inspirations | challenges | solutions| design

71
Inspirations Challenges Solutions Design Joel A. Benavides MArch | MBA

Upload: joel-benavides

Post on 29-Jan-2016

225 views

Category:

Documents


0 download

DESCRIPTION

Design Portfolio by Joel Benavides MArch | MBA | HCaF Certified

TRANSCRIPT

  • Inspirations

    Challenges

    Solutions

    Design

    Joel A. BenavidesMArch | MBA

  • 1PAGE TITLE ContactJoel A. Benavides

    Email:[email protected]@gmail.com

    Cell Phone:210.827.6169

    JBDJ | B | D

  • 2

  • 3ContentsHealthcare Design

    Dallas Presbyterian Cancer Center

    AIA/AAH Design Charrette

    Educational DesignTexas Tech Satellite Graduate College

    Urban DesignPassage Du Caire Fashion School| Paris, France

    Various Skill Delineations

    4 :: 35

    36 :: 59

    60 :: 65

    66 :: 69

  • 4 Healthcare Design

  • 5 Healthcare Design

    Dallas Presbyterian Cancer Center

    AIA/AAH Design Charrette Medical Facility for Athletes

  • 6Daylight, Atriums, & CourtyardsEarly on in the research phase of the design natural daylighting was a major emphasis of the client. Through various personal interviews natural daylighting was a key element that every interviewee wanted. Along with site analysis the logical and proper solution was to implement an atrium as the key design element. Many people

    interviewed wanted natural light as much as possible as well as a connection to the outside. Due to the design being a cancer center patients did not always have the opportunity to be outside because of health risks. Therefore small atriums and large expanses of glazing were utilized to provide the feeling and sense of being outside of the building. Evidence has shown that elements such as this tend to help

    benefit the facility employees as well as help patients heal.

    Dallas Presbyterian Cancer Center

    8200 Walnut Hill Lane

    Square Footage: 58,175 sq. ft.Max Allowed: 60,000 sq. ft.

    Dallas Presbyterian Hospital is owned and operated by Texas Health Resources (THR). This particular project was under the guidance and direction of HKS Inc. and Principal Norman Morgan and Principal Ron Gover, both of HKS.The project is a current project being

    designed by HKS Inc. Key design concerns were the association of the new cancer center with the existing Presbyterian campus, the use of natural daylighting, and the use of the site.

    Research

  • 7ResearchThe design project was centered around Evidence Based Design (EBD). This made it imperative that proper research was conducted to find the best information available to inform the decisions made during the design process. Such research was found in Health Environments Research and Design Journal. The resulting information was used as proper evidence for

    reasoning in the design solution. The initial evidence research dealt with the spatial organization of many healthcare facilities. It was important to try and find evidence of facilities that not only had successful spatial planning but also utilized the concept of atriums and natural daylighting. The image above was a proper example of this as it contains a large natural daylit central atrium that organizes the

    remaining program of the buildng around that central axis.

    Research

  • 8ImagesWhile in Dallas visiting the existing site photographs were taken in order to have a visual reference and understanding of how the site currently is to the entrances and the users of the facility. Views on this site were highly important because of the natural vegatation and nature just south of the site that also included a creek. The site also had a large grade and slope from the

    North end of the site to the South end of the site and therefore working with that grade was an oppurtunity to provide views of the building from the exterior as well as views from the interior for the occupants.

    Buildable Area

    Buildable AreaExisting

    Existing

    Existing

    Existing

    Possible Views

    Possible Views

    Trees/Nature

    Water

    D.A.R.T

    Possible Views ExistingExisting

    1

    4

    2

    3

    The site analysis involved traveling to Dallas to visit the site and the clients to understand the needs of the project. While visiting the site there were key items that were to be addressed such as: -Location of Entries/Drives -Views -Noise -Proximity to nature

    4: Intersection toward nature area

    3: Parking Lot toward existing building

    2: Intersection toward site

    1: On site view toward entry bridge

    Site Analysis

  • 9Daylight AnalysisThe second step in the site analysis was to analyze the climate of the site. The main climate data that was used to inform the design was the daylight analysis. The direction and angles of natural daylight throughout the year was vital because of the use of large expanses of glass and atrium space within the design.

    The diagrams above were taken from AutoDesk Ecotect and show the Best Orientation for a structure on the site and the sun paths and angles for the summer and winter solstice. The solstice was taken for both seasons because these would be the highest and lowest angles the sun would be at for any given time throughout the year for this site.

    Key Angle MeasurementsThe diagrams produced key angles that could be used to design the main natural lighting concepts.

    Key Angles:Best Orientation: 187.5 degrees West of SouthSummer Sun Angle: Max of 80.6 degrees

    Winter Sun Angle: Max of 33.7

    Best Orientation Analysis Winter Solstice Analysis Summer Solstice Analysis

    Media: AutoDesk Ecotect AnalysisSite Analysis

  • 10

    Schematic DiagramsThe human spine is one of the main heirarchical pieces of the body. It makes sense to use the spine as a model of organizing paths and direction through the building design. The subsequent radiating bones and organs become the lower levels in the organizational heirarchy.

    The initial image of spine was taken and analyzed in different levels and parts. The Spinal Cord became

    the major heirarchical piece while other parts such as the bones of the rib cage became paths that lead to other points of interest. In the human body the rib cage acts as a protective shield to other vital organs that lie underneath the cage and within the body. The other vital organs in this case are the yellow points of interest in the diagram that are connected by secondary circulation. This secondary circulation is much like the veins and

    arteries that carry blood between muscles and organs within the body.

