i. boscolo, f. castelli, s. cialdi, d. cipriani care-phin fp6 at milano care-phin-december 2008...

23
I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Upload: hope-greene

Post on 23-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani

CARE-PHIN FP6at Milano

CARE-PHIN-December 2008

Summary from Lecce PHIN Collaboration meeting

Page 2: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

The taskTitle of Milano - JRA2 - CARE scientific task:

Two technologies

• LCM-SLM (liquid crystal mask – spatial light modulator)

• Dazzler-AOPDF (acousto optic programmable dispersive filter)

“Investigate and test systems for complicated ultra-fast optical waveforms according to user specifications, as those for the new generation of FEL, with benefits for linac photo-injectors.”

Page 3: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

the achievements Studied and developed the 4f-system and implemented in the SPARC machine at Frascati

Studied and tested the DAZZLER in

FrascatiProposed and successfully tested a novel optical system as pulse shaper for rectangular UV laser pulses.

A pulse train generationSome work on CLIC Phase-Coding system + a PHD collaboration Malka

Page 4: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

The 4f-system LCM-SLM

1. Developed in Milano Lab a Nd;YAG laser system for studing and testing

2. Studied and set the 4f-system driven by an adaptive algorithm

3. Studied and solved the general pulse shaping problem with harmonic generation, tetsted in SPARC machine

shapingncompressiomask

Page 5: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

UV pulse in SPARC with DAZZLER 2.6 ps rise time 6 ps wide

Page 6: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

The final result resulted un-satisfactory: too long rise time

New idea:

A new design stretcher at the UV

Page 7: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

New 4f-shaping scheme

222

3

sin1

1

io

o

d

dc

h

h

mask

Page 8: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

From thesis of Valeria Brizzolara

Entering pulse Output pulse

[ps] [ps]

Autocorrelator

Stretcher-compressorScheme of the experimental setup

Page 9: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Extention for SPARC

h

UV pulse

Tool to reduce the rise time of the UV rectangular pulse

Simulation

Iris

Page 10: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Pulse output with the new stretcher after UV-HG 1.4 rise time

Page 11: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Published articles about laser pulse shaping

• 9 papers

• Conferences proceeedings

• 5 Physics thesis (MI)

Page 12: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Phase Coding system tests in Milano

Page 13: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Operation of the Phase Coding System

Re-pattern a CW 1.5 GHz mode-locked laser beam into a laser beam made up of a succession of trains as shown in figure;

Page 14: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting
Page 15: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

1. fiber launch losses

2.Modulator losses

3.Fiber-fiber junction losses

4.Fiber beam-splitter losses

5.Entire system losses

6.RF-driver modulus test

7.Full system operation

THE EXPERIMENTAL TESTS IN MILANO

Page 16: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

1- Fiber launch losses

input and output collimators are lossy about 15 %.

Losses 1 dB

Choose collimators tailored to our wavelength

2- Modulator losses Pin mW Pout mW e

%

75 15 20

170 30 18

250 45 18About 2 times higher than CCLRC estimate

Page 17: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

3-Fiber-fiber junction losses loss of about 0.5 dB

Junction soldered

4- fiber beam splitter losses

Again higher than foreseen

Page 18: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Measured: Pout about 7 mWVery difficult to set correctly fiber junctions and input fiber launch

measurementsPin 300 mW expected Pout 10.7 mW

5 F U L L S Y STEM LOSSES

Page 19: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

6- test of RF-driver amplifier

The item is now fixed

Page 20: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Trains of the right length are generated

Page 21: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

7- full system operation

The interleaving is tested positively

Page 22: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting

Power test of full system

Pin = 300 mW

Pout = 2 mW measured

Assuming the best launch and junctions

Pout expected 0.017x300 = 5.2 mW

System with soldered junctions and tailored collimators Pout expected 0.045x320= 14.4 mW

Unless we can find a better performace with the modulator

Page 23: I. Boscolo, F. Castelli, S. Cialdi, D. Cipriani CARE-PHIN FP6 at Milano CARE-PHIN-December 2008 Summary from Lecce PHIN Collaboration meeting