isee3 reboot

57
1/42 Rebooting an old Spacecraft – ISEE3 Reboot Support @AMSAT-DL Achim Vollhardt, DH2VA Mario Lorenz, DL5MLO For the AMSAT-DL / Bochum Observatory Team

Upload: hybr1s

Post on 14-Jul-2015

153 views

Category:

Technology


1 download

TRANSCRIPT

1/42

Rebooting an old Spacecraft –ISEE3 Reboot Support @AMSAT-DL

Achim Vollhardt, DH2VAMario Lorenz, DL5MLO For the AMSAT-DL / Bochum Observatory Team

Mario Lorenz (DL5MLO), Achim Vollhardt (DH2VA),

on behalf of the AMSAT-DL/Bochum observatory team

AMSAT-UK colloquium 2014

spr
Schreibmaschinentext
1
spr
Schreibmaschinentext
adapted for HaSi-Talks by Frank (DL6DBN) - Nov. 2014
spr
Schreibmaschinentext
spr
Schreibmaschinentext

International Sun-Earth Explorer 3

● Launched August 12 1978,15:12:00 UTCDelta Launch 1978-079A

● Halo-Orbit at L1

● Study Sun/Earth Interaction:Plasmas, Waves, Fields

● Other in series:ISEE-1 (NASA), ISEE-2 (ESA)

spr
Schreibmaschinentext
2

Spacecraft Firsts

● First S/C to achieveSEL1 Halo Orbit

● First Cometary Encounter(Giacobini-Zinner, 1985)

● First TranscontinentalAntenna Arraying

Image: http://tmo.jpl.nasa.gov/progress_report/42-84/84W.PDF

spr
Schreibmaschinentext
3

Image Source: NASA

spr
Schreibmaschinentext
4

Further Mission of ICE

● 1985 Comet Flyby (tail) of Giacobini-Zinner● 1986 Comet Flyby (Halley)● 1991 Mission Update: Monitor Solar CME's

(with Ulysses (1990-2009)● 19 Dec 1995: Modulation turned off. Carrier used for

Radio Science● 5 May 1997: Termination of Operations● 18 Sep 2008 DSN tracks Carrier

spr
Schreibmaschinentext
5

Robert Farquhar

• born 1932 in Chicago, IL • ISEE-3 flight director • mission director for NEAR, CONTOUR,

MESSENGER, New Horizons his idea: use ISEE-3 with its limited fuel and comm system for comet encounter by ‘stealing’ it from L1 (Giacobini-Zinner, Halley) one final major orbit maneuver (Apr 1986): put ISEE-3 for rendezvous with Earth-Moon

spr
Schreibmaschinentext
6
spr
Schreibmaschinentext
7
spr
Schreibmaschinentext
8

The end...?

Dec 1995: switched off telemetry modulation, carrier remained for JPL radio science May 1997: ICE mission support officially ‘terminated’ Sep 2008: one final tracking pass by NASA DSN, updating orbital data

spr
Schreibmaschinentext
9

Analysis of GSFC Engineering Team, Feb 4 2014

http://www.planetary.org/blogs/emily-lakdawalla/2014/02070836-isee-3.html

spr
Schreibmaschinentext
10

conclusion from Emily Lakdawalla:

http://www.planetary.org/blogs/emily-lakdawalla/2014/02070836-isee-

3.html

spr
Schreibmaschinentext
11

Mounting Pressure to do something

spr
Schreibmaschinentext
12

media ‘candy storm’ hamradio media:

Funkamateur

CQ-DL

Southgatearc.org

amsat-uk.org

non-hamradio media:

Spiegel Online

SRF2 Wissen (swiss radio), DLF (german radio)

Frankfurter Rundschau

Bild newspaper (regional section)

guest blog ‘The Planetary Society’

Gizmag.com

and more..

spr
Schreibmaschinentext
13

Bochum Observatory

Outside … and inside

spr
Schreibmaschinentext
14

Getting to work (Feb 2014)

● Find frequencies/comms information:http://mdkenny.customer.netspace.net.au/ISEE-3.pdf

● Celestial Location:– Not on Horizons– With help from GSFC and JPL and some data translations:

