www.durr.com www.durr.com IMPROVING PRODUCTION EFFICIENCY PAINT AND FINAL ASSEMBLY SYSTEMS Barcelona, October 2-3, 2014 WELCOME Dr. Frederic de Molière

Upload: danglien

Post on 13-Feb-2017

225 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: IMPROVING PRODUCTION EFFICIENCY

www.durr.comwww.durr.com

IMPROVING PRODUCTION EFFICIENCY

PAINT AND FINAL ASSEMBLY SYSTEMS

Barcelona, October 2-3, 2014

WELCOME

Dr. Frederic de Molière

Page 2: IMPROVING PRODUCTION EFFICIENCY

OEM´S COMMITMENT TO SUSTAINABILITY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 2

OEM

Sustainability image

Environmental protection

Cost control for sustainability

Governmental regulations

Page 3: IMPROVING PRODUCTION EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 3

Dürr approach to optimize economy & ecology targets

ECO⊕PAINTSHOP

Page 4: IMPROVING PRODUCTION EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 4

Dürr approach to optimize economy & ecology targets

ECO⊕PAINTSHOP

Page 5: IMPROVING PRODUCTION EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 5

Dürr approach to optimize economy & ecology targets

ECO⊕PAINTSHOP

Page 6: IMPROVING PRODUCTION EFFICIENCY

ECO⊕PAINTSHOP

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 6

Stays for short-term and long-term perspectives

Invest

Savings

1,530 yearsoperating life

3 5

Economy & ecology over the whole lifecycle.

25 years ≙5 x invest amount

Time

Page 7: IMPROVING PRODUCTION EFFICIENCY

PRODUCTION EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 7

Holistic view on the whole Paintshop

EcoDryScrubber

EcoBell 2

General Paintshop settings

Ecopure TAR

EcoEMOSEcopure TAR Suntec

Heat Recovery Wheel

Ecopaint RoDipVariable exhaust aircontrol

Low volume air seal

CIC Oven

Straight Pass Oven

Heat Exchanger

EcoLoopLinked HX System

EcoReBooth

Paint Process

Plant Layout

Shop ventilation concept

EcoDC MACS

EcoMultiCyclone

PT/ED heat recovery

Latent cooling storage

EcoBell 3

EcoLCC

EcoRP E

EcoPump 9

Ecopure TARCOM VEcopure RTO

Ecopure KPR

Eco+Energy CPS Suntec

Page 8: IMPROVING PRODUCTION EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 8

Achievements: up to…

ECO⊕PAINTSHOP

- 60% Water

- 60% Waste Water

+ 10-20% Throughput- 50 % CO2- 90 % VOC

- 30-50 % Paint

- 50% Energy

Page 9: IMPROVING PRODUCTION EFFICIENCY

- Independence of climate conditions

- Minimized sealer application time

- Minimized paint application time

- Minimized color change time

- Eco+Speed

- Ecopaint RoDip

- Closed quality loops

- Optimized material flow

- Process decoupling

- Short lead time car body

- Ecopaint RoDip

- EcoReBooth

- EcoSmart AC

- EcoDC MACS

- Degrade Mode

- Approved products

- Stand-by equipment

- Splitted capacities

- Manual backup zones

- Decoupling buffer

- Preventive maintenance

- Short meantime to repair

PROCESS EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 9

Products & Solutions

- Bath maintenance concept

- Dust protection concept

Page 10: IMPROVING PRODUCTION EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 10

ECO DC MACSModular Anode Control System

Page 11: IMPROVING PRODUCTION EFFICIENCY

11© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014

L1-

01L

01R

02L

02R

03L

03R

04L

04R

05L

05R

06L

06R

07L

07R

08L

08R

09L

09R

10L

10R

11L

11R

12L

12R

13L

13R

14L

14R

15L

15R

16L

16R

GL0

1G

L02

GL0

3G

L04

GL0

5G

L06

GL0

7G

L08

GL0

9G

L10

GL1

1G

L12

GL1

3G

L14

GL1

5G

L16

L-

Gleichrichter 1

L2-

17L

17R

18L

18R

19L

19R

20L

20R

21L

21R

22L

22R

23L

23R

24L

24R

25L

25R

26L

26R

27L

27R

28L

28R

29L

29R

30L

30R

31L

31R

32L

32R

GL1

7G

L18

GL1

9G

L20

GL2

1G

L22

GL2

3G

L24

GL2

5G

L26

GL2

7G

L28

GL2

9G

L30

GL3

1G

L32

Gleichrichter 2

L3-

33L

33R

34L

34R

35L

35R

36L

36R

37L

37R

38L

38R

39L

39R

40L

40R

41L

41R

42L

42R

43L

43R

44L

44R

45L

45R

46L

46R

47L

47R

48L

48R

GL3

3G

L34

GL3

5G

L36

GL3

7G

L38

GL3

9G

L40

GL4

1G

L42

GL4

3G

L44

GL4

5G

L46

GL4

7G

L48

Gleichrichter 3

Operating Szenario

Busbar 1 Busbar 2

Current detection forcoating monitoring

Busbar 3

Current detection forcoating monitoring

Current detection forcoating monitoring

ECO DC MACS

Page 12: IMPROVING PRODUCTION EFFICIENCY

Breakdown szenario

12© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014

L1-

01L

01R

02L

02R

03L

03R

04L

04R

05L

05R

06L

06R

07L

07R

08L

08R

09L

09R

10L

10R

11L

11R

12L

12R

13L

13R

14L

14R

15L

15R

16L

16R

Busbar 1

GL0

1G

L02

GL0

3G

L04

GL0

5G

L06

GL0

7G

L08

GL0

9G

L10

GL1

1G

L12

GL1

3G

L14

GL1

5G

L16

L-

Rectifier 1

L2-

17L

17R

18L

18R

19L

19R

20L

20R

21L

21R

22L

22R

23L

23R

24L

24R

25L

25R

26L

26R

27L

27R

28L

28R

29L

29R

30L

30R

31L

31R

32L

32R

Busbar 2

GL1

7G

L18

GL1

9G

L20

GL2

1G

L22

GL2

3G

L24

GL2

5G

L26

GL2

7G

L28

GL2

9G

L30

GL3

1G

L32

Rectifier 2

L3-

Current detection forcoating monitoring

33L

33R

34L

34R

35L

35R

36L

36R

37L

37R

38L

38R

39L

39R

40L

40R

41L

41R

42L

42R

43L

43R

44L

44R

45L

45R

46L

46R

47L

47R

48L

48R

Busbar 3

GL3

3G

L34

GL3

5G

L36

GL3

7G

L38

GL3

9G

L40

GL4

1G

L42

GL4

3G

L44

GL4

5G

L46

GL4

7G

L48

Rectifier 3

Current detection forcoating monitoring

Current detection forcoating monitoring

ECO DC MACS

Neibourgh anodes compensate failure no loss of car body!!!

Page 13: IMPROVING PRODUCTION EFFICIENCY

13

Fast body transfer & color change

Time reduction for body transfer and color change from 16 to 8 sec

Capacity increase up to 15%

Up to 18m² reduction of polluted surface

Reduction of cleaning time

CPU reduction + higher sustainability

Higher profitability

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014

Eco⊕Speed

ECO SPEED

Page 14: IMPROVING PRODUCTION EFFICIENCY

14

Fast body transfer & color change

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014

EcoLCC2 AB

EcoMCC3 AB

For color changes of 8 sec AB technology is necessary as well as a second dosing pump, a second color channel and a second main needle

EcoBell3 is optimized for this requirement

ECO SPEED

Page 15: IMPROVING PRODUCTION EFFICIENCY

- Ecopure KPR

- Ecopure TAR

- Ecopure TARCOM V

- Ecopure RTO

- Plant layout

- Ecopaint RoDip

- EcoBell 2

- EcoBell 3

- EcoLCC

- Shop Ventilation Concept

- EcoReBooth

- EcoDryScrubber

- Eco+Energy CPS

- Ecopure TAR Suntec

- Heat Recovery Wheel

- Heat exchanger

EMISSION EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 15

Products & Solutions

Page 16: IMPROVING PRODUCTION EFFICIENCY

EMISSIONS EFFICIENCYPaintshop References

VOC Emission (examples)

CO2 kg/unit

China141

China291

China208

China268

0

50

100

150

200

250

300

Dürr paint shops recently implemented

China2.3

0

5

10

15

20

25

30

35

Abatement: oven

Abatement: CC, oven Abatement:

primer, BC,CC, oven

China7.3

China30.8

Abatement: oven

Dürr paint shops recently implemented

VOC g/m2

China17.6

CO2 Emission (examples) VOC Emission (examples)

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 16

Page 17: IMPROVING PRODUCTION EFFICIENCY

EMISSION EFFICIENCYRecuperative thermal exhaust air purification system

Integrated purification and energy supply ideal form oven processes

Integrated heat recovery for significant energy savings

Significant flexibility due to adjustable operation points

Highly efficient burner technology

Reduced energy demand due to innovative pre-heating systems with reduced CO2 emissions

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 17

Page 18: IMPROVING PRODUCTION EFFICIENCY

- EcoBell 2 - EcoBell 3- EcoLCC- EcoICC- EcoRP E

- Eco+Energy CPS- Ecopure TAR Suntec- Variable exhaust air control- Low volume air seal - CIC Oven- Straight Pass Oven

