innovation leaders club, coaching and...
TRANSCRIPT
Under the direction of Dave Caissy Eng., M.Eng., NPDP, PMP, CPM, CPMM
INNOVATION LEADERS CLUB,COACHING AND TRAININGS
895, De la Gauchetière Ouest C.P. 96542, Gare centraleMontréal (QC) H3B 5J8 CANADA
Innovation Leaders Club ...........................................................Coaching and Trainings .............................................................Consulting and Implementation ...........................................Samuel Courtemanche, Manager ........................................Dave Caissy, Managing Partner ............................................
59
262829
4
AUDAX INNOVATION
GROWING THE ORGANIZATION’S INNOVATION CAPABILITY
In order to provide comprehensive support to companies wishing to develop and implement performing innovation management practices, Audax Innovation offers three distinct services specialized in innovation management.
Innovation Leaders Club
CoachingTrainings
ConsultingImplementation
Nine (9) ClubsUSA, Europe, Canada
($1.5K)
Conferences($3.5-5.5K)
Coaching Program6 themes
($3.5-8.5K)
Trainings & Workshops15 best practices ($3.5-5.5K each)
Innovation Strategy($26K)
Optimized Innovation Management System
($27K)
Innovation Center($40-125K)
Innovation Leaders Club ................................................... Club Membership ......................................................... Conferences and Workshops ................................................
6 7 8
www.innovationleaders.club [email protected]
6
Innovation Leaders ClubThe Innovation Leaders Club brings together innovation leaders who want to discuss their current reality and their previous innovation management experiences with their peers in a friendly, informal setting, with a view to sharing knowledge and best practices.
Private, elite clubThe Innovation Leaders Club is a private, elite club composed exclusively of senior executives. Its primary purpose is to share best practices and experience among innovation leaders.
Only experienced leadersMeetings are attended by 15 to 20 innovation leaders who engage in productive interpersonal exchanges, centered on sharing knowledge and best practices.
Seasoned innovation expertsMeetings are moderated, and exchanges are led by seasoned innovation management leaders who are recognized as industry experts.
Cities and venuesThe club now operates in major cities in America and Europe. Meetings take place at select venues.
What our members appreciate“The interaction and practical examples from attendees and Dave Caissy” -British Telecom
“The networking, discussions and sharing of good practices and experience” - Premier Tech
“The exchanges with experienced people. The format is perfect. I learn a lot” - Venmar
“The diversity of experiences and exchanges” - Chanel
“The nice dynamic, generous with the tools. Great and motivating!” - Airboss
“The exchanges with participants, the quality of the preparation and of the animator” - Volvo
7
CANADA - QUÉBEC
Montréal Club (Multisectoral)
November 2 or 7, 2017 and May 8 or 15, 2018
Alto Design, Aéroport de Montréal, Bombardier Produits Récréatifs, Cascades, Centre de robotique et de vision industrielles, Corporation Scientifique Claisse, EnGlobe, Équipements Comact, Garant, Gentec, Industries NRC, Kaba, Keurig, Laurentides re-sources, Les Aciers Sofatec, Les Structure Ultratec, Loto Québec, Nexans, Posi-Plus technologies, Premier Tech, Prévost Car, Rotobec, Rouillard, Rousseau Metal, Sani Marc, Solmax International, South Shore Industries, Stedfast, Teknion Roy & Breton, Thomas & Betts, Victor Textiles
Montréal Club (Consumer Products and Services)
November 8, 2017 and May 9, 2018
Agropur, Aéroports de Montréal, Belron Canada, Caisse de dépot et placements du Québec, Ecolopharm, Exceldor, Fédération des producteurs agricoles du Québec, La Capitale, Lavo, Logistik Unicorp, Loto-Québec, Pelican International, SSQ Groupe financier
Québec City Club (Multisectoral)
November 15, 2017 and May 2, 2018
Corporation Scientifique Claisse, Garant, Gentec, Laurentides re-sources, Les Structure Ultratec, Posi-Plus technologies, Prévost Car, Rotobec, Rouillard, Rousseau Metal, Sani Marc, South Shore Industries, Teknion Roy & Breton, Victor Textiles, Équipements Comact
Drummondville Club (Construction)
November 14, 2017 and May 1, 2018
Boa-Franc, Distech Controls, Fenergic, GL&V, Groupe AGF, Groupe Canam, Millette et fils, Portes Patio Novatech, Société Laurentide, Torngats, Venmar Ventilation, Vic Mobilier de Magasins
UNITED STATESNorth-East USA (Multisectoral)
September 25, 2017 and March 19, 2018
Apple & Eve, Imaginatik, John Wiley & sons, Kluber Lubrication, Lindt & Sprungli, Memorial Sloan Kettering Cancer Center, New Pig, Panasonic Corporation of North America, Pfizer Consumer Healthcare, Pitney Bowes, United Nations Development Programme, Vesuvius
EUROPEParis Club (Multisectoral)
September 12, 2017 and January 30, 2018Atos France, Bureau Véritas, Chanel Parfums Beauté, Ericsson, FM logistic, FMC technologies, GRDF, Groupe Armor, Innov’Acteurs, Legrand France
Club MembershipAs a member of the Innovation Leaders Club, you could participate in more than 10 Clubs around the world. Please see below the list of our venues and their members.
One year tandemmembership
One yearmembership
$2,380$1,400
THEY TRUST US
8
LIST OF THE CONFERENCE THEMES
[DEFINE] • Define an innovation strategy• Moving from tactical to strategic innovation• Develop a Blue Ocean strategy• Innovate by business model
[GENERATE]
• Improve front-end of innovation• Hold a corporate innovation tournament• Manage innovation ecosystems• Getting your clients involved in the big idea process• Make open innovation part of your current practices• Foster a creative environment• Reinforce strategic marketing within a framework of innovation• Innovate through customer experience
[SELECT]• Deploy effective portfolio management• Evaluating the real market potential of a major innovation
[EXECUTE]
• Market a highly innovative product/platform• Develop effective multifunctional project teams• Manage the risks of an innovation project• Management of relocated team• Integrate the customer value chain to accelerate innovation• Implement a technological development process• Advanced product development process - 3rd generation
[LAUNCH]• Measure the innovation performance
OTHERCONFERENCE
TOPICS ][ • Leverage innovation as a business opportunity• Change your corporate culture to increase innovation• Develop a culture that fosters creativity and innovation
Dave Caissy and his collaborators offer a series of conferences linked to innovation. The conferences and workshops will allow you to communicate to your colleagues the importance of innovation within your organization through real, concrete examples from leading enterprises. Additionally, they will enable the training of the innovation team on the best practices of innovation management.
(1) Special price for members of the Innovation Leaders Club. Travel fees may apply.
FULL DAY SESSION IN YOUR COMPANY $5,500• Two conference themes approached or• Two conference themes and a workshop
HALF-DAY SESSION IN YOUR COMPANY $3,500• One conference theme approached or• One conference theme and a mini-workshop
(1)(1)
Conferences and Workshops
9
COACHING AND TRAININGS
Coaching Program ...............................................................Moving from Tactical to Strategic Innovation .........Toolboxes and Training Offered .....................................What is Included in a Toolbox? .......................................What Types of Training Sessions are Available? .......
101213 14 15
www.toolbox4.com [email protected]
Audax Innovation now offers several themes in its coaching program. These different offerings are broken down into six themes that the leader will be able to choose à la carte according to developmental, professional and organizational needs.
AThe
Innovation Leader
BA Project or
Innovation Program
CStrategic
Innovation
DInnovation
Performance
EInnovation as a
Business Opportunity
FNew Product Introduction
A - The Innovation LeaderIn order to support the goals and objectives of the leader, this theme aims at developing a plan of action to overcome obstacles and allow the leader to reach the required performance level. This topic is targeted specifically to the innovation leader and not the company as a whole.
B - A Project or Innovation ProgramThis theme targets mainly a project or program (a set of projects) from conception to close, the whole time going through follow-ups and checks. Supported by the most complete toolbox possible and personalized consulting, the leader will be supported during his/her project or innovation program.
C - Strategic Innovation Going from tactical innovation to strategic is not an easy task, as was seen in the spring and fall meetings of 2016. A set of winning conditions help to attain this move. This coaching them aims at supporting the leader during this strategic turning point.
D - Innovation Performance Just about everything is measured in companies, but this is often not the case for innovation. First, this theme aims at identifying good performance indicators in order to correctly measure innovation reach a Benchmark with comparable companies. Consulting is then provided to improve company performance.
