Page 1: IPG Portfolio June 2009

DESIGN PORTFOLIOIrshaad [email protected]

Page 2: IPG Portfolio June 2009

Overview of Recent Projects

Siemens Energy & Automation, Inc.

(May – August 2008)

Mechanical / electrical engineering internship

Worked on a team with focus in industrial circuit

breaker accessory design

Georgia Tech Capstone Design Project

(January – May 2009)

Cryogenic freezer redesign sponsored by Air

Products Chemicals, Inc.

Disclaimer: The information contained in this presentation has been deemed suitable for

disclosure to the general public by authorities within these companies.

Page 3: IPG Portfolio June 2009

SE&A Internship

Page 4: IPG Portfolio June 2009

SE&A Internship

Background

Learning Pro/E during first week

Modeled “neutral assemblies” for use in circuit

breakers to maintain equal voltage across poles

Page 5: IPG Portfolio June 2009

SE&A Internship

Background (cont.)

Maxflex Handle Operator

Accessory

Functions to trip a circuit

breaker remotely

Design problem

Ergonomic issue: installation of

cables onto breaker requires

disassembly of Maxflex unit

Maxflex unit

Page 6: IPG Portfolio June 2009

SE&A Internship

Proposed solution 1

Re-manufacture both

plates in Maxflex unit

to allow unobstructed

access to bolts

Problem:

Expensive because it

will create scrap parts

Upper plate (sliding)

Lower plate (fixed)Unobstructed bolt

access

Page 7: IPG Portfolio June 2009

SE&A Internship

Proposed solution 2

Reverse bolt

positioning to allow

quicker disassembly of

Maxflex unit

Problem:

Cheap fix, but presents

inconvenience of rear-

mounted breaker

Obstructed but

easier disassembly

Page 8: IPG Portfolio June 2009

SE&A Internship

Proposed solution 3

Slot the fixed plate to

allow removal of Maxflex

unit from side

Problem:

Unconstrained unit

(lateral motion possible)

presents safety hazard

Loosen bolts and slide

plate right to remove

Page 9: IPG Portfolio June 2009

SE&A Internship

Proposed solution 4

Make L-shaped slots in fixed

plate to allow lateral removal

Unit is constrained because it

can only produce motion

downward (to turn breaker off)

Conclusion:

Solution 4 implemented after

extensive quoting process

Page 10: IPG Portfolio June 2009

SE&A Internship

Page 11: IPG Portfolio June 2009

SE&A Internship

Design project

Larger enclosure and

stronger mounting

structure needed for

internal testing of

prototypical circuit

breaker

Combined a modular

steel mounting structure

with glastic reinforcement

Page 12: IPG Portfolio June 2009

SE&A Internship

Design project (cont.)

Responsibilities

3-D modeling

Preparation of drawings

Part / hardware ordering

Machining

Assembly

Page 13: IPG Portfolio June 2009

SE&A Internship

Design project (cont.)

Pro-E Model Actual

Page 14: IPG Portfolio June 2009

SE&A Internship

Page 15: IPG Portfolio June 2009

Capstone Design Project

Background

Sponsored and budgeted by Air Products

Design focus:

Innovation

Minimizing cost and weight

Maximizing efficiency

Page 16: IPG Portfolio June 2009

Capstone Design Project

Design Overview

Exhaust

System

Pneumatic Lift

SystemConveyor Drive

System

Cryogen Supply

System

Enclosure

SystemRecirculation

System

Page 17: IPG Portfolio June 2009

Capstone Design Project

Design Overview (cont.)

All these various systems were designed from the

ground-up to obtain fresh perspective

Researched competition at 2009 Poultry Expo

Relied on APCI contacts when necessary

Scope of project:

Material selection and structural analyses

Part specifications and BOM

Thermodynamics and heat transfer analyses

Cost and marketability analysis

Page 18: IPG Portfolio June 2009

Capstone Design Project

Some Details

Pneumatic Lift SystemEnclosure System

Page 19: IPG Portfolio June 2009

Capstone Design Project

Some Details

Cryogen Supply System

Conveyor Drive System

Page 20: IPG Portfolio June 2009

Some Details

Capstone Design Project

Recirculation System

Exhaust System

Page 21: IPG Portfolio June 2009

Key Elements / Innovations

Replaced stainless steel exterior with polyester-

fiberglass composite (glastic) panels

Capstone Design Project

304SS

interior panel

Polyurethane

foam insulation

Glastic

exterior panel

Rivets

Page 22: IPG Portfolio June 2009

Capstone Design Project

Key Elements / Innovations (cont.)

Effects on performance and marketability:

Page 23: IPG Portfolio June 2009

Thanks for your time!

Contact information

Irshaad Goedar

[email protected]