Paul Scherrer Institut • 5232 Villigen PSI Page 1/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 1 - V3.2 [email protected]

Bml upgrade

INFOBOOK

Emergency phone#

3333

SLS control room

5503

Paul Scherrer Institut • 5232 Villigen PSI Page 2/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 1 - V3.2 [email protected]

MS Beamline X04SA upgrade

INDEX

1. IMPORTANT PHONE NUMBERS ................................................................................................................... 1-5

1.1. MS BEAMLINE X04SA .................................................................................................................................. 1-5

1.2. SERVICES ....................................................................................................................................................... 1-6

1.3. SLS OPERATION SUPPORT ............................................................................................................................. 1-8

2. EMERGENCY ORGANIZATION .................................................................................................................... 2-9

2.1. RADIATION PROTECTION ............................................................................................................................. 2-10 2.2. SAFETY AT MS BEAMLINE X04SA .............................................................................................................. 2-11 2.3. GAS AND FIRE ALARM ................................................................................................................................. 2-12

3. GENERAL SPECIFICATIONS ....................................................................................................................... 3-13

3.1. GENERAL DESCRIPTION AND SPECIFICATIONS ............................................................................................. 3-13

3.2. BML LAYOUT .............................................................................................................................................. 3-13

3.3. POWDER DIFFRACTION (PD) ........................................................................................................................ 3-14 3.4. IN-SITU SURFACE DIFFRACTION (SD) ........................................................................................................... 3-15

4. COMPUTER, RACKS, PORTS ....................................................................................................................... 4-17

4.1. COMPUTER .................................................................................................................................................. 4-17

4.2. RACKS ......................................................................................................................................................... 4-18 4.3. SERIAL PORT CONNECTIONS (RS-232-C) .................................................................................................... 4-19 4.4. SOFT-IOC .................................................................................................................................................... 4-20

5. CHECKLISTS .................................................................................................................................................... 5-21

5.1. TROUBLESHOOTING ..................................................................................................................................... 5-22

6. UPGRADE PLANNING .................................................................................................................................... 6-27

6.1. SUMMARY ................................................................................................................................................... 6-27

6.2. COMMENTS ................................................................................................................................................. 6-28

6.3. BUDGET ....................................................................................................................................................... 6-28

6.4. ABLAUF ....................................................................................................................................................... 6-29

6.5. PROJEKTPLAN .............................................................................................................................................. 6-37

6.6. BESTELLUNGEN ........................................................................................................................................... 6-38

6.7. ARBEITEN IM MS SHUTDOWN ..................................................................................................................... 6-39 6.8. SHUTDOWN – PLANUNG OKTOBER 2010 – JUNI 2011 .................................................................................. 6-40

6.9. K ICK-OFF MEETINGS .................................................................................................................................. 6-41

7. BEAMLINE OVERVIEW ................................................................................................................................ 7-45

7.1. DISTANCE LIST ............................................................................................................................................ 7-47

7.2. STRAHLENSCHUTZ SU ................................................................................................................................. 7-48

7.3. LN2 CLOSED-LOOP SYSTEM ......................................................................................................................... 7-49 7.4. ALARMS ...................................................................................................................................................... 7-58

7.5. CONTROL HUTCHES ..................................................................................................................................... 7-64

7.6. VENTILATION .............................................................................................................................................. 7-64

7.7. AIR DEHUMIDIFIER ...................................................................................................................................... 7-65

7.8. SPARE PARTS ............................................................................................................................................... 7-65

7.9. PEARL.......................................................................................................................................................... 7-66 7.10. VERKABELUNG / DEVICELIST ...................................................................................................................... 7-68 7.11. BERECHNUNGEN.......................................................................................................................................... 7-69

7.12. VERMESSUNG .............................................................................................................................................. 7-70

8. SAFETY SYSTEMS (LAC, MIS, EPS, CVS) .................................................................................................. 8-71

Paul Scherrer Institut • 5232 Villigen PSI Page 3/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 1 - V3.2 [email protected]

8.1. LAC LOCAL ACCESS CONTROL ................................................................................................................ 8-71 8.2. MIS ............................................................................................................................................................. 8-76 8.3. EPS ............................................................................................................................................................. 8-81 8.4. CVS .......................................................................................................................................................... 8-100

9. BEAMLINE OPERATION ............................................................................................................................. 9-101

9.1. MOTORS .................................................................................................................................................... 9-102

9.2. ENCODER................................................................................................................................................... 9-104

9.3. BEAMLINE GUI (GRAPHICAL USER INTERFACE) ........................................................................................ 9-105

9.4. X04SA LAUNCHER.................................................................................................................................... 9-108

9.5. COMMANDS ............................................................................................................................................... 9-110

10. UNDULATOR U14 (CPMU) ......................................................................................................................... 10-111

10.1. CHANNELS............................................................................................................................................... 10-113

10.2. ID CONTROL ........................................................................................................................................... 10-114

10.3. STRIP CHARTS .......................................................................................................................................... 10-117

10.4. BILDER VOM EINBAU (5.1.2011) ............................................................................................................. 10-120

11. FRONT END .................................................................................................................................................. 11-121

11.1. GATE VALVES .......................................................................................................................................... 11-124

11.2. MASK ...................................................................................................................................................... 11-125 11.3. BPM 1 ..................................................................................................................................................... 11-127 11.4. PUMPING CHAMBER ................................................................................................................................. 11-127

11.5. PHOTON SHUTTER .................................................................................................................................... 11-128

11.6. GATE VALVES (ALL METAL , FAST) ........................................................................................................... 11-129 11.7. BEAM STOPPER ........................................................................................................................................ 11-130

11.8. BPM 2 ..................................................................................................................................................... 11-131 11.9. DIAPHRAGM ............................................................................................................................................ 11-132

11.10. CVD FILTER ....................................................................................................................................... 11-132

11.11. CVD WINDOWS .................................................................................................................................. 11-132

12. OPTICS ........................................................................................................................................................... 12-133

12.1. COMPONENTS .......................................................................................................................................... 12-133

12.2. FSX CHAMBER (FILTERS, SLITS, XBPM)................................................................................................ 12-137 12.3. GATE VALVE 1…3 ................................................................................................................................... 12-142

12.4. MONOCHROMATOR ................................................................................................................................. 12-143

12.5. BSB (BREMSSTRAHLBLOCKER) ............................................................................................................... 12-162 12.6. 4QM2 ...................................................................................................................................................... 12-163 12.7. M IRROR ................................................................................................................................................... 12-164

12.8. SI3N4 - WINDOW ...................................................................................................................................... 12-176

12.9. 4QM3 ...................................................................................................................................................... 12-178 12.10. STATION SHUTTER .............................................................................................................................. 12-179

13. EH1 EXPERIMENTAL HUTCH 1 ............................................................................................................ 13-181

14. EH2 EXPERIMENTAL HUTCH 2 ............................................................................................................ 14-183

15. SUNDRY ......................................................................................................................................................... 15-185

15.1. WEBCAM ................................................................................................................................................. 15-185

15.2. V IDEOSERVER ......................................................................................................................................... 15-186

15.3. WEBCAM VIEWER .................................................................................................................................... 15-187

16. ARCHIVER .................................................................................................................................................... 16-189

17. APPENDIX .......................................................................................................................................................... 190

Paul Scherrer Institut • 5232 Villigen PSI Page 5/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 2 - V3.2 [email protected]

1. Important phone numbers Direct dial from outside PSI +41 56 310 xx xx Switchboard 111 PSI Emergency Number 3333 Sicherheitszentrale (SIZ) / Safety HQ 2600 User Office 4666 Entry Passes (Interflex) 2601 [email protected] Securitas (night watch, badge etc. at off-hours) 8350 Dosimetry (West) 3305 Reception West 3221 Control Room Mobile operator 5503 SLS 5500 WBGB/135 Control Room 3301 / 3302 SLS Pikett http://abk.web.psi.ch/operation/plan/pikett.php