E - Innovation as a Business Opportunity Many organizations have good innovation management practices. Despite this, it is often expected that innovation provide a larger contribution to the financial performance of the organization. This theme is divided into two steps: first, measure the earnings foregone from projects pending or ambitious opportunities that are not presently captured due to a lack of resources; subsequently, strategies are developed to seize these earnings while demonstrating the business opportunity and the return on investment.
F - New Product IntroductionNew Product Introduction (NPI) is one of the most important and complex organizational processes. First, since it aims at valuing the efforts and the invested amounts in product or service development, and also because many functions are required to work in a coordinated manner. However, several organizations fail at maximizing their return on investment due to lack of an efficient and synchronous process. Thus, this thematic aims at auditing stakeholder practices and developing paths to improvement in order to achieve the full potential of new products and services.
The six themes are:
COACHING PROGRAM10
AThe Innovation
Leader
BA Project or
Innovation Program
CStrategic
Innovation
DInnovation
Performance
EInnovation as a
Business Opportunity
FNew Product Introduction
TM - Tailor-Made OfferIt is possible that none of the themes fit with the leader’s needs. Several other options are available, tailor-made, for the same price. These options include:
Number of selected
themes
Equivalent value
All-inclusive rate
Number of meetings
(3,5 h/Coaching)
Number of eCoaching
(1h /eCoaching)
Total number of coaching
sessionsLength
1 theme $3,500 $3,500 2 2 4 6-12 months2 themes $7,000 $5,000 3 3 6
3 themes $10,500 $6,500 4 4 8 12-18 months
Innovation Strategy Applied Creativity Management Innovation Portfolio Management
Blue Ocean Strategy Idea and Front-End of Innovation Management Product Development Process
Business Model Innovation Open Innovation Innovation Risk Management
Strategic Roadmapping Customer Experience
-29%
-38%
Certain conditions apply: - Travel costs take in consideration meetings taking place in Dave Caissy’s offices in downtown Montréal. - Travel costs apply for coaching sessions outside Montreal for up to $250 while in the province of Québec, and $500
per session outside of Québec if it takes place the day before or after an Innovation Leaders Club meeting. The costs related to other dates or locations will have to be discussed.
- Dave Caissy is an accredited trainer: the coaching hours are thus included in the regulatory training hours for the Ordre des ingénieurs du Québec(OIQ), and as training expenses (the 1% law)
- The invoicing process will start at the time of confirmation.
11
Coaching Session Curriculums
Kick-off call (1h)
Coaching session (3,5h)
eCoaching (1h)
1 Theme
2 Themes
3 Themes
Month 6 Month 12 Month 18
12
0 4 7 10Innovation Strategy
How is your strategy defined? Only opportunistic short-term strategy
Mainly opportunistic short-term strategy,
some proactive elements
Mainly long-term proactive strategy, some opportunistic
elements
Clear long-term proactive strategy
Do you have objectives defined for strategic innovation?
No objective has been set
Some broad objectives are set,
but nothing related to strategic innovation
Innovation objectives have been set, but
strategic innovation objectives are not
clear
Clear innovation objectives and KPI are set and part of them are those for
strategic innovation
Vision & Scope
Is there a vision defined for strategic innovations?
No specific vision defined for innovation
There is a vision for the innovation
pursue, but nothinf related to strategic
innovation
There is a vision for strategic innovation, but it reflect mainly incremental change
There is a specific vision defined for
strategic innovation, pursuing bold and
ambitious innovation
What is the typical scope of the strategic innovation?
Not much strategic innovation; only
product innovation
Various types of innovation, no combination
A combination of few types of innovation
A combination of several types of
innovation part of a program
What are the typical strategic innovations developed?
No strategic innovation are
developped; only incremental
Mainly incremental, some ambitious
innovation
Mainly ambitious innovation
Only bold and ambitious innovation
Governance
How the strategic innovation team is managed?
Project leader ahead of a functional team
Project leader ahead of a multifunctional
matrix team
Program director ahead a shared resources team
Program director ahead a
multifunctional dedicated team
How the strategic innovation process is managed?
Typical project management
Mostly project management, some
program management
Somewhat agile program
management
Long term agile program
management with feedback loop
Do you get external guidance during the development of the strategic innovation?
No, we keep our stuff in-house
We talk with some supplier/consultant when in needs, but their involvement is
limited
We included external resources during the
project to get a additional expertizes
We integrate external advisor(s) as part of our decisional board to have an unbiased and knowledgable
opinion
PRACTICESSCALE
SCORE COMMENTS
MAI
N E
LEM
ENTS
OF
STRA
TEG
IC IN
NO
VATI
ON
© 2013 Lean Startup Machine. You are free to use it and earn money with it as an entrepreneur, consultant, or executive, as long as you are not a software company (the latter need to license it from us).www.ValidationBoard.com
Validation Board
Track Pivots
1st Pivot 2nd Pivot 3rd Pivot 4th PivotStart
RiskiestAssumption
MethodCore AssumptionsAny assumption that, if invalidated, will break the business
Which Core Assumption has the highest level of uncertainty?
What is the lowest cost way to test the Riskiest Assumption?
Choose: Exploration, Pitch, or Concierge
Only put the Riskiest Assumption from an experiment in these boxes
Record data & learnings separately
If Invalidated, pivot at least one Core Hypothesis
If Validated, brainstorm and test the next Riskiest Assumption
What is the weakest outcome we will accept as validation?
MinimumSuccessCriterion
1
3
5
2
4
6
1
3
5
2
4
6
Project Name: Team Leader Name:
Customer Hypothesis
Problem Hypothesis
Solution Hypothesis
Design Experiment
Track Pivots
Tip: For two-sided markets, always validate the riskier side first
Tip: Clear all post-its from this area after each experiment is completed
Invalidated Validated
GETOUT
OF THEBLDG
Results
Tip: Do NOT define a solution until you’ve validated the problem
Remember:Limit one sticky-note per boxWrite in ALL CAPSDo not write more than 5 words on any sticky-note
ROLE OF THE INTRAPRENEUR
PRODUCT LIFECYCLE
Adapted from “Intrapreneuring”, by Gifford Pinchot III, Harper and Row Publishers, 1986
Scientist & Researcher
Inventor & Idea Person
Planner
Growth Business Mgr.
Cash Cow Mgr.
‘’Liquidation’’ Mgr.
INTRAPRENEUR BRIDGES THE VOID BETWEEN IDEA AND EXECUTION
CONFERENCE AND WORKSHOP
ONE DAYCONFERENCE
HALF A DAY
$5,500$3,500
OBJECTIVEThe «Moving to Strategic Innovation» conference and workshop features a methodology along with many real-life scenarios to initiate the transition toward ambitious or «strategic» projects. The practical workshop will allow your company to identify market opportunities ideal for strategic innovation and begin the transition toward projects having a much bigger impact.
Overseeing strategic innovation is most likely the most significant responsibility for innovation leaders. The main reason for this is due to the fact that tactical innovation happens on its own, either via client request or by need for maintenance on products evolving in their life cycle. On the other hand, strategic innovation, with the goal of being proactive, must be brought about and supported by the innovating organization as well as led by the innovation leader.
1. Current Context2. Tactical vs Strategic Innovation3. Innovation Strategy4. Intrapreneur Driven5. Program Based6. Program’s Vision & Scope7. Tools8. Governance, Leadership & Core Team
9. Localization10. Front-End of Innovation11. Unique Customer Experience12. Innovative Business Model13. Roadmap14. Budget15. Minimum Viable Product
Tools and Visual Content
Agenda
Markets
Products
Processes
Technologies
Time (5 years)
Benefits:
Help set up the innovation strategy. Improve communication about the innovation strategy. Link the company departments/business units.
ROADMAP INTRODUCTION
Incremental innovation
To sustain current business
Shared Innovation Resources
Project management
Mainly product innovation
Follow an annualinnovation cycle
TACTICAL INNOVATION
Bold and ambitious innovation
To create new business opportunities
Fully dedicated resources on a strategic innovation program
Long term agile program management with market feedback
loop
A combination of several types of innovation
(Product, services, system, business model, customer experience, distribution network, etc.)
In parallel with the tactical innovation, but not on an annual cycle
STRATEGIC INNOVATION
WHAT
WHY
WHO
HOW
SCOPE
WHEN
Opportunistic short-term strategy Clear long-term proactive strategy
VS
Tactical
Predictable output
Process driven
Strategic
Less predictable output
Intrapreneurship driven
TWO DIFFERENT APPROACHES
Is there a Golden Ratio?
