8. Basement9. Fire Extinguishers & Refuge Area10. Fire Alarm Control Panel11. Illumination & Sign boards12. Fire Hydrant Chamber & Fire Hose Reel13. Fire Extractors 14.Water Tanks15. Construction16. Other fire Services

Page 3: jamia polytechnique delhi

UNIVERSITY POLYTECHNIC

Approach- Main road- M.M.A Johar Road, JMI

Height of the building- 26m

Numbers of floors- 05

Occupancy per floor- 300-350 persons

Page 4: jamia polytechnique delhi

FLOOR PLANS

I. Typical Floor PlanII. Terrace PlanIII. Service Plan

Page 5: jamia polytechnique delhi

TYPICAL FLOOR PLAN

Fire Staircase Corridor

Entrance/Exit

Classrooms

Classrooms

Classrooms

ClassroomsClassrooms

Lift

FHC

FHC

FHC

Page 6: jamia polytechnique delhi

9m

9m

4.5m

17m

2m

Smoke detectors in Classroom

2m

4m

Smoke detectors in Lecture hall

4.5m

Page 7: jamia polytechnique delhi

BASEMENT1.Basement floor plan2.Services

Page 8: jamia polytechnique delhi

BASEMENT SERVICE PLAN

Main Sprinkler pipe-65 mm dia

Branch Sprinkler pipe- 25mm dia

Fire Exit

Ramp for Exit

Smoke Extractors

Page 9: jamia polytechnique delhi

9m

9 Sprinklers are provided in area of 9x9m

1.5m 3m 3m 1.5m

14m

18 Sprinklers are provided in an area of 14x8m

Page 10: jamia polytechnique delhi

• Openable windows on external walls are fitted with such locks that can be opened by a fireman’s axe.

• Sprinklers are provided in the basement.

• Mechanical extractors for smoke venting system are provided.

Page 11: jamia polytechnique delhi

• Fire Extinguishers provided & Signage available.

• Fire Hose reel provided in the basement.

• Fire Alarm located on the service core and at regular system.

Page 12: jamia polytechnique delhi

TERRACE PLAN

Lift

Water tank

Fire tank

Page 13: jamia polytechnique delhi

1.Lecture Hall• 17x8m- 140students• No of smoke detectors-8

2. Classroom• 9mx9m for 70 students.• No of smoke detecators-03

• Smoke Detectors are provided on the ceiling.

• Exit signs on the doors are pasted, but without illumination.

• No fire extinguisher present within the Hall. • Smoke Detectors

Page 14: jamia polytechnique delhi

• 2500mm wide corridor

• Corridors are fitted with Smoke Detectors But no Sprinklers provided.

• Fire alarm is provided.

• ‘Panic button’ with breakable glass is provided in the corridors.

• Signage at regular interval provided for exit.

CORRIDORS

Page 15: jamia polytechnique delhi

• No Fire Lift Provided.

• Lift floor area -2400mmx2100mm• Has a loading capacity of 545kg(10

persons) • Width of door.-1000mm

• Communication facilities are provided in lift cars.

• A sign is been pasted and maintained on the lift indicating that in case of fire occupants shall use the stairs.

• Lifts are installed in a common enclosures having individual lift separated by walls

LIFT

Page 16: jamia polytechnique delhi

STAIRCASEI. Normal StairsII. Fire Stairs

Page 17: jamia polytechnique delhi

• Width of the Stair-1500mm

• Stair type- Circular & Winder

• Fire Exit Signage provided near to staircase.

1. Normal Staircase 2.Fire Stairs

• Width of Stair-2000mm

• Height of riser-150mm

Page 18: jamia polytechnique delhi

Fire extinguishers &

Refuge Area

Page 19: jamia polytechnique delhi

• Type of fire extinguishers-ABC with ISI certification mark.

• 2 extinguishers for every floor is been provided.

• 1 fire extinguisher each in lab, near to electrical installation & generator room is been provided.

