ibm maximo adapter for 7

49
IBM Maximo Adapter for Primavera

Upload: cadvis2k

Post on 21-Apr-2015

127 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: IBM Maximo Adapter for 7

IBM Maximo Adapter for Primavera

���

Page 2: IBM Maximo Adapter for 7

ii IBM Maximo Adapter for Primavera

Page 3: IBM Maximo Adapter for 7

Contents

Chapter 1. IBM Maximo Adapter for

Primavera 7.1 product overview . . . . 1

Chapter 2. User interface changes with

IBM Maximo Adapter for Primavera . . . 3

Chapter 3. Administering . . . . . . . 5

Customizing user preferences . . . . . . . . . 5

Query names . . . . . . . . . . . . . . 5

Defining projects in Maximo and Primavera Project

Management . . . . . . . . . . . . . . 6

Creating relationships between tasks on projects . 7

Tracking project progress . . . . . . . . . 8

Transferring data between Maximo and Primavera . 8

Importing data from Primavera . . . . . . . 9

Exporting data to Primavera Project Management 11

Appending result sets . . . . . . . . . . 14

Updating projects . . . . . . . . . . . 15

Overwriting projects . . . . . . . . . . 16

EPS detail . . . . . . . . . . . . . . . 17

Options for exporting data . . . . . . . . . 18

Data transfer requirements and restrictions . . . . 20

Deleting projects in Maximo and in Primavera

Project Management . . . . . . . . . . . 21

Excluding data from Primavera Project Management 22

Specifying scheduling information for tasks . . . 22

Defining custom mapping . . . . . . . . . 23

Checking error details . . . . . . . . . . . 24

Data transfer tables . . . . . . . . . . . . 24

Data transfer customization: PLUSVMAP Table 24

The Maximo Asset Management WORKORDER

table for importing activities . . . . . . . . 27

The Maximo Asset Management base table for

exporting craft roles . . . . . . . . . . 29

The Maximo Asset Management PLUSVSESSION

table for importing EPS nodes . . . . . . . 31

The Maximo Asset Management table for

exporting labor and crafts . . . . . . . . 33

The PLUSVLOGIC table for importing logic . . 34

The Maximo Asset Management table for

exporting project expenses . . . . . . . . 35

The Maximo Asset Management PLUSVSESSION

table for importing new activities . . . . . . 36

The Maximo Asset Management PLUSVCACHE

table for transferring resources . . . . . . . 37

The Maximo Asset Management WORKORDER

Table for exporting tasks . . . . . . . . . 38

The Maximo Asset Management table for

exporting tools as resources . . . . . . . . 39

The Maximo Asset Management PLUSVSESSION

table for exporting work breakdown structure

(WBS) . . . . . . . . . . . . . . . 39

The Maximo Asset Management WORKORDER

Table for importing work breakdown structure

(WBS) . . . . . . . . . . . . . . . 40

The Maximo Asset Management PLUSVSESSION

table for transferring the work order hierarchy . 40

Chapter 4. Notices for IBM Maximo

Adapter for Primavera 7.1 . . . . . . 43

Index . . . . . . . . . . . . . . . 45

iii

Page 4: IBM Maximo Adapter for 7

iv IBM Maximo Adapter for Primavera

Page 5: IBM Maximo Adapter for 7

Chapter 1. IBM Maximo Adapter for Primavera 7.1 product

overview

With IBM® Maximo® Adapter for Primavera, you can view, schedule and work

with Primavera Project Management data from within IBM Maximo Asset

Management. The Maximo Adapter for Primavera integrates the work

management of Maximo Asset Management with the resource levelling and

scheduling of Primavera.

With the Maximo Adapter for Primavera, you can perform the following tasks:

v Integrate Maximo Asset Management work orders, preventive maintenance (PM)

records, assets, resources, and calendars with Primavera. In Primavera, work

orders and PM records are referred to as activities.

v Create Maximo Asset Management work orders from activities in Primavera.

v Update data in the Maximo Asset Management database with the new

schedules, logic, and activities from Primavera.

v Link operational maintenance activities that are defined in Maximo Adapter for

Primavera with project work that is planned in Primavera.Related reference

Chapter 2, “User interface changes with IBM Maximo Adapter for Primavera,” on

page 3When you install IBM Maximo Adapter for Primavera some new fields and tabs

are added to the user interface.

1

Page 6: IBM Maximo Adapter for 7

2 IBM Maximo Adapter for Primavera

Page 7: IBM Maximo Adapter for 7

Chapter 2. User interface changes with IBM Maximo Adapter

for Primavera

When you install IBM Maximo Adapter for Primavera some new fields and tabs

are added to the user interface.

Table 1. Tabs added to the Maximo Asset Management user interface

Tab name Applications Function

Primavera v Work Order Tracking (PV)

v Preventive Maintenance

(PV)

v Labor

Controls the transfer of data

between Maximo Adapter for

Primavera and Primavera

Logic v Work Order Tracking (PV)

v Job Plans (PV)

Holds logic information

between tasks

Fields are also added to the Work Order Tracking (PV), Labor, and Locations (PV)

applications to hold Primavera data.

Related concepts

Chapter 1, “IBM Maximo Adapter for Primavera 7.1 product overview,” on page 1With IBM Maximo Adapter for Primavera, you can view, schedule and work with

Primavera Project Management data from within IBM Maximo Asset Management.

The Maximo Adapter for Primavera integrates the work management of Maximo

Asset Management with the resource levelling and scheduling of Primavera.

3

Page 8: IBM Maximo Adapter for 7

4 IBM Maximo Adapter for Primavera

Page 9: IBM Maximo Adapter for 7

Chapter 3. Administering

Customizing user preferences

Each user can create custom settings in IBM Maximo Adapter for Primavera to

exclude particular data from Primavera Project Management.

1. On the List tab of the Labor application, run a query to select the labor records

that you want to work with.

2. In the Labor application, click the Primavera tab.

3. Select from the following options for the data that you want to exclude:

v Exclude Milestone Generation on Primavera

Used with Workorders export to Activities. If you want the WBS structure

created but not the milestones, select this check box. If Workorders export to

Activities is not selected, work orders are transferred into a WBS structure

and milestones are created from target start and finish dates.

v Exclude Export of Duplicate Projects

If selected, any projects existing in Primavera Enterprise Project Manager are

not exported.

v Exclude Labor from Primavera Resource Pool

If selected, labor records are not transferred to Primavera Enterprise Project

Manager.

Results

After you set the user preferences, the preferences will be in effect the next time

you perform an export procedure.

Related tasks

“Configuring settings for exporting purchase constraints” on page 13You can configure settings in the Primavera Site Options dialog box in IBM

Maximo Adapter for Primavera for exporting purchase constraints to Primavera

Project Management. You can control when the purchase constraints are exported,

based on purchase line items, requisition line items, or both.

Query names

The IBM Maximo Asset Management query function can be used to create queries

for work orders or PM records that are exported to Primavera Project Management.

When the selection criteria is defined, it is recommended that you save the query

with a name that uses a project reference so that the selection criteria can be reused

for the given project. It is recommended that you use a naming convention that

distinguishes Primavera integration queries from other queries.

5

Page 10: IBM Maximo Adapter for 7

Related tasks

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.

Defining projects in Maximo and Primavera Project Management

A project is a collection of one or more work orders. The project logic establishes

the relationships between the work orders. You can define a project when you

export work orders to Primavera Project Management.

About this task

If you export a work order to create a project, that project name is the selected

work order ID or the ID of the parent work order. The project description is the

work order description or the parent work order description and the project

planned start date is the date that you exported the work orders.

1. On the List tab of the Work Order Tracking (PV) application, run a query to

select the work orders that you want to export to the new project.

2. In the Work Order Tracking application, click.

3. From the Primavera tab, go to the Export tab and expand the EPS node in

which you want the new project to be.

4. Select the appropriate options from the options list.

5. In the Primavera EPS Detail section, choose one of the following export

functions to export your data:

Option Description

Work Orders Export creates a new project in

Primavera for each work order in the query

result set.

Click Work Orders Export.

Project Export creates a new project in

Primavera that includes all work orders in

the query result set.

Specify the project name, project description,

and planned start date and then click

Project Export. If you do not specify a

planned start date, the current date is used

as the planned start date on the project.

Results

After you have confirmed the action, the project is created in Primavera.

6 IBM Maximo Adapter for Primavera

Page 11: IBM Maximo Adapter for 7

Related concepts

“Data transfer requirements and restrictions” on page 20There are several requirements and restrictions on what data can be transferred

between IBM Maximo Asset Management and Primavera Project Management.

“EPS detail” on page 17The Enterprise Project Structure (EPS) is a framework in the Primavera product

that contains details of the projects that are in the database and the ownership of

those projects. When a project is created, it is assigned to an EPS node. Every time

that you transfer data between IBM Maximo Asset Management and Primavera

Project Management, you should verify that the Enterprise Project Structure (EPS)

into which you plan to transfer data exists in Primavera.Related tasks

“Appending result sets” on page 14You can use the IBM Maximo Asset Management to append a result set to a

project. When you append a work order to a project, you are creating new

activities in Primavera Project Management.

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

“Overwriting projects” on page 16You can use the overwrite functionality to overwrite a project in Primavera Project

Management that was created by exporting the project from IBM Maximo Asset

Management. When you overwrite a project, all work orders are removed but all

the project details, such as notes and logs are maintained.