Analysis reveals that the allocation ofresources shown below correlateswith a meaningfully higher share priceperformance. For most companies,this breakdown is a good startingpoint for discussion.
85%
15%
TACTICAL INNOVATION
STRATEGIC INNOVATION
How strategic innovation pays the bills
Among high performers that invest inboth levels of innovation, we find thefollowing distribution of total returns.As it happens, this ratio is the inverseof the resource allocation ratio wediscovered in high-performingcompanies.
20%
80%
TACTICAL INNOVATION
STRATEGIC INNOVATION
3https://hbr.org/2012/05/managing-your-innovation-portfolio
FIGURE 1.1
Source: Winning at New Products, Robert G. Cooper, 2011, 4th Edition. Refer to page 3 , Cooper endnote 2 and Adams et Boike, endnote 4 for the detailed explanations
BREAKDOWN OF DEVELOPMENT PORTFOLIOS BY PROJECT TYPE – THEN AND NOW
Percent (%) of Projects in the Average Development Portfolio
There has been a strong trend to smaller, lower risk, and less innovative projects
New-to-world, new-to-market innovations
New-product lines to the company
Additions to existing product line in company
Improvements & modifications to existing company products
Total
Development Project Type
20.4%
38.8%
20.4%
20.4%
100.0%
1990s
11.5%
27.1%
24.7%
36.7%
100.0%
2000s
43.7% decrease
30.1% decrease
20.8% increase
80.1% increase
-60% -40% -20% 0% 20% 40% 60% 80% 100%
2
• Vision and scope• Governance• Leadership• Core team• Localization• Front-end of innovation
• Unique customer experience• Innovative business model• Roadmap• Budget (2-3 years)• Intellectual property• Minimum viable product
Innovation Strategy• Objectives• Strategic arenas• Attack plan
Feedback Loop Process(Learnings, pivot & patience
Tactical Arenas
Project BasedFront-end of innovation
Portfolio management
Product development process
Strategic Arenas
Program Based
or Custom Product(For a specific client)
IMPLEMENTING STRATEGIC INNOVATION
Scheduled Market Launch(yearly or seasonal)
Source: Dave Caissy, Eng., M.Eng., NPDP, PMP, CPM, CPMM
Process Driven Intrapreneur Driven
Tactical Innovation Strategic Innovation
New platformNew product
A New Supply Chain
REDUCE
CREATE
ELIMINATE RAISE
Ref: Chan Kim & Renee Mauborne
BLUE OCEAN STRATEGY
8
FOUR ACTIONS FRAMEWORK
Tactical Innovation Strategic InnovationProject Leader
Multifunctional matrix team(not dedicated)
3-12 months“Project” Management
Product Development Process:• Light process• Full process
Team
Exec
utio
n
Program DirectorMultifunctional dedicated team
2-4 or 5 years“Program” Management
Roadmap• Build-measure feedback loop• Full Product development process
Resu
lts
Product• Improvement• Cost reduction• Line extension
Platform• Minimum viable product• Beta• Version 1• Version 2
Then it becomes tactical innovation
Team A
Team B
Program Director
Core team
Extented team
Product Development
Process(Lite Process)
(Complete Process)
Markets
Products
Processes
Technologies Time (5 years)
Updated on:
Objective : Define your goals and quantify your objectives
Objectives Validation
Targeted %
Sales target (M $)
% Current
Sales Target(M $)
% Organic
Sales Target(M $)
% Organic
Sales Target(M $)
% Organic
Sales Target(M $)
% AcquisitionSales Target
(M $)
Validation
Product Innovation Objective Calcultation - Template
0.0%0.0%
Description
Description
Description
Description
Description
Description
Description
Description
Description
Description
0.5%
Description
Description
Description
0.0%
Description
0 0 0 0
Description
Description
Description
Description
Description
Description
Description
Description
Description
Description
0
Current Products to Current MarketsCurrent Products to New
MarketsNew Products to Current
MarketsNew Products to New
Markets
End Market(s) Growth (+/-)
Increase Share Geographic Expansion Organic Growth Acquisition
Annual Growth Objectives
Detailed objectives
YEAR Actual annual sales (M $)
Targeted %
Targeted growth objectives (M $) 0
Sales target (M $) 0
Updated on:
ELIMINATE REDUCE RAISE CREATE
CHARACTERISTIC 1 CHARACTERISTIC 2 CHARACTERISTIC 3 CHARACTERISTIC 4 CHARACTERISTIC 5 CHARACTERISTIC 6 CHARACTERISTIC 7 CHARACTERISTIC 8 CHARACTERISTIC 9CHARACTERISTIC
10
Current 1 2 3 10 10 10 7 8
Proposed 10 9 9 8 2 2 2 2 3
Strategic Canvasfrom the Blue Ocean Strategy Methodology
Objective: Visualize the current industry strategic canvas with an innovative strategic canvas.
0
1
2
3
4
5
6
7
8
9
10
Strategic Canvas
Current Proposed
MOVING FROM TACTICAL TO STRATEGIC INNOVATION
13
Toolbox4 Innovators™ offers Toolboxes and Training that facilitate the adoption of innovation management practices.
TOOLBOXES AND TRAINING OFFERED
Innovation Strategy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 16Blue Ocean Strategy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 25Business Model Innovation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 25Strategic Roadmapping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 17
Applied Creativity Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 18Idea and Front-End of Innovation Management . . . . . . . . . . . . . . . . . . . . . . p. 19Open Innovation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 25Innovation Tournament . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 25Customer Experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 25
Innovation Portfolio Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p.20
Product Development Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 21Innovation Project Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 22Innovation Risk Management. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 25
Product Innovation Performance Metrics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 23Innovation Management Self-Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p. 24
The innovation management system
15 T O OL BOX E S AND T R AINING AVAIL ABL E
[DEFINE]
[GENERATE]
[SELECT]
[EXECUTE]
[LAUNCH]
14
What is Included in a Toolbox?
The tools are not a type of software: they are designed to manage innovation processes using Microsoft Office’s common applications. The ultimate aim of these editable, user-friendly tools is to help business professionals improve their innovation skills.
TOOLS
Updated on:
Objective: Determine the project attractiveness score of the project using the gatekeepers' score for each evaluation criterionInstructions: ▪ For each gate meeting, report the gatekeepers' scores for each evaluation criterion from the evaluation criteria document that they have filled in.▪ The mean and standard deviation for each evaluation criterion will be automatically calculated. ▪ Discuss the gatekeepers' score and especially high standard deviations scores (and report the discussion results in the Gate Minutes document) during the gate meeting.▪ The "Project Attractiveness Score" (sum of the means) will be automatically calculated.▪ Gatekeepers should use the "Project Attractiveness Score" along with the results of the discussion and other documents to make the Go/Kill decision.
CRITERIAGATEKEEPER
1GATEKEEPER
2GATEKEEPER
3GATEKEEPER
4GATEKEEPER
5GATEKEEPER
6GATEKEEPER
7AVERAGE RATING
STANDARD DEVIATION
Strategy 1 2 3 1 2 3 1 2 1
Product Advantage 4 5 6 4 5 6 4 5 1
Market Attractiveness 7 8 9 7 8 9 7 8 1
Leverage Competencies 1 5 10 1 5 10 1 5 4
Technical Feasability 10 10 10 10 10 10 10 10 0
Risk vs Reward 8 7 7 6 8 9 5 7 1
GATEKEEPERTOTAL SCORE
31 37 45 29 38 47 28
Gate Scorecard
TEAM TOTAL SCORE - TEAM PROJECT ATTRACTIVENESS SCORE ( /60)
DECISION
REFE
REN
CE:
Win
ning
at N
ew P
rodu
cts
p.27
6 Pr
oduc
t Dev
elop
men
t Pro
cess
- Vi
sual
Con
tent
- sl
ide
# 20
7
Go
36
02468
10Strategy
Product Advantage
Market Attractiveness
Leverage Competencies
Technical Feasability
Risk vs Reward
Gate Scorecard - Mean Rate for Each Criterion
2
5
8
5
10
7
0
2
4
6
8
10
Strategy Product Advantage MarketAttractiveness
LeverageCompetencies
TechnicalFeasability
Risk vs Reward
Gate Scorecard - Mean Rating for Each Criterion
1 1 1
4
0
1
0
1
2
3
4
5
Strategy Product Advantage Market Attractiveness Leverage Competencies Technical Feasability Risk vs Reward
STANDARD DEVIATION
The step-by-step methodology is based on the practices of some of the most successful organizations. Each step is then paired with specific tools and a selection of visual content.