1.1. MS Beamline X04SA Control Hutch 1 5082 Control Hutch 2 5083 Optics hutch 5081 BL Mobile 5085 Willmott Philip Beamline Manager / SD 5126 Cervellino Antonio Powder Diffraction 4611 Casati Nicola Powder Diffraction 5346 Lange Michael BL Technician 4537 Meister Dominik BL Engineer 5123 Wang Xiaoqiang Software/Controls 3380 Evans, Shaun Postdoc PD 3114 Leake Steven Postdoc SD 3615 Schmitt Mathilde PhD SD 4536 Kalichava Irakli PhD SD 5025 Cancellieri Claudia Postdoc SD 5689 Schmitt Bernd Detector Group 2314 Bergamaschi Anna Detector Group 3227

Paul Scherrer Institut • 5232 Villigen PSI Page 6/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 2 - V3.2 [email protected]

1.2. Services SU Mohr Dieter 4069 Amrein Beat 4353 SU-System Harm Christine 3358 Lüscher Roland 9645 Electricity Muser Marco 5876 Fichte Werner 4083 Knill Daniel 5357 EPS Lüscher Christian 3039 MIS Speckert Stefan 3395 LAC … Staudenmann Stefan 3737 Controls, EPICS Wang Xiaoqiang 3380 Gabadinho Jose 5518 CiTy Inventory Hämmerli Fabian 5594 Vacuum Bieri Theo 5106 Steinacher Martin 5107 Schulz Lothar 4532 Pfeiffer Vacuum Zehnder Walter 079 677 04 54 WBGA/B12 Knecht Rolf 3250 Kst 8861 Water cooling Strittmatter Michael 3035 Käslin Gabriel 5361 Air pressure Kramer Christian 5803 Sektion Prozesskühlung Weber Andre 3747 Müller Dominik 3073 Ventilation Bondt Silvio 2952 Air dehumidifier Stanek Heinz 2835 LN2 Lucy Didier 3567 Geiselhart Christian 4531 Liquid Helium Schraner Reto 4105 WKSB U14 Schmidt Thomas 4592 Brügger Marc 5470 Danner Steffen 2704 Front End Hoechli Klemens 5920 BPM Krempasky Juraj 5131 SLS Crane Erdin Alois 5915 Fischer Hans 5903 Nguyen Thanh Lai 5908

Paul Scherrer Institut • 5232 Villigen PSI Page 7/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 2 - V3.2 [email protected]

Forklift driver West Schoch Patrick 5910 (Gnädinger Adrian 5904) Security officer SLS Zehnder Elmar 3074 Honegger Juri 4601 Pixel Detector Schmitt Bernd 2314 Computer Helpdesk 8400 Higgs Colin 2062 Bindschädler Felix 3960 [email protected] Windows Dominik Meister 5123 Linux Kapeller Rene 2397 Printer Bolliger Robert 3624 Hallendienst Baumann Ernst 4650 Hausdienst Äschbacher Roland 5966 Guesthouse 3222 PSI Ausfuhr / Zoll … 2913 afd.web.psi.ch/Einkauf/zoll.html WLGA Labor WLGA/224 4251 Hausdienst Äschbacher Roland 5966 Gas Pikett Melchers Karl-Heinz 2297 Gasüberwachung Sutter-Lerf, Josef 5463 (alt Gisel Eduardo) SLGas R. Berger 062 886 41 46 Gasanschlüsse … (alt: Läuchli Heinz) Elektro Installation Käch René 3074 Firma Jenny Köpfer Thomas 2987 WC Anlage Dieterle Helmut 5658

Paul Scherrer Institut • 5232 Villigen PSI Page 8/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 2 - V3.2 [email protected]

1.3. SLS Operation Support http://www.psi.ch/sls/people Labor officer Department Head Gabriel Aeppli, Prof. Dr. 4232 LSY B Oliver Bunk 3077 LSY C Frithjof Nolting 5111 LSY K Jeroen van Bokhoven 5046 Beamline Managers http://www.psi.ch/sls/people#Beamline_Managers Not updated

Beamline BL wireless

BL phone

Cellphone 1

Cellphone 2

Beamline responsible

Technician

X01DC-IR P. Lerch 3231 ???

X02DA-TOMCAT 5192 M. Stampanoni 4724 G. Mikuljan 5446

X03MA-ADRESS V. Strokov 5131 M. Kropf 5961

X03 -PEARL M. Muntwiler 5138

X04SA-MS 5085 5082, 5083 Ph. Willmott 5126 D. Meister 5123

X04DB-VUV T. Gerber 2475 P. Hemberger 3265

X05LA-MicroXAS 5053 D. Grolimund 4782 B. Meyer 5186

X05LA-FEMTO 5053 G. Ingold 2665 A. Oggenfuss 3175

X05DA-Diagnostik 5127 V. Schlott 4237

X05DB-Optik U. Flechsig 4535 S. Spielmann 2476

X06SA-PXI 5080 5077 079 387 0529 079 387 0542 M. Wang 4175 C. Pradervand 4357

X06DA-PXIII M. Wang 4175 R. Schneider 5136

X07MA-XTREME C. Piamonteze 5855 J. Honegger 4601

X07MB-Phoenix 5293 079 820 3318 M. Janousch 2712 R. Wetter 5174

X07DA-PolLux 5474 5475 J. Raabe 5193 B. Sarafimov 5306

X07DB-nanoXAS J. Raabe 5193

X09LA-SIS 5979 5089 079 385 0471 079 385 0478 L. Patthey 4562 F. Dubi 2575

X09LA-XIL 5027 H. Solak 4279 M. Kropf 5961

X10SA-PXII 5370 M. Fuchs 5455 R. Schneider 5136

X10DA-SuperXAS 5056 M. Nachtegaal 3056 M. Lange 4537

X11MA-SIM 5978 079 385 0420 079 385 0450 F. Nolting 5111 M. Schmidt 5175

X11MA-RESOXS U. Staub

X12SA-cSAXS 5845 5844 079 343 9230 A. Menzel 3711 X. Donath 3211

Paul Scherrer Institut • 5232 Villigen PSI Page 9/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 3 - V3.2 [email protected]

2. Emergency Organization Notfallorganisation NFO INTERNAL EMERGENCY PSI Emergency Number 3333 Safety HQ (Sicherheitszentrale SIZ) 2600 Doctor, Ambulance, Swiss Air-Rescue Radiation Protection 8707 First Aid 8333 Dosimetry 3305 Electrical Engineering 8880 Control center (accelerator) 3301 Control center (SLS) 5500 EXTERNAL EMERGENCY Police 117 Fire department 118 Medical 144 REGA 1414 Appendix L: Notfallorganisation (NFO) des PSI (AW-NFO-98-01)

Paul Scherrer Institut • 5232 Villigen PSI Page 10/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 3 - V3.2 [email protected]

2.1. Radiation protection Strahlenschutzbestimmungen Information services.web.psi.ch/safety PSI West, Safety Sheets services.web.psi.ch/safety/safetysheet.shtml Strahlenüberwachung Areal-West https://intranet.psi.ch/ASI/West Sektion Betriebsstrahlenschutz asi.web.psi.ch/bss9640 PSI West Dieter Mohr 4069 Beat Amrein 4353 Dosimetriestelle Leitung M. Boschung 4104 Büro PSI-West Pfeifer Sabine 3305 Sicherheitszentrale (SIZ) PSI Loge Ost 2600 Safety HQ Andreas Gertsch 2993 Notfall-Organisation (NFO): Leitung M. Brotschi 2993 SU Tagespikett Areal West 8707

Beam monitor in optics hutch

Paul Scherrer Institut • 5232 Villigen PSI Page 11/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 3 - V3.2 [email protected]

2.2. Safety at MS Beamline X04SA Safety Procedures: sls2.web.psi.ch/view.php/beamlines/ms/safecont/index.html Dosimeter: Do not enter the hutches (EH1, EH2 and Optics) without dosimeter. OP and EH doors: Always close the door slowly but firmly to activate the magnetic switch on the door. Chicanes: Do NOT remove the chicanes without to

contact the SU Experimental Chicanes: The keys to open the chicanes can

you find on the LAC panels. Safety search: You have to press each button during the safety search

(optics hutch - 2x, EH1 - 3x, EH2 - 2x)

To ensure that nobody is left in the hutch(es), do the safety search by pressing all three safety buttons in the hutch.