Creating relationships between tasks on projects

The relationships between tasks on a work order is called logic in IBM Maximo

Asset Management. You can add relationships in Primavera Project Management

and export them to Maximo Asset Management where they can be viewed on the

Logic tab. All dates that are based on the relationships that are generated in

Primavera can be exported and stored also in Maximo Asset Management. You can

add logic in Maximo Asset Management but Maximo Asset Management does not

display the relationships through a visual component as in Primavera.

About this task

The Logic tab in the Job Plans (PV) application and the Logic tab in the Work

Order Tracking (PV) application provide the same functionality. You can begin this

process from either application.

Valid values for the type of relationship are the following:

v FF - Finish to Finish: The completion of the To Task activity depends on the

completion of the From Task activity.

v FS - Finish to Start: The start of the To Task activity depends on the completion

of the From Task activity.

v SF - Start to Finish: The To Task activity cannot complete until the From Task

activity starts.

Chapter 3. Administering 7

Page 12: IBM Maximo Adapter for 7

v SS - Start to Start: The start of the To Task activity depends on the start of the

From Task activity.1. Go into the Job Plans (PV) or the Work Order Tracking (PV) application. Select

the job plan or work order for which you want to create logic.

2. On the Logic tab, in the Logic for Job Plan name section or Logic for Work

Order name section, click New Row.

3. Enter the information in the fields to indicate the relationship between the two

tasks.

4. Optional: Enter a number in the Lag field to indicate the number of hours

required before the subsequent activity can start.

5. Save your changes.

What to do next

If you want to view the logic for a particular job plan or work order, you can view

that information on the Logic tab.

Related reference

“The PLUSVLOGIC table for importing logic” on page 34Predecessor and successor constraints are imported from Primavera Project

Management to the IBM Maximo Asset Management WORKORDER table as task

records and to the PLUSVLOGIC table.

Tracking project progress

You can check the progress of your project by looking at the percent complete for

the work orders that make up that project.

1. In the Work Order Tracking (PV) application, click the Work Order tab.

2. In the Scheduling Information section, check the % Complete for the work

order.

Related tasks

“Specifying scheduling information for tasks” on page 22You can use the IBM Maximo Adapter for Primavera to specify scheduling

information for selected tasks including target, actual and scheduled start and

finish dates, primary constraint and constraint date, the duration and the percent

complete.

Transferring data between Maximo and Primavera

There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.

8 IBM Maximo Adapter for Primavera

Page 13: IBM Maximo Adapter for 7

Related concepts

“Data transfer requirements and restrictions” on page 20There are several requirements and restrictions on what data can be transferred

between IBM Maximo Asset Management and Primavera Project Management.

“Query names” on page 5The IBM Maximo Asset Management query function can be used to create queries

for work orders or PM records that are exported to Primavera Project Management.

When the selection criteria is defined, it is recommended that you save the query

with a name that uses a project reference so that the selection criteria can be reused

for the given project. It is recommended that you use a naming convention that

distinguishes Primavera integration queries from other queries.Related tasks

“Appending result sets” on page 14You can use the IBM Maximo Asset Management to append a result set to a

project. When you append a work order to a project, you are creating new

activities in Primavera Project Management.

“Defining projects in Maximo and Primavera Project Management” on page 6A project is a collection of one or more work orders. The project logic establishes

the relationships between the work orders. You can define a project when you

export work orders to Primavera Project Management.

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

“Importing data from Primavera”You can use the IBM Maximo Adapter for Primavera to import information from

Primavera Project Management. The types of information that you can import

include logic, activities, schedule dates, and actual dates. Activities are imported as

work orders.

“Updating projects” on page 15You can use Update Work Order/Task Options to update a project. The update

process only changes work orders that currently exist in the project. It does not

create new data or new work orders.Related reference

“Data transfer customization: PLUSVMAP Table” on page 24You can use the PLUSVMAP table to customize the transfer of data between IBM

Maximo Asset Management and Primavera Project Management. Because the

information must be entered into the table manually, a System Administrator or

equally qualified person must enter the data.

“The Maximo Asset Management PLUSVCACHE table for transferring resources”

on page 37Craft, labor, tools, and calendars are transferred from IBM Maximo Asset

Management base tables to the PLUSVCACHE table.

Importing data from Primavera

You can use the IBM Maximo Adapter for Primavera to import information from

Primavera Project Management. The types of information that you can import

include logic, activities, schedule dates, and actual dates. Activities are imported as

work orders.

Chapter 3. Administering 9

Page 14: IBM Maximo Adapter for 7

About this task

The Primavera activity ID is used as the work order number for the imported

work orders.

1. In the Work Order Tracking (PV) application, click the Primavera tab.

2. From the Projects tab, select a project for which you want to import

information.

3. From the Import Work Order Items field, select from the appropriate options.

4. Click Import.

Results

After you confirm the action, the data is imported to Maximo Asset Management.

Related concepts

“EPS detail” on page 17The Enterprise Project Structure (EPS) is a framework in the Primavera product

that contains details of the projects that are in the database and the ownership of

those projects. When a project is created, it is assigned to an EPS node. Every time

that you transfer data between IBM Maximo Asset Management and Primavera

Project Management, you should verify that the Enterprise Project Structure (EPS)

into which you plan to transfer data exists in Primavera.Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

“Importing new activities from Primavera Project Management”You use the Import Work Order Options option to import new activities from

Primavera Project Management into IBM Maximo Asset Management via the IBM

Maximo Adapter for Primavera.

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.

Importing new activities from Primavera Project Management

You use the Import Work Order Options option to import new activities from

Primavera Project Management into IBM Maximo Asset Management via the IBM

Maximo Adapter for Primavera.

1. On the List tab of the Work Order Tracking (PV) application, run a query to

select the work orders that you want to export to the new project.

2. From the Primavera tab, go to the Export tab and expand the EPS node for the

project that contains the new activities that you want to import.

3. In the Projects tab, in the Import Work Order Options field, click Import.

Results

After you confirm the action, the activities are imported to Primavera.

10 IBM Maximo Adapter for Primavera

Page 15: IBM Maximo Adapter for 7

Related tasks

“Importing data from Primavera” on page 9You can use the IBM Maximo Adapter for Primavera to import information from

Primavera Project Management. The types of information that you can import

include logic, activities, schedule dates, and actual dates. Activities are imported as

work orders.Related reference

“The Maximo Asset Management WORKORDER table for importing activities” on

page 27Activities are imported from Primavera Project Management to the IBM Maximo

Asset Management WORKORDER table as task records.

Exporting data to Primavera Project Management

You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

About this task

If you do not want to export all the child work orders and their content, you can

check Exclude work order hierarchy to exclude all child work orders from the

export procedure.

1. On the List tab of the Work Order Tracking (PV) application, run a query to

select the work orders that you want to export to the new project.

2. From the Primavera tab, go to the Export tab and expand the EPS node in

which you want the new project to be.

3. Select the appropriate options from the options list.

4. In the Primavera EPS Detail section, choose one of the following export

functions to export your data:

Option Description

Work Orders Export creates a new project in

Primavera for each work order in the query

result set.

Click Work Orders Export.

Project Export creates a new project in

Primavera that includes all work orders in

the query result set.

Enter the project name, project description,

and planned start date and then click

Project Export. If you do not enter a

planned start date, the current date is used

as the planned start date on the project.

Results

After you have confirmed the action, the project is exported to Primavera.

Chapter 3. Administering 11

Page 16: IBM Maximo Adapter for 7

Related concepts

“EPS detail” on page 17The Enterprise Project Structure (EPS) is a framework in the Primavera product

that contains details of the projects that are in the database and the ownership of

those projects. When a project is created, it is assigned to an EPS node. Every time

that you transfer data between IBM Maximo Asset Management and Primavera

Project Management, you should verify that the Enterprise Project Structure (EPS)

into which you plan to transfer data exists in Primavera.Related tasks

“Appending result sets” on page 14You can use the IBM Maximo Asset Management to append a result set to a

project. When you append a work order to a project, you are creating new

activities in Primavera Project Management.

“Checking error details” on page 24If you receive an error message after an export procedure, you can check the

details of these errors on the Exception tab.

“Configuring settings for exporting purchase constraints” on page 13You can configure settings in the Primavera Site Options dialog box in IBM

Maximo Adapter for Primavera for exporting purchase constraints to Primavera

Project Management. You can control when the purchase constraints are exported,

based on purchase line items, requisition line items, or both.

“Defining projects in Maximo and Primavera Project Management” on page 6A project is a collection of one or more work orders. The project logic establishes

the relationships between the work orders. You can define a project when you

export work orders to Primavera Project Management.

“Excluding data from Primavera Project Management” on page 22You can create custom settings in IBM Maximo Adapter for Primavera to exclude

particular data from Primavera Project Management.

“Importing data from Primavera” on page 9You can use the IBM Maximo Adapter for Primavera to import information from

Primavera Project Management. The types of information that you can import

include logic, activities, schedule dates, and actual dates. Activities are imported as

work orders.

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.Related reference

“The Maximo Asset Management base table for exporting craft roles” on page 29IBM Maximo Asset Management crafts are exported to Primavera Project

Management as roles. When Maximo Asset Management crafts are exported as

roles, they are collected under a single Primavera role heading called MAXCRAFT.