METHODOLOGY
The visual content is usually a PowerPoint presentation illustrating the key principles of each Toolbox. All slides are editable and can easily be transferred to other work documents.
THE VISUAL CONTENT ALLOWS YOU TO: Easily communicate innovation management content Take advantage of key reminders
THE METHODOLOGY ALLOWS YOU TO: Accelerate your performance Optimize the implementation of tools and visual content
VISUAL CONTENT
All tools are available in English and in French.
Please note that the slides are only available in English, as no official translation of the sources is available.
Updated on:
Objective: Determine the people in your company who meet the gatekeeper criteriaInstructions: ▪ List all the people who could meet gatekeeper criteria and thereby become candidates.▪ Enter the candidate information.▪ For each candidate, checkmark the gatekeeper criteria that are met.▪ For each checkmark, 1 "point" is given to the candidate.▪ The graph automatically calculates the sum of the checkmarks for each candidate.▪ It is suggested to select as your gatekeepers those who meet the most gatekeeper criteria.▪ Suggestion : There should be some continuity of gatekeepers (the composition of the evaluation group can change from gate to gate, but not completely).▪ Note : Project fit: different types of projects have different gatekeepers (high-risk, larger projects need more senior gatekeepers).
CANDIDATE 1
CANDIDATE 2
CANDIDATE 3
CANDIDATE 4
CANDIDATE 5
CANDIDATE 6
CANDIDATE 7
CANDIDATE 8
CANDIDATE 9
CANDIDATE 10
Name 1 Name 2 Name 3 Name 4 Name 5 Name 6 Name 7 Name 8 Name 9 Name 10Function Function Function Function Function Function Function Function Function Function
Department Department Department Department Department Department Department Department Department Department
Does the candidate have the authority to approve the resources required ?
Does the candidate represent different functional areas ?
Will the candidate be key to the project’s success
Does the candidate have experience in the market sector ?
Does the candidate have an interest in product innovation ?
Gate
keep
er C
riter
ia -
Bar G
raph
Unique_Publication_Identifier
REFE
RENC
E:
Win
ning
at N
ew P
rodu
cts f
rom
p.2
89 to
p. 2
91Pr
oduc
t Dev
elop
men
t Pro
cess
- Vi
sual
Con
tent
- sli
de #
216
Gatekeepers Selection
GATEKEEPER CRITERIA
1
2
3
4
5
4
3
2
1 1
0
1
2
3
4
5
Name 1 Name 2 Name 3 Name 4 Name 5 Name 6 Name 7 Name 8 Name 9 Name 10
Updated on:
Objective : Use these metrics to determine your "front-end" performance
Instructions:▪ For each metric, enter the required data (number of projects, etc) in the light yellow boxes.▪ The result will automatically be calculated in % in the textured light grey boxes.▪ The graphs will automatically be updated.
PRESENT
YEAR -3 YEAR -2 YEAR -1 YEAR 0 YEAR +1 YEAR +2
R&D budget (in hours, days or $, €, etc.)
2000 2500 1800 1500 - -
Effort level in front end of innovation (in hours, days or $, €, etc.)
210 220 220 180 - -
Percent of the effort level in front-end innovation (%)
10.5% 8.8% 12.2% 12.0% 13% 15%
Effo
rt le
vel
Bar g
raph
PRESENT
YEAR -3 YEAR -2 YEAR -1 YEAR 0 YEAR +1 YEAR +2
Total number of ideas evaluated at Gate 1 (nb)
100 130 128 120 - -
Number of approved development product projects (nb)
22 24 26 20 - -
Percent of approved development product projects (%)
22.0% 18.5% 20.3% 16.7% 20% 25%
Number of products launched (nb) 12 10 15 16 - -
Percent of products launched (%) 12.0% 7.7% 11.7% 13.3% 15% 16%
Fron
t-en
d Pe
rfor
man
ce
Bar g
raph
Unique_Publication_Identifier
"Front-end" Performance
OBJECTIVES
EFFO
RT L
EVEL
: FR
ON
T-EN
D IN
NO
VATI
ON
METRICS VARIABLESPAST DATA OBJECTIVES
FRO
NT-
END
PERF
ORM
ANCE
METRICS VARIABLESPAST DATA
10.5%
8.8%
12.2% 12.0%13%
15%
0%
2%
4%
6%
8%
10%
12%
14%
16%
YEAR -3 YEAR -2 YEAR -1 YEAR 0 YEAR +1 YEAR +2
22.0%
18.5%20.3%
16.7%
12.0%
7.7%
11.7%13.3%
20%25%
15%16%
0%
5%
10%
15%
20%
25%
30%
YEAR -3 YEAR -2 YEAR -1 YEAR 0 YEAR +1 YEAR +2
Percent of approved development product projects (%) Percent of products launched (%)
Percent of approved development product projects (%) Percent of products launched (%)
THE TOOLS ALLOW YOU TO: Adopt the practices of some of the most innovative organizations Save time during the implementation phase Quantify your actual performance and set goals
Unique_Publication_Identifier
THE TOOLBOX METHODOLOGY
TOOLSA tool is usually an Excel worksheet or a Word document.
The tools are editable, ready-to-use and enable business professionals to quickly and easily use the innovation management practice.
VISUAL CONTENTVisual content is usually composed of PowerPoint slides.
They are proposed as references by which to present the innovation practices for the communication, for instance. Since all slides are editable, the design and content can be copied and pasted to transfer information in the current organization’s documents.
STEPSIn order to implement or enhance the innovation management practices, a step-by-step sequence is proposed. These steps are based on the successful practices of the most innovative organizations.
What is a Toolbox?Multiple tools, visuals, a methodology as well as a start-up support, are grouped together to form a toolbox.
What is the use of a methodology?To enhance your performance with the use of the tools and visuals, a methodology is suggested and can be completed with a tool-synchronized training (optional).
How does the methodology work?Throughout the methodology, steps associated to specific tools and a selection of visuals are presented. Prerequisite actions, other toolbox references and recommendations may also be suggested.
Unique_Publication_Identifier
THE INNOVATION MANAGEMENT SYSTEM
Unique_Publication_Identifier
PRODUCT DEVELOPMENT PROCESS METHODOLOGY
TOOLBOXES STEPS VISUAL CONTENT
• Roles & Responsibilities Audit
• PDP Development & Implementation
• Product Development Process (Complete, Lite or Express)
• Roles Assignment Matrix
• Product Development Process
• Evaluation Criteria • Gate Management
PREREQUISITE (To be done before filling-in the toolbox) -Evaluation of the current situation:
- Product Innovation Management Self-Audit (qualitative)*- Product Innovation Performance Metrics (quantitative)*
1. Evaluate current roles and responsibilities regarding innovation management.
2. Plan the product development process (PDP) development/improvement and implementation.
3. Define project requirements:- Identify required deliverables and tasks to personalize the product
development process.- Define the stakeholder involved and their role regarding each
deliverable and task.
AFTER having implemented a product development process, it is recommended that you:- Evaluate the implementation - Evaluate the organization performance subsequent to implementation- Take correcting action, if necessary
4. Manage the project stages and gates: - Follow-up the task and deliverable completion of each stage- For each gate, use criteria to evaluate the project- For each gate, decide if the project is worth further development or
should be killed.
• See other Toolboxes(not included).
Slides # 4 to 55(Chapter 1, 2 & 3)
Slides # 250 to 259(Chapter 11)
Slides # 56 to 87(Chapter 4)
Slides # 129 to 160(Chapter 7)
Slides # 220 to 249 (Chapter 10)
Slides # 56 to 87(Chapter 4)
Slides # 197 to 219(Chapter 9)
Throughout all the visual content
15
What Types of Training Sessions are Available?
Includes workshops synchronized with the use of the tools (customized with your organization’s logo) Consists of a private, practical session held at your offices or ours (1)
Can include up to 10 participants at no extra charge Eligible for government grants Counts as training time for professional orders
PRIVATE TRAINING SESSIONThe Private Training session, held specifically for your organization, is coordinated with the use of the tools. Led by an expert in innovation leadership, it will support your team to take full advantage of the Toolboxes.
