innovation - model-to-execute - software ag/media/files/s/software-ag-ir/... · innovation -...

28
Innovation - Model-to-execute How we align Business & IT Dr. Katrina Simon Product Management ARIS

Upload: doankien

Post on 10-Jul-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Innovation - Model-to-execute

How we align Business & IT

Dr. Katrina Simon

Product Management ARIS

February 22, 2012 | 2

Babylonian Confusion

February 22, 2012 | 3

Agenda

The challenge – BPM Gap

SAG solution – Model to execute (M2E)

Summary & Best Practices

1

2

3

February 22, 2012 | 4

Business

Process

Babylonian Confusion

进程

February 22, 2012 | 5

It‘s not only about language…

IT

Busi

ness

Tools & Methods

Office Tooling

Conceptual Modeling

SE / Configuration

Technical Modeling

Objectives & KPIs

Financial KPIs

Operational KPIs

Tactical KPIs

Domains & Vocabulary

Business units

IT systems

& infrastructure

Business processes

Workflows

February 22, 2012 | 6

Enterprise BPM bridging Business and IT

IT

Busi

ness

Tools & Methods

Office Tooling

Conceptual Modeling

SE / Configuration

Technical Modeling

Objectives & KPIs

Financial KPIs

Operational KPIs

Tactical KPIs

E-B

PM

Domains & Vocabulary

Business units

IT systems

& infrastructure

Business processes

Workflows

February 22, 2012 | 7

BPM-Gap between Business and IT

IT-focused Process Automation

Business-focused Process Transformation Business Process Model

Technical Process Model

Process Owner

Business Analyst

Business Line Manager

Integration Engineer

Process Developer

BPM

Gap

February 22, 2012 | 8

Model-to-Execute

… or better “Going from Problem to Solution”

See the problem Understand the problem Define the solution

Realize the solution Process Improvement!

February 22, 2012 | 9

Keeping Business and IT in synch

Business Process Model

Technical Process Model

Process Owner

Business Analyst

Business Line Manager

Integration Engineer

Process Developer

Business-IT Alignment by EPC-2-BPMN Transformation Governance Workflow Model Roundtripping Conflict Resolution Diff-Merge View Review Cycle Automated Notification Ad-Hoc Collaboration

February 22, 2012 | 10

Business Process Analysis and Requirements Analysis in ARIS

Business Analyst

Business Line Manager

Process Engineer

Business process can be analyzed and requirement will be defined based on an Event-driven Process Chain with the line of business managers or process owners involved.

Sandy Paul

Head of Credit Financing

Peter May

Business Analyst

Marc Allen

Process Engineer

February 22, 2012 | 11

Collaboration within ARIS to identify Requirements and

Process Changes

Business Analyst

Process Owner

Process Engineer

During the process analysis and the requirements engineering all involved roles can work together based on a collaborative real-time interaction. Results of the discussion can be recorded and archived.

Tom Smith

Process Owner Credit Financing

Peter May

Business Analyst

Marc Allen

Process Engineer

February 22, 2012 | 12

Transformation of EPC-based Business Model into BPMN

Logical Model

Process Engineer

Marc Allen

Process Engineer

EPC-based business processes can be transformed into logical BPMN process which is used by Process Engineer to describe a solution blueprint.

February 22, 2012 | 13

Enhancement of logical BPMN Model with Software Services in

ARIS

Process Engineer

Marc Allen

Process Engineer

The Process Engineer uses the generated BPMN model to develop a solution blueprint and connect tasks with software services. The flow and structure of the logical BPMN process can be changed according to fulfill technical design restrictions.

February 22, 2012 | 14

Transformation of EPC-based Business Model into BPMN

Logical Model

Process Engineer

Marc Allen

Process Engineer

The logical BPMN process is approved by the Process Engineer as solution blueprint and can be shared with IT for process implementation.

Process Developer

Kevin Parker

Process Developer

February 22, 2012 | 15

Technical Enhancement of BPMN model in webMethods

Designer

The Process Developer uses the solution blueprint BPMN Model and enhances technical necessary elements and process flow changes, like i.e. adding error steps, locking tasks etc.