Paul Scherrer Institut • 5232 Villigen PSI Page 12/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 3 - V3.2 [email protected]

2.3. Gas and fire alarm Gas monitoring X04SA-KIMESSA3:Aussen-O2 bei LN2 Anlage X04SA-KIMESSA3:Blei_EH_2-O2 EH1 X04SA-KIMESSA3:Blei_EH_3-O2 EH2 X04SA-KIMESSA3:Tunnel_U14-O2 im Tunnel beim U14 Adjustment of the Oxygen-surveillance The levels of the oxygen-alarm have been changed. New the alarm will be triggered when the oxygen level falls below the following values. Pre-alarm: 18% Main-alarm: 17% Behavior in case of gas and fire alarm

More information: Coordination Lightsource web intranet.psi.ch/SLS_Tech_Coord/WebHome

Paul Scherrer Institut • 5232 Villigen PSI Page 13/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 4 - V3.2 [email protected]

3. General specifications http://www.psi.ch/sls/ms/ms Energy range 5 - 40 keV Theoretical Flux (10 keV) 1013 ph/s/0.4 A Focused spot size 160 µm x 32 µm (1:1 focussing)

3.1. General description and specifications The MS beamline is presently undergoing an upgrade to produce a high flux of hard X-rays from an undulator source, U14. A detailed technical description of the beamline when served by the previous ID, the W61 wiggler, can be downloaded here.

3.2. Bml Layout

Paul Scherrer Institut • 5232 Villigen PSI Page 14/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 4 - V3.2 [email protected]

3.3. Powder diffraction (PD) - http://www.psi.ch/sls/ms/powder-diffraction - Documentation: Infobook EH1 PD.doc Powder diffraction is performed in Experimental Hutch 1 (EH1). Responsible scientists are Antonio Cervellino and Nicola Casati. The MS Powder diffractometer has three coaxial independent angular motions, one for the sample (or sample environment) and the remaining two for independent detector systems: - A multicrystal-analyzer detector - A unique solid-state silicon microstrip detector, called MYTHEN (Microstrip sYstem for

Time-rEsolved experimeNts), an outstanding in-house PSI detector group development (Bernd Schmitt, group leader and Anna Bergamaschi, MYTHEN II development).

The second generation microstrip detector, MYTHEN II, consists of 30,720 Si-detector elements (50 micron strips, each subtending 4 x 10-3degrees). The total subtended angle is 120o. The multicrystal analyzer detector is the appropriate choice for ultra-high-resolution studies (better than 2 mdeg FWHM in 2θ) and anomalous scattering XRPD experiments, whereas MYTHEN is particularly suitable for time-resolved in-situ non-ambient XRPD and applications to the study of radiation sensitive materials, like organic compounds. MYTHEN is also ideal for Industrial Applications of XRPD , particularly in the field of pharmaceuticals. At the MS-PD station it is also possible to perform SR-XRPD experiments in combination with neutron PD experiments, the latter performed at the PSI Neutron facility SINQ facility. Once a year, users can submit joint XRPD and neutron-PD proposals via the so-called X-rays and neutrons (x+n) channel and if the proposal is accepted, the joint X+n beamtime allocation is coordinated by the SLS and SINQ beamline scientists (Fabia Gozzo and Antonio Cervellino at the SLS-MS and Denis Sheptyakov and Vladimir Pomjakushin at SINQ) so to sequentially perform the experiments. The joint X+n user operation is still a pilot project and, therefore, it is presently limited to crystallographic applications and only involves the SLS-MS beamline Powder Station and the SINQ HRPT laboratory. Upon user request, this new user operation access could eventually involve more laboratories and be extended to any synchrotron and neutron application.

Paul Scherrer Institut • 5232 Villigen PSI Page 15/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 4 - V3.2 [email protected]

3.4. In-situ surface diffraction (SD) - http://www.psi.ch/sls/ms/surface-diffraction - Documentation: Infobook EH2 SD.doc In-situ surface diffraction is performed in Experimental Hutch 2 (EH2). The heart of the station is a large 2+3-circle surface diffractometer from Micro-Controle Newport, with two circles for the sample and three for the detector, plus a hexapod for precise alignment of the sample surface relative to the diffractometer axes. The diffractometer can be operated in two modes, either with a vertical, or a horizontal sample surface orientation. The detector system is the PILATUS II novel photon-counting 2-D pixel detector, consisting of 486 x 195 pixels, each pixel subtending 0.0086o x 0.0086o. It also provides unsurpassed signal-to-noise ratios due to its zero electronic background noise, and has an excellent point spread function. The present maximum frame rate is 200 Hz. Typical surface diffraction experiments include recording crystal truncation rods, superstructure rods, reflectivity curves, in-plane diffraction, grazing-incidence small-angle scattering experiments, and time-resolved studies.

Paul Scherrer Institut • 5232 Villigen PSI Page 17/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 5 - V3.2 [email protected]

4. Computer, Racks, Ports Twiki from Xiaoqiang Wang: controls.web.psi.ch/cgi-bin/twiki/view/Main/X04SATasks Webpage from David Maden: www.sls.psi.ch/beamlines/x04sa/index.php3 How to start see 4S-checklists.

4.1. Computer Control hutch 1 PC8556 x04sa-cons-3 x04sa / MS SL6 MPC1781 x04sa-cons-1 x04sa / MS SL6 PD Control-PC MPC1268 x04sa / SLS_user Win7 32bit Control hutch 2 PC11901 SD Control-PC PC7618 x04sa-ms-1 x04sa / SLS_user Win7 Media-Station PC10187 x04sa-cons-2 x04sa / MS SL6 SD Control-PC (- 6.11.2015) PC7264 x04sa-cons-4 x04sa / MS SL6 PC7197 x04sa-cons-6 x04sa / MS SL6 PC5888 Pilatus pixel detector PC8211 x04sa / MS SL6 Laptop Webcam EH1 x04sa-cam-1 129.129.104.63 user: admin Pw: … EH2 x04sa-cam-1 129.129.104.62 user: admin Pw: … EH2 129.129.104.77 user: admin Pw: … Videoserver chapter 15.2 Sundry Bml Network: 129.129.104. ... Proxy Server: http://nedi.web.psi.ch/proxy.pac Public operator account: \\x04sa-fs-1.psi.ch\x04sa_public PSI scratch: \\scratch0\scratch ftp: ftp.psi.ch Printer: WSLA_X04SA Xerox GPD PS V2.1 / Phaser6280DN (IP: 129.129.104.20) Color, Duplex, A4, Xerox Phaser 6280DN, WSLA_X04SA Toner: PSI Lager 25.103.0993 (black) WLGA/224 PC9391 Win7 PC4016 Linux PC7251 SL6 64bit

Paul Scherrer Institut • 5232 Villigen PSI Page 18/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 5 - V3.2 [email protected]

4.2. Racks WSLA.35.0.51 FE, MIS, Vacuum, FCS WSLA.37.0.53 OP, Motor, Encoder WSLA.37.0.52 Motor, WSLA.37.0.54 OP Vacuum WSLA.37.0.55 EPS WSLA.38.0.52 ES2 WSLA.38.0.51 ES2 PD WSLA.38.0.56 LAN WSLA.39.0.52 ES3 SD

VME crates OP, ES2, ES3, PLD To reboot see checklists intranet.psi.ch/MSBL/BmlManuals

WSLA.35.0.51

WSLA.37.0.51...56

FE

OP ES2

ES3

Paul Scherrer Institut • 5232 Villigen PSI Page 19/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 5 - V3.2 [email protected]

4.3. Serial Port Connections (RS-232-C) Powder Diffractometer - Serial Ports There are 8 RS-232-C serial ports available on the Powder Diffractometer VME crate, X04SA-VME-ES2, located in rack WSLA.38.0.51. They consist of 8 RJ-45 connectors in the back of the rack. The ports and their settings are as follows: Port Device Baud Data Bits Stop Bits Parity 1 (0) Lakeshore 331 (Cryostat) 9600 7 1 Odd 2 (1) - 3 (2) Cryojet temp controller 9600 8 2 None 4 (3) Cryojet Auto-fill 9600 8 2 None 5 (4) Oven (Stoe, MRI) 19200 7 1 Even 6 (5) - 7 (6) - 8 (7) - Surface Diffractometer - Serial Ports There are 8 RS-232-C serial ports available on the Surface Diffractometer VME crate, X04SA-VME-ES3, located in rack WSLA.39.0.51. They consist of 8 RJ-45 connectors in the back of the rack. The ports and their settings are as follows: Port Device Baud Data Bits Stop Bits Parity 1 2 Cryojet temp controller 9600 8 2 None 3 Cryojet Auto-fill 9600 8 2 None 4 Newport Controller 1 9600 8 1 None 5 Newport Controller 2 9600 8 1 None 6 Newport Controller 3 9600 8 1 None 7 Cryostat Lakeshore 9600 7 1 Odd 8 -