FULL-DAY SESSION $5,500Applicable for the following Toolboxes:• Innovation Strategy• Applied Creativity Management• Product Development Process• Innovation Project Management
HALF-DAY SESSION $3,500Applicable for the following Toolboxes:• Strategic Roadmapping• Idea and Front-End of Innovation Management• Innovation Portfolio Management• Product Innovation Performance Metrics• Innovation Management Self-Audit
(1) Additional traveling expenses may apply depending on the location of the training
16
Innovation Strategy
Visual Content – 150+ editable slides Methodology
OBJECTIVEThe “Innovation Strategy” Toolbox and Training allows managers to establish clear strategic innovation orientations. These can be determined by analyzing past performance, defining the organization’s goals and objectives and identifying, selecting and planning new strategic arenas.
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Attaining objectives to stimulate innovation – Defining clear strategic arenas to focus efforts dedicated to innovation – Setting a realistic and proactive attack plan for each arena
Tools – 8 Packages (31 tools in all) – Product Innovation Strategy (2) – Past Performance, Goals & Objectives (6) – Identification of Strategic Arenas (7) – Selection of Strategic Arenas (3) – Attack Plan by Strategic Arena (3)
TOOLBOX
Updated on:
Objective : Define your goals and quantify your objectives
Objectives Validation
Targeted % 10%
Sales target (M $)
% Current
Sales Target(M $)
% Organic
Sales Target(M $)
% Organic
Sales Target(M $)
% Organic
Sales Target(M $)
% AcquisitionSales Target
(M $)
2,0% 5 0,1% 0 0,5% 1 0,4% 1 1,0% 2
1,0% 2 1,0% 2
1,0% 2 1,0% 2
2,0% 5
Validation
Product Innovation Objective Calcultation - Template
3,0%1,0%
Description
Description
Description
Description
Description
Description
Description
Description
Description
Description
0,5%
Description
Description
Description
6,0%
Description
5 8 3 3
Description
Description
Description
Description
Description
Description
Description
Description
Description
Description
8
Current Products to Current Markets Current Products to New Markets
New Products to Current Markets
New Products to New Markets
3%
End Market(s) Growth Increase Share Geographic Expansion Organic Growth Acquisition
Annual Growth Objectives
Detailed objectives
YEAR Actual annual sales (M $)
2010 240
Targeted % 10%
Targeted growth objectives (M $)
24
Sales target (M $)
264
2% 3% 1% 1%
INNOVATION SELECTION TECHNOATTACK COMPANYGOALS & OBJ. IDENTIFICATION MARKETS
[DEFINE]
– Inputs - Markets (4) – Inputs - Technologies (2) – Inputs - Company Data (4)
Unique_Publication_Identifier
INNOVATION STRATEGY METHODOLOGY
Markets
Technologies
Company Data
Inputs(Facts and Data) Corporate Strategy
Product Innovation Strategy• Goals and Objectives• Identification of Strategic Arenas• Selection of Strategic Arenas
Attack Plan (By Strategic Arena)• Competitive Stance Matrix• Competitive Positioning Matrix• Entry Strategy Matrix
Portfolio Management(Including Resource Commitment)
Roadmap
Development
Commercialization
Updated on:
Objective: Define competitive positioning and compare it with competitors.
PRODUCT 1
PRODUCT 2
PRODUCT 3
PRODUCT 4
PRODUCT 5
PRODUCT 6
PRODUCT 7
PRODUCT 8
PRODUCT 9
PRODUCT 10
OFFERINGS (WHAT) 1 4 8 3 6Platforms 2 4 8 3 7Solutions 1 5 9 2 7
CUSTOMERS (WHO) 2 3 9 2 6Customer Experience 2 3 7 2 5Value capture 3 4 8 1 5
PROCESSES (HOW) 1 2 8 3 6Organization 2 3 8 2 7Supply Chain 3 3 8 4 7
PRESENCE (WHERE) 2 4 7 2 7Networking 3 4 9 2 8Brand 1 4 8 3 7
Competitive Positioning Matrix
0123456789
OFFERINGS (WHAT)
Platforms
Solutions
CUSTOMERS (WHO)
Customer Experience
Value capturePROCESSES (HOW)
Supply Chain
PRESENCE (WHERE)
Networking
Brand
Competitive Positioning Matrix
Updated on:
2013-10-16
PROJECT TITLE
YEAR REFERENCE (Project Launch)
FINANCIAL REWARD (1-10 Scale)
INNOVATION LEVEL
(1-10 Scale)
PROJECT COST (K $)
PROJECT A 2008 1 1 10
PROJECT B 2012 8 2 20
PROJECT C 2008 2 8 30
PROJECT D 2009 3 4 40
PROJECT E 2009 3 5 50
PROJECT F 2009 3 6 100
PROJECT G 2010 4 7 70
PROJECT I 2010 4 8 65
PROJECT J 2010 5 9 80
PROJECT K 2011 5 10 120
PROJECT L 2011 6 8 150
PROJECT M 2011 6 6 35
PROJECT N 2012 7 4 48
PROJECT O 2012 8 5 66
PROJECT P 2012 9 3 13
Objective : Analyze past projects regarding their innovation level
Financial Reward vs Innovation Level
PROJECT A
PROJECT B
PROJECT C
PROJECT D
PROJECT E
PROJECT F
PROJECT G
PROJECT I
PROJECT J
PROJECT K
PROJECT L
PROJECT M
PROJECT N
PROJECT O
PROJECT P
0
1
2
3
4
5
6
7
8
9
10
0 1 2 3 4 5 6 7 8 9 10Financial Reward
Inno
vatio
n Le
vel
FINANCIAL REWARD VS INNOVATION LEVEL
LENGTH: ONE DAYDates are set according to your availability
$5,500Offered in English or French
17
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Defining the roadmap’s milestones (years and development levels) – Identifying, evaluating and prioritizing opportunities – Building a structured roadmap
TOOLBOX
Strategic RoadmappingOBJECTIVEThe “Strategic Roadmapping” Toolbox and Training allows managers to plan and design their innovation roadmap. It offers a proven framework, including a set of templates of various formats. It allows multifunctional resources to work together on common plan-based strategic goals.
Tools – 4 Packages (7 tools in all) – Roadmap template for Excel (1) – Roadmap templates for PowerPoint (4) – Roadmap template for Visio (1) – Facilitation guide (1)
Visual Content – 60+ editable slides Methodology
EXCEL VISIO GUIDEPOWERPOINT
2011Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2012Jan Feb Mar
STRATEGIC ROADMAPPING
DELIVERY
Delays expected to Version 1
MAR
KETI
NG
DEV
ELO
PMEN
TKP
ID
ASH
BOAR
D RED
BUDGET RESOURCE MARCOM DEPENDENCIES
Budget will needbolstering in Q2 2011
AMBER
All resource on track.
GREEN
Public perception is very healthy. Positive.
GREEN
Partnerships and services all in place and on track.
GREEN
RISKS ISSUES ON RADAR
COMPETITORTyrell corp – new product.
MARKETLower pricing expected Q3
DELIVERYTech issues (BOB)
BUDGETInvestment needed Q2
AUG 2011New mobile opportunity
JUN 2011New Suppliers possible.
TBCLOWRISK
HIGHRISK BAU
Press Launch
MediaCampaign Celebrity Partnerships Ongoing Marketing
RICH MOBILE WEB APPSMOBILE WEB v2MOBILE WEB v1
PC PLATFORM v1 PC PLATFORM v2 ONGOING RELEASES
RESEARCH ANDROID v1 ANDROID v2 ANDROID BAU
5% MARKET SHARE 15% MARKET SHARE 28% MARKET SHARE [n]% MARKET SHARE
2012
JAN9 16 23 30
FEB6 13 20 27
MAR5 12 19 26
APR2 9 16 23
STRATEGIC ROADMAPPINGMilestone 1
RISK EPIC THEME
Milestone 2
Milestone 3
Milestone 4
Milestone 6 Milestone 7
Milestone 8
2 STREAMS + INFO
1TEAM 1
1TEAM2
2 3 4 5 6 7 8
2 3 4 5
THEME 1 – BASICS THEME 2 – SET DETAILS
THEME 1 – BASICS THEME 2 – DETAILS
EPIC 1.1
EPIC 1.2
EPIC 2.1 EPIC 2.5
EPIC 2.3
EPIC 1.1 EPIC 1.2 EPIC 1.3 EPIC 1.4
Create record. Delete record. Compare record.
Reserverecord.
EPIC 2.1 EPIC 2.2 EPIC 2.3 EPIC 2.4
Anti-record Beam.
Record phase disruptor.
Beam shifter. Mind meld.
EPIC 2.4
EPIC 1.5 EPIC 1.6
Move record. Tag record.