Process Developer

Kevin Parker

Process Developer

February 22, 2012 | 16

Change of BPMN model in webMethods – i.e. adding task in

webMethods BPMN model

After changing the BPMN model the Process Developer starts an approval or update cycle to the Process Engineer or Business Analyst in ARIS.

Process Developer

Kevin Parker

Process Developer

February 22, 2012 | 17

Change Comparison and Approval of Changes in BPMN Model

in ARIS

Process Engineer

Marc Allen

Process Engineer

The Process Engineer can compare all changes within the BPMN model. Changes can be accepted or denied. The relevance of a change regarding the business logic can be evaluated.

February 22, 2012 | 18

Conflict Resolution and Collaborative Business Process Update

- Merged BPMN Models and Delta

Business Analyst

Business Line Manager

Process Engineer

Changes that are business relevant can be analyzed and compared with the origin EPC requirement model. The delta is highlighted in ARIS and a collaborative conflict resolution or update of the business process model can be achieved with all involved roles.

Sandy Paul

Head of Credit Financing

Peter May

Business Analyst

Marc Allen

Process Engineer

February 22, 2012 | 20

Model to Execute for Business/IT alignment

IT

Busi

ness

Tools & Methods Objectives & KPIs

E-B

PM

Domains & Vocabulary

Model Roundtripping between ARIS and wM BPMS

February 22, 2012 | 21

Model to Execute for Business/IT alignment

IT

Busi

ness

Tools & Methods Objectives & KPIs

E-B

PM

Domains & Vocabulary

Continuous Alignment of

Business Process and Technical Process

February 22, 2012 | 22

Model to Execute for Business/IT alignment

IT

Busi

ness

Tools & Methods Objectives & KPIs

E-B

PM

Domains & Vocabulary

Real-time Collaboration and Shared Modeling

February 22, 2012 | 23

Model to Execute for Business/IT alignment

IT

Busi

ness

Tools & Methods Objectives & KPIs

E-B

PM

Domains & Vocabulary

E-BPM Governance and Methodology

February 22, 2012 | 24

Model to Execute – Benefits and Features

Model Roundtripping between ARIS and wM BPMS

Continuous Alignment of Business Process (EPC)

and Technical Process (BPMN)

Governance and Methodology

Real-time Collaboration and Shared Modeling

February 22, 2012 | 25

Recognized by Analysts, … Leaders Quadrant of Gartner’s Magic Quadrant for Business Process Analysis

“When used in conjunction with a

BPMS, the BPA tool can be an

integrated component of a single-

vendor BPMS, or it can be a best-

of-breed BPA tool that bridges into

a best-of-breed BPMS.”

Source: Gartner, Inc., Magic Quadrant for Business Process Analysis Tools, David Norton, December

12, 2011

Gartner does not endorse any vendor, product or service depicted in the Magic Quadrant and does

not advise technology users to select only those vendors with the highest ratings. Gartner research

publications consist of the opinions of Gartner’s research organization and should not be construed

as statements of fact. Gartner disclaims all warranties, expressed or implied, with respect to this

research, including any warranties of merchantability or fitness for a particular purpose.

The Magic Quadrant graphic was published by Gartner, Inc., as part of a larger research note and

should be evaluated in the context of the entire report. The Gartner report is available upon

request from Software AG.

February 22, 2012 | 26

Recognized by Analysts, …

„ ARIS integration into the wider Software

AG product suite, such as webMethods,

will make it of particular interest to

organizations looking for a complete BPA,

BPM and SOA solution, or for a strong

modernization partner.“

Gartner, MQ BPA 2012

February 22, 2012 | 27

… well received by diverse industry players across the globe.

OMG Germany

Kneipp Werke, Germany

Kroger, USA

CACI, USA Woolworth, Australia

Credit Agricole, France

Benetton, Italy

Philipps, Belgium BC Gov., Canada

Medtronic, USA

February 22, 2012 | 28

… well received by customers.

• „Elimination process“ modelled in

ARIS with the business …

• … „shared with IT“, i.e.

implemented and executed in

webMethods.

• „Digital campaign process“

modelled in ARIS with the

business…

• … „shared with IT“, i.e.

implemented and executed in wM

BPMS.

Model-to-Execute

How we align Business and IT

Dr. Katrina Simon

Product Manager, ARIS

Software AG