Page 1: ICAO Aviation System Block Upgrade Executive Briefing:

International Civil Aviation Organization

ICAO Aviation System Block Upgrade Executive Briefing:

The Framework for Global Harmonization

Issued 10 June 2011

Page 2: ICAO Aviation System Block Upgrade Executive Briefing:

2ICAO ASBU Executive Briefing

The Challenge

• USD 120 billion will be spent on ATS transformation in next 10 years

• NextGen and SESAR account for large share of spending• Parallel investment initiatives also include:

– Latin America, Russia, Japan, and elsewhere • ATM Modernization is enormously complex task• As traffic levels in civil aviation continue to increase, Industry

stakeholders seek benefits of new initiatives

Page 3: ICAO Aviation System Block Upgrade Executive Briefing:

3ICAO ASBU Executive Briefing

Why is Action Needed?

• Need to renovate ATM systems to:– Safely accommodate increase of air traffic demand– Respond to diversified needs of operators– Global environmental issue– Other issues inherent with current ANS

• ATM modernization programmes must harmonize to:– Provide greatest operational & performance benefits– Achieve seamless global air navigation into future

Page 4: ICAO Aviation System Block Upgrade Executive Briefing:

4ICAO ASBU Executive Briefing

What are the Impediments?

• All programmes face risks & require mitigation strategies• Most significant risk is related to timing and mix of technical,

political, and infrastructure requirements • Set of risks exist independent of specific solution chosen:

– Non-homogeneous deployment across regions– Lack of synchronization of air & ground deployments– Future investment in existing ATM programmes by key stakeholders

not secured– Delays in standards development and approvals– AIM not implemented in global interoperable way– SWIM not implemented in correct form

Page 5: ICAO Aviation System Block Upgrade Executive Briefing:

5ICAO ASBU Executive Briefing

ICAO’s Approach

• ICAO established programmatic, collaborative approach to develop set of ATM solutions

• Meet global needs for interoperable airspace that: – Takes advantage of current equipage– Establishes transition plan that provides key performance

improvements– Enables global interoperability

• ICAO launched Aviation System Global Block Upgrade initiative to facilitate:– Interoperability– Harmonization– Modernization of air transportation world-wide

Page 6: ICAO Aviation System Block Upgrade Executive Briefing:

6ICAO ASBU Executive Briefing

What is an ASBU?

• Aviation System Block Upgrade (ASBU) designates set of improvements that can be implemented globally from defined point in time to enhance performance of ATM System

• A Block is made up of modules• Each module represents a specific, well-bounded improvement• A module can be grouping of several elements which can contain:

– Communications, navigation, surveillance components in aircraft– Communication system– Ground component of ATC automation

• or decision support tool for controllers

– etc. • Elements mutually make module comprehensive & cohesive

Page 7: ICAO Aviation System Block Upgrade Executive Briefing:

7ICAO ASBU Executive Briefing

What is an ASBU? (Cont’d)

• ABSUs are suite or package of capabilities (called modules) where each has essential qualities of: – Clearly defined measurable operational improvement

• with appropriate metric to determine success– Necessary equipment and/or systems in aircraft and on

ground • along with operational approval or certification plan

– Standards & procedures• for airborne & ground systems

– Positive business case • over clearly defined period of time

Page 8: ICAO Aviation System Block Upgrade Executive Briefing:

8ICAO ASBU Executive Briefing

What is an ‘Aviation System Block Upgrade’ ?

8

Page 9: ICAO Aviation System Block Upgrade Executive Briefing:

9ICAO ASBU Executive Briefing

It’s been done before - PBN

9

Operational Improvement•Fewer Runway Excursions•Less Noise & Emissions•Fuel Savings•Lower Pilot workload•Lower ATC WorkloadPerformance Monitoring by PIRGs/States• Metrics

Positive Business Case

•Minimum investment; using existing airborne technology•Rollout (Formulation of business case by States)

Necessary Technology Air & Ground

•Annex 10 (2008)•GNSS Manual (2011)• Rollout (planning & implementation by PIRGs/States)

Global Demonstrationsand/or Trials

•Oceanic – RNP 4; Pacific•Continental – RNAV 5; S. America•RNAV 10; Red Carpet Africa•Challenging Approaches• Lhasa, Queenstown

• Rollout (planning & implementation by PIRGs/States)

Regulatory Approval PlanAir & Ground

•Ops Approval Handbook (2011)•PBN Model Regulations (2011)•Rollout (planning& implementation by PIRGs/States)

Necessary ProceduresAir & Ground

•Annex 2, 10 & 11 (2008)•Annex 14 & 15 (2009)•Annex 4 & 6 (2010)•Annex 3 (2012)•Procedures Ops Vol. 1 & 2 (2008+2010+2012)•Procedures ATM (2010+2012)•Procedures ABC (2010)•PBN Manual (2008+2011)•RNP AR Manual (2009)•Continuous Descent Operations (2010)•Continuous Climb Operations (2012)•Quality Assurance Manual (2010)•Airspace Design Handbook (2011)•Rollout (planning& implementation by PIRGs/States)

Page 10: ICAO Aviation System Block Upgrade Executive Briefing:

ICAO ASBU Executive Briefing 10

Advantage of ICAO’s Approach

• Block Upgrades provide a series of measurable, operational performance improvements

• Organized into flexible & scalable building blocks

• Could be introduced as needed• Implemented as each

individual State and or Region determines feasible – based on individual needs &

level of readiness

Page 11: ICAO Aviation System Block Upgrade Executive Briefing:

11ICAO ASBU Executive Briefing

What is the Basis for ASBUs?

