in-place pavement recycling: vdot experiences and …in-place pavement recycling: vdot experiences...

28
In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist 2016 SCAPA Winter Meeting Columbia, SC

Upload: others

Post on 17-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

In-Place Pavement Recycling:

VDOT Experiences and Expectations

Brian Diefenderfer, PhD, PE

Senior Research Scientist

2016 SCAPA Winter Meeting

Columbia, SC

Page 2: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Pavement Recycling

• Overview

• VDOT experiences

– Why VDOT recycles

– Performance and cost examples

• Goal

– Show how pavement recycling can work in

South Carolina

Page 3: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Interstate Use

Page 4: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Most Use

• New York

– 350 lane miles in 2015

• Iowa

– 2300 lane miles over last 5 years

• Nevada

– Has recycled nearly 25% of their system

Page 5: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Definitions

• Processes

– Full-depth reclamation (FDR)

– Cold in-place recycling (CIR)

– Cold central-plant recycling (CCPR)

• Differences

– Location & thickness

Page 6: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

6

Full-Depth

Reclamation

– Bound layers, agg base, and subgrade

– Creates a stabilized base course

– 4 to 12 inches

Page 7: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

7

Cold In-Place

Recycling

– Within the asphalt layers

– 2 to 5 inches

Page 8: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

8

Cold Central-Plant

Recycling

– Similar to CIR

– Multiple layers

– Stockpiles of existing RAP

Page 9: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

• ARRA

– Basic Asphalt Recycling Manual

• NCPP regional workshops

– Presentations online (free)

• NHI

– Asphalt Pavement In-Place

Recycling Techniques

• Wirtgen

– Cold Recycling Technology

(free)

More Information

Page 10: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Why VDOT Recycles (and why SCDOT should too)

• Economic

– Nevada DOT saved $600 million over 20 years

– 30-50 percent cost savings per project

• Environment

– MTO (Ontario) estimated 50 percent less greenhouse

gases emitted

• Construction

– Fixes deterioration causes rather than symptoms

Page 11: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

11

• Rapid deterioration

– Overlays had 2-3 year

service-life

I-81

Page 12: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

I-81 Design & Construction

• 30 year design

– AADT = 23,000 with 28% trucks

– 102 million ESALs

– 7.9 required SN

• Construction

– 8 months

– Innovative traffic management

– $10 million (vs $16 million)

Page 13: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

• Left lane

1) Mill 2 inches

2) CIR 5 inches

3) 4 inch asphalt

overlay

I-81 Processes

• Right lane

1) Mill 10 inches

2) FDR 12 inches

3) 8 & 6 inch CCPR

4) 4 & 6 inch asphalt

overlay

Page 14: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

14

Page 15: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

I-81 Performance

• Summer 2015

– 4 years ~ 7 million ESALs (right lane)

– Average rut depth = 0.1 inches

– Average IRI = 53 / 44 (left / right)

– SNeff > 9 (right lane)

• 3-year performance report

– AASHTO High Value Research project

– www.virginiadot.org/vtrc/main/online_reports/pdf/15-r1.pdf

Page 16: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

16

Page 17: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCAT

N3 N4

S12

Page 18: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCAT

5-in CCPR

6-in AC

Subgrade

6-in Agg

N3

5-in CCPR

4-in AC

Subgrade

6-in Agg

N4

5-in CCPR

4-in AC

Subgrade

8-in FDR

S12

Page 19: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCAT Performance

• 2012 Track Cycle

– 10 million ESALs

– No surface cracking

– Average rut depth < 1/4 inch

• 2015 Track Cycle

– About 1.5 million ESALs so far

– 11.5 million total

Page 20: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCAT Performance 4 inch AC

6 inch AC

4 inch AC+FDR

Page 21: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

• 17 inches manipulated

– Layer 1 = 12.5% recycled

– Layer 2 = 30% recycled

– Layer 3 = 100% recycled

– Layer 4 = 100% recycled

• Entire cross section

– 80% recycled

• New construction?

S12 Recycled Content

5-inch CCPR

4-inch AC

Subgrade

8-inch FDR

S12 1 2

3

4

Page 22: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

I-64 Lane Widening

Current AADT =

37,500 w/ 8.5%

trucks

Page 23: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

I-64 Lane Widening

• Design build, 7.08 miles

– Add travel lane and shoulder to the inside

• CCPR

– Reconstruct existing two lanes

• FDR + CCPR

– Awarded January 2016

• Benefits

– RAP use could exceed 200,000 tons

– Cost savings could exceed $10 million

Page 24: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCHRP 9-51

• Material Properties for CIR and FDR for

Pavement Design

• Cores from 24 projects

• Partners

– Univ of Maryland

– Virginia DOT

– Wirtgen

– Colas Solutions

Page 25: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCHRP 9-51

0

2000

4000

6000

8000

10000

12000

0.0001 0.01 1 100 10000

Dy

na

mic

Mo

du

lus

(MP

a)

Reduced Frequency (Hz)

CCPR

CIR

FDR

Higher temperature

Lower temperature

Page 26: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

0

2000

4000

6000

8000

10000

12000

0.0001 0.01 1 100 10000

Dy

na

mic

Mo

du

lus

(MP

a)

Reduced Frequency (Hz)

Emulsified Asphalt

Foamed Asphalt

NCHRP 9-51

Higher temperature

Lower temperature

Page 27: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Summary

• Pavement recycling can reduce costs by 30-50%

• It can reduce greenhouse gas emissions by

more than 50%

• It has been used successfully on high volume

roadways

• It can be used on new construction and

rehabilitation projects

Page 28: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Thank you!

[email protected]