high speed technology infrastructure engineering for high speed

12
HIGH SPEED TECHNOLOGY HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH INFRASTRUCTURE ENGINEERING FOR HIGH SPEED SPEED eurailSpeed 2005 Milan, 8 november What technologic choice for the high What technologic choice for the high speed infrastructure? speed infrastructure? The point of view of a rail The point of view of a rail producer producer

Upload: davis-witt

Post on 03-Jan-2016

57 views

Category:

Documents


0 download

DESCRIPTION

eurailSpeed 2005. Milan, 8 november. HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED. What technologic choice for the high speed infrastructure?. The point of view of a rail producer. eurailSpeed 2005. Milan, 8 november. Quality requirements for high speed rails: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

HIGH SPEED TECHNOLOGYHIGH SPEED TECHNOLOGY

INFRASTRUCTURE ENGINEERING FOR HIGH INFRASTRUCTURE ENGINEERING FOR HIGH SPEEDSPEED

HIGH SPEED TECHNOLOGYHIGH SPEED TECHNOLOGY

INFRASTRUCTURE ENGINEERING FOR HIGH INFRASTRUCTURE ENGINEERING FOR HIGH SPEEDSPEED

eurailSpeed 2005

Milan, 8 november

What technologic choice for the high speed What technologic choice for the high speed infrastructure?infrastructure?

What technologic choice for the high speed What technologic choice for the high speed infrastructure?infrastructure?

The point of view of a rail producerThe point of view of a rail producerThe point of view of a rail producerThe point of view of a rail producer

Page 2: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

Quality requirements for high speed rails:Quality requirements for high speed rails:

Low inclusions contentLow inclusions content Low gas contentLow gas content Strict control of straightness and Strict control of straightness and profileprofile Absence of harmful defectsAbsence of harmful defects

Quality requirements for high speed rails:Quality requirements for high speed rails:

Low inclusions contentLow inclusions content Low gas contentLow gas content Strict control of straightness and Strict control of straightness and profileprofile Absence of harmful defectsAbsence of harmful defects

eurailSpeed 2005

Milan, 8 november

Standardization of rails production cycle, Standardization of rails production cycle, aiming, for the aiming, for the whole production,whole production, to the to the

quality level corresponding with rails quality level corresponding with rails intended for the most critical applicationsintended for the most critical applications

Standardization of rails production cycle, Standardization of rails production cycle, aiming, for the aiming, for the whole production,whole production, to the to the

quality level corresponding with rails quality level corresponding with rails intended for the most critical applicationsintended for the most critical applications

Page 3: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

eurailSpeed 2005

Milan, 8 november

To obtain the goalTo obtain the goalTo obtain the goalTo obtain the goal

New New investments investments

New New investments investments

Production route Production route Production route Production route Advanced hot and Advanced hot and cold inspection cold inspection

techniques techniques

Advanced hot and Advanced hot and cold inspection cold inspection

techniques techniques

Page 4: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

eurailSpeed 2005

Milan, 8 november

STEEL PRODUCTION CYCLESTEEL PRODUCTION CYCLESTEEL PRODUCTION CYCLESTEEL PRODUCTION CYCLE

Hot metal TappingHot metal Tapping HMDHMD Oxygen Converter

Oxygen Converter

LFLF VDVDContinuous

CastierContinuous

Castier

DESULPHURIZATION•Manufacturer: SMS Demag (1999)

• Injection of lime and magnesium by submerged lance

• Mean time of the process: 20 min

• Typical S content: before treatment 0.045% after treatment 0.010%

DESULPHURIZATION•Manufacturer: SMS Demag (1999)

• Injection of lime and magnesium by submerged lance

• Mean time of the process: 20 min

• Typical S content: before treatment 0.045% after treatment 0.010%

TANK DEGASSING •Manufacturer: SMS Demag (2000/2002)

• Min attainable vacuum: 0.7 mbar

• Mean treatment time: 20 min

• Typical H2 after treatment: 1.5 ppm

TANK DEGASSING •Manufacturer: SMS Demag (2000/2002)