    Ultimately, in a 2-Dimensional diagram, the spine is a perfect organizing principle for space and circulation in order to create circulation paths that lead to different points in the building. These points are either departments, atriums, or courtyards.

    Most Public Circulation

    Semi Private Circulation

    Private or Department Specific Circulation

    Interior Atriums and Waiting Spaces

    Concept Process

  • 11

    The Spine and SpaceIn this stage of the design process the spine concept was taken and merged with the site analysis and daylight analysis. The daylight analysis produced a Best Orientation for this specific site of 187.5 degrees West of South. This means that the southern facade and consequently the southern part of the building had to be turned 2.5 degrees to the West. This provided

    the best possibility of sunlight as well as compromised heat gain and heat losses throughout the summer and winter months. Once the form of the large circulation atrium spine had been defined it was clear that the building would have both a major and minor entry point. This fit well to the program as well due to the need for a returning patient entrance.Seen in the upper right diagram,

    the entry points were defined on the East and West sides of the spine. The East entrance would accomodate the first time visitors and any returning patients coming from Greenville Avenue. The West entrance would be a two story entrance with access to an adjacent parking garage for returning patients as well as an emergency entrance on the bottom

    Final Spatial Organization

    Original Organizational Layout Best Orientation Angles Applied

    Waiting Space

    Waiting Space

    Waiting Space

    Waiting Space

    Waiting Space

    Waiting Space

    Central Spine

    Best Orientation Overlay

    Entry/Exit Points

    Central Spine Atrium

    Media: AutoCAD, Adobe Illustrator

    Waiting SpaceWaiting Space

    Waiting Space

    Waiting Space

    Central Spine

    Concept Process

  • 12

    Ground Floor Plan

    Square Footage: 40,033 of 58,175

    Radiation Therapy

    Multi-Specialty Suites

    Stat Laboratory

    Administration

    Services & Maintenance

    Ck. In

    StretchStretch

    PhysicistOffice

    SharedStaffArea

    Exam Exam Exam

    PhysicistOffice

    StaffBreakRoom

    ServiceArea

    Office

    Office

    Office

    RROfficeResearch

    OfficeResearch

    WorkRoom

    OfficeTumorRegist.

    OfficeTumorRegist.

    OfficeNursePract. OfficeMed.

    Director

    OfficeDirector OfficeClin.

    Special

    SoiledClean

    PhysicianWorkArea

    Exam

    Intake

    SurgerySch.

    WorkRoom

    Ck.Out Ck. In

    Waiting

    Storage Pantry

    ConferenceRoom

    CCA

    Office

    Office

    Office

    WorkRoom

    Ck. In

    Sub-Waiting

    Lab

    RR

    BloodBlood

    Blood

    Blood

    Storage

    Intake

    MassageRoom

    Office

    StaffLockerRoom

    RR

    Consultat

    ion

    Office

    Cancer LifeWaiting

    ConferenceRoom

    Activity Room

    RR

    Storage

    Reception

    MassageRoom

    Pharmacy,Retail

    PatientLibraryBoutique

    ServiceArea

    Storage

    RR

    DosimetryWorkstations Block Room

    EquipmentRoom

    ImageProcessing

    DiagnosticRadiography

    Fan Room

    Office

    ConferenceRoomCubicles

    WorkroomCheckOut

    CheckIn

    Nuclear Medicine

    ExamRoom

    ExamRoom

    S-1

    S-1

    Exam-GYN

    ExamRoom

    ExamRoom

    PET/CT

    Subwaiting ColdLab

    SourceRoom

    HotLab

    Brachytherapy/HDR

    Linens Clean Meds

    Scale

    PhysicianAlcove

    NursesWorkstation

    CleanSupply

    Soiled

    BloodDraw

    ReturnWaiting

    Ck.Out

    Ck.In

    RR

    DressingRoom

    Rad.Office

    NursePractitionerOffice

    Rad.Office

    Consultation

    Atrium

    RRChangingRooms

    Intake

    RR

    SubWaiting

    DressingRoom

    Exam-GYN

    ChangingRooms

    Rad. Office

    Rad. Office

    Rad. Office

    GammaKnife

    GammaKnife

    LINACVault

    LINACVault

    LINACVault

    LINACVault

    GammaKnife

    GammaKnife

    GammaControl Room

    27 x 7" = 16'-0"

    12 x 2" = 2'-0"

    Waiting

    Atrium

    12 x 2" = 2'-0" 12 x 2" = 2'-0"

    Garden Areas

    Storage

    Scale: 1/64=1

    Drawings

  • 13

    Second Floor Plan

    Square Footage: 18,142 of 58,175

    Hematology & Oncology Clinic

    Infusion Therapy

    Pharmacy

    Service & Maintenance

    Media: ArchiCAD 14 BIM Software

    Hematology/Oncology

    Open To Below

    &Infusion Waiting Area

    Chk. InChk.Out

    Chk.Out

    Storage

    Workroom

    ProcedureRoom

    Intake Consult

    Exam

    Exam

    Exam

    ExamOffice

    Office

    Office

    Shared

    Shared

    Shared

    Shared

    Office

    Office

    Office

    Chk.Out

    Chk. InWorkRoom

    ExamRR

    Scale

    NursesStation

    NursesStation

    MedAlcove Med

    Alcove

    Infusion Infusion

    Office

    BreakRoom

    RR

    RR

    LockerRoom

    Nourish

    Nourish

    SoiledRoom

    CleanRoom

    ReturningPatient

    Service

    Receiving

    Med Prep

    DrugStorage

    Chk. In

    Chemo/CompoundPrep.

