Page 1: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

ICAO Annex 10 and Doc 8071: current status and

planned developments

Alessandro CaprettiAlessandro Capretti

Technical Officer, CNSTechnical Officer, CNS

ICAOICAO

Page 2: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Presentation overview

Introduction to ICAO Introduction to ICAO ICAO SARPs and guidance materialICAO SARPs and guidance material

DefinitionsDefinitions Development processDevelopment process

Navigation systems SARPs and GMNavigation systems SARPs and GM The ICAO Navigation Systems Panel (NSP)The ICAO Navigation Systems Panel (NSP) Current SARPs developments in NSPCurrent SARPs developments in NSP Doc 8071 evolutionDoc 8071 evolution

Page 3: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Introduction - ICAO

Convention (Chicago, 1944) and AnnexesConvention (Chicago, 1944) and Annexes UN Specialized AgencyUN Specialized Agency 190 Contracting States190 Contracting States Assembly (ordinarily every 3 years)Assembly (ordinarily every 3 years) Council – 36 StatesCouncil – 36 States Air Navigation Commission – 19 membersAir Navigation Commission – 19 members Secretariat (Secretary General)Secretariat (Secretary General) Standards and Recommended Practices (SARPs)Standards and Recommended Practices (SARPs)

Page 4: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Standards and Recommended Practices (SARPs)

Contained in the Annexes to the ICAO Convention Contained in the Annexes to the ICAO Convention Standard: Any specification […] the uniform Standard: Any specification […] the uniform

application of which is recognized as necessary for the application of which is recognized as necessary for the safety or regularity of international air navigation and to safety or regularity of international air navigation and to which Contracting States will conform in accordance which Contracting States will conform in accordance with the Convention; in the event of impossibility of with the Convention; in the event of impossibility of compliance, notification to the Council is compulsory compliance, notification to the Council is compulsory

Recommended Practice: Similar to Standard, but Recommended Practice: Similar to Standard, but application is “desirable” rather than “necessary” and application is “desirable” rather than “necessary” and notification of non-compliance is not compulsorynotification of non-compliance is not compulsory

Page 5: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Guidance material (GM)

Additional material supplementary to SARPsAdditional material supplementary to SARPs Provides guidance on technical aspects and Provides guidance on technical aspects and

application of SARPsapplication of SARPs Placed in Attachments to Annexes or in separate Placed in Attachments to Annexes or in separate

documents documents Does not have the legal status of SARPsDoes not have the legal status of SARPs Examples: “green pages” in Annexes; Doc 8071; Examples: “green pages” in Annexes; Doc 8071;

GNSS Manual (Doc 9849)GNSS Manual (Doc 9849)

Page 6: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

SARPs development process

Proposed draft developed by ICAO Secretariat and/or Proposed draft developed by ICAO Secretariat and/or groups of expertsgroups of experts

Preliminary review by the Air Navigation Commission Preliminary review by the Air Navigation Commission (ANC)(ANC)

Consultation with States and International Organizations Consultation with States and International Organizations (“State letter”)(“State letter”)

Final review by ANC and report to CouncilFinal review by ANC and report to Council Adoption by CouncilAdoption by Council Approval/disapproval by StatesApproval/disapproval by States SARPs become applicableSARPs become applicable

Page 7: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

InternationalO

rganizations

ANC Recommends

AN Study Group

Divisional MeetingSecretariat

AssemblyContracting States

CouncilSecretariat ANC

Panels & Committees

ANC Panel

ANC

Secretariat Analysis

States

ANNEX

Proposal for Action

PANS

Meetings

3 Months

ANC Approves

Adoption Date(Usually March)

Secretariat

Blue EditionApplicability Date

Disapprove

(Amendment becomes effective if not disapproved by majority of States)