“The Maximo Asset Management table for exporting project expenses” on page 35IBM Maximo Asset Management material costs are exported to Primavera Project

Management as expenses. When Maximo Asset Management materials are

exported to Primavera, they are summarized as activity expenses.

“Options for exporting data” on page 18You can customize how you export data using the data export options on the

Export sub-tab of the Primavera tab.

“The Maximo Asset Management WORKORDER Table for exporting tasks” on

page 38Work orders identified in the PLUSVSESSION table as tasks (EXP_TASK) are

exported to Primavera Project Management as activities.

12 IBM Maximo Adapter for Primavera

Page 17: IBM Maximo Adapter for 7

“The Maximo Asset Management table for exporting tools as resources” on page 39IBM Maximo Asset Management tools are exported to Primavera Project

Management as resources. Maximo Asset Management tools are collected under a

single Primavera role heading called MAXTOOLS.

“The Maximo Asset Management PLUSVSESSION table for transferring the work

order hierarchy” on page 40Parent work orders and the hierarchy of sub work orders are transferred from IBM

Maximo Asset Management base tables to the PLUSVSESSION table.

Configuring settings for exporting purchase constraints

You can configure settings in the Primavera Site Options dialog box in IBM

Maximo Adapter for Primavera for exporting purchase constraints to Primavera

Project Management. You can control when the purchase constraints are exported,

based on purchase line items, requisition line items, or both.

1. On the List tab in the Organizations (PV) application, select an organization.

2. From the Select Action menu, select Primavera Site Options.

3. In the Transfer Purchase Constraints To Primavera Based On section, select

the one option that you want from the following:

v Purchase Line Item

If selected, purchase constraint activities are created in Primavera only when

the purchase line item is tied to a work order task that is being exported to

Primavera.

v Requisition Line Item

If selected, purchase constraint activities are created in Primavera only when

the requisition line item is tied to a work order task that is being exported to

Primavera.

v Both Purchase and Requisition

If selected, purchase constraint activities are created in Primavera when

either the purchase line item or the requisition line item is tied to a work

order task that is being exported to Primavera.

v None

If selected, no purchase constraint activities are created in Primavera. This is

the default option.4. To specify a constraint type, click Select Value to display a list of valid values.

5. Click OK.

Results

After the settings have been configured, the purchase constraints will be exported

as configured during the next export process.

Chapter 3. Administering 13

Page 18: IBM Maximo Adapter for 7

Related tasks

“Configuring settings for exporting purchase constraints” on page 13You can configure settings in the Primavera Site Options dialog box in IBM

Maximo Adapter for Primavera for exporting purchase constraints to Primavera

Project Management. You can control when the purchase constraints are exported,

based on purchase line items, requisition line items, or both.

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

“Customizing user preferences” on page 5Each user can create custom settings in IBM Maximo Adapter for Primavera to

exclude particular data from Primavera Project Management.

Appending result sets

You can use the IBM Maximo Asset Management to append a result set to a

project. When you append a work order to a project, you are creating new

activities in Primavera Project Management.

1. On the List tab of the Work Order Tracking (PV) application, run a query to

select the work orders that you want to append to the project.

2. On the Primavera tab, click the Projects tab. Expand the project to which you

want to append the selected work orders.

3. In the Modify Project section, click Append.

Results

After you confirm the action, the result set is appended to the project.

14 IBM Maximo Adapter for Primavera

Page 19: IBM Maximo Adapter for 7

Related concepts

“Data transfer requirements and restrictions” on page 20There are several requirements and restrictions on what data can be transferred

between IBM Maximo Asset Management and Primavera Project Management.Related tasks

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.

“Defining projects in Maximo and Primavera Project Management” on page 6A project is a collection of one or more work orders. The project logic establishes

the relationships between the work orders. You can define a project when you

export work orders to Primavera Project Management.

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

“Updating projects”You can use Update Work Order/Task Options to update a project. The update

process only changes work orders that currently exist in the project. It does not

create new data or new work orders.Related reference

“Options for exporting data” on page 18You can customize how you export data using the data export options on the

Export sub-tab of the Primavera tab.

Updating projects

You can use Update Work Order/Task Options to update a project. The update

process only changes work orders that currently exist in the project. It does not

create new data or new work orders.

About this task

The parent work orders, or PM records that you want to transfer to Primavera

Project Management must be listed on the List tab in the Work Order Tracking

(PV) or Preventive Maintenance (PV) application. Child work orders are

transferred to Primavera Project Management only as part of a hierarchy. Child

work orders listed on the List tab are not transferred to Primavera Project

Management.

The activity changes that are transferred are as follows.

v All activity resource assignments

v Maximo named activity codes

v Activity fields defined in the standard integration and in the PLUSVMAP table

The update happens in two phases. The first phase identifies all activities created

in IBM Maximo Asset Management and their associated resource assignments. The

resource assignments are deleted from the adapter table. This approach does not

affect any activity information that was added through Primavera Project

Management. The second phase inserts activity information created in Maximo

Asset Management into the adapter table, including resource assignments.

Chapter 3. Administering 15

Page 20: IBM Maximo Adapter for 7

1. On the List tab of the Work Order Tracking (PV) application, run a query to

select the work orders that you want to export to the new project.

2. From the Primavera tab, go to the Projects tab and select a project that you

want to update.

3. In the Update Work Order/Task Options section, select what you want to

update,

v Update cost only

v Update all

v Update all except

If you choose Update all except, select the check boxes that correspond to the

items that you want to exclude from the update.

You can also choose to append new data from query results and update

existing data by selecting the Append on update check box.Related tasks

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.

“Appending result sets” on page 14You can use the IBM Maximo Asset Management to append a result set to a

project. When you append a work order to a project, you are creating new

activities in Primavera Project Management.Related reference

“Options for exporting data” on page 18You can customize how you export data using the data export options on the

Export sub-tab of the Primavera tab.

Overwriting projects

You can use the overwrite functionality to overwrite a project in Primavera Project

Management that was created by exporting the project from IBM Maximo Asset

Management. When you overwrite a project, all work orders are removed but all

the project details, such as notes and logs are maintained.

About this task

The following items are replaced when you overwrite a project:

v Work Breakdown Structure (WBS)

v Activities

v Resource assignments

v Activity codes

v Predecessor and successor logic

One advantage to using the overwrite function is that when the new project is

exported, rather than exporting all the data, only the changed data is exported,

which simplifies the process and cuts down on processing time.

1. In the Work Order Tracking (PV) application, click on the Primavera tab.

2. From the Projects tab, select the project that you want to overwrite.

3. In the Overwrite section, click Overwrite Project.

16 IBM Maximo Adapter for Primavera

Page 21: IBM Maximo Adapter for 7

Results

After you confirm the action, the project is overwritten.

Related concepts

“EPS detail”The Enterprise Project Structure (EPS) is a framework in the Primavera product

that contains details of the projects that are in the database and the ownership of

those projects. When a project is created, it is assigned to an EPS node. Every time

that you transfer data between IBM Maximo Asset Management and Primavera

Project Management, you should verify that the Enterprise Project Structure (EPS)

into which you plan to transfer data exists in Primavera.Related tasks

“Deleting projects in Maximo and in Primavera Project Management” on page 21You can delete a project from IBM Maximo Asset Management and Primavera

Project Management at the same time. If you delete a project, you delete the

relationships between the work orders that make up the project. The work orders

are not actually deleted.

“Defining projects in Maximo and Primavera Project Management” on page 6A project is a collection of one or more work orders. The project logic establishes

the relationships between the work orders. You can define a project when you

export work orders to Primavera Project Management.

EPS detail

The Enterprise Project Structure (EPS) is a framework in the Primavera product

that contains details of the projects that are in the database and the ownership of

those projects. When a project is created, it is assigned to an EPS node. Every time

that you transfer data between IBM Maximo Asset Management and Primavera

Project Management, you should verify that the Enterprise Project Structure (EPS)

into which you plan to transfer data exists in Primavera.

The EPS and the Organizational Breakdown Structure (OBS) must be defined in

Primavera Project Management and then imported into IBM Maximo Asset

Management before data can be exported to Primavera. You must keep the EPS

detail up-to-date in Maximo Asset Management.

Refresh the EPS details from the Export tab before any transfer operation.

Chapter 3. Administering 17

Page 22: IBM Maximo Adapter for 7

Related concepts

“Data transfer requirements and restrictions” on page 20There are several requirements and restrictions on what data can be transferred

between IBM Maximo Asset Management and Primavera Project Management.Related tasks

“Defining projects in Maximo and Primavera Project Management” on page 6A project is a collection of one or more work orders. The project logic establishes

the relationships between the work orders. You can define a project when you

export work orders to Primavera Project Management.

“Deleting projects in Maximo and in Primavera Project Management” on page 21You can delete a project from IBM Maximo Asset Management and Primavera

Project Management at the same time. If you delete a project, you delete the

relationships between the work orders that make up the project. The work orders

are not actually deleted.

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

“Importing data from Primavera” on page 9You can use the IBM Maximo Adapter for Primavera to import information from

Primavera Project Management. The types of information that you can import

include logic, activities, schedule dates, and actual dates. Activities are imported as

work orders.