- Heat Recovery Wheel / Plate- EcoLoopLinked HX System

- EcoReBooth- EcoDryScrubber- EcoSmart AC

- site, product (m²), skid length, jph, working hours/day

- Shop ventilation concept

- Ecopaint RoDip- EcoDC MACS- EcoMultiCyclone- PT/ED Heat Recovery- Latent cooling storage

ENERGY EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 18

Products & Solutions

- Ecopure TAR- Ecopure TARCOM V

- EcoEMOS Energy - Paint Process- Plant Layout

Page 19: IMPROVING PRODUCTION EFFICIENCY

ENERGY EFFICIENCYReferences and sensitivities

Hungary790 China

711China551

Russia590

China430

China922

100200300400500600700800900

1000

kWh/unit

Dürr paint shops recently implemented

Total energy saving potential worldwide for reduction by 400 kWh/car ( 75 Mio cars/year):

- 4 nuclear power plantsChina399

Germany

Brazil

- 59 kWh/unit

- 97 kWh/unit- 59 kWh/unitShenyang

Yantai

100200300400500600

kWh/unit

- 70 kWh/unit

16 h/day 24 h/day

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 19

Page 20: IMPROVING PRODUCTION EFFICIENCY

DRY OVERSPRAY SEPARATION

The intentionally simple and robust paintoverspray separation

The exclusive paintoverspray withoutadditives

Fluidized bed furnace –Limestone powderrecycling

Efficiency throughdry separation

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 20

Page 21: IMPROVING PRODUCTION EFFICIENCY

21

DRY OVERSPRAY SEPARATION

21

References

Rehau Südafrika TC I+II

HKK Japan

70 paint lines with more than 2.200 EcoDryScrubber modules 70 paint lines with more than 2.200 EcoDryScrubber modules

Yamaha I Japan

Yamaha Indonesia

FAW Audi Changchun CP1BMW Shenyang TC I+II

SGM NorsomChery Dalian

SGM YantaiBBAC Daimler Beijing

SVW Yizheng CP 5SGM Shanghai

SCJLR ChangshuSVW Nanjing CP4 TC I+II

SGM WuhanFAW Chengdu CP 3.2FAW Chengdu CP 3.3

Nissan HuaduSVW Ningbo CP6

Honda East LibertyBMW Spartanburg

VW ChattanoogaFord Kansas

Porsche LeipzigBMW Leipzig

BMW RegensburgRehau Viechtach

SMART HambachWagon Nagold

PSA Sochaux TC I+IIBMW Dingolfing

Audi GyörRehau Györ

Daimler KecskemétFord Otosan Yamaha II Japan

Audi Mexico

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014

0%10%20%30%40%

50%

60%

70%

80%

90%

100%

2010 2011 2012 2013 2014 2015

WetScrubber

EcoDryScrubber

Page 22: IMPROVING PRODUCTION EFFICIENCY

Your advantages:

Reduced energy consumption

Automated process control without manual intervention

Minimized reaction time on rapid climate changes

Short pay-back time < 1 year

Adaptable for green- and brownfields

Product information:

Precise control of temperature and humidity

Coordinated teamwork of modules instead of previous individual control for each module

Measurement of external conditions for optimal selection of target setpoint

Feedforward control for precise setpointcontrol depending on external conditions

Optimal control of air supply

units and recirculation air units

Optimal air supply unit control

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 22

ECOSMART AC

Page 23: IMPROVING PRODUCTION EFFICIENCY

Classical air control: Plant startup and disturbance

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 23

Booth Temperature

time

Booth Relative Humidity

%

°C

Setpoint

Setpoint

time

0%

100%

Module setpointsSustained oscillations

Increased energy usage

Limit

Limit

Limit

Limit

OptimumOptimum

ECOSMART AC

Page 24: IMPROVING PRODUCTION EFFICIENCY

ECOSMART AC

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 24

Plant startup and disturbance

0%

100%

Module setpoints

time

%

°C

Setpoint

Setpoint

time

OptimumOptimum

Small oscillations

Optimal energy usage

Limit

Limit

Limit

Limit

Booth Temperature

Booth Relative Humidity

Page 25: IMPROVING PRODUCTION EFFICIENCY

- EcoDose

- EcoGun Sealing

- EcoRS

- EcoFlow Sealing

- EcoShot Meter

- EcoJet

- EcoTemp / EcoHeat

- Pre-Treatment

- Electro Coating

- EcoReBooth

- EcoDryScrubber

- Ecopaint RoDip

- EcoReBooth

- EcoMultiCyclone

- EcoIon Ex

- EcoFilter-Oil-UF

MATERIAL EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 25

Products & Solutions

- Ecopaint RoDip

- EcoBell 2

- EcoBell 3

- EcoLCC

- EcoICC

- EcoPump 9

Page 26: IMPROVING PRODUCTION EFFICIENCY

MATERIAL EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014

26

Minimized material consumption - less waste & waste water

Waxing

CC

BCLASD

Benchmark 118,5 € / unit*

Material consumption (excl. water)