EPIC 2.5 EPIC 2.6 EPIC 2.7 EPIC 2.8
Record cloak. Record bridge. Record starfleet.
Record academy
EPIC 1.1
EPIC 1.1
EPIC 1.3
EPIC 1.4
EPIC 1.5
EPIC 1.6
EPIC 2.2 EPIC 2.6
EPIC 2.6EPIC 2.8
3 week iterations
2 week iterations
[DEFINE]
LENGTH: HALF A DAYDates are set according to your availability
$3,500Offered in English or French
18
Applied Creativity Management
3 levels• Breakthrough• Distinctive• Incremental
Breakthrough
Distinctive
Incremental
LEVELS OF INNOVATIVENESS
1
Identificationof the opportunity
Identificationof a solution
Improvementof the solution
GO THROUGH A COMPLETE PROCESS
3
Creativity:Particular mental aptitude where various methods are used to generate new ideas or to find original solutions to an opportunity.
• An innate potential
• That can be developed
• That people express differently
REVIEW OF THE DEFINITION
2
Visual Content – 100+ editable slides Methodology
OBJECTIVEThe “Applied Creativity Management” Toolbox and Training offers a simple yet effective methodology and tools to foster human creativity. It encourages the development of innovative ideas and projects through opportunity identification, idea generation and concept development.
Tools – 4 Packages (31 tools in all) – Identification of Need/Opportunity (9) – Idea Generation (11) – Concept Development (6) – Communication of Concept (5)
OPPORTUNITY IDEA DEVELOP. COMM.
[GENERATE]
TOOLBOX
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Defining precise innovation targets – Mastering idea generation techniques – Setting evaluation criterion for the ideas received
LENGTH: ONE DAYDates are set according to your availability
$5,500Offered in English or French
19
Idea and Front-End of Innovation Management
Tools – 11 ToolsPipeline Section – 6 Tools
– Front-End of Innovation: Annual Objectives – Front-End of Innovation: Idea Management – Indicators: Objectives vs Actual – Indicators: Idea Information – Indicators: Evaluation Scores – Indicators: Global Front-End of Innovation
Template Section – 5 Tools – Opportunity Summary – Idea Summary – Evaluation Criteria – Idea Feedback Report – Concept Summary
Visual Content – 70+ editable slides Methodology
OBJECTIVEThe “Idea and Front-End of Innovation Management” Toolbox and Training offers a simple way to determine front-end annual objectives, manage these objectives using an idea pipeline and analyze the complete front-end of innovation process using multiple dashboards.
[GENERATE]
OBJECTIVES PIPELINE INDICATORS 1-4 SUBMISSION FEEDBACK EVALUATION
TOOLBOX
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Defining front-end of innovation objectives – Managing received ideas – Building an action plan to optimize the font-end of innovation
LENGTH: HALF A DAYDates are set according to your availability
$3,500Offered in English or French
20
Innovation Portfolio Management
Tools – 16 Tools – Innovation Budget Allocation (1) – Project Evaluation Criteria (1) – One-Page Opportunity Summary (1) – Bucket 1-12 (12) – Results Analysis & Charts (1)
BUDGET EVALUATION SUMMARY BUCKET 1-12 ANALYSIS
Visual Content – 70+ editable slides Methodology
OBJECTIVEThe “Innovation Portfolio Management” Toolbox and Training offers tables, graphs and key indicators which are designed to help business professionals and organizations manage their project portfolio using the “strategic buckets” concept.
[SELECT]
TOOLBOX
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Defining the right strategic buckets – Allocating the budget per strategic bucket – Setting evaluation criterion for the projects
LENGTH: HALF A DAYDates are set according to your availability
$3,500Offered in English or French
21
Product Development ProcessOBJECTIVEThe “Product Development Process” Toolbox and Training allows managers to effectively develop products by improving their existing process or developing a new process, while ensuring that the best practices are followed.
Tools – 8 Packages (37 tools in all) – PDP Development & Implementation (5) – Roles & Responsibilities Audit (3) – Product Development Process (6) – Roles Assignment Matrix (5)
– Gate Evaluation Criteria (3) – Gate Management (8) – PDP Express (4) – PDP Light (3)
Visual Content – 250+ editable slides Methodology
DEV. & IMPL. ROLES PDP RASCI EVALUATION GATE EXPRESS LIGHT
[EXECUTE]
TOOLBOX
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Implementing or improving the product development process – Defining the tasks and deliverables for each phase – Determining the roles and responsibilities for each phase
LENGTH: ONE DAYDates are set according to your availability
$5,500Offered in English or French
22
DIRECTLY INVOLVED ACTORS
Requester Project Manager Project Client
The 3 key players
GANTT DIAGRAM EXAMPLE
Process reengineeringID WBS Name Duration
1 1 New process 153 days
2 1.1 Analysis 15 days
3 1.1.1 Process objectives 2 days
4 1.1.2 Performance review 5 days
5 1.1.3 “Clients” meetings 5 days
6 1.1.4 Evaluation of inputs/outputs 3 days
7 1.2 Development 33 days
8 1.2.1 Process development 10 days
9 1.2.2 Preliminary validation 5 days
10 1.2.3 Detailed development 15 days
11 1.2.4 Final validation 3 days
12 1.3 Implementation 77 days
13 1.3.1 Pilot implementation 42 days
14 1.3.1.1 Training 2 days
15 1.3.1.2 Testing 20 days
16 1.3.1.3 Evaluation 15 days
17 1.3.1.4 Adjustment 5 days
18 1.3.2 Final implementation 35 days
19 1.3.2.1 Training 10 days
20 1.3.2.2 Implementation 25 days
21 1.4 Evaluation 14 days
22 1.4.1 Audit 4 days
23 1.4.2 Improvement plan 10 days
24 1.5 Improvement 14 days
25 1.5.1 Improvement validation 4 days
26 1.5.2 Improvement implementation 10 days
Nov ‘02 Dec ‘02 Jan ‘03 Feb ‘03 Mar ‘03 Apr ‘03 May ‘03 Jun ‘0320 27 03 10 17 24 01 08 15 22 29 05 12 19 26 02 09 16 23 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15
PROJECT DIVISION STRUCTURE
Project Development Time
Det
ail L
evel
Project
Subsystem # A
Component# B
Unit # C
Deliverable A.1
Deliverable A.2
Deliverable C.1
Deliverable B.1
Deliverable C.2
Sub-deliverable A.1.1
Sub-deliverable C.1.1
Sub-deliverable B.1.1
Sub-deliverable C.2.1
Work PackageB.1.1.1
Work PackageB.1.1.2
OBJECTIVEThe “Innovation Project Management” Toolbox and Training offers managers clear procedures by which to implement best practices in managing innovative projects. It was designed to be specifically effective in the context of innovation and uncertainty.
Tools – 6 Packages (20 tools in all) – Introduction to Project Management (1) – Self-Audit of Project Management (3) – Phase: Initialization (4) – Phase: Planning (5) – Phase: Execution (5) – Phase: Closure (2)
Visual Content – 140+ editable slides Methodology
Innovation Project Management
AUDITINTRO PLANNING EXEC.INITIAL. CLOSURE
Interest regardingproject management
Contribution to carrer advancement
Available time for the project
Change of priorities Experience Level of knowledge
1 Low ▪ No interest
▪ No contribution to carrer advancement
▪ No available time▪ Already late in several other cases
▪ Impossible to reclassify priorities
▪ No experience in project management
▪ Low level▪ No training
2
Begi
nner
▪ Low interest
▪ Small contribution to carrer advancement▪ Poorly motivated for carrer advancement
▪ Limited available time▪ Already late in several other cases
▪ Hard to reclassifypriorities
▪ Took active part in projects as a team member
▪ Low level▪ Basic training
3
Inte
rmed
iate
▪ Average interest▪ Average contribution to carrer advancement
▪ Available time▪ In partial control of his/her cases
▪ Possible to reclassify priorities
▪ Has managed simple projects
▪ Average level▪ Basic training
4
Adva
nced
▪ Strong interest▪ Signification contribution to carrer advancement
▪ Available time▪ In control of his/her cases
▪ Possible and easy to reclassify priorities
▪ Has managed moderately complex projects
▪ Advanced level▪ Intermediate training
5
Expe
rt
▪ Very strong interest
▪ In direct line with carrer advancement▪ Projects are identified in roles & responsibilities
▪ Available time▪ In total control of his/her cases
▪ Unnecessary to reclassify priorities
▪ Has managed very complex projects
▪ Very advanced level▪ Advanced training
Unique_Publication_Identifier
GO
- N
O G
O :
If th
e av
erag
e of
the
two
prec
eedi
ng c
olum
ns is
bel
ow 2
, the
re is
no
need
to g
o fu
rthe
r.
