hoja de calculo - diseño puente tipo losa - metodo lrfd

Upload: misangelitos123

Post on 29-Oct-2015

2.253 views

Category:

Documents


3 download

TRANSCRIPT

Hoja1DETERMINACIN DEL ANCHO EFECTIVODISEO DE PUENTE TIPO LOSA : MTODO LRFDACERO DE REPARTICINL1 =8000mmSE CONSIDERA:W1 =7200mmAsr =6.31cmW =7800mmLUZ DEL PUENTE (L->mts)8mNL =2Dimetro a usar =5/8"rea =2.00cmSOBRECARGA VEHICULARHL-93NUMERO DE VAS21. Un Carril Cargado:Espaciamiento (S) =31.68cm.3.5714.7814.78MATERIALES:E = 250+0.42(L1*W1)^1/2W/NLS asumido =30cm.Asp (final) =6.67cmRESISTENCIA DEL CONCRETO (fc)280Kg./cmE =3437.583900mmFLUENCIA DEL ACERO (fy)4200Kg./cmUSAR: 5/8" @30cm.CARPETA ASFLTICA0.05m2. Dos o mas Carriles CargadosDENSIDAD DEL CONCRETO2400Kg./cm2.4Tn/mDENSIDAD DEL ASFALTO2000Kg./cm2.0Tn/mE = 2100+0.12(L1*W1)^1/2W/NLBOMBEO2%ACERO DE TEMPERATURAE =3010.743900mmAst =8.93cmA. REDIMENSIONAMIENTOCALCULO DE LOS EFECTOS DE LA CARGA VIVADimetro a usar =5/8"rea =2.00cmLUZ DEL PUENTELUZ (L,S) =8mANCHO DE CALZADA7.2mPara Una Va CargadaEspaciamiento (S) =22.40cm.PERALTE DE LOSAh=(1.2(S+3000))/30 =0.44mM LL+IM = m(Mmax*1.33+Ms/c)/ES asumido =20cm.Asp (final) =10.00cmSE ASUMEh =0.50mMmax =38.30Tn-mANCHO DE SARDINELb =0.30mEntre 0.20 a 0.25mMs/c =7.76Tn-mUSAR: 5/8" @20cm.H. DE LA VIGA BORDEhb =0.25mEntre 0.20 a 0.25mm =1.20M LL+IM =20.49Tn-m/m0.307.200.30Para Dos Vas CargadasGRAFICA0.252%2%M LL+IM = m(Mmax*1.33+Ms/c)/E0.05Mmax =38.30Tn-m5/8200.50Ms/c =7.76Tn-m " @ cm.5/830m =1.00 " @ cm.M LL+IM =19.50Tn-m/m7.80SE ASUMEM LL+IM =20.49Tn-m/mB. DISEO DE LOSAMETRADO DE CARGASSELECCIN DE MODIFICADORES DE CARGA (n)115b.1 Momentos por Carga Muerta(Franja Interior de 1.00 m de ancho)Factor de Ductibilidad (nD) =0.95 " @ cm.Factor de Redundancia (NR) =1.05DCPeso Concreto =1.20Tn/mSector de Importancia Opertica (nI) =1.05MDC = DC*L^2/8 =9.60Tn.mn = nD * nR * n1DWPeso Asfalto =0.10Tn/mMDW = DW*L^2/8 =0.80Tn.mn =1.05b.2 Momentos por Carga VivaCOMBINACIN DE CARGAS APLICABLES* Camin HL-93RESISTENCIA 1 Estado Limite(Por Barett)14.7814.783.57Mu = n(1.25 DC + 1.50 DW + 1.75 (LL + IM))CLMu =51.39Tn-mMcamion =31.63Tn-m0.783.2252.925SERVICIO 1 Estado Limite0.281.86Mu = 1.0(DC + DW) + 1.0 (LL + IM)5.0752.925Mu =30.89Tn-mDISEO14.7814.783.57A. DISEO POR ESTADO LIMITE POR SERVICIOCLVERIFICACIN DE PERALTE DE SERVICIOMcamion =27.34Tn-m-0.34.34.3-0.152.00Mu =30892.69Kg.-m4.004.00fc = 0.4 * fc112Kg./cmfs = 0.4 * fy1680Kg./cmEs =2100000Kg./cmMcamion =31.63Tn-mEc = 15000 fc250998.01n = Es / Ec8.37r = fs / fc15* TandemK = n/(n + r)0.36j = 1 - K/30.88(Por Barett)11.2011.20b =100cm.CLDETERMINACIN DEL VALOR DEL PERALTEMtandem =38.30Tn-m3.71.23.1d = (2M / (fc * K * j * b)) =41.83cm.