international civil aviation organization satellite data-link communication requirements and issues...

16
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

Upload: kate-scaife

Post on 31-Mar-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

International Civil Aviation Organization

SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES

ICAO APAC Office8 February, 2012

Page 2: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

2SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

STRUCTURE

• Background

• FANS Inter-operability Team (FIT) Outcome

• ICAO NATSPG/47 Outcome

• APANPIRG Outcome

• Conclusion

Page 3: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

ACARS

• Data Link for Aviation Started in 1978 with ACARS

• Initial data-link applications included Departure Clearance, ATIS etc.

• ACARS expanded to use INMARSAT AMSS in 1990

• ACARS extended to IRIDIUM Satellites since 2007 through Short Burst Data transmission

Page 4: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

ICAO DATA-LINK SERVICES

• ICAO ANC created FANS Committee in 1980s and FANS Committee recommended use of data links and satellite for CNS

• Installation FANS 1 by Boeing and FANS A by AIRBUS defined CPDLC and ADS-C

• ICAO AMSS Standards adopted in 1994. Standards specify standard ITU protocols for the provision of voice and data link services.

Page 5: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

FANS INTEROPERABILITY TEAM• Lessons learnt after investigating Performance Deficiencies:– Pilots: avoid sending multiple elements in downlink messages,

avoid using free-text, continue to monitor HF– Air Traffic Controllers: priority for messages containing “DUE TO

WEATHER”, avoid sending multiple elements

• System Performance Lessons Learnt:Performance requirements includea) Message Delay: <60 seconds 95% timeb) Integrity: Undetected bit errors< 10-6 per hourc) CPDLC System availability: > 99.9%d) Reliability: message delivery success rate > 99%

Page 6: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

RECOMMENDATIONSPACIFIC DATA LINK OPERATORS

CPDLC Procedures a) Communication initiated on voice to be completed on voice b) Include only single request in each CPDLC clearance request c) Free text to supplement formatted message only d) Pilot not to expect controller response to position report e) Conflict in messaged to be resolved using voice f) Read-back of clearance/instruction on CPDLC not reqd. g) For relay messages

i) only a free text message to be used ii) First word of the message should be ‘Relay’

Page 7: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

7Project title (Insert, Header & Footer)

FIT/18 OUTCOME

• Network availability improved • Performance measured against GOLD• ANSPs improved their Automation systems• Recommend ISPACG develop performance based

framework for Comm./Surveillance• All ANSPs encouraged to support system performance

monitoring outlined in GOLD• Current configuration, flight crew cannot cancel or modify

crew reminder. • Typing errors in logon request may result flight crew

waiting for 10 minutes before airplane function times out

Page 8: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

8SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

INMARSAT IRIDIUM

• FAA agrees that IRIDIUM that meets appropriate requirements be allowed CPDLC/ADS-C– Approval of IRIDIUM SATCOM for use CPDLC/ADS-C

still pending• AIRBUS informed IRIDIUM SATCOM tested for

voice/data. Results promising– Some interference with INMARSAT– Voice calls good quality

• IRIDIUM “NEXT” initial launch 2015, Operational 2017.

Page 9: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

9SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

NATSPG

• NATSPG Conclusion 46/02 endorsing draft proposal to amend NAT SUPPs mandating carriage/use of CPDLC & ADS-C

• NAT DLMA providing service, but needs data in format from ATSUs for becoming operational

• Noted Satellite data-link met 95% criteria for RCP 240

• SBB & oceanic safety trials planned for 2012• INMARSAT clarified I-3 Classic Aero equipped

aircraft will gradually begin utilizing I4 network.

Page 10: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

10SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

APANPIRG

• SAT DATA-LINK performance issues raised in APANPIRG Sub-Groups in 2008

• APANPIRG/19 asks ICAO to organize meeting of stake-holders to develop solutions

• SOCM/1 organized from 26 to 28 August, 2009– 56 participants from 13 States, International

Organizations, Industry attended– 5 Working and 16 Information papers were presented

and several presentations were made

Page 11: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

11SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

SOCM/1 OUTCOME

• Communication and Surveillance specifications included in the GOLD as Appendices B and C

• States and IATA urged to provide information for Appendices E and F of the GOLD Document

• Satellite data-link critical requirement for the implementation of RNP-4 -- IATA

• ICAO views that multiple redundant connectivity has potential of improving availability

Page 12: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

12SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

QUESTIONS RAISED

• Options available for Satellite data-link considering business model

• Service life left on I3 Network to recover investment after implementing upgrades

• PARC CWG investigating use of IRIDIUM Satellite Short Burst Data (SBD)

• Requirement of performance specs to support “longer term” operational initiatives.

Page 13: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

13Project title (Insert, Header & Footer)

SOCM/2

Following issues were recommended in SOCM/1 for discussion in SOCM/2• Review Status of Satellite Data-link Communication

in the Region• Develop common Outage/Maintenance Reporting

Template for STATEs/ANSPs/CRAs• Develop a common service level agreement

between CSPs and States/ANSPs• Mid/Long Term Strategy for Satellite

Communication beyond 2016

Page 14: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

14SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

DATALINK PERFORMANCE

• Data-link performance significantly improved, safety target being achieved, efficiency target to be met

• APANPIRG/22 noting the pre- and post-implementation system performance monitoring requirements, urged States in the APAC Region to ensure that the appropriate data link performance monitoring is undertaken and reported to CRAs/FITs, as required, in a timely manner. (APANPIRG Conclusion 22/12)

Page 15: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

15SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

CONCLUSION

• Safety targets for RNP-4 met, Efficiency target yet to be met

• ICAO recommends use of two or more autonomous systems

• Mid/Long Term strategy to be developed in view of end of lifetime of satellites

Page 16: International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

16SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

THANK YOU