Score
INTEREST AVAILABILITY KNOWLEDGE
Start date End dateActual duration time (nb of days
worked) Start date End date
Actual duration time (nb of days
worked)
Nb de jours ouvrables de retard
sur la date de début
Nb de jours ouvrables de retard
sur la date de fin
10% 85 112
7% 85 102
Summary
% of completionDuration of execution (nb of days worked)
Initial forecast Completed or revised Difference9% 170 214 44
% of completion
Cale
nder
Calender
Initial forecast Completed (or revision of forecast) Retard
10% January 6, 2014 January 24, 2014 15 January 6, 2014 January 24, 2014 15 0 0
0% January 6, 2014 January 24, 2014 15 January 9, 2014 February 5, 2014 20 3 8
0% January 6, 2014 January 24, 2014 15 January 9, 2014 January 29, 2014 15 3 3
15% February 3, 2014 February 28, 2014 20 February 3, 2014 March 17, 2014 31 0 11
25% February 3, 2014 February 28, 2014 20 February 3, 2014 March 17, 2014 31 0 11
25% January 6, 2014 January 24, 2014 15 January 6, 2014 January 24, 2014 15 0 0
10% January 6, 2014 January 24, 2014 15 January 9, 2014 January 29, 2014 15 3 3
0% January 6, 2014 January 24, 2014 15 January 9, 2014 January 29, 2014
0% February 3, 2014 February 28, 2014 26 0 6
15 3 3
February 28, 2014 20 February 3, 2014 March 17, 2014
20 February 3, 2014 March 10, 2014
31 0 110% February 3, 2014
Start date
Start date End dateActual duration time (nb of days
worked) Start date End date
Actual duration time (nb of days
worked)
Nb de jours ouvrables de
retard sur la date de début
Nb de jours ouvrables de
retard sur la date de fin
Nb de jours ouvrables
supplémentaires (réalisés - prévus)
1 Phase 1 10% #NAME? #NAME? #NAME?
Initial forecast
Completed or revised forecast
Initial forecast
Completed or revised forecast
Initial forecast
Completed or revised forecast
Initial forecast
Completed or revised forecast
Initial forecast
Completed or revised forecast
2 Phase 2 7% #NAME? #NAME? #NAME?
Initial forecast
Completed or revised forecast
Initial forecast
Completed or revised forecast
Initial forecast
Completed or revised forecast
Initial forecast
Completed or revised forecast
Initial forecast
Completed or revised forecast
Date de début du calendrier Summary
December 30, 2013 % of completionDuration of execution (nb of days worked)
Initial forecast Completed or revised Difference9% #NAME? #NAME? #NAME?
Numéro de référence de
l'action / tâcheAction / Tâche Nom du responsable % of completion
Cale
nder
Calender
Dece
mbe
r 30,
201
3
Janu
ary
6, 2
014
Janu
ary
13, 2
014
Janu
ary
20, 2
014
Janu
ary
27, 2
014
Febr
uary
3, 2
014
Febr
uary
10,
201
4
Febr
uary
17,
201
4
Febr
uary
24,
201
4
Mar
ch 3
, 201
4
Mar
ch 1
0, 2
014
Mar
ch 1
7, 2
014
Mar
ch 2
4, 2
014
Mar
ch 3
1, 2
014
April
7, 2
014
April
14,
201
4
April
21,
201
4
April
28,
201
4
May
5, 2
014
May
12,
201
4
May
19,
201
4
May
26,
201
4
June
2, 2
014
June
9, 2
014
June
16,
201
4
June
23,
201
4
June
30,
201
4
July
7, 2
014
July
14,
201
4
July
21,
201
4
July
28,
201
4
Augu
st 4
, 201
4
Augu
st 1
1, 2
014
Augu
st 1
8, 2
014
Augu
st 2
5, 2
014
Sept
embe
r 1, 2
014
Sept
embe
r 8, 2
014
Sept
embe
r 15,
201
4
Sept
embe
r 22,
201
4
Sept
embe
r 29,
201
4
Oct
ober
6, 2
014
Oct
ober
13,
201
4
Oct
ober
20,
201
4
Oct
ober
27,
201
4
Nov
embe
r 3, 2
014
Nov
embe
r 10,
201
4
Nov
embe
r 17,
201
4
Nov
embe
r 24,
201
4
Dece
mbe
r 1, 2
014
Dece
mbe
r 8, 2
014
Dece
mbe
r 15,
201
4
Dece
mbe
r 22,
201
4
Dece
mbe
r 29,
201
4
Janu
ary
5, 2
015
Janu
ary
12, 2
015
Janu
ary
19, 2
015
Janu
ary
26, 2
015
Febr
uary
2, 2
015
Febr
uary
9, 2
015
Febr
uary
16,
201
5
Febr
uary
23,
201
5
Mar
ch 2
, 201
5
Mar
ch 9
, 201
5
Mar
ch 1
6, 2
015
Mar
ch 2
3, 2
015
Mar
ch 3
0, 2
015
April
6, 2
015
April
13,
201
5
April
20,
201
5
April
27,
201
5
May
4, 2
015
May
11,
201
5
May
18,
201
5
May
25,
201
5
June
1, 2
015
June
8, 2
015
June
15,
201
5
June
22,
201
5
June
29,
201
5
July
6, 2
015
July
13,
201
5
July
20,
201
5
July
27,
201
5
Augu
st 3
, 201
5
Augu
st 1
0, 2
015
Augu
st 1
7, 2
015
Augu
st 2
4, 2
015
Augu
st 3
1, 2
015
Sept
embe
r 7, 2
015
Sept
embe
r 14,
201
5
30 n
ovem
bre
2015
7 dé
cem
bre
2015
Sept
embe
r 21,
201
5
Sept
embe
r 28,
201
5
Oct
ober
5, 2
015
Oct
ober
12,
201
5
19 o
ctob
re 2
015
26 o
ctob
re 2
015
14 d
écem
bre
2015
21 d
écem
bre
2015
Initial forecast Completed (or revision of forecast) Retard
December 30, 2013
2 no
vem
bre
2015
9 no
vem
bre
2015
16 n
ovem
bre
2015
23 n
ovem
bre
2015
1.01 Identification du contexte marketing M. Li 10% January 6, 2014 January 24, 2014 #NAME? January 6, 2014 January 24, 2014 #NAME? #NAME? #NAME? #NAME?
1.02 Définition des méthodes d'études et de recherche Mme Arnold 0% January 6, 2014 January 24, 2014 #NAME? January 9, 2014 February 5, 2014 #NAME? #NAME? #NAME? #NAME?
1.03 Choix du projet d'étude M. Duchênes 0% January 6, 2014 January 24, 2014 #NAME? January 9, 2014 January 29, 2014 #NAME? #NAME? #NAME? #NAME?
1.04 Réalisation de l 'étude Mme Jean 15% February 3, 2014 February 28, 2014 #NAME? February 3, 2014 March 17, 2014 #NAME? #NAME? #NAME? #NAME?
1.05 Analyse des résultats M. Li 25% February 3, 2014 February 28, 2014 #NAME? February 3, 2014 March 17, 2014 #NAME? #NAME? #NAME? #NAME?
2.01 Définition des rôles et responsabil ités Mme John 25% January 6, 2014 January 24, 2014 #NAME? January 6, 2014 January 24, 2014 #NAME? #NAME? #NAME? #NAME?
2.02 Définition du calendrier Mme John 10% January 6, 2014 January 24, 2014 #NAME? January 9, 2014 January 29, 2014 #NAME? #NAME? #NAME? #NAME?
2.03 Réalisation des outils de suivi et de gouvernance Mme John 0% January 6, 2014 January 24, 2014 #NAME? January 9, 2014 January 29, 2014 #NAME?
2.04 Réalisation d'un plan de communication Mme John 0% February 3, 2014 February 28, 2014 #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
February 28, 2014 #NAME? February 3, 2014 March 17, 2014
#NAME? February 3, 2014 March 10, 2014
#NAME? #NAME? #NAME? #NAME?
#NAME?
