How to work on team projects and prepare reports. Benito Arruñada. Process. Team formation I’m from third year! I don’t know anyone! Diversity Organization Selection and case assignment Urgent: Deadline General reading on the case Selection of the specific problem to be dealt with - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: How to work on team projects and prepare reports

How to work on team projects and prepare reports

Benito Arruñada

Page 2: How to work on team projects and prepare reports

Preparing the project

Page 3: How to work on team projects and prepare reports

Case study

▪ What’s it about? ♦ Assume a client and a position ♦ Identify the main task (i.e., question, problem)

▪ What theory and concepts can be applied? ♦ To describe, explain, predict, solve

▪ Development♦ Counter-arguments♦ Nuances, explanatory hypotheses, testing♦ Additional information needed?♦ Summarizing is not analyzing, just a first step

▪ Revise, revise, revise

Page 4: How to work on team projects and prepare reports

Information sources

▪ Theories: previous courses▪ Empirical info

♦ Data bases• EconLit: scientific studies• EBSCO: professional publications• Financial press, The Economist• SABI: co. financial statements

♦ Personal contacts♦ Internet ???

• Pros and cons, risks

Page 5: How to work on team projects and prepare reports

Basics of info processing:

Maintain a critical, selective attitude of “buying ideas”

Often, there is no point in gathering contradictory arguments of unequal value

Page 6: How to work on team projects and prepare reports

Basic recommendation for reports and presentations

▪ This is not an exam ▪ The reader / audience is not your captive

♦ They have not obligation to listen to you or read what you have written

♦ Do not waste their time

Page 7: How to work on team projects and prepare reports

Recommendations for preparing reports(1): Substance

▪ Focus on the subject Selection: Answer a single question

▪ Focus on the audience Address a specific audience▪ Advice: assume you are working for a specific client▪ Use theory:

♦ Essential for drawing up a “map” of the problem♦ Needed at least for organizing the info: explanations, solutions♦ With no theory, we are just bad journalists

▪ Proper use of visual aids: only convincing if pertinent▪ Excise, excise, excise: do not be committed to your

creature—it does not deserve it & “less is more”

Page 8: How to work on team projects and prepare reports

Recommendations for preparing reports (2): Form

▪ Executive summary: should allow readers to understand the main points♦ Allow multiple levels of reading

▪ Sources: state them correctly and fully▪ Wording: read aloud several times▪ Correct spelling use the spellcheck

watch out for mistakes not detected by the spellcheck, e.g. «affect» instead of «effect»

Page 9: How to work on team projects and prepare reports

Presentations

▪ PowerPoint♦ Consider not using it♦ Do not overuse: numbers, colors, figures, photos♦ No more than… what? 10 slides?♦ Relevance, understandability, legible color

▪ Oral presentation♦ Wait for silence before beginning♦ Essential: Speak without papers be prepared for mistakes♦ Participation by all logical structure, introductions, etc.

▪ Discussing and answering questions♦ Participation by all♦ Do not reveal failings unnecessarily

Page 10: How to work on team projects and prepare reports

Hints

▪ Legibility♦ Contrast between text and background♦ Lighting in the room

▪ Not many words on each line♦ Activate automatic restrictions on PPT

▪ Simplify▪ These may seem obvious hints, but…

▪ For example:

Page 11: How to work on team projects and prepare reports
Page 12: How to work on team projects and prepare reports
Page 13: How to work on team projects and prepare reports

Reviewing the project

Page 14: How to work on team projects and prepare reports

How to review projects (1)

▪ Define the argument♦ What question is being asked?♦ Of whom?♦ What weapons can be used? What is the basic framework?

▪ Stick to the argument. This requires:♦ New content♦ Elimination of much content that has already been written♦ Elimination of contradictions between arguments

▪ My comments♦ Do not follow them strictly♦ They are only suggestions after a quick read-through much

more has to be changed, especially in line with the discussion▪ Briefly explain the changes in a short note on the

executive summary page

Page 15: How to work on team projects and prepare reports

How to review projects (2)

Receiving criticisms requires:▪ (1) «being open» to understanding them, and▪ (2) accepting criticisms productively:

♦ They often just point to a problem but do not give a solution, or the solution is no solution at all

♦ We have to find the right solution♦ We must avoid thinking we do not deserve the

criticism because the critic didn’t give a solution

Page 16: How to work on team projects and prepare reports

Writing the report

Page 17: How to work on team projects and prepare reports

Metaphors

▪ “We are seeing wolf pack behavior in the markets, and if we don’t stop these packs, they will tear the weaker countries apart.”

Anders Borg, Sweden’s finance minister, about the financial crisis of the Euro in May 2010, http://www.ft.com/cms/s/0/f96a6c14-5b48-11df-85a3-00144feab49a.html.

Page 18: How to work on team projects and prepare reports

How to write clearlyA golden rule: avoid “nominalization”

(forming nouns from verbs)▪ Examples (bad good):

♦ The police conducted an investigation into the matter The police investigated the matter.

♦ There is a need for further study of this program The staff must study this program further

♦ Our discussion concerned a tax cut We discussed a tax cut

♦ There was first a review of the evolution of the dorsal fin First, she reviewed how the dorsal fin evolved.

