Hounslow HighwaysSpring Grove & Osterley Residents Association meeting Tuesday 28th February 2017

Timothy Hurley

Roads & Pavements

www.hounslowhighways.org

What is included in the PFI?

2

3

Services

• Routine Maintenance of assets

• Emergency and Winter Services

• Street Cleansing

• Illegal Waste Removal

• Tree Maintenance and

Grass/Horticulture

• Policy Setting and Highway Strategy

• Management of Inventory

• Highway Safety Inspections

• Street Works – Permits and

Licenses

• Environmental Education and

Management

• Enforcement for Environment and

Highway offences

• Management of Public Claims

• Illegal Crossovers

4

Condition Improvement Progress so farMilestone 8 (4 Years) – Borough Wide

Carriageways

• 952 Schemes

• 186 Km of roads

Footways

• 822 Schemes

• 205 Km of footways

Street Lighting

• 14,357 new Street Lights replaced

• 700 remaining lights to complete

5

Progress across the boroughEnd of Year 4 (Milestone 8)

Roads and Footway Improvements

• The condition of roads and footways is measured every

year through detailed technical evaluation by a third-party

survey organisation

• The “gap” between current condition and the target is

represented by the Network Performance Gap (NPG)

• The overall target for a compliant network is 0.5 NPG

• The contract started at NPG of 4.58 and is reduced by

each new road or footway completed

• At the end of Year 4 (Milestone 8) the NPG was 0.85

• This represents a 81% improvement in overall condition

– ahead of the contract improvement profile

6

• The LBH road infrastructure asset value increased by £71 million to £778

million in the last financial year.

• Road and Footway works continue through years 4&5 to achieve the

required level of compliance

• Capital works will also take place in the following 20 years based on the

condition of the network each year

• Day to day repairs that qualify for immediate action will continue to be

assessed and actioned.

• Hounslow Highways remains responsible for all streets and their condition

through until 2037

Investment Programme

7

Managing the Infrastructure

• Highway Safety Inspections

• Inventory Updates (269,284 assets)

• Policy setting and Network Compliance Audit

• Street Works – Licenses and Permits (LoPS)

• Condition Surveys and specifications

What is a Pothole ?

• Hounslow Highways has adopted dimensional

definitions for potholes as part of the Safety Inspection

Strategy and Plan

• Response times and treatment of potholes is based on

importance of Carriageways, Footway, Cycle lanes

and an assessment of risk

• Having assessed and categorised the risk impact and

risk probability, the risk matrix is utilised to determine

an appropriate response

8

Potholes identified/ repaired by year

9

0

50

100

150

200

250

300

1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11

2013 2014 2015 2016

CW08 - CW: Pothole

Linear (CW08 - CW:Pothole)

10

When do we repair- Carriageways?

Table: Investigatory levels on Carriageways

Defect Type

Investigatory level

Crossings, Junctions

and in or adjacent to

the Kerb

Other Locations on

Link 1, 2, 3, and 4 Link 5

Pothole/Spalling 40mm depth 50mm depth 75mm depth

Crowning 50mm depth 50mm depth 75mm depth

Depression (area 2m2) 50mm 50mm 75mm

Gap/Crack 20mm depth (20mm

wide)

20mm depth (20mm

wide)

30mm depth (20mm

wide)

Sunken and Raised

Ironwork

20mm level difference 20mm level difference 25mm level difference

Level Difference within

Ironwork Framework

15mm 15mm 15mm

11

Defect Type

Investigatory level

Place A & B Place C Place D Place E & PROW

Hierarchy 1

Trip/Pothole 15mm depth 20mm depth 25mm depth 25mm depth

Rocking Slab/Block 15mm vertical

movement

20mm vertical

movement

25mm vertical

movement

25mm vertical

movement

Open Joint 20mm width x 200mm length (min depth 20mm)

Tree Root Damage 15mm trip 20mm trip 25mm trip 25mm trip

Sunken and Raised

Ironwork

15mm level

difference

20 mm level

difference

25mm difference 25mm difference

Dislodged Kerb 50mm

horizontally

50mm horizontally 50mm horizontally 50mm horizontally

Loose/Rocking Kerb 15mm vertically 20mm vertically 25mm vertically 25mm vertically

Missing Kerb Yes

Table: Investigatory levels on Footways

When do we repair- Footways?

12

Risk Matrix

Probability

ImpactVery Low (1) Low (2) Medium (3) High (4)

Negligible (1) 1 2 3 4

Low (2) 2 4 6 8

Noticeable (3) 3 6 9 12

High (4) 4 8 12 16

Response Category Cat 2 Low (L) Cat2 Medium (M) Cat 2 High (H) Cat 1

Priority Risk Factor Response

Priority 1

(Category 1 defect)

12 to 16 Make safe within 1 hour and complete temporary repair

within 24 Hours, then complete a permanent repair within 28

days

Priority 2 Cat2 H 8 to 11 Repair within 28 days

Priority 3 Cat2 M 5 to 7 Repair within 56 days

Priority 4 Cat 2 L 1 to 4 Repair during next available programme

Works in Osterley & Spring Grove

13

2013-2016 No. RSL Length (km)

109 23.5

CW 47 12.2

FW 62 11.3

2017 No. RSL

CW 11

FW 17

Lighting in Osterley & Spring Grove

14

• 2013 – 2016

• Osterley + Spring Grove – 983 LED lighting points installed

• 2017

• 0 remaining - [Not including Heritage Lighting]

Energy savings for the borough

• HH have reduced the energy consumption for our Street Lighting assets by

55% since the contract started. HH are by far the leading London Borough in

this aspect, and in turn we are reducing our carbon footprint.

16

Tree Works

• Current street tree stock is 11,398 trees

• All street trees are surveyed every three years as part of a

rotational cycle of one third per year.

• Survey used to establish maintenance requirement for each

tree.

• Maintenance regime includes

Cyclical pruning

Clean Sweep

Large plane and lime tree maintenance

• Felling and replanting Dead, Dying, Diseased and Dangerous

17

Environment & Enforcement

Flytipping

18

19

What are we doing about?

Working with the community

20

• School visits

• Community clean-up days

• Graduates and apprenticeships

• Volunteer programme – Lay

Assessors

• Local workforce

• Junior Citizens

• Hounslow Business Awards

• Enabling Enterprise

• Joint task force

Reporting Issues on

Hounslow Highways website

21

• Why is it important to report issues through our website?

- 24/7 monitoring

- Immediate response to Cat 1 hazards

- Immediate assignment to the correct team/officer

- Enquiries do not get lost

- Customers get a reference number

- Data allows us to monitor trends and know which services to provide

Reactive Enquiries

22

High Enquiry Areas

23

24

Lay Assessor Volunteers

25

• Lay Assessor programme started November 2014

• 10 Lay Assessors (each representing a ward)

• Site visits/ Monthly coffee mornings

• Additional contact i.e. user acceptance testing for website, meetings with the IC

(who signs off our schemes)

• Always looking for new ideas to refresh the programme

• Interested people should email [email protected]

Questions?