Husky Air Pilot Angel Availability System (HAPAAS)

Project Charter

Company Synopsis

Located at DeKalb Taylor Municipal Airport (DKB) in DeKalb, Illinois, Husky Air opened and founded in

January 2008 by L.T. Scully and other investors. Husky Air is a fixed based operator (FBO) facility offering

a full range of services including charter service, maintenance and flight instruction. As of 2014, there

are 23 employees including pilots, mechanics and office staff.

Pilot Angels is a charitable service coordinated by Husky Air. Pilot Angels works with hospitals,

healthcare agencies, and organ banks by matching pilot volunteers with those in need of service. Flights

are free of charge and cost is the sole responsibility of the volunteers.

Project Overview/Scope

Project is being undertaken to develop a computer-based system to manage and track Husky Air’s Pilot

Angel volunteers. Pilot background information (ex. flight hours, certifications, ratings, etc.) and aircraft

specifics (ex. Aircraft identification number (N number), engine type, capacity, etc.) will be recorded and

housed in the system. Those requesting Pilot Air services will also be recorded along with the associated

patients/passengers to better match volunteers. Analytic reporting capability will be needed to

recognize the activities of volunteers.

Page 2: Husky Air Pilot Angel Availability System (HAPAAS)projectmanagement001.weebly.com/uploads/2/9/7/1/29715577/project... · 1 Husky Air Pilot Angel Availability System (HAPAAS) Project

2

Project Team

Member Name (Last,

First)

Title/Role Contact Information (Phone and Email)

Signature

Do, Toan Project Manager (312) 609-5926

[email protected]

Toan Do

Miller, Bud Senior IT

Consultant/Project

Team Lead

(312) 619-5462

[email protected]

Bud S Miller

Kelly, Christine IT Consultant/Project

Team Member

(312) 514-5234

[email protected]

Christine Kelly

Chang, Kelsey Husky Air Pilot Angel

Program Director/Client

(815) 541-2541

[email protected]

Kelsey Chang

Patel, Kevin Software

Engineer/Subject Matter

Expert

(312) 547-6521

[email protected]

Kevin Patel

Roles and Responsibilities:

Project Manager – Provide oversight and approval of the project plan and deliverables. Manage, review

and prioritize project plans with business objectives to remain on task and within budget (resources).

Inform Sponsor and Steering Committee on the project’s status.

Project Team Lead – Participate in the plan development and manage/coordinate specific project plan

activities.

Team Member – Assist in contributing to project objectives and specific team deliverables.

Client – Responsible for creating the Project Charter, manage project, identify approaches to project

delivery, define the business objective and take ownership of the developed process and system.

Subject Matter Expert (SME) – Provide expertise on subject at hand.

Page 3: Husky Air Pilot Angel Availability System (HAPAAS)projectmanagement001.weebly.com/uploads/2/9/7/1/29715577/project... · 1 Husky Air Pilot Angel Availability System (HAPAAS) Project

3

Project Status Meeting Agenda

Phase I:

Date/Time Location/Medium Topic of Discussion Discussion Leader(s)

May 12th, 2014 @

8:30 AM

DeKalb Taylor Municipal

Airport (DKB) at DeKalb,

Illinois Face-to-Face or

Video Conferencing

(GoToMeeting – link

provided via email)

Kickoff Meeting Project Manager

May 19th, 2014 @

8:30 AM

Chicago, Illinois Face-to-

Face or Video

Conferencing

(GoToMeeting – link

provided via email)

Status Update Project Team Lead

May 27th, 2014 @

8:30 AM

Chicago, Illinois Face-to-

Face or Video

Conferencing

(GoToMeeting – link

provided via email)

Status Update Project Team Lead

June 2nd, 2014 @

8:30 AM

Chicago, Illinois Face-to-

Face or Video

Conferencing

(GoToMeeting – link

provided via email)

Status Update Project Team Lead

June 9th, 2014 @

8:30 AM

Chicago, Illinois Face-to-

Face or Video

Conferencing

(GoToMeeting – link

provided via email)

Status Update Project Team Lead

June 16th, 2014 @ 11:30

AM

DeKalb Taylor Municipal

Airport (DKB) at DeKalb,

Illinois Face-to-Face or

Video Conferencing

(GoToMeeting – link

provided via email)

Preliminary System

Implementation

Project Manager

Phase II Schedule Available after completion of Phase I.

Project Completion Date Expected July 28th, 2014

Page 4: Husky Air Pilot Angel Availability System (HAPAAS)projectmanagement001.weebly.com/uploads/2/9/7/1/29715577/project... · 1 Husky Air Pilot Angel Availability System (HAPAAS) Project

4

Team Values

Accountability – Acknowledge and assume responsibility for actions, products and decisions

Diligence – Provide constant earnest effort to accomplish business objectives.

Fairness – Duty to make impartial decisions

Honesty – To act morally and with integrity, truthfulness and straightforwardness of conduct

Reliability – Act of being dependable

Respect – Show a high regard for ourselves, others and the resources entrusted to us

Responsibility – An obligation to complete task and conduct all activities in accordance to applicable

regulations

Teamwork – Contributions to the shared goal

Vision – Support and enhance the client’s mission and business objectives. Promote best practice

standards and methodologies into discipline. Provide a communication channel for project status

Page 5: Husky Air Pilot Angel Availability System (HAPAAS)projectmanagement001.weebly.com/uploads/2/9/7/1/29715577/project... · 1 Husky Air Pilot Angel Availability System (HAPAAS) Project

5

Ground Rules and Expectations

1. All members, regardless of position/role, are to participate and take ownership of project

2. Project assignment is to be completed timely and within budget

3. Keep in mind the projective objectives as it relates to the overall business goal: project scope,

schedule, budget and quality

4. Ask questions and seek assistance after having exploited opportunities on own

5. Attendance at all meetings is mandatory, unless emergency, contact Project Lead for missed

meeting information

6. Meeting Minutes are to be recorded by a Team Member and be distributed for Team

approval/confirm of discussed topics and decisions

7. Respect the work of your peers and provide only constructive criticism with supporting

recommendations

8. Group consensus will override differences in opinion between individuals

9. Safeguard all project details both written and verbal

10. Document all project activities, progressions, discussions, issues, etc.

Breaking any Ground Rules and Expectations will result in corrective action and up to termination

from project and potentially Do Consulting LLP