▪ Moral: We are telling a story. Therefore we must focus on the characters and the action but without being too colloquial

Page 19: How to work on team projects and prepare reports

Some typical faults

▪ Footnotes: ♦ Place them before a comma or full stop, not in mid-sentence

▪ Avoid: ♦ Excessive use of adjectives♦ Exaggeration♦ Colloquialisms♦ Excessively formal language♦ Double emphasis♦ Value judgments

▪ References: ♦ Follow a single, professional system♦ Give thorough information, to facilitate location

Page 20: How to work on team projects and prepare reports

Examples of wording

Page 21: How to work on team projects and prepare reports

Title:

How should second year business science or economics students

manage their career?

Page 22: How to work on team projects and prepare reports

How should we manage a professional career?

Page 23: How to work on team projects and prepare reports

How we should manage a professional career

Page 24: How to work on team projects and prepare reports

How to manage a career

Page 25: How to work on team projects and prepare reports

Titles

▪ Requirements:♦ Short♦ Informative♦ Attractive

▪ Because they are fundamental: ♦ We should devote a lot of time to them♦ We should rewrite them many times

Page 26: How to work on team projects and prepare reports

▪ It can therefore be concluded that the labour market faced by graduates in economics or business science when they leave university is currently at a high point for number of workers.

▪ Ambiguous:♦ “... at a high point for number of workers”.

▪ Impersonal, repetitions:♦ “It can therefore be concluded that the labour market

faced by graduates in economics or business science when they leave university is currently at a high point for number of workers.

Page 27: How to work on team projects and prepare reports

▪ We conclude that the market for new graduates in Economics or Business Science had a surplus supply / demand.

▪ Lessons♦ Do not avoid using the first person:

• “It can be concluded” Who concludes?

♦ Precision is fundamental: ambiguity must be avoided• “is currently at a high point for number of workers.”• Are there too many or too few workers?

♦ Avoid repetitions• “is currently”

Page 28: How to work on team projects and prepare reports

▪ Job offers can be found on specialized Internet portals (such as Infojobs, Monster,…).

▪ Job offers can be found on specialized Internet portals like Infojobs and Monster.

▪ Ellipsis (suspension point): ♦ Reveals lack of information and of interest in the

reader♦ Can often be eliminated without affecting the

meaning (as in our case)♦ Sometimes, more examples should be found♦ Should be used very rarely

Page 29: How to work on team projects and prepare reports

▪ To what extent is the market prepared to reward students for something extra in their education? The question can be converted into what is the return on education, covered in the section on econometric models.

▪ Too many questions♦ To what extent is the market prepared to reward students for

something extra in their education)?” ♦ The reader wants answers, not questions

▪ Abuse of the impersonal♦ “The question can be converted into...” Who converts it?

▪ ¿Do not leave out words – it slows down reading♦ “... (which will be) covered in ...”

Page 30: How to work on team projects and prepare reports

▪ Good career management requires analysis of the different options a student has during the close of their studies.

▪ Good career management requires analysis of the different options a student has when they finish studying.

▪ For good career management, students coming to the end of their studies should analyze all their options.

Page 31: How to work on team projects and prepare reports

▪ The purpose of this study is to explain how to solve the problem of water shortage. For this purpose, we have studied the causes of this shortage, focusing on the management of water resources. For this purpose, we have analyzed four possible mechanisms to solve the problem, weighing the pros and cons in order to reach the optimum solution.

▪ The purpose of this study is to explain how to solve the problem of water shortage. For this purpose, we have studied the causes of this shortage, focusing on the management of water resources. For this purpose, we have analyzed four possible mechanisms to solve the problem, weighing the pros and cons in order to reach the optimum solution.

Page 32: How to work on team projects and prepare reports

▪ Our objective is to solve the problem of water shortage. After studying its causes and examining how it would be possible to manage the shortage, we analyze four possible solutions : 1, 2, 3 and 4. We defend solution X because Y.

▪ After studying the problem of water shortage, we analyze four solutions: 1, 2, 3 and 4. We defend solution X because Y.

▪ Lessons:♦ Word order is fundamental♦ We give the necessary information: the options and,

above all, our recommendation

Page 33: How to work on team projects and prepare reports

▪ The causes considered initially when we start to analyze the problem

▪ The first causes that are analyzed

Page 34: How to work on team projects and prepare reports

▪ Regarding what are known as first-world countries, it can be stated...

▪ Regarding developed countries, we consider that...

▪ Lessons:♦ Avoid circumlocution (roundabout expressions)

• As stated by Mark Twain (who was paid by the word), do not write «metropolis» if you can use «city»

♦ It «it can be stated», prove it by stating it. • In general, do not waste readers time by describing your

problems or how you write.

Page 35: How to work on team projects and prepare reports

▪ This is because the fact that we are dealing with an essential good makes it necessary for a body supervising development of the mechanism to be adopted to act.

▪ This is because the fact that we are dealing with an essential good makes it necessary for a body supervising the development of the mechanism to be adopted to act.

Page 36: How to work on team projects and prepare reports

▪ This is because, since it is a basic good, it is necessary for a body to supervise implementation of the chosen policy.

▪ Lesson: ♦ Check, then check again, then check once more.♦ Then, at the end, when we think everything is ready,

forget that everything is ready, and check again.