The Idaho Transportation Department is replacing the Rose Road Interchange on Interstate 15. The project includes: • Widening the Rose Road overpass over I-15. • Increasing the height of the overpass to current standards. • Reconfiguring and enhancing the on- and off-ramps. • Replacing two canal structures south of Rose Road to support current traffic loads. • Improving signage and irrigation. When complete, this project will improve mobility and safety at the interchange and benefit surrounding communities. What to expect during construction Interstate 15 and the interchange ramps will be open during the majority of construction. • Overnight closures will be necessary when setting bridge girders and moving ramp traffic. • The majority of work will occur during the day (7 a.m. – 5:30 p.m., M–Th). • The speed limit will be reduced to 65 mph. • Rose Road will be open throughout construction. To request email updates about construction, please text INTERSTATE15 to 22828. [email protected] ITDPROJECTS.ORG/ROSE 208.745.5611 ROSE ROAD INTERCHANGE CONSTRUCTION September 2018 – Late 2019 INTERSTATE Rose Road ROSE To BLACKFOOT To IDAHO FALLS MAP NOT TO SCALE R i v e rsi d e C a n al EXISTING INTERCHANGE NEW INTERCHANGE Rose Road R i v ersi de C a n a l

Upload: others

Post on 08-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INTERSTATE ROSE ROAD INTERCHANGE CONSTRUCTIONzgcpj2sylc51eof8mwqh1t6a-wpengine.netdna-ssl.com/...la construcción por favor mande un texto a INTERSTATE15 a 22828. I-15CONSTRUCTION@ITD.IDAHO.GOV

The Idaho Transportation Department is replacing the Rose Road Interchange on Interstate 15. The project includes:• Widening the Rose Road overpass over I-15.

• Increasing the height of the overpass to current standards.

• Reconfiguring and enhancing the on- and off-ramps.

• Replacing two canal structures south of Rose Road to support current traffic loads.

• Improving signage and irrigation.

When complete, this project will improve mobility and safety at the interchange and benefit surrounding communities.

What to expect during construction • Interstate 15 and the interchange ramps will be open

during the majority of construction.

• Overnight closures will be necessary when setting bridge girders and moving ramp traffic.

• The majority of work will occur during the day (7 a.m. – 5:30 p.m., M–Th).

• The speed limit will be reduced to 65 mph.

• Rose Road will be open throughout construction.

To request email updates about construction, please text INTERSTATE15 to 22828.

[email protected]

ITDPROJECTS.ORG/ROSE

208.745.5611

ROSE ROAD INTERCHANGE CONSTRUCTION

September 2018 – Late 2019

INTERSTATE

Rose Road

ROSE

ToBLACKFOOT

To IDAHO FALLS

MAP NOT TO SCALE

River

side

Canal

EXISTINGINTERCHANGE

NEWINTERCHANGE

Rose Road

Rive

rsid

e

Canal

Page 2: INTERSTATE ROSE ROAD INTERCHANGE CONSTRUCTIONzgcpj2sylc51eof8mwqh1t6a-wpengine.netdna-ssl.com/...la construcción por favor mande un texto a INTERSTATE15 a 22828. I-15CONSTRUCTION@ITD.IDAHO.GOV

El Departamento de Transportación de Idaho está reemplazando el cruce de la calle Rose en el Interestatal 15. El Proyecto incluye:• Ampliar el paso elevado de la calle Rose sobre el

Interestatal 15.

• Aumentar la altura del paso elevado a los estándares actuals.

• Configurar y mejorar las rampas de las entradas y las salidas.

• Cambiar las dos canales estructurales del sur de la calle Rose para soportar el tráfico actual.

• Mejorar las señales e irrigación.

Cuando este termina, este mejorará la movilidad y la seguridad en el cruce y beneficiará a las comunidades.

Que esperamos en el año del otoño 2018 • Interestatal 15 y las rampas del cruce van a ser abiertas

durante la mayoría de la construcción.

• Las cerradas durante la noche son necesarios cuando los trabajadores ponen la viga en su lugar y mover el tráfico sobre las rampas.

• El velocidad va a disminuir a 65 mph.

• La calle Rose va a ser abierta durante la construcción.

Para pedir avisos de correo electronico sobre la construcción por favor mande un texto a INTERSTATE15 a 22828.

[email protected]

ITDPROJECTS.ORG/ROSE

208.745.5611

LA CONSTRUCCIÓN DEL CRUCE DE LA CALLE ROSE

septiembre 2018 – el fin de 2019