    Staff Area

    Exam

    Exam

    Exam

    Exam

    Infusion

    Infusion

    InfusionInfusion

    Infusion

    Infusion

    Infusion

    InfusionInfusion

    Infusion Infusion Infusion Infusion Infusion Infusion Infusion

    InfusionInfusion

    InfusionInfusion

    Infusion InfusionInfusion Infusion Infusion

    Infusion

    Scale: 1/32=1

    Drawings

  • 14

    Atrium Section The atrium section was drawn in order to show the relationship between waiting spaces and the central circulation spine of the building. A key idea for this project was to give people a better waiting experience and therefore many of the waiting spaces were linked to the large expanse of natural lit atrium space as well as smaller atriums in other departments of the building.

    Waiting Space

    CommonAtrium

    Waiting Space

    Renders

  • 15

    Exterior Aerial Perspective

    Exterior image of final design for Dallas Presbyterian Hospital Cancer Center.

    Garden Area Central Spine Atrium Two interior radiation therapy atriums

    iting

    Media: ArchiCAD 14 BIM SoftwareRenders

  • 16

    GreenVille Avenue Entrance Perspective

    Client: Dallas Presbyterian & Texas Health Resources

    Project: Cancer Center Addition

    Size: 58,175 sq. ft.

    Description: This is a final image of the proposed design for the cancer

    center addition. This particular image is the entry view as a visitor comes from the GreenVille Avenue entrance.

    1

  • 17

    Aerial Parking Lot Perspective

    Media: ArchiCAD 14 BIM Software, Adobe Photoshop

    2

    2

    1

  • 18

    Interior Renders

    3. Radiation therapy waiting area

    4. Return patient waiting area

    5. Central spine atrium with waiting areas adjacent

    3

    4

  • 19

    6. Main entrance atrium perspective

    Media: ArchiCAD 14 BIM Software, Adobe Photoshop

    5

    6

  • 20

    AIA/AAH Design Charrette

  • 21

    AIA/AAH Design CharretteNational Healthcare Design Conference| Design Charrette

    Nashville, TennesseNovember 12-14, 2011

    Teams:Texas Tech University, Kansas University, Illinois University, Texas

    A&M University

  • 22

    Project Description

    The project was a 48 hour charrette sponsored by the AIA/AAH at the National Healthcare Design Conference. The conference and charrette were by invite only and Texas Tech and the Healthcare Certificate Program were selected for 2011. Myself and three other team members were selected and traveled to Nashville, Tennessee where we participated in the design challenge.

    The project was described as an adaptive re-use of an existing medical facility... with a twist. That twist became a medical facility for athletes and the exact determination of what a medical facility for athletes included and needed was completely up to us as the design team. The site was located in Centennial Park not far from Vanderbilt University.

    Team: Joel A BenavidesTyler WashburnMatt DavisLeo Spurgin

  • 23

    The Future Facility for The Future Athlete

    See Yourself Improve & Exceed Past Performance Measures

  • 24

  • 25

    Schematic Progression

  • 26

    Initial Program

    Rapid Repair - Orthopedic Surgery - Imaging - Pharmacy - Exam Rooms - In-Patient Rooms - PACU & Prep/Hold Rooms - Rehabilitation - Extended Stay Suites

    Enhance Performance - Consulting - Nutrition - Training - Kinesiology - Therapy - Extended Stay Suites

    Final Program

    Rapid Repair - Orthopedic Surgery - Imaging + Research & Simulation - Pharmacy - Exam Rooms - In-Patient Rooms - PACU & Prep/Hold Rooms - Rehabilitation - Extended Stay Suites

    Enhance Performance - Consulting - Nutrition - Training +Strength Training +Cardio Training - Kinesiology - Therapy - Extended Stay Suites

    Program/Form

  • 27

    04 Fourth Floor Extended Stay Suites

    03 Third Floor Extended Stay Suites + Administration

    02 Second Floor Rehab Spaces + Physical Therapy + Cardio Training

    01 First Floor Research and Imaging + Community Lobby + Locker Rooms + Strength Training

    00 Ground Floor Maintenance + Service Space

  • 28

    01 First Stage Form Central Space with a track that runs through the interior spaces of the structure

    02 Second Stage Form Reaching out to the site with new proposed forms. Additional outdoor spaces at the ends.

  • 29

    03 Third Stage Form Strengthen the space between the Cube, a technology and training destination.

    04 Final Form Strengthen the space between. Overhead canopies and training spaces below step down with the landscape.

  • 30

    Drawings

    TN PN

    7,700 SFImaging

    11,773 SFResearch

    S

    8,069 SFCommunit

    1,411 SFConsultation

    SE

    7,700 SFImaging

    11,773 SFResearch

    S

    8,069 SFCommunit

    1,411 SFConsultation

    SE

    First Floor

  • 31

    4,393 SFLocker Room

    13,175 SFWeight Room

    8,069 SFCommunity Lobby

    S

    S

    4,393 SFLocker Room

    13,175 SFWeight Room

    8,069 SFCommunity Lobby

    S

    S

    6,604 SFRehab Gym

    1,628 SFRehab Room

    1,335 SFRehab Room

    1,692 SFRehab Room

    746 SFPharamacy

    S

    S

    S

    S

    Cardio Area

    E

    2,332 SFPT Offices

    Open to Below

    Open to Below

    Open to Below

    Second Floor

  • 32

    1,908 SFBalconiesS

    SE

    609 SF

    Extended StaySuites

    1,000 SF

    Extended StaySuites

    Open

    to Be

    low

    Third Floor

  • 33

    S

    S

    S

    S

    2,843 SFAdministration

    E

    1,908 SFBalconies

    609 SF

    Extended StaySuites

    1,000 SF

    Extended StaySuites

    Fourth Floor

  • 34

    EnvelopeMimicking the focus of orthopedics- The study of the muscoskeletal system. The facade system imitates muscular structure and connection.