Paul Scherrer Institut • 5232 Villigen PSI Page 20/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 5 - V3.2 [email protected]

4.4. Soft-IOC X04SA-PC-ALARM X04SA-SOFTIOC R3.14.12 50004

X04SA-PC-EPS X04SA-SOFTIOC-EPS R3.14.12 50001

X04SA-PC-FILTER X04SA-SOFTIOC R3.14.12 50006

X04SA-PC-GES X04SA-SOFTIOC R3.14.12 50002

X04SA-PC-Hexapod X04SA-CONS-2 R3.14.12 50001

X04SA-PC-MYTHEN X04SA-SOFTIOC R3.14.12 50007

X04SA-PC-PDCAM X04SA-CONS-1 R3.14.12 50001

X04SA-PC-ROBO X04SA-SOFTIOC R3.14.12 50001

X04SA-PC-SDCAM X04SA-CONS-6 R3.14.12 50001

X04SA-PC-SOFT X04SA-SOFTIOC R3.14.12 50005 See https://inventory.psi.ch/hosts/hostSoftIocList.aspx

Paul Scherrer Institut • 5232 Villigen PSI Page 21/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 6 - V3.2 [email protected]

5. Checklists https://intranet.psi.ch/pub/MSBL/WebHome/4S_Checklists.pdf Index Before a Proposal period 6 months After a shutdown staff Before an experiment – General staff Before an experiment – Powder Diffraction staff Before an experiment – Surface Diffraction staff Before a run user During a run user After a run user

Paul Scherrer Institut • 5232 Villigen PSI Page 22/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 6 - V3.2 [email protected]

5.1. Troubleshooting The Photon shutter is closed and cannot be opened: 1. Check Machine status on the Operation Info Panel

Launcher / Operation Info Panel 2. Check the GUI Beamline Overview

Launcher / Beamline Overview 3. Check Optics overview

Launcher / Optics Overview 4. On the LAC panels

is the green shutter enable external LEDs lit? 5. Check the Machine Interlock System GUI (the text should be blinking):

Launcher/ Beamline Overview - MIS Details 6. Check the Photon shutter GUI Operator enable and BL enable

Launcher / FE / Photon shutter 7. Check the EPS – VME communication (the text should be blinking):

Launcher / Beamline Overview - EPS Details 8. Check the EPS GUI:

alarm message: cooling, temperature, valves, vacuum 9. Check the vacuum gauges:

vacuum FE, OP (FSX, MO, MI) 10. Check the ion getter pump controllers

controller FSX, MO, MI are running 11. Check Mono turbo pump 12. Check the LN2 closed-loop

Launcher / Optics overview / U14-More / CC Graphic

Paul Scherrer Institut • 5232 Villigen PSI Page 23/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 6 - V3.2 [email protected]

Procedure to open the photon shutter 1. Optics overview start water cooling pump 2. open cooling valve 3. open all vacuum valves 4. open EH1:VG1 valve 5. Operation Info Panel: set to ATTENDED 6. Close optics door safety search, close and lock door at the LAC panel 7. LAC: open Photon Shutter 8. Check BL overview and Operation Info Panel 9. Check that the U14 closes 10. Search the experimental hutch(es), and close and lock the hutch doors

set EH1 and EH2 Station shutter to ENABLE

If the LAC panel shows an alarm: • Did you press each button during the safety search (optics hutch – 2x, EH1 – 3x, EH2 – 2x)? • Always close the door slowly but firmly to activate the magnetic switch on the door. • Try to reset the alarm: simultaneously press the buttons [SAFETY SEARCH confirm] +

[LOCK enabled] + [OPEN enabled] (A reset may be necessary at all three doors: Optics, Powder Diffraction and Surface Diffraction.)

Paul Scherrer Institut • 5232 Villigen PSI Page 24/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 6 - V3.2 [email protected]

Cannot find beam • Open GUI Optics Overview

Launcher / Optics Overview • Check that each shutter, filter and slits are open and the U14 is closed.

Photon shutter; optics slits; optics filter; vacuum valves; station shutters, EH1 slits; experimental shutters, filters and slits, fast shutter

• Check vacuum, water cooling and temperatures • LN2 closed-loop: level, temperature, pressure • Set a correct energy (between 5-40keV) • Use the 3 XBPM to check beam after FSX (4QM1), Mono (4QM2) and Mirror (4QM3)

Optics overview / 4QM … • Rock second crystal (MOX2:ROX) • Rock Mirror 2 using the mirror GUI to move the beam in vertical direction No signal on ionization chamber • Check connection: are the cables (HV and signal) correctly connected? • Set the Voltage at 1000V for N2 and 700V for Helium. • Is the N2 or He Gas flowing? • Is the Ionization chamber in beam position? • Check with green paper before the Io. • Change the sensitivity to a lower value. EPS crash (communication doesn’t work) You have to reboot the EPS Before you do anything on the EPS settings close the photon shutter. Cooling failure • Start water cooling pump on GUI Optics Overview • Open cooling valves • Open vacuum valve If the water pump shuts off again within 2 minutes, try again to start from the GUI otherwise you have to set the water pump to hand mode. (Rack 37.0.55) Vacuum failure • Open GUI Optics Overview, check vacuum values

Launcher / Optics Overview • Check values and limits on vacuum maxi gauge • Ion Getter Pump controllers are ok? • Is the turbo pump on mono working? Check Mono vacuum and valves

Launcher / Optics Overview - Mono TP

Paul Scherrer Institut • 5232 Villigen PSI Page 25/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 6 - V3.2 [email protected]

Motor doesn’t move • Open the debug GUI and check values. • Try STOP – PAUSE – MOVE – GO. • Switch on the enable button (direct under the GO button). • Check if possible the cable connection and motor driver is working (switch). • Check the settings values. • For more information see SLS SYNTRONICS intranet.psi.ch/SYNTRONICS/WebHome If this troubleshooting doesn’t help, you are able to contact the control room or somebody from the MS Bml group • Control room 5503 • Safety HQ 2600 https://intranet.psi.ch/MSBL/WebHome

Paul Scherrer Institut • 5232 Villigen PSI Page 27/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6. Upgrade planning

6.1. Summary Start MS upgrade shutdown 21.10.2010 - Offene Arbeiten: Bml upgrade Arbeiten 20100813.doc - Meeting 22.3.2011 - see file MSmeeting20110322.doc Front End Qianhong Chen, Rolf Wullschleger - BPM 1 + 2 - Diaphragm - Photon shutter - Station shutter - CVD filter + window Optics - XBPM Claude - FSX (filter, slit, XPM) Dominik - Mono Cinel - Mirror AMI (Stephan Maag ,Daniel Rossetti, Reto Oberli,

Markus Vittins) - Station shutter - BSB SU, Dominik EH1 - PD station verschieben? - Höhe verstellen an allen Komponenten auf 1420mm EH2 - Höhe verstellen auf 1420mm - SD Höhe, geht das noch ohne zu unterlegen? Ordner: - Mono - Mirror, BPM - Upgrade allgemein - FSX chamber File system: - https://intranet.psi.ch/MSBL/BmlUpgrade - alle Files auf \\fs02\6310\6311\Bml upgrade

Paul Scherrer Institut • 5232 Villigen PSI Page 28/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.2. Comments 6.2.1. XBPM Besprechung mit Claude am 27.1.2011 - 2 Stk. XBPM von Claude für „white beam“ bis März 2011 - Grösse large: - 1 Stk. Bestellen von Dectris - XPM weitere Infos im Sommer 2011 Embedded EPICS Server Box : X04SA-PC-4QM http://x04sa-pc-4qm/ user: root pw: …

6.3. Budget Excel file: Budget.xls U14 ??? (2'000'000.-) Frond End 160'000.- Optics (Mono, LN2) 700'000.- EH1, EH2, Sundry 75'000.- Grosse Bestellungen - Mono - U14 - LN2 -