“Overwriting projects” on page 16You can use the overwrite functionality to overwrite a project in Primavera Project

Management that was created by exporting the project from IBM Maximo Asset

Management. When you overwrite a project, all work orders are removed but all

the project details, such as notes and logs are maintained.Related reference

“The Maximo Asset Management PLUSVSESSION table for importing EPS nodes”

on page 31Use the IBM Maximo Asset Management crafts are exported to PLUSVSESSION

table to import EPS nodes from Primavera Project Management to Maximo Asset

Management. The PLUSVSESSION table holds project and parent work order

information. When a project is selected to import into Maximo Asset Management,

the relevant row is retrieved from the PLUSVSESSION table and the PV_PROJ_ID

is used to retrieve the project from Primavera.

Options for exporting data

You can customize how you export data using the data export options on the

Export sub-tab of the Primavera tab.

Table 2. Data export options on the Export tab

Option name Status Notes

Work orders export to

activities

Optional If selected, all work orders and tasks are

created as activities in Primavera; no WBS

structure is created. As a result, milestones

are not generated in Primavera.

18 IBM Maximo Adapter for Primavera

Page 23: IBM Maximo Adapter for 7

Table 2. Data export options on the Export tab (continued)

Option name Status Notes

Import new activities from

Primavera

Optional If selected, the option Import new

activities from Primavera sets the

corresponding option, Import Primavera

Activities As New WO Tasks in the

project record that is created on Maximo

Asset Management. When you import a

project from the Projects tab, the Import

Primavera Activities As New WO Tasks

option is already checked.

Include Primavera logic on

import

Optional If selected, the option Include Primavera

logic on import sets the corresponding

option, Import Primavera Logic Between

WO Tasks in the project record that is

created on Maximo Asset Management.

When you import a project from the

Projects tab, the Import Primavera Logic

Between WO Tasks option is already

checked.

Exclude work order

hierarchy

Optional If selected, child work orders are not

included in the export to Primavera unless

they satisfy the query condition.

Allocate New Wonum

automatically

Optional If selected, work order numbers are

generated for new task work orders that

are imported into Maximo Asset

Management.

Calculate remaining units

from reported actual hours

Optional If selected, actual labor hours are used to

calculate labor remaining units and labor

remaining units and time.

SQL Where clause to filter

child WOs and tasks

Optional If completed, the where clause is used to

determine the child work orders and tasks

to include with the work orders that are

selected for transfer. Any valid field of a

work order can be used in the where

clause as well as standard SQL logical

operations.

Specify cost transfer method Select one

option.

This option determines whether costs are

transferred from Maximo Asset

Management to Primavera and the level of

detail of the costs.

Transfer Detail Labor

Transactions

Optional If selected, detailed actual labor hours are

transferred from Maximo Asset

Management to Primavera. To enable this

option, the Transfer Detailed Work Order

and Task Costs cost transfer method must

be selected and the Exclude Labor from

Primavera Resource Pool option on the

Primavera tab in the Labor application

must be empty.

Chapter 3. Administering 19

Page 24: IBM Maximo Adapter for 7

Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

“Appending result sets” on page 14You can use the IBM Maximo Asset Management to append a result set to a

project. When you append a work order to a project, you are creating new

activities in Primavera Project Management.

“Updating projects” on page 15You can use Update Work Order/Task Options to update a project. The update

process only changes work orders that currently exist in the project. It does not

create new data or new work orders.

Data transfer requirements and restrictions

There are several requirements and restrictions on what data can be transferred

between IBM Maximo Asset Management and Primavera Project Management.

v Project maintenance (PM) records

To transfer PM records from Maximo Asset Management to Primavera, in the

Preventative Maintenance (PV) application, the following settings must be

configured.

– The Estimated Next Due Date (that is located on the Time Based Frequency

sub-tab of the Frequency tab) must be set to a future date.

– The Extended Date on the Frequency tab must equal the current date.

– Adjust Next Due Date must be selected.

PM records in a hierarchy and PM records not in a hierarchy can be exported.

All PM records and job plans that you want to export must be active.

v Purchase order lines

If a work order is referenced on a purchase order line and the work order is

exported to a project in Primavera, the purchase order line becomes a constraint

activity in Primavera with a Finish-Start relationship to the work order activity.

For example: In Maximo Asset Management, PO 1068 line 1 references work

order 1032. When the project is exported, both the PO line and the work order

become activities in Primavera. The PO activity is created with a Finish-Start

relationship to activity 1032.

v Labor, crafts, and tools

All labor, crafts, and tools are exported to Primavera the first time there is an

export from Maximo Asset Management. If a resource changes in Maximo Asset

Management, the corresponding record in Primavera changes on the next export

from Maximo Asset Management.

v Calendars

If the mxe.primavera.exportcalendars parameter in the MAXPROP table is set to

Y then all calendars are exported to Primavera the first time there is an export

from Maximo Asset Management to Primavera. If a calendar changes in Maximo

Asset Management, the corresponding calendar in Primavera changes on the

next export from Maximo Asset Management.

v Dates

Actual start, actual finish, scheduled start, scheduled finish, and constraint dates

are the only date fields that are exported from Maximo Asset Management to

20 IBM Maximo Adapter for Primavera

Page 25: IBM Maximo Adapter for 7

Primavera. Projects that are imported back into Maximo Asset Management

update the scheduled or actual dates depending on the status of the activity in

Primavera. If the activity is not started, the scheduled dates are changed with

the values that are imported from Primavera. If an activity is started, the actual

dates are changed with the values that are imported from Primavera. Target

dates are never affected by importing a project into Maximo Asset Management.

Related concepts

“EPS detail” on page 17The Enterprise Project Structure (EPS) is a framework in the Primavera product

that contains details of the projects that are in the database and the ownership of

those projects. When a project is created, it is assigned to an EPS node. Every time

that you transfer data between IBM Maximo Asset Management and Primavera

Project Management, you should verify that the Enterprise Project Structure (EPS)

into which you plan to transfer data exists in Primavera.Related tasks

“Appending result sets” on page 14You can use the IBM Maximo Asset Management to append a result set to a

project. When you append a work order to a project, you are creating new

activities in Primavera Project Management.

“Defining projects in Maximo and Primavera Project Management” on page 6A project is a collection of one or more work orders. The project logic establishes

the relationships between the work orders. You can define a project when you

export work orders to Primavera Project Management.

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.Related reference

“Data transfer customization: PLUSVMAP Table” on page 24You can use the PLUSVMAP table to customize the transfer of data between IBM

Maximo Asset Management and Primavera Project Management. Because the

information must be entered into the table manually, a System Administrator or

equally qualified person must enter the data.

Deleting projects in Maximo and in Primavera Project Management

You can delete a project from IBM Maximo Asset Management and Primavera

Project Management at the same time. If you delete a project, you delete the

relationships between the work orders that make up the project. The work orders

are not actually deleted.

1. Open the Work Order Tracking (PV) application and click the Primavera tab.

2. On the Project tab, select the project that you want to delete. Expand the

project detail.

3. In the Modify Projects section, click Delete.

Chapter 3. Administering 21

Page 26: IBM Maximo Adapter for 7

Related concepts

“EPS detail” on page 17The Enterprise Project Structure (EPS) is a framework in the Primavera product

that contains details of the projects that are in the database and the ownership of

those projects. When a project is created, it is assigned to an EPS node. Every time

that you transfer data between IBM Maximo Asset Management and Primavera

Project Management, you should verify that the Enterprise Project Structure (EPS)

into which you plan to transfer data exists in Primavera.Related tasks

“Overwriting projects” on page 16You can use the overwrite functionality to overwrite a project in Primavera Project

Management that was created by exporting the project from IBM Maximo Asset

Management. When you overwrite a project, all work orders are removed but all

the project details, such as notes and logs are maintained.

Excluding data from Primavera Project Management

You can create custom settings in IBM Maximo Adapter for Primavera to exclude

particular data from Primavera Project Management.

1. In the Labor application, click the Primavera tab.

2. Select from the following options for the data that you want to exclude:

v Exclude Milestone Generation on Primavera

Used with Workorders export to Activities. If you want the WBS structure

created but not the milestones, select this check box. If Workorders export to

Activities is not selected, work orders are transferred into a WBS structure

and milestones are created from target start and finish dates.

v Exclude Export of Duplicate Projects

If selected, any projects existing in Primavera are not exported.

v Exclude Labor from Primavera Resource Pool

If selected, labor records are not transferred to Primavera.

Results

After these settings are configured, they will go into effect during the next export

procedure.

Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

Specifying scheduling information for tasks

You can use the IBM Maximo Adapter for Primavera to specify scheduling

information for selected tasks including target, actual and scheduled start and

finish dates, primary constraint and constraint date, the duration and the percent

complete.

About this task

Actual start, actual finish, scheduled start, scheduled finish,and constraint dates are

the only date fields that are exported from IBM Maximo Asset Management to

22 IBM Maximo Adapter for Primavera

Page 27: IBM Maximo Adapter for 7

Primavera Project Management. Projects that are imported into Maximo Asset

Management change the scheduled or actual dates depending on the status of the

activity in Primavera. If the activity is not started, the scheduled dates are changed

with the values imported from Primavera. If an activity is started, the actual dates

are changed with the values imported from Primavera. Target dates are never

affected by importing a project into Maximo Asset Management.

1. On the List tab of the Work Order Tracking (PV) application, run a query to

select the work orders that contain the tasks for which you want to specify

scheduling information.

2. Click the Plans tab. The Plans tab is populated with a list of tasks for the

selected work orders.

3. Select a task and expand the detail for that task.

4. In the Scheduling Information section, enter the appropriate information.

Related tasks

“Tracking project progress” on page 8You can check the progress of your project by looking at the percent complete for

the work orders that make up that project.

