SITE ANALYSIS INTRODUCTION TO THE SITE The site is located along Jalan Lengkuk Keluli, Shah Alam in Selangor. The location of this site is found around an industrial and is also near a residential area. The industrial area consists of a number of factories. The residential area includes houses and condominiums. The size of site is 60 x 70m and we will be using 50 X 50m as required.

Upload: supasaiyan1plus1

Post on 12-Apr-2017

197 views

Category:

Education


0 download

TRANSCRIPT

Page 1: ICI FInal Project FNBE March 2015

SITE ANALYSISINTRODUCTION TO THE SITE

The site is located along Jalan Lengkuk Keluli, Shah Alam in Selangor. The location of this site is found around an industrial and is also near a residential area.

The industrial area consists of a number of factories. The residential area includes houses and condominiums. The size of site is 60 x 70m and we will be using 50 X 50m as required.

Page 2: ICI FInal Project FNBE March 2015

SITE CONTEXT

Industrial area

Industrial area

Industrial area

Residential area

KEY PLAN

Page 3: ICI FInal Project FNBE March 2015

SITE OBSERVATION

Industrial area

Industrial area

Industrial area

Housing area

Site

Page 4: ICI FInal Project FNBE March 2015

BY

PROPOSAL

MUHAMMAD MIRZA QAYYUM BIN MOHD SHARIFF

0324031

Page 5: ICI FInal Project FNBE March 2015

COMMERCIAL AREA- FUTSAL COURT

INTRODUCTION

- Consists of 2 floors which is the ground floor and the first floor.

- The ground floor consists of two futsal courts, a cafeteria, and toilets.

- The first floor consists of another two futsal courts, an equipment shop and a locker room.

- There are a few car parks outside the futsal court for convenience.

Page 6: ICI FInal Project FNBE March 2015

GROUND FLOOR

FUTSAL COURTSTOILETS

CAFETERIA

Page 7: ICI FInal Project FNBE March 2015

FIRST FLOOR

LOCKERS

FUTSAL COURTS

EQUIPMENT SHOP

Page 8: ICI FInal Project FNBE March 2015

FACALITIES

BUBBLE DIAGRAM

Page 9: ICI FInal Project FNBE March 2015

AIM- Built as a means to encourage and also to provide

a place for people to play futsal with the intention to lead a healthier lifestyle.

TARGET PEOPLE- For anyone who likes playing futsal or would like to

try a new sport. It can also be for anyone who is active in general and for the nearby residences.

BENEFITS- It will be a proper place for people to play futsal .- Complete and functional equipments for the

residents nearby and also for the public to use.- Can be a place to hangout with friends.

IMPACTS- Increasing amount of traffic due to the increasing

number of people that goes to the area to go to the futsal court.

- Decreasing number of green plants that provide oxygen.

Page 10: ICI FInal Project FNBE March 2015

CONCEPTUAL PLAN

MASTER PLAN

As can be seen above, the building occupies the most space. There is also a driveway that leads to the parking lots found outside the building. there are also some bushes and green plants found on both sides of the building.

Page 11: ICI FInal Project FNBE March 2015

RATIONALE ON BUILDING A FUTSAL COURT ON THIS PARTICULAR SITE

Nowadays, a lot of people in this area are not actively doing sports, due to the fact that there is no nearby sports related facilities.

Due to this, I have decided to propose a futsal court. The reason I chose to propose a futsal court over other sports courts is due to its size being compatible to the size of the site. Also, based on observation, futsal is becoming a popular sport and in conjunction to this, it is appropriate that a proper futsal court is built to accommodate the nearby residence and visitors of the area.

It will also be placed nearby enough to the residential area for easier access but also far enough from it as to not cause too much noise that will disturb the residents.

Page 12: ICI FInal Project FNBE March 2015

PROFESSIONS INVOLVED

Architect- An architect is responsible for the design. They are also responsible for the public safety and overseeing of projects.

Civil Engineer- A civil engineer is to analyse various factors concerning a construction job. The civil engineer must also play the construction project that will be taking place.

Page 13: ICI FInal Project FNBE March 2015

Quantity Surveyor- A quantity surveyor will be the one in charge of managing the finances for any kind of construction project. They are also to work to keep the project within the budget.

Interior Designer- An interior designer evaluates and designs interior living and work spaces to make them functional and more appealing.

Page 14: ICI FInal Project FNBE March 2015

SITE OBSERVATION

The sun path is from the east to the west of the site. Also, due to the site being an open space, it is exposed to the sunlight.

The land on the site is relatively flat, which makes it a suitable spot to start a construction project. The flow of traffic around the area is smooth due to the lack of vehicles on the road in this area. The wind flow comes from the north-east of the site.

Page 15: ICI FInal Project FNBE March 2015

CONCLUSION

After completing this project, I have learnt the importance of each profession involved in the construction industry. I have also learnt more on the roles of these professions and how it plays a part of its own to make a particular project a success and flow smoothly. Furthermore, I am able to explain the need to coordinate and develop an understanding of coherent working relations among various industry players and to improve the communication channels.

REFERENCES