    Plastication served as the inspiration for the the envelopes design and composition.

    The digital path landscape that runs through the adjacent sportsplex (visible in site plan) was inspired by the interwoven layering of an athletic quadricep muscle and the intricacies between the muscles, tendons, and bones.

  • 35

  • 36

    Satellite Graduate College

  • 37

    Designed in coordination with Matthew R. Davis

    Satellite Graduate College

  • 38

    BackgroundThe initial program involved the development of a highly extensive set of spaces for a graduate satellite school for the Texas Tech College of Architecture as well as a new Library Sciences graduate school. The location of the project was to be in Lubbock in the original and historic district of downtown. The site included two lots, one on the north side of Broadway Avenue and the second lot being on the

    south side of Broadway Avenue. This site was highly important because the satellite campus would hopefully bring a strong connection of Texas Tech to downtown with the ultimate goal of revitalizing the downtown district. The direct axis between Texas Techs campus down Broadway to the East became the heirarchical organizational street of the design. A secondary challenge was to tie the Art District to the north of Broadway Avenue back to

    the organizing axis and through to the downtown Depot District. The Depot District is a large area of bars and restaurants and therefore brings immense amounts of commerce to the area. The Art District brings commerce as well but also brings a cultural and artistic prescence back to dowtown. A key task in designing for this project was to meld the arts with the commerce around a central common axis to create a more vibrant downtown Lubbock.

    Site Analysis

    TTU Campus Broadway

    TTU Campus

    Context and Site Images

  • 39

    As Texas Tech University strives to become a Tier I status school, the need for a much larger outreach to the community is absolutely necessary. The development of a downtown Graduate School will ultimately help to break the bounds of Texas Techs campus into the urban fabric and scene of the community. Texas Tech is quite simply the life line of the city of Lubbock and the city grows and thrives as the university and its

    student body and faculty thrive. The fact that Texas Tech is planned and designed in such a way that blocks off the outside public world to its internal structure is not a conducive way of planning for the future and expansion of the university and Lubbock. There is a fundamental need to begin to tie the different types of neighborhoods and districts in Lubbock to the very entity that gives it life, Texas Tech University.

    Site Analysis

    Broadway Site

    To Depot District

    To Art District

    Broadway

    Art and Depot District Images

    www.lubbockarts.org www.ttu.edu www.downtownlubbockwarehouseapartment.com

  • 40

    The first stage of the design process began with the development of foci. Both partners were at liberty to choose any number of foci that they would like to focus on. These ideas could come from literally anything the person found as interesting to themselves. As the project progressed the foci were developed first in order to better understand what the idea could be used for in the design of the building. The

    project itself has a program that ultimately is a contradiction of itself. The program calls for the combination of a building that includes both a Graduate College of Architecture as well as a Graduate College of Library Sciences. These two academic majors would normally never be put next to each other in the planning of an academic facility for campus simply because of the differences in curriculum for both.

    This lends itself to the idea of the foci more because it forces the design team to take different ideas that may not normally pair together and make them meld to each other in order to satisfy the needs of the building, the program, the client, and the site.

    The final three foci ideas selected are seen above and briefly explained.

    Rhythm & HarmonyHarmony is the vertical aspect of music. Harmony becomes a series of waves and rhythms that change depending on the point of the harmonic series. Harmonies eventually develop a rhythmic pattern to create a song. A building must have a rhythm in many ways in order to function properly.

    GrowthThe focus of growth became a key idea because of the need for this design to be able to help grow the downtown district back to what it once was. The design ultimately will incorporate growth in some form of the building.

    Foci Developed by Joel Benavides Foci Developed by Matthew R. Davis

    Foci

  • 41

    ImpactAn impact can hold many different meanings. Some of these meanings could be the idea of two or more objects colliding or meeting at some given time and the resulting action of that moment. This could lend itself to an enormous event and action that could have either good or bad results. An impact could also be a feeling or lasting meaning to an area, building, place, etc that could ultimately affect how that place develops into the future. This

    became a key element in the design foci because it can be seen how a building program such as this could have an enormous impact on Texas Tech, the downtown districts, and the Lubbock Community as a whole.

    Foci Developed by Matthew R. Davis

    Foci

  • 42

    The foci for the project were further developed into basic studies that could be used later on in the design process for different uses. The harmony/rhythm foci is used to determine circulation paths and within those paths there are patterns in the floor and cuts in the side walls of the paths. The paths act as catwalks that weave their way through the structure of the final building design. The initial idea of

    rhythms and weaving can be seen above. The teal colored paths are the finalized circulation tubes or paths that were created. The larger gray tubes are the programmatic areas that are adjacent to the circulation paths. The rhythms are eventually the regulating principle of where windows, structure, and interior details are seen throughout the project.

    Progression

  • 43

    The development of this foci also included the notion of bridging Broadway Avenue. The long gray tubes at certain points became bridges from one programmatic part of the building to the next. This also lended itself to the development of the teal circulation catwalks because a thin circulation system was needed to move along side the program tubes as well. The program tubes in this

    study bridge over Broadway to the southern side of the site where more program would potentially be located. An initial study into the impact foci was also incorporated so that the relationships that would otherwise not be there could begin to be seen, discussed, and iterated.