Defining custom mapping

Custom mapping of additional data between IBM Maximo Asset Management and

Primavera Project Management is available through a dialog box at the site level in

Maximo Asset Management. Access must be granted to the Primavera Custom

Map for Sites for the appropriate group or groups before you can define custom

maps.

1. In the Organizations (PV) application, select the organization that you want to

work with on the List tab.

2. The organization record opens on the Organization tab. From the Select Action

menu, select Primavera Custom Map for Sites.

3. In the Primavera Custom Map for Sites dialog box, enter the following

required information:

v Maximo Asset Management Field

v Primavera Object

v Primavera Field

v Transaction Type

v Maximo Asset Management Type

v Primavera Type4. Click OK.

Results

After you define the custom mapping, the custom mappings are incorporated into

the next export procedure.

Chapter 3. Administering 23

Page 28: IBM Maximo Adapter for 7

Related reference

“Data transfer customization: PLUSVMAP Table”You can use the PLUSVMAP table to customize the transfer of data between IBM

Maximo Asset Management and Primavera Project Management. Because the

information must be entered into the table manually, a System Administrator or

equally qualified person must enter the data.

Checking error details

If you receive an error message after an export procedure, you can check the

details of these errors on the Exception tab.

1. In the Work Order Tracking (PV) application, click the Primavera tab.

2. On the Exception tab, enter the information pertaining to the work orders for

which you received an error in the search fields.

3. The following read only attributes display on the Exception tab:

v Primavera Exception The error from the Primavera API.

v Maximo Exception The translation of the Primavera exception.

v Created Date The date and time the error was encountered during the

transfer.

v Created By The user who performed the transfer.Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

Data transfer tables

You can work with the several tables in IBM Maximo Asset Management to

customize data transfer.

Data transfer customization: PLUSVMAP Table

You can use the PLUSVMAP table to customize the transfer of data between IBM

Maximo Asset Management and Primavera Project Management. Because the

information must be entered into the table manually, a System Administrator or

equally qualified person must enter the data.

The flow of data that is supported by the PLUSVMAP table is as follows:

Table 3. The flow of data from Maximo to Primavera

Maximo Asset Management to Primavera

Work order tasks >> Activities

WORKORDER >> WBS

PM >> WBS

LABOR >> Labor resource

CRAFT >> Labor resource and roles

TOOLS >> Non-labor resource

24 IBM Maximo Adapter for Primavera

Page 29: IBM Maximo Adapter for 7

Table 4. The flow of data from Primavera to Maximo

Primavera to Maximo Asset Management

Activities >> Work order tasks

WBS >> WORKORDER

The PLUSVMAP mapping runs after the adapter completes the standard updates

and inserts into Primavera for an export or Maximo Asset Management for an

import. Spare fields in the respective applications are intended to be used to

customize data transfer. However, the process can be overwritten. If this is done,

the client must take full responsibility for doing so.

Table 5. The PLUSVMAP table for customizing data transfer

PLUSVMAP table Notes

Column

PLUSVMAP_ID Unique identifier for each row

PVMAP_ID The ID field, entered by user

DESCRIPTION Description of the new mapping

MXMBO Maximo Asset Management object. Use one

of the following: WORKORDER, TOOL,

LABOR, PM

MXFIELD Field name for the Maximo Asset

Management object. Value entered must be

in all caps.

PVOBJECT Primavera API Business Object. Use one of

the following: ACTIVITY, RESOURCE, WBS

PVFIELD Field name for the Primavera API Business

Object. Value entered is case-sensitive.

TRANSACTIONTYPE Use one of the following: IMPORT, EXPORT

FIELDTYPE

Use one of the following:

<BLANK> - if PV_FIELD defines a

Primavera API attribute of a permitted class

(object)

VARIABLE - if PV_FIELD refers to a virtual

method

LITERAL - if PV_FIELD holds a literal value

MXTYPE See the following table for permitted

Maximo Asset Management/Primavera type

pairings

PVTYPE See following table for permitted Maximo

Asset Management/Primavera type pairings

EXECOPTION

Use one of the following:

<BLANK> - current transaction stops if

value for current mapping is null

SKIPIFNULL - current transaction continues

if value for current mapping is null

Chapter 3. Administering 25

Page 30: IBM Maximo Adapter for 7

Table 6. Permitted Maximo Asset Management/Primavera Class Type Pairings

Maximo Asset Management Class Type

(MXTYPE) Primavera Class Type (PVTYPE)

Double Percent

Double Cost

Double UnitsPerTime

String Objectid

Double Unit

Double Duration

Date EndDate

Date BeginDate

String PercentCompleteType

String ActivityStatus

String ConstraintType

String RelationshipType

String DurationType

String ActivityType

String CalendarType

String ResourceType

String UDF_Text

Double UDF_Number

Date UDF_StartDate

Date UDF_FinishDate

Date Date

Integer Integer

String String

Double Double

All values are case-sensitive.

The following example shows the PLUSVMAP table that contains customized data

transfer settings.

Table 7. Example of PLUSVMAP table with customized data transfer settings

PVMAPID DESC MXMBO MXFIELD PVOBJECT PVFIELD

TRANSACTION

TYPE FIELDTYPE MXTYPE PVTYPE EXECOPTION

1 Status to

Feedback

WORKORDER STATUS Activity Feedback EXPORT String String SKIPIFNULL

2 Status to

Feedback

TOOL DESCRIPTION Resource ResourceNotes EXPORT String String SKIPIFNULL

3 PV

Wbs_Short_Name

to MX

WO1

WORKORDER WO1 Activity Name IMPORT String String SKIPIFNULL

26 IBM Maximo Adapter for Primavera

Page 31: IBM Maximo Adapter for 7

Table 7. Example of PLUSVMAP table with customized data transfer settings (continued)

PVMAPID DESC MXMBO MXFIELD PVOBJECT PVFIELD

TRANSACTION

TYPE FIELDTYPE MXTYPE PVTYPE EXECOPTION

4 WO

LeadCraft

to

Activity

Code

WORKORDER LEADCRAFT Activity v_activityCode EXPORT Variable String String SKIPIFNULL

5 Set

Updated

mark

WORKORDER WO2 WBS Y IMPORT Literal String String SKIPIFNULL

6 Set

Updated

mark

WORKORDER WO2 Activity Y IMPORT Literal String String

7 Location

to

Primavera

Activity.user_text1

WORKORDER LOCATION Activity user_text1 EXPORT Double Duration SKIPIFNULL

8 Location WORKORDER LOCATION Activity v_activityCode EXPORT Variable String UDF_Tex SKIPIFNULL

9 Status WORKORDER STATUS Activity v_activityCode EXPORT Variable String String SKIPIFNULL

10 Priority WORKORDER WOPRIORITY Activity v_activityCode EXPORT Variable String String SKIPIFNULL

11 Work

Type

WORKORDER WORKTYPE Activity v_activityCode EXPORT Variable String String SKIPIFNULL

12 Supervisor WORKORDER SUPERVISOR Activity v_activityCode EXPORT Variable String String SKIPIFNULL

13 Purchase

Order

Number

WORKORDER WO1 Activity v_activityCode EXPORT Variable String String SKIPIFNULL

14 Null the

Lead

Craft

Interface

using

Crew

WORKORDER CREWID Activity PrimaryResourceObjectid EXPORT String ObjectId SKIPIFNULL

Related concepts

“Data transfer requirements and restrictions” on page 20There are several requirements and restrictions on what data can be transferred

between IBM Maximo Asset Management and Primavera Project Management.Related tasks

“Defining custom mapping” on page 23Custom mapping of additional data between IBM Maximo Asset Management and

Primavera Project Management is available through a dialog box at the site level in

Maximo Asset Management. Access must be granted to the Primavera Custom

Map for Sites for the appropriate group or groups before you can define custom

maps.

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.

The Maximo Asset Management WORKORDER table for

importing activities

Activities are imported from Primavera Project Management to the IBM Maximo

Asset Management WORKORDER table as task records.

Chapter 3. Administering 27

Page 32: IBM Maximo Adapter for 7

Table 8. WORKORDER table for importing activities

Primavera

Maximo

WORKORDER

table Notes

Table Column Column

TASK TASK_ID Set to Used for Logging only

TASK TASK_CODE WONUM If the value of the TASK_CODE

does not exist in Maximo Asset

Management, this activity was

created in Primavera. The value

of the TASK_CODE is used to

create a new task work order

record.

TASK TASK_NAME DESCRIPTION If value of the TASK_CODE

does not exist in Maximo Asset

Management, this activity was

created in Primavera. The value

of the TASK_CODE is used to

create a new task work order

record.

PROJWBS WBS_SHORT_NAME PARENT If the value of the TASK_CODE

does not exist in Maximo Asset

Management, this activity was

created in Primavera. The value

of the WBS_SHORT_NAME is

used to create a new task work

order record.