• Foundation of blocks originates from existing, near term implementations and access to benefits that already exist

• Blocks are based on operational concepts extracted from:

• Intent is to apply key capabilities and performance improvements across other regional and local environments – with same level of performance and associated benefits worldwide

• Block upgrades will allow structured approach to meet needs of individual aviation communities worldwide– while considering associated business cases

• Block upgrades reflect recognition that all module solutions are not required in all airspaces

Page 12: ICAO Aviation System Block Upgrade Executive Briefing:

12ICAO ASBU Executive Briefing

ASBUs & Performance Improvements

• ASBUs address 4 key Performance Improvement Areas: – Greener Airports– Globally Interoperable Systems and Data– Optimum Capacity and Flexible Flights– Efficient Flight Path

Page 13: ICAO Aviation System Block Upgrade Executive Briefing:

ICAO ASBU Executive Briefing 13

Improvement Areas, Blocks & ModulesBlock 0(2013)

Block 2(2023)

Block 1(2018)

Block 3(2028 & >)

Optimum Capacity and

Flexible Flights

Globally Interoperable

Systems and Data

Efficient Flight Plan

Greener Airports

Performance Improvement

Areas

Page 14: ICAO Aviation System Block Upgrade Executive Briefing:

14

Roadmaps???

ICAO ASBExecutive Briefing

A slice based on technology.Block 0 Block 1 Block 2 Block 3

+

Communications NavigationSurveillanceAIMAVIONICS

+ Plus whatever else we are doing!!!14

Page 15: ICAO Aviation System Block Upgrade Executive Briefing:

ICAO ASBU Executive Briefing 15

Example of MappingBlock 0(2013)

Block 2(2023)

Block 1(2018)

Block 3(2028 & >)

Optimisation of Approach Procedures Including Vertical

Guidance (GBAS I)

Optimisation of Approach Procedures Including Vertical

Guidance (GBAS II/III)

Wake Vortex Separation

(Time-based)

Greener Airports

Performance Improvement

Areas

Wake Vortex Separation,

Refined

Advanced Wake Vortex Separation

(Time-based)

Runway Sequencing

AMAN/DMAN Metroplex

Linked AMAN/DMAN

Integrated AMAN/DMAN/

SMAN

etc. etc. etc. etc.

Page 16: ICAO Aviation System Block Upgrade Executive Briefing:

16ICAO ASBU Executive Briefing

Timeframe

• Block 0: available to be deployed globally from 2013• Block 1: available to be deployed globally from 2018• Block 2: available to be deployed globally from 2023• Block 3: available to be deployed globally from 2028/beyond

Page 17: ICAO Aviation System Block Upgrade Executive Briefing:

17ICAO ASBU Executive Briefing

Mitigating the Risks

• Deployment of ASBUs chosen to resolve many identified risks• Timing and sizing of Block Upgrades are in response to need for:

– Mature standards– Integrated air and ground solutions– Establishment of positive business cases for level of equipage and

infrastructure costs• Capabilities lacking specific maturity in content or described benefit

are purposefully placed in later Block Upgrades• ASBUs respond to issue of “non-homogeneous deployment across

regions”. – Block components are intended to interoperate seamlessly independent of

how they are implemented in neighboring States– To ensure procedures, training, policy, and other “infrastructure” are

consistent • Ensure safe transition to more capable airspace

Page 18: ICAO Aviation System Block Upgrade Executive Briefing:

18ICAO ASBU Executive Briefing

Improvements for Phases of FlightExample: Block 0

Page 19: ICAO Aviation System Block Upgrade Executive Briefing:

19ICAO ASBU Executive Briefing

A Team Effort

Page 20: ICAO Aviation System Block Upgrade Executive Briefing:

20ICAO ASBU Executive Briefing

What’s Next?

• ASBUs initiative formalized at 12th Air Navigation Conference– In November 2012– As revision to ICAO Global Air Navigation Plan

• Global Air Navigation Industry Symposium (Sept 2011):– Allow States and industry partners to gain insight– Provide feedback– Ultimately commit to concept

• Initiative will influence ICAO’s future Standards development work programmes

• Block Upgrades and associated performance improvements will be realized by implementation actions in regions

Page 21: ICAO Aviation System Block Upgrade Executive Briefing: