internship portfolio

24
5646 MILTON ST, NO. 221, DALLAS TX 75206 214-653-1900 [email protected] HTTP://FLICKMARS.COM/

Upload: rachel-huynh

Post on 13-Aug-2015

33 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: INTERNSHIP PORTFOLIO

5646 MILTON ST, NO. 221, DALLAS TX 75206

214-653-1900

[email protected]

HTTP: / /FL ICKMARS.COM/

Page 2: INTERNSHIP PORTFOLIO

ARCHITECTS JAMES FLICKARCHITECT

James Flick, RA, NCARB, LEED AP

214-653-1900

[email protected]

MATT MARSARCHITECT

Matt Mars, RA

214-653-1900

[email protected]

RACHEL HUYNHINTD 4393

Page 3: INTERNSHIP PORTFOLIO

INTERIOR DESIGNERS

ELLEN [email protected]

ANN [email protected]

KAREN [email protected]

LINDSEY [email protected]

ALYSSA [email protected]

RACHEL HUYNHINTD 4393

Page 4: INTERNSHIP PORTFOLIO

PROJECT CONTRIBUTIONS 1. HILTON TIMES SQUARE

◦ NEW YORK, NEW YORK

2. HARD ROCK HOTEL ◦ DAYTONA, FLORIDA

3. CHATEAU LEMOYNE◦ NEW ORLEANS, LOUISIANA

4. ADMIRAL SEMMES◦ MOBILE ALABAMA

5. OLD PARKLAND◦ DALLAS, TEXAS

6. SOUTH SHORE HARBOR◦ HOUSTON, TEXAS

RACHEL HUYNHINTD 4393

Page 5: INTERNSHIP PORTFOLIO

HILTON TIMES SQUARE Duties: Aided in drawing the elevation for the restroom renovations

RACHEL HUYNHINTD 4393

Page 6: INTERNSHIP PORTFOLIO

HARD ROCK HOTEL Scope:

◦ Beach, Rock, Speed.... This is Hard Rock Daytona Beach. Sitting on ten acres of oceanfront property, less than three-quarters of a mile south of the Daytona Beach pier, Flick·Mars is envisioning the guestrooms, restaurants, bars, and function space to accentuate the energy created by the thrill of racing mixed with the exuberance of rock and roll music.

◦ The Hard Rock Daytona Beach is comprised of 250 guestrooms and 107 luxury residences on the 11 floors towering above the world famous Daytona beach. The one of a kind property is set to open late 2017.

◦ http://flickmars.com/portfolio/hard-rock-hotel/

Duties: ◦ Transferring sketch floor plans into AutoCAD and updating the CAD file after every

change◦ Rendered floor plans and elevations for presentations ◦ Corrected redlines from the architects and interior designers◦ Helped with creating construction documents and keynotes

RACHEL HUYNHINTD 4393

Page 7: INTERNSHIP PORTFOLIO

RENDERINGS GUESTROOMS FLOOR PLAN

RACHEL HUYNHINTD 4393

Page 8: INTERNSHIP PORTFOLIO

RENDERINGS KING ROOM ELEVATIONS

RACHEL HUYNHINTD 4393

Page 9: INTERNSHIP PORTFOLIO

RENDERINGS DOUBLE QUEEN ELEVATIONS

RACHEL HUYNHINTD 4393

Page 10: INTERNSHIP PORTFOLIO

RENDERINGS VARIOUS ELEVATIONS

RACHEL HUYNHINTD 4393

Page 11: INTERNSHIP PORTFOLIO

CHATEAU LEMOYNE Duties:

◦ Corrected redlines from the architects and interior designers◦ Helped with creating construction documents and keynotes

RACHEL HUYNHINTD 4393

Page 12: INTERNSHIP PORTFOLIO

CONSTRUCTION DOCUMENTS2ND FLOOR PLAN SHEET

RACHEL HUYNHINTD 4393

Page 13: INTERNSHIP PORTFOLIO

CONSTRUCTION DOCUMENTSENLARGED FLOOR PLAN WITH DETAILS SHEET

RACHEL HUYNHINTD 4393

Page 14: INTERNSHIP PORTFOLIO

CONSTRUCTION DOCUMENTSDETAILS SHEET

RACHEL HUYNHINTD 4393

Page 15: INTERNSHIP PORTFOLIO

CONSTRUCTION DOCUMENTSMATERIALS SPECIFICATION SHEET

RACHEL HUYNHINTD 4393

Page 16: INTERNSHIP PORTFOLIO

ADMIRAL SEMMES Duties:

◦ Corrected redlines from the architects and interior designers◦ Helped with creating construction documents and keynotes◦ Created material and concept boards for presentations

RACHEL HUYNHINTD 4393

Page 17: INTERNSHIP PORTFOLIO

ADMIRAL SEMMES

RACHEL HUYNHINTD 4393

Page 18: INTERNSHIP PORTFOLIO

OLD PARKLAND Duties:

◦ Rendered floor plans and elevations for presentations

RACHEL HUYNHINTD 4393

Page 19: INTERNSHIP PORTFOLIO

SOUTH SHORE HARBOR Duties:

◦ Transferred drawing from construction documentation sheets to AutoCAD◦ Corrected redlines from the architects and interior designers◦ Helped with creating construction documents and keynotes

RACHEL HUYNHINTD 4393

Page 20: INTERNSHIP PORTFOLIO

CONSTRUCTION DOCUMENTELEVATION SHEET

RACHEL HUYNHINTD 4393

Page 21: INTERNSHIP PORTFOLIO

FUN WITH FLICK MARS

RACHEL HUYNHINTD 4393

Page 22: INTERNSHIP PORTFOLIO

TIMESHEETSWeekly Time Sheet

Flick⋅Mars     Rachel Huynh 

 

Week ending: 6/15/2014

Day Phase Project Code Billable HoursNon-Billable

HoursTotal

Monday 6/9/2014  Library

Management7.50   7.50

                 

                 

Tuesday 6/10/2014  Library

Management7.50   7.50

                 

                 

Wednesday 6/11/2014   Hard Rock Hotel 7.50   7.50

                 

                 

Thursday FALSE   Hilton Time Square 8.00   8.00

                 

                 

Friday 6/13/2014   Hard Rock Hotel 8.00   8.00

                 

                 

Saturday 6/14/2014          

Sunday 6/15/2014          

  Total hours 38.50   38.50

 

  

Employee signature

Date

Weekly Time SheetFlick⋅Mars     Rachel Huynh

 

 

Week ending:6/22/201

4

Day Phase Project Code Billable HoursNon-Billable

HoursTotal

Monday 6/16/2014   Hard Rock Hotel 9.00   9.00

                 

                 

Tuesday 6/17/2014   Hard Rock Hotel 8.00   8.00

                 

                 

Wednesday 6/18/2014   Libarary Management 8.25   8.25

                 

                 

Thursday 6/19/2014   Hard Rock Hotel 8.25   8.25

                 

                 

Friday 6/20/2014   Hard Rock Hotel 6.50   6.50

                 

                 

Saturday 6/21/2014          

Sunday 6/22/2014          

  Total hours 40.00   40.00 

  

Employee signature Date

RACHEL HUYNHINTD 4393

Page 23: INTERNSHIP PORTFOLIO

TIMESHEETSWeekly Time

SheetFlick⋅Mars     Rachel Huynh

 

 

Week ending:6/29/201

4

Day Phase Project Code Billable HoursNon-Billable

HoursTotal

Monday 6/23/2014   Hard Rock Hotel 8.00   8.00

                 

                 Tuesday 6/24/2014   Hard Rock Hotel 8.00   8.00                                  Wednesday 6/25/2014   Hard Rock Hotel 8.00   8.00                                  Thursday 6/26/2014   Hard Rock Hotel 8.00   8.00                                  Friday 6/27/2014   Hard Rock Hotel 9.00   9.00                                  Saturday 6/28/2014   Hard Rock Hotel 9.00   9.00Sunday 6/29/2014          

  Total hours 50.00   50.00 

  

Employee signature Date

Weekly Time Sheet

Flick⋅Mars     Rachel Huynh 

 

Week ending: 7/6/2014

Day Phase Project Code Billable HoursNon-Billable

HoursTotal

Monday 6/30/2014   Hard Rock Hotel 8.00   8.00

                 

                 Tuesday 7/1/2014   Hard Rock Hotel 8.25   8.25                                  Wednesday 7/2/2014   Hard Rock Hotel 8.75   8.75                                  Thursday 7/3/2014   Hard Rock Hotel 8.00   8.00                                  Friday 7/4/2014                                            Saturday 7/5/2014          Sunday 7/6/2014   Hard Rock Hotel 11.00    

  Total hours 44.00   44.00 

  

Employee signature Date

RACHEL HUYNHINTD 4393

Page 24: INTERNSHIP PORTFOLIO

TIMESHEETSWeekly Time

SheetFlick⋅Mars     Rachel Huynh

 

 

Week ending:7/13/201

4

Day Phase Project Code Billable HoursNon-Billable

HoursTotal

Monday 7/7/2014   Hard Rock Hotel 13.00   13.00

                 

                 Tuesday 7/8/2014   Chateau LeMoyne 8.00   8.00                                  Wednesday 7/9/2014   Chataeu LeMoyne 8.00   8.00                                  Thursday 7/10/2014   Chataeu LeMoyne 9.00   9.00                                  Friday 7/11/2014   Old Parkland 8.00   8.00                                  Saturday 7/12/2014          Sunday 7/13/2014          

  Total hours 46.00   46.00 

  

Employee signature Date RACHEL HUYNHINTD 4393