Industrialization process
Power couplers for XFEL project
as an example
------------
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
2/4
1
Industrialization:
Why?
Sta
rt:
Prototypes
( 30Couplers)
End
:Large
series
( 1000Couplers)
Quality:
-uneven
-rand
omanom
alies
Manufacturing:
-long
and difficult
-lack
ofprocedure
-only
a few people have
the com
petence
High cost
Quality:
-equal
for all items
-reliab
le
Manufacturing:
-regular process
-written procedures
-standardcompe
tence
Low
er cost
Ind
ustrialization
process
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
3/4
1
Industrialization:
Whatfor ?
Obje
ctives:
1.Toimprove the quality
2.
Todefine precisely:
•allmanufacturing processes
•thecontrol plan for
qualityassurance
•the necessary equipment
•the com
petences and
thepe
ople
•the manufacturing sequences
•the sch
edule
•theroom
space neededfor allsteps
•the cos
ts
•the
risk
s(tech
nical, ofprocurement,financial)
3.
Toreduce the manufacturing costs
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
4/4
1
Before industrialization:
specificationschanges
TTF-3 Coupler
XFEL Coupler
•4 diagnostics
removed
•motorized tuning
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
5/4
1
Before industrialization: final design
�Review drawings
ofeachcomponent interm
sof
tolerances
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
6/4
1
Ana
lysis
ofeach
fun
ction
resu
lts
in:
•options for design
•options formaterial
•options forge
ometry
•options for componentsjunctions
Each
option
s has
tobe inv
est
igate
din
term
sof
:
•pe
rformance com
patibility
•feasibility
•availability
•cost
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
7/4
1
�Sim
plify
concept
Example:
Coldexternal conductor
Present
design:bellows collarsaremachined+weldedto stand
ardbellows
Alternative:bellow
s includ
ing special collars
arehyd
roform
ed togetherin 1 part
Identify cost reductionsby component
-3 -
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
8/4
1
•Review existing design
•Identify the necessary functions
•Determ
ine max
imum
acceptab
le tolerances
•Identify possible options for design
•Seek functional simplicity :
•to minimise the num
ber of parts
•use stand
ard products whenever possible
•design for ease of assembly: several assembly solutions are possible,
investigate and
optimise
•design for ease of control and test
•design in view of packing and transport
Industrialization:
Topicsofdevelopment
-1-
�Design for «
manufacturability»
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
9/4
1
•Other design topics to be considered:
•reliab
ility
(of components, welds, coatings)
•other risks
(of procurem
ent, logistics, financial)
•MTBF, failure analysis (welds, window
s, motions)
•maintainability
(easiness of replacement)
•ergonom
y(handling, assembly)
Industrialization:
Topicsofdevelopment
-2-
•Riskmitigation:
•Assessment and
re-design ofareas af tech
nical and process risk
•Generation
ofprod
uct and process spe
cifications
•Upd
atedesign
•Validation ph
ase:
•Mod
ellingof com
ponent
and process
•Testing
•Prototypes
•Upd
atedesign
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
10/4
1
Industrialization: Check ?
�Verify that the desired spe
cificationsarefulfilled
�Check
the coh
erenceof interfaces
�Prod
uceprototypes
�Followa test
program
�Analyze
the results
�Corrective actions ifnecessary
�Decideon
thefinal solution
�Finalize M
anufacturing
Control Plan
�Iterative process after every
change
Verification
phase
Severalpossible new designsresult from the functional analysis:
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
11/4
1
For the XFEL pow
er couplers, industrialization studieswill be performed
through “Definition contracts” :
•Essentially intellectual work (in dialog betw
een the ind
ustry and our Lab
):
�Define all manufacturing processes (analysis and validation mod
els)
�Risk analysis (process, logistics)
�Determ
ine cost in series and justify
•Prod
uce 2 prototype
s (to be tested at LAL –Orsay)
Particularities
•3contracts will be awardedon
the same sub
ject: «Ind
ustrial stud
ies»
•2 team
swill be selected afterfinalevaluation
•contractsformanufacturing
2seriesof 500 XFELcouplers will be awarded
withouta new call for tend
ers
•the2contracts may be awardedto a singlecompany
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
12/4
1
Follow-up
and evaluation
ofdefinition contracts
1.Continuous evaluationof performance
-contracts will run simultaneously during21months
-Regular progress
reports
-Continuouscontrol of
industry activity
2.
Formal reviewsareke
ypoints
with delivery
of docum
ents, mod
els
andprototypes
-SDR ( System Design
Review)
-PD
R (PreliminaryDesign
Review)
-CDR (CriticalDesign
Review)
-FinalReview
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
13/4
1
Keypoints
of the definition contracts
Contract Award:
T0
Kickoff
meeting:
soon afterT0
System Design
Review:
T0+ 3months
-functional analysis
-identification of
processes and proposalfor mod
els
-preliminary developm
ent
plan, management plan
PreliminaryDesign
Review:
T0+ 8months
-mod
els for
welding,
brazing,specific materials,Cu coating
-Quality
assurance plan
-developm
ent
plan, management plan
-Tech
nicaldesign
review
-preliminary risk analysis
CriticalDesign
Review:
T0+ 14
months
-final mod
els for validation of
Cu coating
-final justification design file
-finalrisk analysis
-preliminary cost analysis
Final
Review:
T0+ 21months
-delivery
of 2 prototypes
-plan for
logisticsof
manufacturing and
conditioning
-finalcost
report
Serg
e
Pra
t
T
ES
LA
m
eeting -
30 M
arc
h 2
005
14/4
1
Deliverables for the definition contracts
1 -
Tech
nica
l re
port
s:spread
over 3 in
term
ediate reviews (see
time sche
dule)
-Conduct and com
ment all st
udiesnecessary for the fab
rication of couplers, includ
ing TiN
deposit
-Determ
ine and
explain the manufacturing pro
cess
es,
provide m
odelsfor validation of each process
-Finalize and
justify the mech
anical d
esign
in view of lower cost in series and shorter time of assembly, evaluate risks
-Define and
com
ment the sequences of ass
embly
and con
ditioning
of couplers, estimate time for assembly sequences
-Determ
ine and
com
ment the m
anufacturing log
istics
(in manpower, in building area) including cond
itioning, and evaluate
difficulties and risks
-Estab
lish a project m
ana
gement
planfor the manufacturing in series:
. PB
S, WBS
. interfaces . Cost control, time sch
edule control
. Management of ch
anges
. Quality assurance
. Risk management
. Docum
entation control
-Estab
lish a manufacturing sch
eduleinclud
ing cond
itioning and
delivery
3 -
Financ
ial re
port
:
Obje
ctive: �
Com
mitment to a unit price in series, for 500 and
for 1000 couplers
-Fill out a detailed price list includ
ing manufacturing, assembly and
HF conditioning ( Klystrons and
mod
ulators could be
provided
by the XFEL project ), packing and transport on site
-Deliveradetailedreport onprice justification analysis
2 -
Delive
r va
lidation
mod
els a
nd 2
pro
toty
pes:
-mod
els to validate each manufacturing process (welding, brazing,spinning, Cu coating, …)
-2 prototypes assembled on test stand
read
y forcond
itionning:
-alread
y cleaned,baked,assembled, vacuum
pumped and
leak tested