Paul Scherrer Institut • 5232 Villigen PSI Page 29/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.4. Ablauf Fehlermeldungen vom Kontrollraum chapter 7.4 6.4.1. 2015 Hexapod Service, neuer Controller 10.7.2015 Mono X2: „alter“ Aufbau wieder eingebaut 26.3.2015 SD Hexapod: Ausstausch Power Supply (LPQ252) 18.3.2015 Air Pressure: Ausstausch 2 Sensoren (Pumpe, EH1) 12.3.2015 SD Hexapod: Controller bootet selbstständig 10.3.2015 Mono X2: Motor 1 funktioniert nicht!!! 9.3.2015 SD Gamma emergency brake: neu initialisieren und home 26.2.2015 Eine Unterlagscheibe lag innerhalb der Endschalter “End of travel“ Schiene Die Gummimatte ist reingerutscht und hat den Sensor ausgelöst 27.2.2015 LN2 CC Phasentrenner Druck reduziert (~0.3bar) 11.2.2015 Mono nochmals geöffnet, Motor 2 leicht justiert 30.1.2015 Pumpen über Wochenende ohne Ausheizen Mono kühlen 16.1.2015 Abkühlen U14 14.1.2015 LN2 CC: Austausch Einlauf Phasentrenner 13.1.2015 Mono Bake-out 140°C 12.1.2015 Mono: Reparatur Y1 Encoder 7.1.2015 Mono X2: Einbau neuer Kristallhalter 6.1.2015

Paul Scherrer Institut • 5232 Villigen PSI Page 30/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.4.2. 2014 LN2 CC: Heizung Abgasventil verursacht Kurzschluss 10.10.2014 LN2 CC: Einlaufkopf Iso-Vac defekt 1.10.2014 Neuen bestellt SD: Power Supply vom XPS-1 defekt 11.7.2014 Wasserkühlung: Bei Fehler an einem Drucksensor umschalten auf Hand 5.5.2014 LN2 CC: Sinterdüse gereinigt. Ablassventil ausgewechselt 23.4.2014 LN2 CC: Pumpe 55Hz, Rücklauf U14 auf 8.5 11.4.2014 U14 Einbau 25.2.2014 Abkühlen U14 27.2.2014 Mono warm-up 4.2.2014 U14 defekt. CuNi-Folie gerissen 2.2.2014 Ausbau, kein Strahl bis April!!! Mirror Bender: limit switch TR3D 0.64, TR3U kein limit (bis 0.85) 20.1.2014 LN2 CC Abkühlen Mono 17.1.2014 LN2 CC Abkühlen U14 16.1.2014

Paul Scherrer Institut • 5232 Villigen PSI Page 31/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.4.3. 2013 Abschalten während Ferien 23.12.2013 Rack OP EH1 EH2, Lüftung, Monitore In Betrieb: Kontroller LN2, EPS, Rack FE, Linux-PC’s LN2 CL: Aufwärmen von Mono und U14 23.12.2013 Gasdruck 1bar im closed-loop PD: Stromausfall Rack 17.12.2013 WLGA/224 Wasserleck 6.12.2013 Mono Crash: Energie von 6.5 auf 5.5 (Bügel!), Vakuum peak 26.9.2013 X04SA-OP-MO:CRASH [12.4.8] EH1: Wasserleck bei EH1 slits Rücklauf (G. Käslin repariert) 20.8.2013 EPS: CPU defekt (ausgetauscht durch Speckert) 9.8.2013 gemäss Pierre Müller hat er das falsche Programm geladen Mono Turbopumpe: Service im Shutdown November ??? LN2 CC: kleiner Auslass-Stutzen Subcooler (Thermoelement) gefroren 25.7.2013 Phasentrennen Düse gereinigt Inbetriebnahme Sicherheitsabschaltung LN2 Zuleitung (pneu. Ventil) SD: Ganzer Diffractometer verschoben wegen Vibrationen von Delta 28.5.2013 Neu Vermessen 6.6.2013 EPS Karte gewechselt (Chr. Lüscher), weil valves schliessen 24.5.2013 Fehler im ALH GE-CSTC1:EPS_SM Kontakt beim Sensor schlecht (behoben am 29.5.2013) OP: Kontroller Mono Turbopumpe defekt. OP fast ganz belüftet 14.5.2013 Drucksensor X04SA-EH2-CS:AP1 defekt. Austausch durch G. Käslin 30.4.2013 LN2 CC: Dichtung KF50 beim Phasentrenner undicht, Schelle angezogen 12.3.2013 LN2 CC: Überwachung Strom Pumpe X04SA-OP-CCFC18:CURRENT 8.3.2013 EPS Karte gewechselt (Chr. Lüscher), weil valves schliessen 15.2.2013 Fehler im ALH GE-CSTC1:EPS_SM SD: upgrade Controller durch 2 Personen (Eric, Akim) von MicroControl 14.1.2013 USV hat wohl nicht gereicht! OP-VG3 war geschlossen (ohne pumpen) 14.1.2013 Abschalten für Stromabschaltung (Last USV 5%) 11.1.2013 alles ausser Turbo, IonGetterPump, EPS, MaxiGauge, FE Rack

Paul Scherrer Institut • 5232 Villigen PSI Page 32/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.4.4. 2012 Abschalten während Ferien 21.12.2012 Rack OP EH1 EH2, Lüftung, Monitore In Betrieb: Kontroller LN2, EPS, Rack FE, PC’s LN2 CL: Aufwärmen von Mono und U14 20.12.2012 Gasdruck 1bar im closed-loop Gasalarm 2x, verursacht durch User, LN2 – Leitung (Dewar) defekt 24.11.2012 Feuerwehr aufgeboten!!! SD: Phi defekt. Kabel bei stage 2 Litzen los, neu gelötet 24.10.2012 Wasserkühlung Expansionsgefäss eingebaut 1.10.2012 Druckanzeige OP-CS:AP1 ausgetauscht (Gabriel Käslin) 19.7.2012 LN2 CL: Die Potis von beiden ADURβ neu eingestellt 18.7.2012 Mono ausheizen 120°C / 140°C (siehe Mono 12.4.8) 11.7.2012 Mono: Leck suchen an LN2 Leitung (Leck von aussen 2.7x10-7 mbar) 9.7.2012 Mono geöffnet, Leck bei VRC Kupplung Kristall ring Commissioning LN2 CL, PID optimiert 25.6.2012 Mono IonGetterPump ausgeschaltet, weil heiss! 11.6.2012 Encoder Mono MOX1+2 ROX, drift und peak beim füllen 11.6.2012 Mono erhitzt sich, wahrscheinlich wegen IonGetterPump 6.6.2012 LN2 CL: Thermoelemente GasOut installiert 11.4.2012 Strahl ändert beim Füllen vom Subcooler (Druckänderung) 9.3.2012 Immer wieder Probleme mit Filtern (Fallen raus oder verklemmen) 29.2.2012 Messzelle FI1MF1 hat „peaks“, schliesst Bml 2.2.2012 wahrscheinlich von IonGetter CH4 (umschalten) Si3N4-Window defekt: wahrscheinlich wegen direktem Strahl 31.1.2012 Strahl inzwischen gefunden. X1 Roll war falsch (verliert Schritte) 26.1.2012 MOX1:TRY : anderes Kabel (Z1), ERES -0.0005, funktioniert 24.1.2012 Leider doch nicht! 25.1.2012 Finden Strahl nicht!!! 23.1.2012 Einbau neuer Microstrip 17.1.2012 Einschalten LN2: Div. Probleme 13.1.2012 Ausheizen von Mirror (150°C) und Mono (120°C) 3.1.2012 Temp Mono auf 140°C erhöht 4.1.2012 Leider bleibt Vakuum schlecht 6.1.2012 Wahrscheinlich gibt’s ein LN2 Leck