Benchmark 397 l / unit

Sealing

others PT

* (excl. water)

EC

Page 27: IMPROVING PRODUCTION EFFICIENCY

INNOVATIONS IN APPLICATION

27

EcoBell3 Ci: Application systems, new high speed atomizer for interior painting

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014

Application area Water based paint 1K, 2Kwith high tension without high tension

Solvent based paint 1K, 2Kwith high tension

Interior paintingSB50%: 50-220 mm

Exterior paintingSB50%: 180-600 mm -

Combined zone (interior & exterior), plastic parts & bumper painting

SB50%: up to 600 mm -

EcoBell3 Ci

EcoBell3 E

EcoBell3 C

EcoBell3

EcoBell3

EcoBell3

EcoBell3

Page 28: IMPROVING PRODUCTION EFFICIENCY

INNOVATIONS IN APPLICATION

28

EcoBell3 Ci: Application systems, new high speed atomizer for interior painting

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014

Lowest self-contaminationReduction of oversprayAutomatically cleaning without production cycle lossHigh productivity Further increase of the transfer efficiency

Highest HT-safety (CE type examination)Compact design

Page 29: IMPROVING PRODUCTION EFFICIENCY

SPACE EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 29

Products & Solutions

Page 30: IMPROVING PRODUCTION EFFICIENCY

Ecopaint Oven

Layout concepts

Ecopaint ReBooth

Minimized Footprint

SPACE EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 30

EcoRP E and EcoRP

Reduced Booth width and length

High Bay Storage

Minimized Footprint

Products & Solutions

Page 31: IMPROVING PRODUCTION EFFICIENCY

SPACE EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 31

STORAGE SYSTEMS

Foot Print 970 m²

Floor Conveyor Storage System

Flexible Layout Function to design/LocationFoot print requirement

Compact LayoutHigh functioanlityHigh flexibility

Layout to requirement

Advantages Disadvantages Advantages Disadvantages

Foot Print 170 m²

High Bay Storage System

Page 32: IMPROVING PRODUCTION EFFICIENCY

EFFICIENCY THROUGH FLEXIBILITY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 32

Flexible products & solutions

30 jph 60 jph

30 jph30 jph

30 jph

60 jph30 jph

BC/CC

Oven

BC/CC

Page 33: IMPROVING PRODUCTION EFFICIENCY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 33

Eco Screen 3D-on Site

task bar

program editor

fitting tool

change log

access protection

call of further editors and tools

graphics editor

EFFICIENCY THROUGH FLEXIBILITY

Page 34: IMPROVING PRODUCTION EFFICIENCY

EFFICIENCY THROUGH FLEXIBILITY

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 34

Solutions

Box Concept Color changer EcoLCC EcoBell 3

Single stations (boxes) arranged in parallel

Bodies fed in/out by adequate conveyors

Painting task is maximized in each box

Stop & go mode

Reduced color change time < 10 sec. with pushout

Exterior and interior painting

High automation level

Page 35: IMPROVING PRODUCTION EFFICIENCY

10 years agoAverage today

New Paintshop Plant Tiexi

Thanks to state-of-the-art technologies, Tiexi plant paint shop ranks the world’s most sustainable paint shops, water consumption, VOC emission and waste water are reduced to 1/3 of average level 10 years ago.

Energy Water VOC Waste Water

Major lever in resource conservation in production is the Paint Shop

41% of Tiexi total energy. 35% of total water usage. 100% of Process waste water: 100% Solvent emissions.

PRODUCTION EFFICIENCYHolistic view on all efficiency criteria – Example: BBA Tiexi paintshop

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 Page 35

Page 36: IMPROVING PRODUCTION EFFICIENCY

REMAINING POTENTIALS

© Dürr Systems GmbH, Production efficiency, Barcelona, October 2-3, 2014 36

Process Efficiency

Emissions Efficiency

Energy Efficiency

Material Efficiency

Space Efficiency

Your Paintshop

Remaining potentials

Efficiency through Flexibility

low high

Page 37: IMPROVING PRODUCTION EFFICIENCY

“Subject to change without prior notice. The information in this presentation contains only general descriptions and performance features. In actual applications they may not be exactly as described here. The desired performance features are only binding if they are agreed explicitly upon completion of contract”.

IMPROVING PRODUCTION EFFICIENCY

www.durr.com

PAINT AND FINAL ASSEMBLY SYSTEMS