Trajectory Data loaded into Tracking Computer by James, G3RUH

● USRP with SBX board in place and hooked to LHCP port– No luck, but not really expected: Noise Figure ~5dB– G4DDK Preamp used at EVE reinstalled (Michael,

DD5ER)

spr
Schreibmaschinentext
15

Focus Room 20m Dish

spr
Schreibmaschinentext
16

first success: Mar 2, 2014

17.8 dB CNR, range ca. 43 mill km

spr
Schreibmaschinentext
17

Situation Analysis

● We have:– Bochum Observatory Dish– Downlink Carrier Xpndr B

● We do not have:– Documentation about Telemetry Details, especially Uplink

Details– Confirmation of Xpndr A (RHCP)– Capable Transmitter– NASA contact indicated required RX level at S/C would

be -120 dBm – Initial estimate revised: ~10 kW

Contact with NASA – and had to agree: No Go.

spr
Schreibmaschinentext
18

Mar 14: Dennis Wingo • CEO Skycorp Inc.

• KD4ETA, SO-33 project lead

• technoarcheologist

• founder of the Lunar Orbiter

Image Recovery Project

(LOIRP)

• US american

spr
Schreibmaschinentext
19

THE plan 2014 reverse exit trajectory (lunar swing-by) to bleed off heliocentric velocity

and enter stable earth orbit

Mike Loucks, @Astrogator_Mike, wwww.see.com

spr
Schreibmaschinentext
20

lunar swing-by

swing-by required ca. 50km above lunar surface

Mike Loucks, @Astrogator_Mike, wwww.see.com

SHOW VIDEO

spr
Schreibmaschinentext
21

Apr 23: ISEE-3 Reboot Crowdfunding

● Pledge for $125k within 30 days for hardware, travel expenses

● Turned out to be successful● Build out Arecibo both for Receive and Transmit

spr
Schreibmaschinentext
22

Get to work

● Install additional hardware– 2nd LNA, Second USRP for XPNDR-A– 1PPS Distribution for exact time Synchronization– Bandpass filters for both Receive Chains

BPF G4DDKLNA

USRP N210

S-BandRHCP

S-BandLHCP

BPF G4DDKLNA

USRP N210/GPS

Z3801Focus Room Control Room

spr
Schreibmaschinentext
24

May 22: getting telemetry Puerto Rican antenna + german-built (4 weeks!) power amplifier (DK2FD)

www.naic.edu

spr
Schreibmaschinentext
spr
Schreibmaschinentext
25

May 29: Telemetry Switched On

…. unfortunately switching to a rate where link would not yet close in Bochum

spr
Schreibmaschinentext
26

Making Sense of the Telemetry

● ITAR Restrictions on Documents● Some were found on public NASA servers

– Conflicting; Version Status unknown● Trial & Error and Guessing → Frame can be decoded● Analog calibration data is ITAR ?

● But apparently not for other contemporary S/C ?

spr
Schreibmaschinentext
27

Old Telemetry Screen

spr
Schreibmaschinentext
28
spr
Schreibmaschinentext
29
spr
Schreibmaschinentext
30
spr
Schreibmaschinentext

manual TRX switching powering and switching attenuators done by hand

BIG THANK YOU to Phil Perillat, Dana

Whitlow, Alessondra Springmann and the whole

Arecibo team!

spr
Schreibmaschinentext
31

June: commanding and position scanning

Arecibo beamwidth (2.2 arcmin = 0.04 deg)

deviation in celestial coordinates from available data (ca. 0.5 deg)

need coherent ranging (2-way ranging, including phase-locked uplink)

for more detailed trajectory determination: NASA Deep Space Network

(DSN)

Telemetry in Bochum since Jun 25

using DSS-24 (Goldstone) for

DSN tracking passes

after some unsuccessful attempts:

Jun 26/27: 2 ranging passes with a

total of 15 range measurement points

spr
Schreibmaschinentext
32

Jul 2: spin up burn

required: 11 pulses

19.16 rpm

19.75 rpm

spr
Schreibmaschinentext
33

21

spr
Schreibmaschinentext
spr
Schreibmaschinentext
35
spr
Schreibmaschinentext

Jul 2: spin up successful

spr
Schreibmaschinentext
36

Jul 8: course correction, attempt #1

• required: 7 m/s

• some 400+ pulses req.