Paul Scherrer Institut • 5232 Villigen PSI Page 33/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.4.5. 2011 Abschalten für Stromabschaltung (Last USV 5%) 23.12.2011 alles ausser Turbo, IonGetterPump, EPS, MaxiGauge Aufheizen Mono + U14 20.12.2011 Dosisanstieg bei 4b_33, evtl. wegen kleinem GAP 5.12.2011 LN2: Phasentrennen Düse ausgebaut, gereinigt und 2 kl. Löcher gebohrt 29.11.2011 LN2: Wieder Alarm Phasentrenner Niveau unten 25.11.2011 LN2: Alarm Phasentrenner Niveau unten 22.11.2011 LN2: Alarm Phasentrenner Niveau unten 17.11.2011 Stromausfall PSI West (ca. 10 Minuten) USV + LN2 ok 15.11.2011 GAP 3.8, ID-GAP:HEATER-PWR_DB=0, TEMP-HBD2=138.35°C (stabil) 9.11.2011 Erster User an PD 3.11.2011 LN2: Besprechung mit Chr. Lüscher, A. Lüdeke, St. Staudenmann 27.10.2011 BSB und EH1 slits Kammer nach unten verschoben 26.10.2011 Neuer Balg vor BSB montiert 25.10.2011 Problem mit Kommunikation, kein Strom im „Net-Rack“ 20.10.2011 LN2: Pump-Frequenz neu 55Hz, Ventile U14 7.8, Mono 6.2 10.10.2011 Water cooling: Temp 34°C, Kabel vom Regelventil abgehängt!!! 5.10.2011 MAXv interface defekt (Mirror). Ausgetauscht durch Xiaoqiang 29.9.2011 Mask: um 0.85mm nach unten gesetzt 22.9.2011 LN2: Thermoelemente beim Rücklauf U14 und Mono 21.9.2011 Mono: Heizdraht montiert 20.9.2011 First diffraction pattern using U14 14.9.2011 Kühlwasser – Temperatur von 27°C auf 26°C gesetzt 12.9.2011 1 Woche Strahl ohne grössere Probleme 9.9.2011 LN2: Michael reinigt Filter (gesinterte Düse) im Phasentrenner, nun ok 30.8.2011 LN2: Sonntag morgen am PSI (2 Stunden) 28.8.2011 LN2: Tel vom Control room, Montag 6:30Uhr 22.8.2011 LN2: Backup system, Subcooler füllen mit externem Dewar 19.8.2011 Si3N4 – Window: Beide Seiten mit gleicher Pumpe, langsam --> ok 18.8.2011 Si3N4 – Window nochmals defekt, Ventil zum Mirror hat geöffnet 17.8.2011 LN2: Wieder Niveau Alarm. Druck über 5bar - alle Überdruckventile 16.8.2011 4QM3 ausgebaut für Messungen von Claude 16.8.2011 dabei ging das Si3N4-Fenster kaputt, neues montiert und Mi etc pumpen LN2: Beide Niveau Alarm am Montag Morgen 15.8.2011 LN2 U14: Stellventile top 100%, bottom 95% 11.8.2011 Alarm handler für Kontrollraum nun in Betrieb 9.8.2011 LN2: Überprüfen Ventil (blau) in Zuleitung und tauschen Abgang + CL 9.8.2011 LN2: Zuwenig LN2 im Phasentrenner, U14 wärmt auf 8.8.2011 IonGetter vom Mono hat dabei abgschaltet! MAXv interface defekt (Mono). Ausgetauscht durch Fabian Hämmerli 3.8.2011 LN2: Diverse Probleme (Michael) 29.7.2011 LN2: Abgasventil Ringleitung, Dichtungscheibe ausgewechselt 28.7.2011 FSX: Bei 3 Si Filter (400, 200, 100 um) gibt’s ein Loch!!! 22.7.2011 CVD alle ok Mirror: Belüften mit N2 und ausrichten der Klemmplatte downstream 21.7.2011 XPBM1 erhöht um 2.5mm. Beide BPM am unteren Endpostition montiert! 21.7.2011 Mono: Beide Roll haben einen drift 20.7.2011

Paul Scherrer Institut • 5232 Villigen PSI Page 34/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

LN2: 1. Ventil der Zuleitung entfernt. Füllt nun besser 19.7.2011 LN2: Phasentrenner füllt nicht richtig!!! 14.7.2011 Filter 1: 200um Si kaputt 7.7.2011 First mono beam 1.7.2011 First Beam on PD station (old X-ray eye) 28.6.2011 SU: Messung ausserhalb Hütten, Strahl bis BSB --> alles io 27.6.2011 FSX wegen 4QBPM geöffnet, aber nur falsch verkabelt 24.6.2011 Ausfall LN2 und Beam dump!!! 21.6.2011 Erstmals Strahl in Optik 20.6.2011 Alle Ventile öffnen 15.6.2011 Mono: LN2 einschalten 14.6.2011 Mirror: BackOut abgeschaltet, Vakuum nicht speziell gut!!! Mirror: Versuch Nr. 5 mit Alu, nicht dicht! 10.6.2011 Montieren O-Ring und heizen, vielleicht „verschweisst“ der O-Ring!!! Heizen mit 150°C (Deckel 180°C) Mirror: Deckel (Aludichtung) nicht dicht, nochmals öffnen 9.6.2011 2. mal nicht dicht --> O-Ring montiert und nicht Aludichtung Auch nicht dicht. Versuch 4 wieder mit Alu Immer noch nicht dicht… Mirror schliessen und Pumpen 8.6.2011 FSX IonGetter eingeschaltet 6.6.2011 Mono: Abkühlen und IonGetter eingeschaltet 6.6.2011 FSX Pumpen 1.6.2011 Mono ausheizen mit 120°C, GetterPump 300°C!!! 1.6.2011 Mono belüftet mit Stickstoff und BPM montiert 31.5.2011 BPM neu erhalten von Dectris 30.5.2011 Vermessung FSX und Mirror (MI1+2) 30.5.2011 BPM von Dectris beim Löten zerstört (Beat Sommer) 24.5.2011 Einbau von MI1+2 in die Kammer 24.5.2011 Einbau FSX, Hutch schiessen 24.5.2011 Mirror MI2: Messung mit LTP fertig 23.5.2011 BPM 1+3 montiert 19.5.2011 MI2: Spindel hat angefressen, Schmierung mit Ultratherm 2000 16.5.2011 MI2: Messungenmit LTP 12.5.2011 Mirror: Montage Vertikalstage 10.5.2011 Mono Vakuumkammer geschlossen 10.5.2011 Mirror MI1: gemessen ok, R=-50km (konkav) 9.5.2011 Mirror MI1 Modifikation der Einspannung vom Spiegelkörper 3.5.2011 Mirror: MI1 mit LTP 2.5.2011 Mono: Anti-collision berührt bei kleinen Energien 29.4.2011 Mono: beide Kristallhalter montiert mit Unterlagen 26.4.2011 Cinel am PSI (Mono wieder geöffnet), Korrektur Z2 und X2 20.4.2011 Mono erstmals gekühlt mit LN2 18.4.2011 Autocollimator – Messunge am Mono 13.4.2011 Besprechung mit Stephan Maag wegen Kristallbieger X2 31.3.2011 Kupplung wird gewechselt X2: Kupplung zu stark, Motoren drehen nicht über ganzen Bereich 31.3.2011 Vermessung Mono + Kammer vom Mirror 29.3.2011 Besprechung mit Uwe/Sibylle: zuerst Kalibrieren, weiter am Mo 11.4. 28.3.2011

Paul Scherrer Institut • 5232 Villigen PSI Page 35/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

Mono Inbetriebnahme (Motoren) 25.3.2011 PD: Bewegung main axis für Elektro, Höhe auf 1420mm 24.3.2011 Mono geöffnet 22.3.2011 Messung mit LTP am Mirror 1 (von unten) 17.3.2011 FSX chamber; Einstellen Motoren/Encoder 16.3.2011 Besprechung mit Chr. Quitmann bez. AMI 15.3.2011 Mirror Si-Hebelarm gebrochen, neuer eingebaut (Bestellen 10mm!) 10.3.2011 Mirror: Hülse bei Biegerantrieb wird rausgedrückt 9.3.2011 Mono FAT Report und Dwg erhalten 8.3.2011 Mirror 2 im Optik Labor montiert zum Messen 3.3.2011 LN2 CL Druck reduziert auf 3.5bar 3.3.2011 Kristallhalter 2 modifiziert vom AMI 1.3.2011 Besprechung mit Uwe/Sibylle bez. Mirror 28.2.2011 Mono eingetroffen und installiert 24.2.2011 Mono wird geliefert 22.2.2011 Kabel IonGetterPump an Cinel gesendet 14.2.2011 Einbau Diaphragma 2 (mit „schrägem“ Flansch) 8.2.2011 BSB und XBPM geliefert 7.2.2011 Besuch bei Cinel für den FAT (31.1.-2.2.2011) 1.2.2011 Besprechung mit Claude bez. XBPM 27.1.2011 U14 LN2 Ventil Rücklauf auf 4.8 24.1.2011 Diaphragm 2, Druck 6.2x10-8mbar, Heizung abgeschaltet 24.1.2011 Ausheizen Diaphragm 2 21.1.2011 Schliessen vom GAP U14 (3.9mm) 20.1.2011 Ausheizen vom Mirror chamber (ohne Inhalt) 20.1.2011 1. Strahl durch U14 und Einweihung 18.1.2011 Diaphragma 2 umgefallen, teils defekt 14.1.2011 Sitzung wegen Vertikalantrieb (2 Stk. fertig) 14.1.2011 LN2 start 11.1.2011 Control hutch putzen 10.1.2011 Einbau U14 5.1.2011 Einbau Front End 3.1.2011

Paul Scherrer Institut • 5232 Villigen PSI Page 36/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.4.6. 2010 Installation LN2 Leitungen 21.12.2010 Beginn Shutdown Dez/Jan 21.12.2010 Zügeln der LN2 Pumpe 17.12.2010 EH1 slits gedreht 16.12.2010 Div. Teile an Cinel gesendet 15.12.2010 Kristallhalter 2: Spindel fressen an (neue Bestellen!!!) 13.12.2010 Diverse Fehler vom LN2 (Level meter neu kalibriert) 13.12.2010 Besprechung mit St.Maag und L.Paly: Fehler im Kristallhalter 2 3.12.2010 PD zügeln (Schienen vermessen etc.) 30.11.2010 Montage Mirror Betonklotz + Führungsplatte 23.11.2010 MI Kammer + Spiegelhalter + Kristallhalter 2 (ohne Motoren) 19.11.2010 Mono Grundplatten geliefert 18.11.2010 MI Grundplatten, Führungen etc eingetroffen (Nachkorrektur!!!) 11.11.2010 SD Erhöhung um 35mm durch Motoren 10.11.2010 Weitere Betonklotze vor Ausgang im FE 3.11.2010 Ausbau Optik (Mono, Mirror etc.) 2.11.2010 Besprechung mit BAG (SU, Dieter Mohr) 26.10.2010 Optik-Ausbau vorbereitet 22.10.2010 Mirror Körper wieder eingetroffen --> Uwe 21.10.2010 START MS SHUTDOWN 21.10.2010 FSX: Änderung Kühlleitung durchgehend 18.10.2010 BSB in Werkstatt 1.10.2010 Start LN2 für U14 20.9.2010 Cinel FDR meeting 3.9.2010 Betonsockel für Mirror angeliefert 13.8.2010 Mirror Verticalstage Prototyp 22.7.2010 Mirror Körper zurückgeschickt 18.6.2010 Cinel Besuch (Interim design meeting) 16.6.2010 Mirror Körper geliefert 7.6.2010 Mirror chamber in Werkstatt 25.5.2010 FSX chamber an AVOR 29.3.2010 Dwg. Von X1 und X2 an Cinel 26.1.2010 6.4.7. 2009 AMI Projekt gestoppt wegen „Problem Rossetti“ 18.12.2009 Besuch Cinel 24.11.2009 Bestellung Mono bei Cinel 1.11.2009 U14 eingetroffen Okt. 2009 Offerten Mono erhalten 31.7.2009 Call for Tender Monochromator 3.6.2009 Auftrag an AMI: Mono Kristallhalter, Mirror, Support, BSB, XBPM 4.3.2009

Paul Scherrer Institut • 5232 Villigen PSI Page 37/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.5. Projektplan Aktuell: Schedule MS Project.mpp auf …\6311\Bml upgrade über winterm1

Paul Scherrer Institut • 5232 Villigen PSI Page 38/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.6. Bestellungen - Undulator U14 Hitachi E662623 25.4.2008 - Kristalle X1 und X2 je 2 Stück Crystal Scientific Ltd. E671623 23.3.2009 - Spiegel 2 Stück Winlight E671624 24.3.2009 - FE (CVD Scheiben) Diamond E675599 24.9.2009 - FE (CVD Filter) Cinel E676796 2.10.2009 - FE (BPM, DI) FMB E676360 26.10.2009 - LN2 Cryo Diffusion-VRV E676785 11.11.2009 - U14 Vakuumkomponenten E677658 14.12.2009 - U14 Getter pumps Varian E677656 14.12.2009 - Mono Cinel E680003 4.1.2010 - U14 Mover (Support zu Undulator) AMI PA02.10-102102 2.2.2010 - IonGetter für Mono (P. Huber) - CVD Diamantfilter M. Lange E690515 20.1.2011

Paul Scherrer Institut • 5232 Villigen PSI Page 39/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.7. Arbeiten im MS Shutdown Neu: Oktober 2010 / Januar – Juni 2011 Alt: Juli – Dezember 2010 (Start ab Shutdown 3. Juni 2010) Besprechnung mit Christoph Quitmann 2.3.2010 - Shutdown - Planung Oktober 2010 (U14) und Januar 2011 (FE) ist ok - Erstellen eine Liste (Prioritäten) für alle Shutdowns - Wette: Mono innerhalb 2 Monate in Betrieb, vom Eintreffen bis 1. Strahl

um 1 Kiste Bier Planen der Arbeiten während Machine shutdowns: U14, Front End Start abhängig vom Monochromator, hoffentlich trifft der bis Ende 2010 ein!!! Email von Cinel (2.3.2010): FAT sollte bis Ende Nov. stattfinden. Bemerkungen: - Koordination: Arbeiten, Personen, Material, etc. - U14 - Front End - Wasser(Kühlung) - Verkabelung - Vermessung - LN2 - Grundplatten, Mover etc. 6.7.1. Machine shutdowns 3. – 14. 6. 2010 23. – 26. 7. 2010 26. 8. – 6. 9. 2010 Einbau Scraper, Vorarbeiten U14 + FE (wenn möglich) 21. 10. – 1. 11. 2010 Ausbau FE und Wiggler W61 (ohne Vakuumkammer) 21. 12. 2010 – 17. 1. 2011 Ausbau Vakuumkammer, U14 Bodenplatte, Einbau U14 (LN2) Einbau FE, Verkabelung FE und U14, Tests LN2 und Motoren 3. – 7. 3. 2011 Korrekturen (5 Tage übers Wochenende) 14. – 25. 4. 2011 lang (12 Tage) 9. – 13. 6. 2011 kurz (5 Tage)

Paul Scherrer Institut • 5232 Villigen PSI Page 40/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.8. Shutdown – Planung Oktober 2010 – Juni 2011 Datum Tag U14 Front End Personen Bemerkungen21.10.2010 Donnerstag Ring abdecken Belüften22.10.2010 Freitag Vorarbeiten zum Ausbau W61 Wasser, Druckluft, Elektro abhängen23.10.2010 Samstag24.10.2010 Sonntag25.10.2010 Montag W61 ausbauen ohne Vakuumkammer Ausbau26.10.2010 Dienstag Ausbau27.10.2010 Mittw och Bodenplatten entfernen, w enn möglich! Kabel raus28.10.2010 Donnerstag Absorber montieren29.10.2010 Freitag neue Betonklötze, Ring schliessen Betonklotz vor Durchgang30.10.2010 Samstag31.10.2010 Sonntag01.11.2010 Montag Allerheiligen

Umbau Front End

21.12.2010 Dienstag Ring abdecken, Kammer belüften Absorber entfernen22.12.2010 Mittw och Kammer ausbauen, Bodenplatten entfernen Vermessung, Bohren23.12.2010 Donnerstag Bodenplatten Bohren,

Vermessen und UntergiessenVerkabelung

24.12.2010 Freitag Reserve 1/2 Tag03.01.2011 Montag U14 Einbau, Vakuumanschüsse, Vermessung Verkabelung04.01.2011 Dienstag Verkabelung, LN2, Pumpen Einbau05.01.2011 Mittw och Verkabelung, LN2, Pumpen Einbau06.01.2011 Donnerstag Verkabelung, Wasserkühlung Vermessung, Verkabelung07.01.2011 Freitag Verkabelung, Wasserkühlung Verkabelung, Kühlung08.01.2011 Samstag09.01.2011 Sonntag10.01.2011 Montag Test LN2 Kühlung testen Verkabelung, Kühlung11.01.2011 Dienstag Test LN2, Vakuum ok Verkabelung12.01.2011 Mittw och Test Motoren, Controls Tests Controls13.01.2011 Donnerstag Test Motoren, Controls Tests Controls14.01.2011 Freitag Test Motoren, Controls Pumpen, Ausheizen15.01.2011 Samstag16.01.2011 Sonntag17.01.2011 Montag Ring schliessen Tests

1. Commissioning w ith Beam

03.03.2011 Donnerstag Korrekturen Korrekturen04.03.2011 Freitag Korrekturen Korrekturen05.03.2011 Samstag06.03.2011 Sonntag07.03.2011 Montag Korrekturen Korrekturen

Commissioning Optics

14.04.2011 Donnerstag15.04.2011 Freitag16.04.2011 Samstag17.04.2011 Sonntag18.04.2011 Montag19.04.2011 Dienstag20.04.2011 Mittw och21.04.2011 Donnerstag22.04.2011 Freitag Karfreitag23.04.2011 Samstag24.04.2011 Sonntag Ostern25.04.2011 Montag Ostermontag

02.05.2011 Montag Pilot user

09.06.2011 Donnerstag10.06.2011 Freitag11.06.2011 Samstag12.06.2011 Sonntag Pfingsten13.06.2011 Montag Pfingstmontag

14.06.2011 Dienstag User operation

Nov./Dez 2010

Jan/Feb 2011

Mar/Apr 2011

Excel file: Shutdown Planung.xls

Paul Scherrer Institut • 5232 Villigen PSI Page 41/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.9. Kick-Off Meetings Elektro / SU Datum: 23.06.2009 10:00, WSLA/105 Personen: Stefan Staudenmann, Christian Luescher, Werner Fichte, Elmar Zehnder, Roland

Luescher, Dieter Mohr, and Christine Harm Anwesend: Phil, Michael, Dominik, Christian Lüscher (EPS), Pierre Müller (EPS), Elmar

Zehnder (Elektro), Roland Lüscher (SU) Protokoll:

- Heilige Liste erstellen und mit alten Vergleichen - Kabel FE und Undulator im Shutdown August anschauen - LN2 Überwachung für Undulator? - Phoenix Pink Beam, BSB - Lagerung alte Komponenten, ausmessen durch SU, Jordanien schicken asap. - Kühlkreislauf direkt?

U14/Controls: Datum: 24.06.2009 15:00, WSLA/105 Personen: Thomas Schmidt, Bruno Jakob, Qianhong Chen, Xiaoqiang Wang, Andreas

Isenegger, Uwe Flechsig, Sybille Spielmann, Claude Pradervand, and Rolf Wullschleger

Anwesend: Phil, Michael, Dominik, Qianhong Chen (FE), Rolf Wullschleger (FE), Bruno Jakob (U14), Marc Brügger (U14), Andreas Isenegger (Controls)

Protokoll: ProtokollMSupgradeKickOff20090624.doc - Undulator U14 Ende August 2009 am PSI - LN2 Leitung zum Undulator (fest ca. 20m), Schlauch für Mono --> Michael - Chr. Lüscher Anschluss Überwachung, Besprechung mit Bruno wenn Undulator hier! - Stellfüsse motorisiert durch uns (A. Oggenfuss fragen), evtl. ähnlich U19 - Marc Brügger erstellt „Heilige Liste“ für Undulator, direkt zu E. Zehnder - Vakuumkammer (Ring) mit Lothar Schulz besprechen, evtl. neue Kammer - Start Umbau neu am 3. Juni 2010 - Neue slits für optics hutch, evtl. kann diaphragm benutzt werden als schlitze? NEIN!!!

Infrastructure: Datum: 09.07.2009 10:00 WSLA/108 Personen: Roger Sommer, Peter Oggenfuss, Michael Strittmatter, Andre Weber, Lothar Schulz,

Theo Bieri, Karsten Dreyer, and Walter Gloor Anwesend: Phil, Michael, Dominik, Antonio, Roger Sommer (Infrastruktur), Lothar Schulz

(Vakuum), Nazareno Gaiffi (Vakuum), Karsten Dreyer (Vermessung), Walter Gloor (LN2), Dieter Mohr (SU)

Protokoll: - U14 Höhe Betonklötze - R. Sommer - U14 Vakuumkammer / Tapper - L. Schulz - Wie hoch kann U14 ausgeheizt werden? - LN2 Leitung für Bml, Sitzung mit W. Gloor, B. Jakob, B. Sommer (im September)

Paul Scherrer Institut • 5232 Villigen PSI Page 42/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

6.9.1. Progress and scheduling U14 and front end Datum: 10. 3. 2010 14:00 Uhr WSLA/008 Personen: Thomas Schmidt; Bruno Jakob; Qianhong Chen; Rolf Wullschleger; Elmar Zehnder;

Christian Lüscher; Xiaoqiang Wang; Roger Sommer; Nazzareno Gaiffi; Michael Strittmatter; Dieter Mohr; Karsten Dreyer

Anwesend: Thomas Schmidt; Qianhong Chen; Rolf Wullschleger; Elmar Zehnder; Christian Lüscher; Xiaoqiang Wang; Nazzareno Gaiffi; Theo Bieri; Dieter Mohr; Juraj Krempasky; Stefan Kempf; Phil, Dominik, Michael

Protokoll: --> ProgressTimetableU14FE20100310.doc - Wiggler raus im Oktober, Vakuumkammer bleibt drin - Shutdown Plan überarbeiten - Front End: alles raus auch Shutter / Stopper - Absorber als Abschluss Front End, vom Okt – Jan - FE Heizer neu verkabeln - Diaphragm 2 mit vertikaler Bewegung (motorisiert) - LN2 test mit Schlaufe als Simulation Mono - Betonklotz im Front End vor Durchbruch - FE am Ende CF63

Controls Datum: 8. 3. 2010 14:00 Uhr WSLA/008 Personen: Andreas Isenegger; Uwe Flechsig; Xiaoqiang Wang Anwesend: Andi Isenegger; Xiaoqiang Wang; Dieter Mohr; Juraj Krempasky; Uwe Flechsig;

Stephan Maag; Phil, Dominik Protokoll: --> ProgressTimetableControls20100308.doc

- SU: Liste mit allen Komponenten die entfernt werden an D. Mohr - Uwe möchte die alten Spiegel ausmessen - Dwg und Skizze vom Mirror an Juraj - Bender calibration durch Uwe - Wo Refernzmarken von Mirror - „Heilige Liste“ mit Motoren, Encoder etc. an Xiaoqiang und Andy - „Home button“ für alle Motoren (Juraj) - FE BPM haben XY Bewegung - LCAD: zwei Stück vermisst (Juraj)

Optics Datum: 11. 3. 2010 14:00 Uhr WSLA/008 Personen: Qianhong Chen; Xiaoqiang Wang; Christian Luescher; Roland Luescher;

Stephan Maag; Markus Vitins; Uwe Flechsig; Karsten Dreyer Anwesend: Xiaoqiang Wang; Christian Luescher; Dieter Mohr; Roland Luescher; Stephan Maag;

Uwe Flechsig; Juraj Krempasky; Phil, Fabia, Antonio, Michael, Dominik Protokoll: --> ProgressTimetableOptics20100311.doc

- Uwe für desihn review meeting Mirror + Mono einladen - Mirror: Vibrationen messen durch Juraj - BSB: 1st BSB braucht’s nicht gemäss Roland

2nd BSB: Berechnungen bis Ende Mai (inkl. Station shutter + Bleiabschirmung) - Evtl. „slits array“ vor Mirror

Paul Scherrer Institut • 5232 Villigen PSI Page 43/192 D. Meister 15.12.2015

Swiss Light Source • Materials Science Beamline X04SA - 7 - V3.2 [email protected]

- Lichtschranke für alle Motoren (Uwe, Juraj) - Evtl. FE crate entfernen und alles in OP1 (oder OP2)