TASK TASK_TYPE Set to Used for detecting

milestones

TASK ACT_START_DATE ACTSTART

TASK ACT_END_DATE ACTFINISH

TASK DRTN_COMPLETE_PCT PCCOMPLETE

TASK TARGET_START_DATE SCHEDSTART

TASK TARGET_END_DATE SCHEDFINISH

TASK ACT_DRTN_HR_CNT ESTDUR

TASK REMAIN_DRTN_HR_CNT REMDUR

28 IBM Maximo Adapter for Primavera

Page 33: IBM Maximo Adapter for 7

Related tasks

“Importing new activities from Primavera Project Management” on page 10You use the Import Work Order Options option to import new activities from

Primavera Project Management into IBM Maximo Asset Management via the IBM

Maximo Adapter for Primavera.Related reference

“The Maximo Asset Management PLUSVSESSION table for importing new

activities” on page 36New activities are imported from Primavera Project Management to the IBM

Maximo Asset Management WORKORDER table as task records. When a project is

selected for import into Maximo Asset Management, the relevant row is retrieved

from the PLUSVSESSION table and the PVPROJID is used to retrieve the project

from Primavera. If the project contains an activity which does not exist in Maximo

Asset Management, a new task record is created in Maximo Asset Management.

The Maximo Asset Management base table for exporting craft

roles

IBM Maximo Asset Management crafts are exported to Primavera Project

Management as roles. When Maximo Asset Management crafts are exported as

roles, they are collected under a single Primavera role heading called MAXCRAFT.

Table 9. The Maximo table for exporting craft roles

Maximo base table Primavera Notes

Table Column Table Column

ROLE PARENT_ROLE_ID Set to MAXCRAFT

Role ID

CRAFT CRAFT ROLE ROLE_NAME

CRAFT DESCRIPTION ROLE ROLE_SHORT_NAME

Related concepts

“Resource records for exported crafts”If a resource record exists in Primavera Project Management for a craft that you are

exporting, the resource record is updated. If a resource record does not exist in

Primavera, one can be created during the export procedure.Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.Related reference

“The Maximo Asset Management table for exporting labor and crafts” on page 33IBM Maximo Asset Management labor and crafts are exported to Primavera Project

Management as resources. Maximo Asset Management labor and crafts are

collected under a single Primavera role heading called MAXLABOR.

Resource records for exported crafts

If a resource record exists in Primavera Project Management for a craft that you are

exporting, the resource record is updated. If a resource record does not exist in

Primavera, one can be created during the export procedure.

Chapter 3. Administering 29

Page 34: IBM Maximo Adapter for 7

Whether the Schedule by Work Location check box is selected or not determines

which resource records are created in Primavera. The Schedule by Work Location

check box is accessed through Organizations (PV)> List tab > Select Action menu

> Primavera Options > System Options. Access must be granted to Primavera

Options and System Options for the appropriate groups before you can use the

Schedule by Work Location check box.

During an export procedure, resource records are handled in one of three ways:

v If a resource record exists in Primavera for a craft that is being exported, the

resource record is updated.

v If the Schedule by Work Location check box is not selected, a resource record is

created in Primavera for the craft record that is specified on the work order or

task. The craft standard rate is included on the resource record. In a

multi-organization environment where duplicate crafts with different standard

rates could exist, only the first craft record is exported to Primavera.

v If the Schedule by Work Location check box is selected, the location specified

on the task is checked for a work location prefix value. If a prefix exists, it is

appended to the beginning of the craft to create a resource record in Primavera.

If the task location does not have a work location prefix, the location of the

parent is checked for a work location prefix. If it has a work location prefix, the

work location of the parent is appended to the craft specified on the task to

create the resource record. The craft standard rate is included on the resource

record.

Example 1 shows a work location prefix for all locations. Schedule by Work

Location is selected for the organization.

Table 10. Work location prefixes for example 1

Location Work Location Prefix

User’s Site BEDFORD

Locations under site BEDFORD ADDR01

ADDR02

ADDR03

Work Location Prefix for ADDR01 MX1

Work Location Prefix for ADDR02 MX2

Work Location Prefix for ADDR03 MX3

Craft MECH

Table 11. Resource records for example 1 that are exported to Primavera

BEDFORD-MECH

MX1-MECH

MX2-MECH

MX3-MECH

Example 2 shows one location without a work location prefix. Schedule by Work

Location is selected for the organization.

30 IBM Maximo Adapter for Primavera

Page 35: IBM Maximo Adapter for 7

Table 12. Work location prefixes for example 2

Location Work Location Prefix

User’s Site BEDFORD

Locations under site BEDFORD ADDR01

ADDR02

ADDR03

Work Location Prefix for ADDR01 MX1

Work Location Prefix for ADDR02 null

Work Location Prefix for ADDR03 MX3

Craft MECH

Table 13. Resource Records for example 2 that are exported to Primavera

BEDFORD-MECH

MX1-MECH

MX3-MECH

Related reference

“The Maximo Asset Management base table for exporting craft roles” on page 29IBM Maximo Asset Management crafts are exported to Primavera Project

Management as roles. When Maximo Asset Management crafts are exported as

roles, they are collected under a single Primavera role heading called MAXCRAFT.

“The Maximo Asset Management table for exporting labor and crafts” on page 33IBM Maximo Asset Management labor and crafts are exported to Primavera Project

Management as resources. Maximo Asset Management labor and crafts are

collected under a single Primavera role heading called MAXLABOR.

The Maximo Asset Management PLUSVSESSION table for

importing EPS nodes

Use the IBM Maximo Asset Management crafts are exported to PLUSVSESSION

table to import EPS nodes from Primavera Project Management to Maximo Asset

Management. The PLUSVSESSION table holds project and parent work order

information. When a project is selected to import into Maximo Asset Management,

the relevant row is retrieved from the PLUSVSESSION table and the PV_PROJ_ID

is used to retrieve the project from Primavera.

Table 14. The PLUSVSESSION table for importing EPS nodes

Primavera

Maximo PLUSVSESSION

table Notes

Table Column Column

OBS OBS_NAME PV_OBS_NAME

OBS OBS_ID PV_OBS_ID

PROJECT PROJ_NAME PV_PROJ_NAME

PROJECT PROJ_SHORT_NAME PV_PROJ_SHORT_NAME

PROJECT ADD_BY_NAME PV_ADD_BY_NAME

PROJECT PLAN_START_DATE PV_PLAN_START_DATE

PROJECT PLAN_END_DATE PV_PLAN_END_DATE

Chapter 3. Administering 31

Page 36: IBM Maximo Adapter for 7

Table 14. The PLUSVSESSION table for importing EPS nodes (continued)

Primavera

Maximo PLUSVSESSION

table Notes

Table Column Column

PROJECT SCD_END_DATE PV_SCD_END_DATE

PROJECT PROJ_ID PV_PROJ_ID

PROJWBS WBS_NAME PV_WBS_NAME

PROJWBS WBS_SHORT_NAME PV_WBS_SHORT_NAME

PROJWBS STATUS_CODE PV_STATUS_CODE

PROJWBS WBS_ID PV_WBS_ID

PROJWBS PARENT_WBS_ID PV_PARENT_WBS_ID

PROJWBS TREE_SORT_STRING PV_TREE_SORT_STRING

PV_USER_ID Set to the Primavera

integration user name

specified in the labor

record for the

Maximo Asset

Management user.

MX_SESSIONSTATUS Set to EPS

MX_SESSIONID Set to WARN: NONE

MX_CREATED Set to the current

date and time

MX_PVSESSION_ID Not used

DESCRIPTION Not used

PV_USER_NAME Not used

MX_USERNAME Maximo Asset

Management user

MX_UPDATED Date and time when

the project is

updated.

MX_WONUM Work order number

or task ID

MXS0 Extra field

MXS1 Extra field

MXS2 Extra field

MXS3 Extra field

MXS4 Extra field

MXS5 Extra field

MXS6 Extra field

MXS7 Extra field

MXS8 Extra field

MXS9 Extra field

ORGID Organization ID

SITEID Site ID

32 IBM Maximo Adapter for Primavera

Page 37: IBM Maximo Adapter for 7

Related concepts

“EPS detail” on page 17The Enterprise Project Structure (EPS) is a framework in the Primavera product

that contains details of the projects that are in the database and the ownership of

those projects. When a project is created, it is assigned to an EPS node. Every time

that you transfer data between IBM Maximo Asset Management and Primavera

Project Management, you should verify that the Enterprise Project Structure (EPS)

into which you plan to transfer data exists in Primavera.

The Maximo Asset Management table for exporting labor and

crafts

IBM Maximo Asset Management labor and crafts are exported to Primavera Project

Management as resources. Maximo Asset Management labor and crafts are

collected under a single Primavera role heading called MAXLABOR.

Table 15. Craft mapping

Maximo base table Primavera Notes

Table Column Table Column

CRAFT CRAFT RSRC RSRC_NAME

CRAFT DESCRIPTION RSRC RSRC_SHORT_NAME

RSRC WORK_FLAG Set to Y

RSRC PARENT_RSRC_ID Set to MAXLABOR

Resource ID

Table 16. Labor mapping

Maximo base table Primavera Notes

Table Column Table Column

LABOR LABORCODE RSRC RSRC_NAME

PERSON 2 DISPLAYNAME RSRC RSRC_SHORT_NAME

RSRC WORK_FLAG Set to Y

RSRC ROLE_ID Set to the

Primavera Role

ID that

corresponds to

the CRAFT

RSRC PARENT_RSRC_ID Set to MAXLABOR

Resource ID

Chapter 3. Administering 33

Page 38: IBM Maximo Adapter for 7

Related concepts

“Resource records for exported crafts” on page 29If a resource record exists in Primavera Project Management for a craft that you are

exporting, the resource record is updated. If a resource record does not exist in

Primavera, one can be created during the export procedure.Related reference

“The Maximo Asset Management base table for exporting craft roles” on page 29IBM Maximo Asset Management crafts are exported to Primavera Project

Management as roles. When Maximo Asset Management crafts are exported as

roles, they are collected under a single Primavera role heading called MAXCRAFT.