    Media: FormZ RenderzoneProgression

  • 44

    Growth and Impact became the final two foci developed for use in the design of the building. Growth became a way of showing the relationship with what is presently in downtown to what could possibly be in downtown Lubbock. It shows the ability for Lubbock to grow as a community and as a district due to affect this school could have on it. Eventually the idea of growth led to the development of any urban green

    space and park on the site in order to give the dowtown site a place of gathering. The places of gathering could be for every day people walking by or driving by in downtown or a place for gather by the students and faculty of the building.

    Holocaust MemorialThe initial precedent example that was informative and inspirational for the development of the urban park was the Holocaust Memorial in Berlin. The urban design of the memorial has unjulating stone memorial pieces that when seen from above create a ripple and wave affect that is very strong and lasting to the viewer. This also helped to develop a connection to the foci of

    impact because of the lasting impact that a structure or a series of structures such as this can have. The urban park for this design was built with this concept largely in mind.

  • 45

    The Growth focus developed the urban park as seen in the diagrams above. The development also created a supplementary idea to growth, that of a gradient. A gradient is essentially a growth of one color to another. The diagram above shows the growth and gradient from the left to the right end. The green spaces and walkable concrete areas are tighter and more compact and then begin to spread out and lengthen as they

    move away from the left edge. This ultimately created the same ripple affect as the Holocaust Memorial. The different parts of this urban park however become planters for landscaping and benches as they become lower in the distance.

    The focus of Impact ultimately tied directly with the idea of the urban park and growth. The impact became a piece of the building program, the auditorium, and was

    located on the southern end of the site. The unjulating urban park grew out of the ground and rippled outward from the impact of the building on that end of the site.

  • 46

    Through initial foci development studies, programmatic groupings began to mature in the form of large functional bars. These bars established a consistency between the spaces that united certain parts of the program. The program bars run along the length of the project site at different levels based on their relation to the atrium of the building. One of the three bars emerged as a larger, more hierchical

    form. Within this bar existed the studios, classrooms, as well as the deans offices of the building. To give this program bar some visual significance, it was given a floating effect by raising the bar over the urban park.

    In an attempt to embrace this idea of a hierchical, floating bar, a complex structural system needed to be implemented. Behind the research

    of a helpful precedent study, a large box truss was developed with the intention of cantilevering the entire bar. This would not only create a stunning structural form but free up the space for the urban park that exists below this bar. The park would not be obstructed by any columns or other supports that come from the bar above. A secondary, supplemental box truss is crossbraced to the west one.

    StructureCantilever Steel Box Truss Truss System Zone Column Grid

    Horizontal Bracing

    Heavy Foundations

    Functional Bars

    Column & Beam Structure Zone

    Nanjing Museum of Art & ArchitectureArchitect: Steven Holl

    This museum became the primary structural precedent for the graduate school structural design. The structure seen on this building is monumental and almost seems impossible. This building pushes two cantilevers in two different directions which makes the structural solution that much more impressive. This building helped to inform our design of the needs for a structural system this demanding.

    www.stevenholl.com www.archicentral.com www.archdaily.com

    Precedents

  • 47

    This truss serves as the counter weight for the cantilevered weight. This supplemental box truss holds different program spaces and serves as the member that ties into the ground as the structural foundation.

    After calculating the span distance and total tributary area of beams, as well as maximum height of the columns, W12x65 wide flange

    steel beams were selected as the proper size for the trusses to be constructed. Different connections exist at different moments within the truss (e.g. instances where cross bracing beams tie the two trusses together).

    William Clinton LibraryThe Clinton Library was a clear choice for a structural precedent. The form is reminiscent of the shape and form of our design. The structure is monumental steel box trusses set within the building. The structure then holds a curtain wall out from to the exterior, creating a double skin layer.

    Structural Bay System20

    13-618

    60

    18 OC

    26

    www.sustainabledesignupdate.com www.construction.com

    Precedents

  • 48

    Design goals for the enclosure of the building were to use a double skin system on the majority of the exterior facing walls. The outter first skin will act as the shading device for the secondary more transparent skin. A major component of the building is the use of the immense truss structure throughout. The original design intent was for all of the structure and MEP to be exposed in the finished design.

    Therefore the decision was made to use Low-E glazing for the secondary skin because of its translucency properties as well as its thermal properties. The primary skinwill be made of long thin panels that are a sustainable 50% bamboo and 50% recycled paper. The panels are all 7 tall with varying lengths. The panels are to be arranged with a gradient from roof level down towards the ground level. The space

    in between each panel ranges from 2 at the top to 30 at the bottom of the facade.

    Envelope SystemDouble Skin Envelope

    Art Center College of Design-South CampusLocated in Pasadena California, it uses a similar structural system to our building design in that its internal structure are trusses. The design has a transparent facade to reveal the structural systems. Our design will not include any patterning but the same basic panel types will be used. The external steel structure holds the glass or transparent material in place which is then structurally held by a secondary system behind the exterior layer.

    ASU Polytechnic SchoolDesigned by Lake/Flato Architects, this building gives a strong precedent for the screen wall being used on this project. The screen is a series of horizontal rigid members that are held by a steel substructure which is subsequently connected to the main structure of the building.

