hopwood hall college, rochdale - d+b facades uk ltd · 2016-08-01 · hopwood hall college,...

5
Hopwood Hall College, Rochdale +

Upload: others

Post on 29-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hopwood Hall College, Rochdale - D+B Facades UK Ltd · 2016-08-01 · Hopwood Hall College, Rochdale + REFERENCE CONTACT Saf Arfan, Director for Corporate Services Hopwood Hall College,

H o p w o o d H a l l C o l l e g e , R o c h d a l e

+

Page 2: Hopwood Hall College, Rochdale - D+B Facades UK Ltd · 2016-08-01 · Hopwood Hall College, Rochdale + REFERENCE CONTACT Saf Arfan, Director for Corporate Services Hopwood Hall College,

+H o p w o o d H a l l C o l l e g e , R o c h d a l e

REFERENCE CONTACTSaf Arfan, Director for Corporate ServicesHopwood Hall College, Rochdale Road, Middleton M24 6XHT: 0161 643 7560 (ext: 3295)M: 07748 111143E: [email protected]

TYPE OF CONTRACTJCT Design & Build 2005 Rev 2 (2009)

CONTRACT VALUE £2.4m

PROJECT DURATION Duration: 40 weeks (Aug 2011 – May 2012)

Hopwood Hall College,Rochdale before

Hopwood Hall College, Rochdale after

Client Testimonial

The over-cladding scheme has not onlyprovided a ‘new-look’ but transformedthe gateway to Rochdale town centre.The project formed part of a larger towncentre regeneration scheme and was part-funded by Rochdale Council. The Collegecontinues to receive very positivefeedback from our key partners, localcouncillors, public sector bodies, thesurrounding community and localbusinesses – it’s uplifted the surroundingarea and created a strong feel-good factoracross the College. Needless to say, theCollege are very pleased the strategicdecision to over-clad the campus hasdelivered the desired result and indeedsurpassed our expectations. The result isprimarily due to the huge team effortfrom the design team, contractor andCollege estates team, to make the schemesucceed. This project was delivered in-year, on time and budget, with minimuminterruption to business continuity and it’sa credit to the flexibility andprofessionalism of D&B facades.

Saf Arfan,Director for Corporate Services,

Hopwood Hall College.

PROJECT SCOPE

Insulated aluminium rainscreen

overcladding, single ply overlay roof and

replacement windows to two

interconnected multi-storey buildings, the

six storey Miles Ashworth Building and the

four storey Benjamin Rudman Building.

Additional works undertaken included

render to brickwork below ground floor sill

level on the Benjamin Rudman Building and

masonry paint treatment to exposed

concrete columns and beams to the ground

floor of the Miles Ashworth Building.

Page 3: Hopwood Hall College, Rochdale - D+B Facades UK Ltd · 2016-08-01 · Hopwood Hall College, Rochdale + REFERENCE CONTACT Saf Arfan, Director for Corporate Services Hopwood Hall College,

+H o p w o o d H a l l C o l l e g e , R o c h d a l e

Hopwood Hall College, Rochdale after

Hopwood Hall College, Rochdale before

Page 4: Hopwood Hall College, Rochdale - D+B Facades UK Ltd · 2016-08-01 · Hopwood Hall College, Rochdale + REFERENCE CONTACT Saf Arfan, Director for Corporate Services Hopwood Hall College,

+H o p w o o d H a l l C o l l e g e , R o c h d a l e

Hopwood Hall College, Rochdale afterHopwood Hall College, Rochdale before

Page 5: Hopwood Hall College, Rochdale - D+B Facades UK Ltd · 2016-08-01 · Hopwood Hall College, Rochdale + REFERENCE CONTACT Saf Arfan, Director for Corporate Services Hopwood Hall College,

+H o p w o o d H a l l C o l l e g e , R o c h d a l e

Hopwood Hall College, Rochdale after

Hopwood Hall College, Rochdale before