• radial thrusters

• fire 45 deg each rev

• split into segments of

63 pulses max.

THE main maneuver to

get ISEE-3 on track to

lunar swing-by

spr
Schreibmaschinentext
37

Jul 8: getting AMSAT-DL TLM display online

www.amsat-dl.org

spr
Schreibmaschinentext
38

Jul 8: course correction, result #1

spr
Schreibmaschinentext
39

Jul 8: course correction, result #2

‘denial-of-service attack‘

on webserver: ca. 500

users hammering server

simultaneously

page refresh limited to

once a minute, REAL

refresh of TLM each 2

sec!

@DutchManPaul offers

TLM mirror:

http://isee3.p3s.nl/

spr
Schreibmaschinentext
40

Jul 9: course correction, attempt #2

different thruster pair

(opposite sign)

same signature, so not

thruster related but likely

common issue

propulsion pressure gone?

spr
Schreibmaschinentext
41

Jul 15: failure analysis (IRP)

fuel + pressure still there

wrong command sequence for thruster ops (documentation

incomplete..)

FIRST: switch on +28V

SECOND: open HPS A/B latch valves

THEN: fire thrusters

going for another try on Jul 16

spr
Schreibmaschinentext
42

Jul 16 + 18: plumbing job and carburetor clean-out

Jul 16:

Trying correct valve sequences

Going for long pulse sequences (512) to try and blow out residual

hydrazine gas

Trying different thruster pairs: radial #1, radial #2, spin down

No significant effect on all combinations. One (?) single pulse

though

Jul 18:

using different combinations of valves, heaters and firing sequences

to learn as much as possible how spacecraft reacts

no smoking gun (literally!), no significant thrust

spr
Schreibmaschinentext
43

Ranging

spr
Schreibmaschinentext
spr
Schreibmaschinentext
44

Jul 23 : final attempt

if everything fails:

trying to hammer the valves

(On-Off-On-Off-...) to see if

this enables fuel flow and

subsequently thrust on any

combination

spr
Schreibmaschinentext
45

Jul 24: Interplanetary Citizen Science Mission

no nitrogen pressurant left, no controlled lunar swing-by possible, no return

to earth orbit

switch ISEE-3 to science telemetry

maximize data download

spr
Schreibmaschinentext
46

Outlook and lessons learned

ISEE-3 will continue to orbit the sun and eventually come back to earth

can ‘civilians’ take over a decommissioned spacecraft? YES

Biggest problems:

TIME

uplink capability

navigation (need coherent ranging testbed!)

DIY DSN station. check:

www.uhf-satcom.com

groups.yahoo.com/neo/groups/amateur-DSN/info

spr
Schreibmaschinentext
47

Acknowledgements

AMSAT-DL BOD

especially Michael DD5ER for doing all the mech work

Thilo Elsner DJ5YM, Sternwarte Bochum

Phil Karn KA9Q, decoder magician

James Miller G3RUH, keeping track

Florian Wolters DF2ET (Webserver)

@DutchManPaul

Arecibo Staff

Mike Loucks (@Astrogator_Mike), www.see.com

ISEE-3 Reboot Project team

spr
Schreibmaschinentext
48

www.amsat-dl.org www.sternwarte-bochum.de

spacecollege.org/isee3

spr
Schreibmaschinentext
49

Don

Kirchner,

University

of Iowa:

"This is

the first

Type III

burst I've

seen in the

data.“

Aug 8

2014

spr
Schreibmaschinentext
50

Waving ISEE 3 Good bye

August 10th, 2014

The ISEE3 reboot team

with visitors and guests at

“McMoon”

the headquarter in a former

McDonald Drive-In

restaurant

spr
Schreibmaschinentext
51

ISEE-3

and

GOES:

Type III

Burst

Correlated

to Solar

Flares

Aug 10

2014

spr
Schreibmaschinentext
52

Trajectory until August 2016

spr
Schreibmaschinentext
53
spr
Schreibmaschinentext
54

http://spacecraftforall.com/ a Chrome Experiment

spr
Schreibmaschinentext
55

Mein Dank geht an:

Achim Vollhardt (DH2VA)

Mario Lorenz (DL5MLO)

AMSAT-DL

AMSAT-UK

und den

British Amateur Television Club

spr
Schreibmaschinentext
56