• Refuge area has been provided on the 4th Floor.

Page 20: jamia polytechnique delhi

FIRE ALARM CONTROL PANEL

Page 21: jamia polytechnique delhi

• Fire control panel is provided on each floor of the building.

• The panel receives information from environmental sensors, such as heat detectors or smoke detectors designed to detect changes associated with fire.

• In fire condition, the fire alarm control panel indicates where the fire originated.

Page 22: jamia polytechnique delhi

Illumination &

Sign Boards

Page 23: jamia polytechnique delhi

• No Emergency lights provided in the staircase and corridor.

• Sign boards ‘Fire Exit’ over the Lift and near to stairs are provided.

• Sign posted without illuminated sign for, all exits and direction of travel to each exit.

• No Fire plan for each floor showing the locations of the stairways.

Page 24: jamia polytechnique delhi

FIRE HYDRANT CHAMBER(FHC)

&FIRE HOSE REELS

Page 25: jamia polytechnique delhi

• Chamber area- 0.7mx1.3m

• A hose reel, 30m long and fitted with 19mm diameter nozzle at the end of it.

• One Fire Hydrant Chamber on each floor of the building is provided.

Page 26: jamia polytechnique delhi

FIRE EXTRACTORS& FIRE DAMPERS

Page 27: jamia polytechnique delhi

• Fire Extractors provided only in the basement area.

• Fire Dampers are located in return air ducts.

• Fire Dampers in fire prevent the spread of smoke inside the ducts.

• When a rise in temperature occurs, the fire damper closes, usually activated by a thermal element which melts at higher temperatures.

FIRE DAMPERS

Page 28: jamia polytechnique delhi

WATER TANKS

I. Fire tank.II. Domestic water tank.

Page 29: jamia polytechnique delhi

• Fire tank capacity- 25klts• Area-16.9sqm

• Domestic water tank capacity- 20klts• Area-15.3

Fire water supply Pipes

Domestic water supply Pipes

Page 30: jamia polytechnique delhi

CONSTRUCTION1.Comustibility2.Material

Page 31: jamia polytechnique delhi

• All materials of constructions in load bearing elements, stairways & corridors and facades are non-combustible.

• The internal walls & staircase are of brick & somewhere with reinforced concrete with a minimum of 2h fire rating.

• Facade treatments is non combustible because of the use of exposed brick.

1.Comustibility Properties

Page 32: jamia polytechnique delhi

2. MATERIALS

Flooring materials•Terrazzo•Marble•Tiles

Tiles as a flooring material

Terrazo as a flooring material

Materials for walls•Tiles•Cement plaster

Page 33: jamia polytechnique delhi

OTHER FIRE SERVICESFacilities Which are necessary to be provided in case of fire which were not present in our CASESTUDY.

1.Call box2.Control Rooms3.Materials (Non Combustible04.Denchers

Page 34: jamia polytechnique delhi

1.CALL BOX

A callbox is a box containing a special-purpose direct line telephone.

Call boxes should be I. Located at each floor. II. One or more should be provided on the floor.III. Accessible within 22.5m.IV. Call boxes shall be wired in a close circuit.V. At a height of 1m from the floor level.

Page 35: jamia polytechnique delhi

• There shall be a control room on the entrance floor of the building with communication system to all floors.

• Details of all floor plans along with the detail of fire fighting equipment and installations shall be maintained in the control room.

2.CONTROL ROOM

Page 36: jamia polytechnique delhi

3.Materials

Fire proofing material for walls•Gypsum plaster•Cementetious plaster•Fibrous plaster•Intumescent fire proofing

Fire proofing material for floors•PCC•Terrazo•Tiles

Page 37: jamia polytechnique delhi

• A drencher fire control system provides a discharge of water over roofs, walls and windows to prevent fire spreading from or to adjacent buildings.

• Drencher systems provide the necessary

curtain of water for protection against

internal and external exposure to fire.

4.DRENCHERS