2.05 Identification des risques M. Diesse 0% February 3, 2014
[EXECUTE]
Number of working days late on
the start date
Lateness
Number of working days late on
the finish date
TOOLBOX
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Defining the mandate – Employing efficient follow-up techniques – Planning the project and managing the changes
LENGTH: ONE DAYDates are set according to your availability
$5,500Offered in English or French
23
Product Innovation Performance MetricsOBJECTIVEThe “Product Innovation Performance Metrics” Toolbox and Training offers metrics, benchmarks and graphs which are designed to help business professionals, managers and organizations evaluate their own performance regarding their front-end, projects and products and to compare these key metrics to the performance of average businesses and those in the top 20%.
Tools – 4 Tools – Benchmarks (1) – Metrics: Front-End Performance (1) – Metrics: Currently developed projects (1) – Metrics: Commercialized products (1)
BENCHMARKS FEI PROJECTS PRODUCTS
Visual Content – 50+ editable slides Methodology
[LAUNCH]
TOOLBOX
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Defining performance indicators in product innovation – Evaluating the organization’s performance – Interpreting the results
LENGTH: HALF A DAYDates are set according to your availability
$3,500Offered in English or French
24
OBJECTIVEThe “Product Innovation Management Self-Audit” Toolbox and Training offers management surveys, whose results, including evaluation summaries and graphs, can help determine the strengths and weaknesses of an organization’s innovation management practices.
Tools – 5 Tools – Practices to Follow: Survey (1) – Practices to Follow: Evaluation (1) – Habits to Avoid: Survey (1) – Habits to Avoid: Evaluation (1) – Consolidated Results Analysis (1)
FOLLOW - SURV. FOLLOW - EVAL. AVOID - EVAL.AVOID - SURV. ANALYSIS
Visual Content – 50+ editable slides Methodology
Innovation Management Self-Audit
[LAUNCH]
TOOLBOX
TRAININGThe training session includes practical workshops with a specific focus on the following subjects:
– Evaluating the organization’s performance in innovation management – Interpreting the results – Improving the organization’s particular situation
LENGTH: HALF A DAYDates are set according to your availability
$3,500Offered in English or French
25
OTHER TOOLBOXES AVAILABLE
Business Model Innovation
Blue OceanStrategy
Open Innovation
InnovationTournament
CustomerExperience
Innovation Risk Management
[DEFINE]
[EXECUTE]
[GENERATE]
Please contact us for more details.
LENGTH: ONE DAY
LENGTH: ONE DAY
LENGTH: ONE DAY
LENGTH: ONE DAY
LENGTH: HALF A DAY
LENGTH: HALF A DAY
Dates are set according to your availability
Dates are set according to your availability
Dates are set according to your availability
Dates are set according to your availability
Dates are set according to your availability
Dates are set according to your availability
$5,500
$5,500
$5,500
$5,500
$3,500
$3,500
Offered in English or French
Offered in English or French
Offered in English or French
Offered in English or French
Offered in English or French
Offered in English or French
Consulting services ..................................................................... Consultants .................................................................................... Innovation management achievements .............................
www.audax-innovation.com/[email protected]
2728 30
CONSULTING AND IMPLEMENTATION
27
CONSULTING SERVICES OFFERED
OTHER SERVICES
• Measure innovation management performance• Evaluate innovation as a business opportunity• Optimize the innovation management system• Evaluate the organization’s actual practices in innovation management and establish an action plan
• Define a winning innovation strategy• Innovate by the business model• Plan a strategic roadmap
• Enhance the creative potential of the organization• Implement a proactive front-end of innovation
• Deploy an efficient portfolio management• Optimize the portfolio management
• Implement or review a product innovation process• Manage the risk of an innovation project• Apply the best practices of innovation project management
• Optimize the new product introduction process
[DEFINE]
[GLOBAL]
[GENERATE]
[SELECT]
[EXECUTE]
[LAUNCH]
Dave Caissy, expert in innovation leadership, has advised more than 400 organizations. He and his team can support and guide your organization in your most complex innovation challenges.
Consulting in innovation managementInnovation program management
CONSULTING SERVICES
• Build the business plan of a R&D center• Develop a blue ocean strategy• Establish open innovation practices• Execute a feasibility study• Hold a corporate innovation tournament• Innovate by the customer experience• Optimize marketing activities in innovation
You can find more details about our consultation services in our other catalog Consulting and Implementation.
28
Mr. Courtemanche is a graduate of Polytechnique Montréal with a degree in Mechanical Engineering and holds a Master’s in Technology and Innovation Management from the same institution. For his Master’s theses, he focused on the Design of an Innovating Organization. Additionally, Mr. Courtemanche remains actively involved at Polytechnique Montréal. He has been teaching new product, services, and process development at the Master’s and Doctoral levels since January of 2016.
In addition to his university degrees, Mr. Courtemanche is also a certified professional in new product development (NPDP) from the Product Development & Management Association (PDMA). The organization is universally recognized as being the gold standard in innovation management and new product development.
At Permacon, the most innovative division of Oldcastle Architectural, the North American leader in architectural concrete products, he managed the new product introduction process. He notably structured the process by equipping it with several management tools including one focusing on organizational innovation capacity. His professional contributions have added up to several millions of dollars generated by the introduction of more than 100 new products. His meticulousness and quality of work have been recognized at the highest levels in Canada and the United States, so much so that the new product introduction process from Canada is by far a reference concerning the best practices in innovation management. In this respect, Mr Courtemanche has been recruited to help his peers in the United States to implement the tools and practices he developed and refined.
At Bauer Hockey, the leader in hockey equipment, he gained significant experience in executing the new product development process, particularly with the steps going from conception to the start of production. In addition, he developed and transferred several processes and quality control equipment systems to Asia.
Mr. Courtemanche advises companies in their management and execution of innovation activities. His expertise covers defining a successful innovation strategy, evaluating organizational innovation capacity, managing innovation projects, evaluating innovation process performance, and bringing new products to market.
For more information, please refer to his Linkedin profile located at www.linkedin.com/in/samuelcourtemanche
[email protected] Office: +1 (514) 375-2472 #101 Cellphone: +1 (514) 569-5691
Samuel Courtemanche, Manager Eng., M.Eng., NPDP
Mr. Courtemanche has more than seven years experience in new product introduction and innovation management with companies who are leaders in their field.
29
Dave Caissy, Managing Partner Eng., M.Eng., NPDP, PMP, CPM, CPMM
Innovation ExpertUnder the management of Mr. Caissy, Audax Innovation actively advises companies of all sizes on all aspects of innovation management, from improving operational processes to developing effective strategies.www.audax-innovation.com
President of the Innovation Leaders ClubMr. Caissy presides and leads the Innovation Leaders Club, a small, but elite club comprised of leaders from close to 200 of the most innovative companies in Europe and Canada. The Club brings together innovation leaders who want to discuss their current reality and their previous innovation management experiences with their peers in a friendly, informal setting, with a view to sharing knowledge and best practices.www.innovationleaders.club
Speaker, trainer and coachKnown as a national and international expert in his field, Mr. Caissy is a highly sought-after speaker and trainer. He also coaches many innovation leaders so they reach their professionnal goals. Additionally, Audax Innovations offers toolboxes and training that facilitate the adoption of best innovation management practices.www.toolbox4.com
Mr. Caissy advises international businesses on how to improve their innovation management performance level through the implementation of effective business processes and strategies. Over the past 20 years, Mr. Caissy has earned a solid reputation in the industry, in addition to teaching at several graduate institutions in Canada and in Europe.
His listening skills and his ability to influence innovation-related organizational changes have earned him numerous recommendations from his clients. An international expert in innovation leadership, Mr. Caissy is a popular speaker in many countries and is often quoted in the media. For more information, please refer to his LinkedIn profile at www.linkedin.com/in/[email protected] Office: +1 (514) 375-2472 #106 Cellphone: +1 (514) 605-5845
Audax Innovation’s business model is built along the following services continuum
Innovation Leaders Club
CoachingTrainings
ConsultingImplementation
30
Increased the sales of new products (less than 3-years-old) from 6.5% in 2004 to 23% in 2009, while significantly increasing profit margins.
Increased the number of hours dedicated to R&D by 220% in less than 6 months with the same resources.
Increased the number of hours spent on front-end of innovation by 450% in less than one year with the same resources.
INNOVATION MANAGEMENT ACHIEVEMENTS
THEY TRUST US
Audax Innovation also has several trustworthy partners; Please find below a list of our partners as well as their fields of expertise.
PARTNERS
Financing of R & D Industrial design Market research
Internet of things Strategic planning Intellectual property
Operational excellence
FIELDS OF EXPERTISE
QE-20J17L