The PLUSVLOGIC table for importing logic

Predecessor and successor constraints are imported from Primavera Project

Management to the IBM Maximo Asset Management WORKORDER table as task

records and to the PLUSVLOGIC table.

Table 17. Mappings for importing logic

Primavera

Maximo

PLUSVLOGIC table Notes

Table Column Column

TASKPRED PROJ_ID PVROOTID

TASKPRED PRED_TYPE PVLINKTYPE

TASKPRED LAG_HR_CNT PVLAG

TASKPRED PRED_TASK_ID PVPREDID

PVPREDTYPE Set to one of the

following: EXP_SMS,

EXP_TASK, EXP_FMS

PVSUCCTYPE

Set to one of the

following: EXP_SMS,

EXP_TASK, EXP_FMS

MXOBJTYPE Set to WO

MXROOTID WORKORDER.WONUM

MXPREDID WORKORDER.WONUM

DESCRIPTION mxPredDesc + ″--->″ +

mxSuccDesc

MXUSERNAME Set to the Maximo

Asset Management

user

MXCREATED Set to the date and

time of import

PVLID Primavera logic link

object ID

LDKEY Maximo Asset

Management long

description key

MXSUCCID Maximo Asset

Management

successor work order

number

34 IBM Maximo Adapter for Primavera

Page 39: IBM Maximo Adapter for 7

Table 17. Mappings for importing logic (continued)

Primavera

Maximo

PLUSVLOGIC table Notes

Table Column Column

MXCHANGED The date and time

that the record was

changed

ORGID The organization ID

SITEID The site ID

LANGCODE Language Code

MXSUCCROOTID The succeeding

parent work order

number

PLUSVLOGICID The record unique ID

PVSUCCID The successor task ID

EXP_SMS = start milestone

EXP_TASK = Primavera activity or Maximo Asset Management task

EXP_FMS = finish milestone

mxPredDesc = description of the work order that is identified by mx_pred_id

mxSuccDesc = description of the work order that is identified by mx_succ_id

date/time of import = date and time that is taken at the beginning of the import

Related tasks

“Creating relationships between tasks on projects” on page 7The relationships between tasks on a work order is called logic in IBM Maximo

Asset Management. You can add relationships in Primavera Project Management

and export them to Maximo Asset Management where they can be viewed on the

Logic tab. All dates that are based on the relationships that are generated in

Primavera can be exported and stored also in Maximo Asset Management. You can

add logic in Maximo Asset Management but Maximo Asset Management does not

display the relationships through a visual component as in Primavera.

The Maximo Asset Management table for exporting project

expenses

IBM Maximo Asset Management material costs are exported to Primavera Project

Management as expenses. When Maximo Asset Management materials are

exported to Primavera, they are summarized as activity expenses.

Table 18. Mappings for exporting project expenses

Maximo base table Primavera Notes

Table Column Table Column

PROJCOST TASK_ID Set to TASK ID

PROJCOST PROJ_ID Set to Project

ID

Chapter 3. Administering 35

Page 40: IBM Maximo Adapter for 7

Table 18. Mappings for exporting project expenses (continued)

Maximo base table Primavera Notes

Table Column Table Column

PROJCOST COST_NAME Set to Total

Material Cost

WPMATERIAL SUM(ITEMQTY

* UNITCOST)

PROJCOST TARGET_COST

PROJCOST TARGET_QTY Set to 1

WPMATERIAL SUM(ITEMQTY

* UNITCOST)

PROJCOST COST_PER_QTY

MATUSETRANS SUM(ACTUALCOST) PROJCOST ACT_COST

PROJCOST REMAIN_COST Set to

TARGET_COST-ACT_COST

Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

The Maximo Asset Management PLUSVSESSION table for

importing new activities

New activities are imported from Primavera Project Management to the IBM

Maximo Asset Management WORKORDER table as task records. When a project is

selected for import into Maximo Asset Management, the relevant row is retrieved

from the PLUSVSESSION table and the PVPROJID is used to retrieve the project

from Primavera. If the project contains an activity which does not exist in Maximo

Asset Management, a new task record is created in Maximo Asset Management.

Table 19. Mappings in the PLUSVSESSION table for importing new activities

Primavera

Maximo

PLUSVSESSION

table Notes

Table Column Column

TASK TASK_ID PVTASKID

TASK TASK_ID PVWBSID

TASK TASK_NAME PVWBSNAME

PVUSERID Set to the Primavera

Integration User

Name that is

specified in the labor

record for the

Maximo Asset

Management user.

PVPROJID Set to Imported

PVPROJECTID

PVPROJNAME Set to Imported

PVPROJECTNAME

36 IBM Maximo Adapter for Primavera

Page 41: IBM Maximo Adapter for 7

Table 19. Mappings in the PLUSVSESSION table for importing new activities (continued)

Primavera

Maximo

PLUSVSESSION

table Notes

Table Column Column

PVPROJSHORTNAME Set to Imported

PVPROJECTSHORTNAME

TASK TASK_CODE PVWBSSHORTNAME

TASK TASK_CODE MXWONUM

MXSESSIONID Set to Imported

PVSESSIONID (the ID

of the root work

order)

MXSESSIONSTATUS Set to EXPTASK

MXCREATED Set to the date and

time stamp at the

start of the

transaction

Related reference

“The Maximo Asset Management WORKORDER table for importing activities” on

page 27Activities are imported from Primavera Project Management to the IBM Maximo

Asset Management WORKORDER table as task records.

The Maximo Asset Management PLUSVCACHE table for

transferring resources

Craft, labor, tools, and calendars are transferred from IBM Maximo Asset

Management base tables to the PLUSVCACHE table.

Table 20. Mapping the transfer for resources from the Maximo base table to the

PLUSVCACHE table

Maximo base table PLUSVCACHE table Notes

table Column Column

LABOR

TOOL

NAME

DESCRIPTION

DESCRIPTION

MXOBJTYPE Set to one of the

following: CRAFT,

LABOR, CALENDAR,

TOOL

LABOR

TOOL

CALENDAR

LABORCODE

TOOLNUM

CALNUM

MXRECID

MXUSERNAME Set to the Maximo

Asset Management

user

MXCREATED Set to current date

and time

Chapter 3. Administering 37

Page 42: IBM Maximo Adapter for 7

Table 20. Mapping the transfer for resources from the Maximo base table to the

PLUSVCACHE table (continued)

Maximo base table PLUSVCACHE table Notes

table Column Column

PVTABLE Set to one of the

following Primavera

tables: ROLES, RSC,

CALENDAR

PVRECID Set to the key field

value of the resource

record (from ROLES,

RSC, or CALENDAR

table)

PVURL The Primavera API

host address

PVUSERNAME The Primavera user

name

ORGID The organization ID

SITEID The site ID

MXUPDATED

Related tasks

“Transferring data between Maximo and Primavera” on page 8There are several methods for transferring data between IBM Maximo Asset

Management and Primavera Project Management.

The Maximo Asset Management WORKORDER Table for

exporting tasks

Work orders identified in the PLUSVSESSION table as tasks (EXP_TASK) are

exported to Primavera Project Management as activities.

Table 21. The WORKORDER Table for exporting tasks

Maximo

WORKORDER table Primavera Notes

Column Table Column

WONUM TASK TASK_CODE

DESCRIPTION TASK TASK_NAME

ACTIVITYTYPE TASK TASK_TYPE

DURATIONTYPE TASK DURATION_TYPE

COMPLETETYPE TASK COMPLETE_PCT_TYPE

PCCOMPLETE TASK WORK_COMPLETE_PCT

PRIMECONSTRAINT TASK CSTR_TYPE

PRIMECONSTDATE TASK CSTR_DATE

ESTDUR TASK TARGET_DRTN_HR_CNT

REMDUR TASK ACT_DRTN_HR_CNT

ESTDUR TASK REMAIN_DRTN_HR_CNT

ACTSTART TASK ACT_START_DATE

ACTFINISH TASK ACT_END_DATE

38 IBM Maximo Adapter for Primavera

Page 43: IBM Maximo Adapter for 7

Table 21. The WORKORDER Table for exporting tasks (continued)

Maximo

WORKORDER table Primavera Notes

Column Table Column

SCHEDSTART TASK TARGET_START_DATE

SCHEDFINISH TASK TARGET_END_DATE

SUPERVISOR TASK RSRC_ID

Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

The Maximo Asset Management table for exporting tools as

resources

IBM Maximo Asset Management tools are exported to Primavera Project

Management as resources. Maximo Asset Management tools are collected under a

single Primavera role heading called MAXTOOLS.

Table 22. Mappings for exporting tools

Maximo base table Primavera Notes

Table Column Table Column

ITEM DESCRIPTION RSRC RSRC_NAME

ITEM ITEMNUM RSRC RSRC_SHORT_NAME

RSRC WORK_FLAG Set to N

RSRC PARENT_RSRC_ID Set to MAXTOOL

Resource ID

Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

The Maximo Asset Management PLUSVSESSION table for

exporting work breakdown structure (WBS)

Work orders identified in the PLUSVSESSION table as work breakdown structures

(EXP_WBS) are exported to Primavera Project Management as WBS nodes or

activities.