Blue EditionApplicability Date

Council Adopts

Technical Proposal

Contracting States

ANC Final Review10 Months Approximately

Review Phase

Origin of Proposal

Development Phase

Adoption/Publication Phase

2 weeks

Secretariat

4 Months minimumApplicability Date(Usually November)

Direct Submission

Validation

Subject to Approvalby P resident of Council

on behalf o f Council

Green Edition

States

Notification of Differences

Supplement

PANS ANNEX

Effective Date

0 - 5 years

Audio-visual Aids Unit

ICAO, 2004©

4 Months

ANC Preliminary Review

International Organizations

Green Edition

Page 8: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Annexes

Annex 1 — Personnel Licensing Annex 2 — Rules of the Air Annex 3 — Meteorological Service for International Air Navigation Annex 4 — Aeronautical Charts Annex 5 — Units of Measurement to be Used in Air and Ground Operations Annex 6 — Operation of Aircraft Annex 7 — Aircraft Nationality and Registration Marks Annex 8 — Airworthiness of Aircraft Annex 9 — Facilitation

Annex 10 — Aeronautical Telecommunications Annex 11 — Air Traffic Services Annex 12 — Search and Rescue Annex 13 — Aircraft Accident and Incident Investigation Annex 14 — Aerodromes Annex 15 — Aeronautical Information Services Annex 16 — Environmental Protection Annex 17 — Security — Safeguarding International Civil Aviation Against Acts of Unlawful Interference Annex 18 — The Safe Transport of Dangerous Goods by Air

Page 9: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Annex 10

Volume I: Radio Navigation AidsVolume I: Radio Navigation Aids Volume II: Communication ProceduresVolume II: Communication Procedures Volume III: Communication SystemsVolume III: Communication Systems Volume IV Surveillance and Collision Volume IV Surveillance and Collision

Avoidance SystemsAvoidance Systems Volume V: Aeronautical Radio Frequency Volume V: Aeronautical Radio Frequency

Spectrum utilization Spectrum utilization

Page 10: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Volume I SARPs and GM

SARPs (Annex 10 Volume I white pages):SARPs (Annex 10 Volume I white pages): Chapter 1: DefinitionsChapter 1: Definitions Chapter 2: General provisions for radio navigation aidsChapter 2: General provisions for radio navigation aids Chapter 3: Specifications for radio navigation aids:Chapter 3: Specifications for radio navigation aids:

Conventional navaids: ILS, PAR,VOR, NDB, DME, marker beacons, MLSConventional navaids: ILS, PAR,VOR, NDB, DME, marker beacons, MLS GNSS: GPS, GLONASS, ABAS, SBAS, GBAS/GRASGNSS: GPS, GLONASS, ABAS, SBAS, GBAS/GRAS

Appendix A: MLS characteristics: Appendix A: MLS characteristics: Appendix B: Technical specifications for GNSSAppendix B: Technical specifications for GNSS

Guidance Material (Annex 10 Volume I green pages); Guidance Material (Annex 10 Volume I green pages); Attachments A-GAttachments A-G

Other guidance material: Other guidance material: ICAO Doc 8071 (Testing of radio navigation aids), Vol. I and IIICAO Doc 8071 (Testing of radio navigation aids), Vol. I and II ICAO Doc 9849 (GNSS Manual)ICAO Doc 9849 (GNSS Manual)

Page 11: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

The ICAO Navigation Systems Panel (NSP)

Technical group of qualified experts formed by the ANCTechnical group of qualified experts formed by the ANC 31 members (from 23 States and 8 International 31 members (from 23 States and 8 International

Organization), nominated at the ANC’s requestOrganization), nominated at the ANC’s request Members participate in their personal, expert capacity and Members participate in their personal, expert capacity and

not as representatives of their nominatorsnot as representatives of their nominators Created in 2003 by merging the GNSS Panel (established in Created in 2003 by merging the GNSS Panel (established in

1993) and the Testing of Radio Navaids Study Group 1993) and the Testing of Radio Navaids Study Group (TRNSG)(TRNSG)

Responsible for development of SARPs and GM for all radio Responsible for development of SARPs and GM for all radio navigation systems (GNSS and conventional navaids)navigation systems (GNSS and conventional navaids)

Page 12: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Current developments

Review of conventional navaids provisionsReview of conventional navaids provisions GPS/GLONASS evolutionGPS/GLONASS evolution Introduction of GalileoIntroduction of Galileo GNSS Cat II/III landing operations GNSS Cat II/III landing operations SBAS evolutionSBAS evolution Other issuesOther issues

Page 13: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Review of conventional navaids provisions (1)

General clean-up of obsolete or ambiguous materialGeneral clean-up of obsolete or ambiguous material Restructuring of Chapter 2 (General provisions)Restructuring of Chapter 2 (General provisions) Deletion of “protection dates”Deletion of “protection dates” Complete revision of material on ILS critical and sensitive Complete revision of material on ILS critical and sensitive

areasareas Review of VOR/DME service volumes and frequency planning Review of VOR/DME service volumes and frequency planning

materialmaterial Alignment of DME accuracy Standard with actual avionics Alignment of DME accuracy Standard with actual avionics

performanceperformance Deletion of NDB testing materialDeletion of NDB testing material MLS CAT III certification issuesMLS CAT III certification issues

Page 14: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Review of conventional navaids provisions (2)

Impact of changes on existing systems carefully Impact of changes on existing systems carefully evaluatedevaluated

Backwards compatibility assessment completedBackwards compatibility assessment completed Most of the changes should raise no cost / Most of the changes should raise no cost /

implementation issuesimplementation issues Feedback from consultation with States will be Feedback from consultation with States will be

used to confirm these findingsused to confirm these findings State Letter sent in JuneState Letter sent in June Amendment 84, to become applicable end 2009Amendment 84, to become applicable end 2009

Page 15: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Review of conventional navaids provisions (3)

Relaxations of ILS localizer coverage requirements are under Relaxations of ILS localizer coverage requirements are under review by NSP, in coordination with the OPSPreview by NSP, in coordination with the OPSP

Intent: to limit clearance signal reflection (multipath) from Intent: to limit clearance signal reflection (multipath) from buildings buildings

Method: Raising the lower boundary of the coverage from Method: Raising the lower boundary of the coverage from 2000ft height above threshold at 17NM and +/- 15 degrees to 2000ft height above threshold at 17NM and +/- 15 degrees to a variable height (4500 ft max) at +/- 35 degreesa variable height (4500 ft max) at +/- 35 degrees

Condition: “if operational requirements permit” (based on a Condition: “if operational requirements permit” (based on a specific operational impact evaluation)specific operational impact evaluation)

NSP recommendation expected at October 2008 meeting NSP recommendation expected at October 2008 meeting

Page 16: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

GPS SARPs evolution

Short-term (Amendment 83 to Annex 10): Short-term (Amendment 83 to Annex 10): Harmonization with GPS Interface Specification Harmonization with GPS Interface Specification

IS-GPS-200IS-GPS-200 Longer-term:Longer-term:

SARPs for GPS L5 signal (1176.45 MHz), SARPs for GPS L5 signal (1176.45 MHz), designed for safety-of-life usesdesigned for safety-of-life uses

Page 17: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

GLONASS SARPs evolution

Short-term (Amendment 83 to Annex 10): Short-term (Amendment 83 to Annex 10): Harmonization of the formulation of GLONASS Harmonization of the formulation of GLONASS

accuracy, availability and reliability provisions accuracy, availability and reliability provisions with that of the corresponding GPS provisionswith that of the corresponding GPS provisions

Modifications to carrier frequency plans to Modifications to carrier frequency plans to protect radio astronomy bands protect radio astronomy bands

Longer-term:Longer-term: SARPs for GLONASS L3 signal in the 1164 – SARPs for GLONASS L3 signal in the 1164 –

1215 MHz band (GLONASS-K satellites)1215 MHz band (GLONASS-K satellites)

Page 18: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Introduction of Galileo SARPs

Longer term: Galileo SARPs to be Longer term: Galileo SARPs to be developeddevelopedOpen Service (OS)Open Service (OS)Safety of Life (SoL)Safety of Life (SoL)

Page 19: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

SBAS SARPs evolution

SBAS: Satellite-based augmentation system (WAAS, SBAS: Satellite-based augmentation system (WAAS, EGNOS, MSAS, GAGAN)EGNOS, MSAS, GAGAN)

Short-term (Amendment 83 to Annex 10):Short-term (Amendment 83 to Annex 10): Harmonization with airborne receiver standards (RTCA Harmonization with airborne receiver standards (RTCA

DO-229C/D)DO-229C/D) Mid term:Mid term:

Investigate use of SBAS down to a 200 ft decision height Investigate use of SBAS down to a 200 ft decision height (already planned for WAAS)(already planned for WAAS)

Longer term:Longer term: SBAS L5 SARPsSBAS L5 SARPs

Page 20: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

GNSS Cat II/III operations

Current GBAS SARPs support Cat ICurrent GBAS SARPs support Cat I Development of GBAS SARPs for Cat II/III Development of GBAS SARPs for Cat II/III

is ongoing is ongoing NSP Cat II/III SubgroupNSP Cat II/III Subgroup

Several conceptual options still under Several conceptual options still under assessmentassessment

Page 21: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Other SARPs issues

Evolving ICAO policy on formulation of SARPs:Evolving ICAO policy on formulation of SARPs: Assembly Resolution A36-13 (2007)Assembly Resolution A36-13 (2007)

“ SARPs and PANS shall be drafted in clear, simple and concise language. SARPs shall consist of broad, mature and stable provisions specifying functional and performance requirements that provide for the requisite levels of safety, efficiency and interoperability. Supporting technical specifications, when developed by ICAO, shall be placed in separate documents to the extent possible;”

“ In the development of SARPs, procedures and guidance material, ICAO should utilize, to the maximum extent appropriate and subject to the adequacy of a verification and validation process, the work of other recognized standards-making organizations. Material developed by these other standards-making organizations may be deemed appropriate by the Council as meeting ICAO requirements; in this case such material should be referenced in ICAO documentation;”

Evolving relationship with other standards-making organizations

Page 22: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Doc 8071Manual on testing of radio navigation aids

Volume IVolume I — Testing of Ground-based Radio Navigation Systems.

Volume II — Testing of Satellite-based Radio Navigation Systems.

Volume III — Testing of Surveillance Radar Systems.

Page 23: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

Doc 8071 evolution

NSP CNTSG (Conventional Navaids and Testing Subgroup) NSP CNTSG (Conventional Navaids and Testing Subgroup) is responsible for the development of updates to Doc 8071is responsible for the development of updates to Doc 8071

New material on flight validation of instrument flight New material on flight validation of instrument flight procedures introduced as Chapter 5 of Volume II in 2007procedures introduced as Chapter 5 of Volume II in 2007

Similar material to be introduced as Chapter 8 of Volume ISimilar material to be introduced as Chapter 8 of Volume I Additional corrigendum to Volume II (GBAS chapter) to be Additional corrigendum to Volume II (GBAS chapter) to be

published shortlypublished shortly Package of Volume I changes to be developed by NSP Package of Volume I changes to be developed by NSP

CNTSG (October 2008 meeting), to align with the proposed CNTSG (October 2008 meeting), to align with the proposed changes to SARPs.changes to SARPs.

Page 24: ICAO Annex 10 and Doc 8071

16th International Flight Inspection Symposium Oklahoma City, 23 – 27 June 2008

END

Thank you for your attention!Thank you for your attention!