    7 ECO-CLAD SHADING PANELS

    BRACKET FOR CLADDING ATTACHMENT

    4x 4 VERTICAL STEEL TUBING

    SUBSTRUCTURE

    12 x 65 WIDE FLANGE GIRDER WITHIN TRUSS SYSTEM

    4x 4 HORIZONTAL STEEL TUBING SUBSTRUCTURE

    SECOND SKIN ETFE PANEL

    ALUMINUM HORIZONTAL BRACKET FOR ETFE PANELS

    ALUMINUM MULLION BETWEEN ETFE PANELS

    RECESSED FLOOR LIGHTING SYSTEM

    10x 10 BEAM SUBSTRUCTURE

  • 49

    The Texas Tech University satellite graduate College of Architecture and graduate College of Library Sciences will implement a number of sustainable systems and materials.

    These implementations include a double skin system to help regulate with passive cooling and solar gain, exterior shading panels of Eco-Clad material, American Clay Materials,

    sustainable flooring materials, rainwater collection systems, and low-e glass.

    These systems and materials are being implemented in the hopes of building a more sustainable and responsible building. This will lend itself to the longevity of the building as well as the rejuvenation of many of the materials back into the natural ecosystem.

    Above: American Clay Wall FinishDescription: Wall finish material made from earth friendly materials. The material is a sustainable plaster. It is susceptible to changes with temperature and moisture control but the climate of the area and the exterior cladding of the building should help

    in aiding this interior wall finish to be durable for the life of the builidng. These particular colors will give a warmth to the interior of the building in coordination with the wood and exposed steel.

    Above: Bamboo flooringDescription: Bamboo is a highly renewable source and therefore is very sustainable. A bamboo flooring system will be implemented throughout the design.

    Sustainable SystemsSystems & Materials

    Left: Low E Curtain Wall GlassDescription: This glass type will be used to help regulate against glare, heat gain, and heat loss. The central entrance atrium should be well protected from sun and winter weather by the two programmatic bars, but the use of this glass system will help to ensure the building functions more sustainably.

  • 50

    Northwest Perspective

    P1 - First Floor 1:40

    S1E3

    E1 E2Passenger

    Elevator

    Passenger Elevator

    Janitor Closet

    Ele. Mech.

    Ele. Mech.

    Rainwater Collection Tank

    UP

    Student Showcase Gallery

    Gallery Storage Closed Gallery Open Gallery

    UP

    UP

    HVACCavity

    Plumbing CavityChimney

    Passenger Elevator

    Ele. Mech.

    UP

    1

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    Drawings

    R1

    R1

  • 51

    Broadway Perspective

    Media: FormZ Renderzone, AutoCAD, Adobe Illustrator

    S1E3

    E1 E2Passenger

    Elevator

    Passenger Elevator

    Janitor Closet

    Ele. Mech.

    Ele. Mech.

    Rainwater Collection Tank

    UP

    Student Showcase Gallery

    Gallery Storage Closed Gallery Open Gallery

    UP

    UP

    HVACCavity

    Plumbing CavityChimney

    Passenger Elevator

    Ele. Mech.

    UP

    1

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    Drawings

    R2

    R2

  • 52

    Main Entry Perspective

    R3

    P3 - Third Floor 1:40

    P2 - Second Floor 1:40

    P2_Second Floor Plan

    1

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    S1E3

    E1 E2

    UP

    Pass

    enge

    r Ele

    vato

    rPa

    ssen

    ger

    Eleva

    tor

    Janit

    or

    Close

    t

    Ele. M

    ech.

    Ele. M

    ech.

    UP

    Library Science Storage

    HVAC

    Shaf

    t

    UP

    CD/DVD Storage Archives

    Head Librarian OfficeLS Faculty 1 LS Faculty 2 LS Faculty 3 LS Faculty 4 LS Faculty 5

    UP

    Plumbing CavityChimney

    Womens Restroom

    Men's Restroom

    LS Lab 2LS Lab 1LS Classroom 1LS Classroom 2

    Student Critique Space

    Passenger Elevator

    Ele. Mech.

    UP

    UP

    P3_Third Floor Plan

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    S1E3

    E1 E2Passenger

    Elevator

    Passenger Elevator

    Janitor Closet

    Ele. Mech.

    Ele. Mech.

    UP

    HVACShaft

    Womens Restroom

    Men's Restroom

    Plumbing CavityChimney

    Student Critique Space

    UP

    Library Stacks

    Architecture Studio 2Architecture Studio 3Architecture Studio 4Architecture Studio 5Secretary/Waiting Area

    Staff Office 1Staff Office 2

    Staff Lounge

    Architecture Model Shop Architecture Model Shop Print Lab Photo Lab

    Conference RoomStaff Office 3

    Library Lobby& Reception

    Architecture Studio 1

    Closed Reading Room

    Passenger Elevator

    Ele. Mech.

  • 53

    P2_Second Floor Plan

    1

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    S1E3

    E1 E2

    UP

    Pass

    enge

    r Ele

    vato

    rPa

    ssen

    ger

    Eleva

    tor

    Janit

    or

    Close

    t

    Ele. M

    ech.

    Ele. M

    ech.

    UP

    Library Science Storage

    HVAC

    Shaf

    t

    UP

    CD/DVD Storage Archives

    Head Librarian OfficeLS Faculty 1 LS Faculty 2 LS Faculty 3 LS Faculty 4 LS Faculty 5

    UP

    Plumbing CavityChimney

    Womens Restroom

    Men's Restroom

    LS Lab 2LS Lab 1LS Classroom 1LS Classroom 2

    Student Critique Space

    Passenger Elevator

    Ele. Mech.

    UP

    UP

    P3_Third Floor Plan

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    S1E3

    E1 E2Passenger

    Elevator

    Passenger Elevator

    Janitor Closet

    Ele. Mech.

    Ele. Mech.

    UP

    HVACShaft

    Womens Restroom

    Men's Restroom

    Plumbing CavityChimney

    Student Critique Space

    UP

    Library Stacks

    Architecture Studio 2Architecture Studio 3Architecture Studio 4Architecture Studio 5Secretary/Waiting Area

    Staff Office 1Staff Office 2

    Staff Lounge

    Architecture Model Shop Architecture Model Shop Print Lab Photo Lab

    Conference RoomStaff Office 3

    Library Lobby& Reception

    Architecture Studio 1

    Closed Reading Room

    Passenger Elevator

    Ele. Mech.

    Auditorium Entrance

    R4

    R3

    R4

  • 54

    Interior Catwalk

    R5

    High Impact Slope_ 4

    Sky Bridge Roof_ 47

    Auditorium Peak_ 54

    Supplemental Lab_ 17

    Sky Bridge Gateway_ 34

    1 _Subtle Impact Slope

    60 _Roof

    34 _Workshops & Studios

    47 _Faculty Offices & Studios

    Auditorium Entry_ 0

    17 _Library Science Classrooms

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30E3 - West Elevation

    P4 - Fourth Floor 1:40

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    S1E3

    E1 E2Passenger

    Elevator

    Passenger Elevator

    Janitor Closet

    Ele. Mech.

    Ele. Mech.

    UP

    HVAC Shaft

    Womens Restroom Men's Restroom

    Plumbing CavityChimney

    Student Critique Space

    UP

    Architecture Studio 7Architecture Studio 8Architecture Studio 9Architecture Studio 10 Architecture Studio 6

    Arch. Faculty Office 10 Arch. Faculty Office 9 Arch. Faculty Office 8 Arch. Faculty Office 7 Arch. Faculty Office 6 Arch. Faculty Office 5 Arch. Faculty Office 4 Arch. Faculty Office 3 Arch. Faculty Office 2 Arch. Faculty Office 1

    Dean's Terrace

    Arch. Dean LS Dean

    Faculty Lounge

    Air Handler UnitRoof Access

    R5

    R6

  • 55

    Architecture Studio Space

    R6

    High Impact Slope_ 4

    Sky Bridge Roof_ 47

    Auditorium Peak_ 54

    Supplemental Lab_ 17

    Sky Bridge Gateway_ 34

    1 _Subtle Impact Slope

    60 _Roof

    34 _Workshops & Studios

    47 _Faculty Offices & Studios

    Auditorium Entry_ 0

    17 _Library Science Classrooms

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    S1E3

    E1 E2Passenger

    Elevator

    Passenger Elevator

    Janitor Closet

    Ele. Mech.

    Ele. Mech.

    UP

    HVAC Shaft

    Womens Restroom Men's Restroom

    Plumbing CavityChimney

    Student Critique Space

    UP

    Architecture Studio 7Architecture Studio 8Architecture Studio 9Architecture Studio 10 Architecture Studio 6

    Arch. Faculty Office 10 Arch. Faculty Office 9 Arch. Faculty Office 8 Arch. Faculty Office 7 Arch. Faculty Office 6 Arch. Faculty Office 5 Arch. Faculty Office 4 Arch. Faculty Office 3 Arch. Faculty Office 2 Arch. Faculty Office 1

    Dean's Terrace

    Arch. Dean LS Dean

    Faculty Lounge

    Air Handler UnitRoof Access

  • 56

    S1_Transverse Section JBMD_Arch 5901_D.Pruske_Fall 20101/4=10

    0 1/4 1/2 1

    3 51

    MANKO

    1 2 3 4 5 6 7 8 9

    -17_Basement

    0_Galleries

    17_Faculty Offices

    34-6_Library

    48_Roof

    Roof_61

    Cladding_67-3

    Cladding_29

    Studios_47-6

    Studios_34-6

    W1

    S1E3

    E1 E2Passenger

    Elevator

    Passenger Elevator

    Janitor Closet

    Ele. Mech.

    Ele. Mech.

    Rainwater Collection Tank

    UP

    Student Showcase Gallery

    Gallery Storage Closed Gallery Open Gallery

    UP

    UP

    HVACCavity

    Plumbing CavityChimney

    Passenger Elevator

    Ele. Mech.

    UP

    1

    A A

    B

    C

    D

    E

    F

    G

    H

    I

    B

    C

    D

    E

    F

    G

    H

    I

    2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    S1 - Transverse Building Section W1- Wall Section

    Eco-Clad Wood Panel Shade Device

    Steel Grate for Maintenance

    1-1/2 Steel Tension RodLateral Bracing for Eco-Clad

    4x 4 Hollow Steel TubeSubstructure

    Threaded Tension Rod Mounting Bracket

    1-7x 1 Steel Wide Flange with Site Weld

    1x 1 Steel Wide Flange with Site Weld

    1x1 Steel Wide Flange Diagonal Truss Support Beam

    1x1 Steel Wide Flange Column

    Double Glazed Window System

    Typical Mullion System

    1 Air Space

    D4

    D3

    D2

    D1

  • 57

    S1_Transverse Section JBMD_Arch 5901_D.Pruske_Fall 20101/4=10

    0 1/4 1/2 1

    3 51

    MANKO

    1 2 3 4 5 6 7 8 9

    -17_Basement

    0_Galleries

    17_Faculty Offices

    34-6_Library

    48_Roof

    Roof_61

    Cladding_67-3

    Cladding_29

    Studios_47-6

    Studios_34-6

    W1

    MANKO MANKO

    A B C D E F G H I

    Sky Bridge Gateway_ 34

    Supplemental Lab_ 34

    Raised concrete planter_ 34

    Raised hardscape_ 34

    A B C D E F G H I

    61 _Roof

    Auditorium Peak_ 54

    47-6 _Studios

    34-6 _Studios

    29 _Cladding

    67-3 _Cladding

    17 _Faculty Offices

    E1 - North Entry Elevation

    E2 - South Entry Auditorium ElevationDetails

    Rubbergard

    6 Concrete Subfloor

    2 Cellular Decking

    6x 3 Steel Weld Plate

    Continuous Bead of Lap Sealant

    4x 4 Hollow Steel Tube

    5x 5 Steel Wide Flange Support

    1-1/2 Counter Sunk Screw

    3-1/2 Counter Sunk Bolt

    7x 3 Eco-Clad Panel

    Bonding Adhesive

    Quickprime Plus

    Quickseam RPF Strip

    EPDM Membrane

    Metal Counterflashing

    1x 1 Steel Wide Flange

    6x 3 Steel Weld Plate

    Aluminum Mullion System

    1x 1 Steel Wide Flange

    1-7x 1 Steel Wide Flange

    6x 3 Steel Weld Plate

    Aluminum Mullion System

    6x 1 Bamboo Flooring

    Recessed LED Floor Light

    1x 1 Steel Wide Flange

    1-7x 1 Steel Wide Flange

    AlucaBond Aluminum Panels

    Steel Backer Support for Panels

    Aluminum Mullion System

    6x 1 Bamboo Flooring

    6 Concrete Subfloor

    Recessed LED Floor Light

    2 Cellular Decking

    9 Rigid Roof Insulation

    2 Ribbed Roof Decking

    8x 5 Steel Tube

    D4

    D3

    D2

    D1

  • 58

    Design Materials:

    Urban Park: MDF Chipboard GlueStructure: Basswood GlueBuilding Cores: MDF

    Auditorium: Basswood Piano Wire MDF

    Model

    Structural Model :: 1/8 =1

  • 59

    Model

  • 60

    This design studio was an urban design studio conducted in Paris, France. The concept was to revive a district of Paris that was known for its fashion stores and schools at one time. The prescence of students and the fashion industry however had begun to lessen due to the crime riddled nature of the area.

    The project was designed in coordination with Billy Henly, a

    student of architecture and civil engineering.

    Site data of Passage Caire.Paris has upwards of 55 passages that cut from the primary radiating streets to the secondary and tertiary streets and alleys throughout the city.

    Often times these passages are covered from the elements and

    provide areas of commerce through retail, restaurants, and services.

    Phase 1 | Massing Phase 2 | Site DataSite Images | Site Trace

    Initial Cafe Plan

    Rue Pelican Massing Study

    Concept: Understand the urban landscape of Paris and the massing that forms the circulation streets and alleys through the city.

    Urban

    NODE

    Cafe

    Plaza

    Courtyard

  • 61

    Phase 3 | Finalized Drawings

    UP

    A

    B B

    A

    First Floor Plan Second Floor Plan

    Media: FormZ Renderzone, AutoCAD, Adobe IllustratorParis, France

  • 62

    Section B

    Section A

  • 63

    Roof Detail

    1/2=1

    B.1

    Aluminum Window Sill

    W18x60 Wide Flange

    Mullion System

    Glazing System

    Face Stone

    Mullion System

    B.11=1

    W18x60 Wide Flange

    Aluminum Window Sill

    4x4 Steel Tubing

    Clerestory Glazing

    Mullion System

    Window Glazing

    1.5 Glazing

    Mullion System

    Formed Aluminum Cap

  • 64

    Phase 4 | Renders

    Plaza To Entrance

  • 65

    Interior Retail Space

    Entrance to Plaza

    Media: FormZ Renderzone, AutoCAD, Adobe Illustrator

  • 66

    Mixed M

    edia

    Delineations & Models

  • 67

    Sketches

    Delineations & Models

  • 68

    Diagramming of Form & Function

    First design challenge to develop a skill of creating form before applying basic program spaces.

    Physical model of Form4 armatures holding the form and program spaces within a physical model.

  • 69

    Lighting StudiesSeries of iterations to assess how light affects a small area or box in order to try and inspire lighting design for future projects.

  • About the designer:Joel A. Benavides was born in San Antonio, Texas in 1988. He and his family moved to a hill country suburb of San Antonio called Boerne, Texas in 1995. Joel continued his education in Boerne through elementary, middle school, and graduated from Boerne High School in 2006. While in high school Joel was a two sport four year varsity letterman and won two state championships with the varsity cross country team. As high school progressed Joel took an interest in drawing and in particular architectural drawing and drafting which led to the decision to attend Texas Tech Universitys College of Architecture in the Fall of 2006. Joel graduated in May of 2010 with his B.S. Architecture with Cum Laude honors. He is also a member of Tau Sigma Delta, the National Honor Society for Architecture and Allied Arts. He will graduate in May of 2012 with a dual Masters Degree, the first a Master of Architecture and the second a Master of Business Administration. Joel obtains his design certification in December of 2011 for Healthcare Facilities Design from the Texas Tech College of Architecture.

    JBDJ | B | D

    Cover File2Updated Portfolio for Publishing