Table 23. The PLUSVSESSION table for exporting WBS

Maximo Primavera

Table Column Table Column

PLUSVSESSION PVWBSID PROJWBS WBS_ID

PLUSVSESSION PVPROJID PROJWBS PROJ_ID

Chapter 3. Administering 39

Page 44: IBM Maximo Adapter for 7

Table 23. The PLUSVSESSION table for exporting WBS (continued)

Maximo Primavera

Table Column Table Column

PLUSVSESSION PVWBSID of the

parent of the current

work order

PROJWBS PARENT_WBS_ID

PLUSVSESSION PVWBSSHORTNAME PROJWBS WBS_SHORT_NAME

Related reference

“The Maximo Asset Management WORKORDER Table for importing work

breakdown structure (WBS)”Work breakdown structures (WBS) are imported from Primavera Project

Management to the IBM Maximo Asset Management WORKORDER table. Projects

created in Primavera as a result of an export of a PM record from Maximo Asset

Management are not imported back into Maximo Asset Management.

The Maximo Asset Management WORKORDER Table for

importing work breakdown structure (WBS)

Work breakdown structures (WBS) are imported from Primavera Project

Management to the IBM Maximo Asset Management WORKORDER table. Projects

created in Primavera as a result of an export of a PM record from Maximo Asset

Management are not imported back into Maximo Asset Management.

Table 24. The WORKORDER Table for importing WBS

Primavera

Maximo

WORKORDER table Notes

Table Column Column

PROJWBS WBS_ID Set to Used for

Logging only

PROJWBS WBS_SHORT_NAME WONUM

PROJWBS ACT_START_DATE ACTSTART

PROJWBS ACT_END_DATE ACTFINISH

PROJWBS DRTN_PCT_SPENT PCCOMPLETE

PROJWBS ACT_DRTN_HR_CNT ESTDUR

PROJWBS REMAIN_DRTN_HR_CNT REMDUR

Related reference

“The Maximo Asset Management PLUSVSESSION table for exporting work

breakdown structure (WBS)” on page 39Work orders identified in the PLUSVSESSION table as work breakdown structures

(EXP_WBS) are exported to Primavera Project Management as WBS nodes or

activities.

The Maximo Asset Management PLUSVSESSION table for

transferring the work order hierarchy

Parent work orders and the hierarchy of sub work orders are transferred from IBM

Maximo Asset Management base tables to the PLUSVSESSION table.

40 IBM Maximo Adapter for Primavera

Page 45: IBM Maximo Adapter for 7

Table 25. Mapping to the PLUSVSESSION table for transferring the work order hierarchy

Maximo base table

PLUSVSESSION

table Notes

Table Column Column

PVUSERID Set to the Primavera

Integration User

Name that is

specified in the labor

record for the

Maximo Asset

Management user.

PVWBSID Set to the WBS ID

from Primavera

PVTASKID Set to the Task ID

from Primavera

WORKORDER DESCRIPTION PVWBSNAME

PVPROJID Set to Project ID

WORKORDER DESCRIPTION PVPROJNAME The description of

the work order at the

top of the hierarchy.

PVPROJSHORTNAME Set to Project Short

Name

LABOR PVUSERNAME PVADDBYNAME

WORKORDER WONUM MXWONUM

MXSESSIONSTATUS Set to one of the

following: EXP_ROOT,

EXP_WBS, EXP_TASK,

EXP_SMS, EXP_FMS

MXUSERNAME Set to the Maximo

Asset Management

user

MXCREATED Set to date and time

of export

MXUPDATED Set to the current

date and time

EXP_ROOT = work order at the top of the hierarchy

EXP_WBS = work breakdown structure

EXP_SMS = start milestone

EXP_TASK = Primavera activity or Maximo Asset Management task

EXP_FMS = finish milestone

Related tasks

“Exporting data to Primavera Project Management” on page 11You can use the IBM Maximo Adapter for Primavera to export IBM Maximo Asset

Management data to Primavera Project Management. The only data that can be

exported includes the actual start date, the actual finish date, scheduled start,

scheduled finish, and constraint dates.

Chapter 3. Administering 41

Page 46: IBM Maximo Adapter for 7

42 IBM Maximo Adapter for Primavera

Page 47: IBM Maximo Adapter for 7

Chapter 4. Notices for IBM Maximo Adapter for Primavera 7.1

© Copyright IBM Corporation 2008.

This information was developed for products and services offered in the U.S.A.

IBM may not offer the products, services, or features discussed in this

documentation in other countries. Consult your local IBM representative for

information on the products and services currently available in your area. Any

reference to an IBM product, program, or service is not intended to state or imply

that only that IBM product, program, or service may be used. Any functionally

equivalent product, program, or service that does not infringe any IBM intellectual

property right may be used instead. However, it is the user’s responsibility to

evaluate and verify the operation of any non-IBM product, program, or service.

IBM may have patents or pending patent applications covering subject matter

described in this documentation. The furnishing of this documentation does not

give you any license to these patents. You can send license inquiries, in writing, to:

IBM Director of Licensing

IBM Corporation

North Castle Drive

Armonk, NY 10504-1785

U.S.A.

The following paragraph does not apply to the United Kingdom or any other

country where such provisions are inconsistent with local law:

INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THIS

PUBLICATION ″AS IS″ WITHOUT WARRANTY OF ANY KIND, EITHER

EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED

WARRANTIES OR CONDITIONS OF NON-INFRINGEMENT,

MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Some states

do not allow disclaimer of express or implied warranties in certain transactions,

therefore, this statement may not apply to you.

This information could include technical inaccuracies or typographical errors.

Changes are periodically made to the information herein; these changes will be

incorporated in new editions of the publication. IBM may make improvements

and/or changes in the product(s) and/or the program(s) described in this

publication at any time without notice.

Any references in this information to non-IBM Web sites are provided for

convenience only and do not in any manner serve as an endorsement of those Web

sites. The materials at those Web sites are not part of the materials for this IBM

product and use of those Web sites is at your own risk.

Licensees of this program who wish to have information about it for the purpose

of enabling: (i) the exchange of information between independently created

programs and other programs (including this one) and (ii) the mutual use of the

information which has been exchanged, should contact:

Intellectual Property Dept. for Rational Software

IBM Corporation

43

Page 48: IBM Maximo Adapter for 7

20 Maguire Road

Lexington, Massachusetts 02421-3112

U.S.A.

Such information may be available, subject to appropriate terms and conditions,

including in some cases, payment of a fee.

The licensed program described in this documentation and all licensed material

available for it are provided by IBM under terms of the IBM Customer Agreement,

IBM International Program License Agreement or any equivalent agreement

between us.

Any performance data contained herein was determined in a controlled

environment. Therefore, the results obtained in other operating environments may

vary significantly. Some measurements may have been made on development-level

systems and there is no guarantee that these measurements will be the same on

generally available systems. Furthermore, some measurements may have been

estimated through extrapolation. Actual results may vary. Users of this document

should verify the applicable data for their specific environment.

Information concerning non-IBM products was obtained from the suppliers of

those products, their published announcements or other publicly available sources.

IBM has not tested those products and cannot confirm the accuracy of

performance, compatibility or any other claims related to non-IBM products.

Questions on the capabilities of non-IBM products should be addressed to the

suppliers of those products.

All statements regarding IBM’s future direction or intent are subject to change or

withdrawal without notice, and represent goals and objectives only.

Trademarks and service marks

See http://www.ibm.com/legal/copytrade.html.

44 IBM Maximo Adapter for Primavera

Page 49: IBM Maximo Adapter for 7

Index

Aactivities, importing 10

adapter errors, checking 24

Cconstraints

exporting 13

setting 22

craft table 33

craftsexporting 30

crafts table 29

custom mapping 23

customization of data transfer 24

Ddata

appending 14

excluding from Primavera 5, 22

export options 18

exporting 11

transfer 9

customization 24

transfer requirements 20

data transfer 24

EEnterprise project structure (EPS) detail

updating 17

EPSnode transfer 31

error details, checking 24

Ffields, new 3

IIBM Maximo Adapter for Primavera

product overview 1

information, importing 10

Llabor table 33

logic 7

importing 34

Logic tab 3

Mmapping, defining 23

materials transfer 35

Maximo Asset Management tables 24

Nnew activities

importing 36

notices 43

Ooptions for exporting data 18

Ppercent complete 8

PLUSVCACHE table 37

PLUSVLOGIC table 34

PLUSVMAP table 24

PLUSVSESSION table 31, 36, 39, 41

Primavera tab 3

project maintenance (PM) records 1

projects 10

cost transfer 35

defining using work order export 6

deleting 21

expenses, exporting 35

logic 7

overwriting 9, 16

progress, tracking 8

updating 15

purchase constraints 13

Qquery names 6

Rrelationships, showing 7

requirements and restrictions for data

transfer 20

resource records 30

resourcesmapping 33

transfer 37

resources transfer 35

result set, appending 14

roles, exporting 29

Sschedule information, specifying 22

Ttabs, new 3

task records 28

toolsexporting 39

tools transfer 35

trademarks 43

Uuser preferences, customizing 5

Wwork breakdown structure (WBS)

exporting 39

importing 40

work location prefixes 30

work orders 1

exporting 11, 38

hierarchy 41

progress 8

updating 9

WORKORDER table 28, 38, 40