• Min attainable vacuum: 0.7 mbar

• Mean treatment time: 20 min

• Typical H2 after treatment: 1.5 ppm

• AMEPA• AMEPA

Page 5: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

RAIL MILL LAY-OUTRAIL MILL LAY-OUT

8

7

2523 24 26

27 28 29 30

16 17

18

1920 21 222

34

5

6

G2

G3

UR0

12 14

9

10

15

1

1311

1234

765

10

9

8

FINISHING STAND

WATER JET RAIL DESCALERS

REVERSABLE STANDSWATER JET RAIL DESCALERS

BLOOM DISPOSAL ARM

BLOOM TRANSFER TROLLEYBLOOMING MILLWATER JET BLOOM DESCALER

REHEATING FURNACE

BLOOM WAREHOUSE

14

1312

15

AUTOMATIC HOT STAMPING MACHINES

AUTOMATIC HIGH TEMP. PROFILE MESAUREMENT SYSTEM

RAILS COOLING BED

HOT SAWS

16 STRAIGHTENING MACHINES

TRANSFER LINE FOR NON-CONFORMING RAIL

RAIL TRANSFER BED17

28

27

26

25

24232221201918

29

30

FINAL INSPECTION TABLE

RAIL WEIGHT SYSTEM

GAG PRESS

PROFILE AND STRAIGHTNESS MEASURING MACHINE

TRANSFER BEDCOLD SAWS

NON DESTRUCTIVE CONTROL (NDT; UT, EC)

AIR JET CLEANER

DESPATCH TO CUSTOMER OR RAIL WAREHOUSE

INTERNAL TRANFER TRACK

CRAINS

RAIL TRANSFER BED

11 AUTOMATIC HIGH TEMP. DEFECTS CONTROL SYSTEM

8

7

2523 24 26

27 28 29 30

16 17

18

1920 21 222

34

5

6

G2

G3

UR0

12 14

9

10

15

1

1311

1234

765

10

9

8

FINISHING STAND

WATER JET RAIL DESCALERS

REVERSABLE STANDSWATER JET RAIL DESCALERS

BLOOM DISPOSAL ARM

BLOOM TRANSFER TROLLEYBLOOMING MILLWATER JET BLOOM DESCALER

REHEATING FURNACE

BLOOM WAREHOUSE

14

1312

15

AUTOMATIC HOT STAMPING MACHINES

AUTOMATIC HIGH TEMP. PROFILE MESAUREMENT SYSTEM

RAILS COOLING BED

HOT SAWS

16 STRAIGHTENING MACHINES

TRANSFER LINE FOR NON-CONFORMING RAIL

RAIL TRANSFER BED17

28

27

26

25

24232221201918

29

30

FINAL INSPECTION TABLE

RAIL WEIGHT SYSTEM

GAG PRESS

PROFILE AND STRAIGHTNESS MEASURING MACHINE

TRANSFER BEDCOLD SAWS

NON DESTRUCTIVE CONTROL (NDT; UT, EC)

AIR JET CLEANER

DESPATCH TO CUSTOMER OR RAIL WAREHOUSE

INTERNAL TRANFER TRACK

CRAINS

RAIL TRANSFER BED

11 AUTOMATIC HIGH TEMP. DEFECTS CONTROL SYSTEM

eurailSpeed 2005

Milan, 8 november

Page 6: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

REHEATING FURNACE: Italimpianti (2001)REHEATING FURNACE: Italimpianti (2001)

• Revamped in 2001

• Walking beam type

• Tmean blooms at the end = 1290 °C

• Equipped with a matematichal model to supply information about the thermal state of the blooms to the control logic

• Revamped in 2001

• Walking beam type

• Tmean blooms at the end = 1290 °C

• Equipped with a matematichal model to supply information about the thermal state of the blooms to the control logic

eurailSpeed 2005

Milan, 8 november

Page 7: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

HIGH TEMPERATURE DEFECTS CONTROL SYSTEM: Tecnogamma (2004)HIGH TEMPERATURE DEFECTS CONTROL SYSTEM: Tecnogamma (2004)HIGH TEMPERATURE DEFECTS CONTROL SYSTEM: Tecnogamma (2004)HIGH TEMPERATURE DEFECTS CONTROL SYSTEM: Tecnogamma (2004)

eurailSpeed 2005

Milan, 8 november

Main characteristics Rail T=800-1200 °C Cameras nr.=6 Scanning field= 400 mm Acquisition frequency=10 frame/sec

Main characteristics Rail T=800-1200 °C Cameras nr.=6 Scanning field= 400 mm Acquisition frequency=10 frame/sec

Page 8: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

HIHI-PROFILE, HIGH TEMP. PROFILE CONTROL SYSTEM: Danieli (2001)-PROFILE, HIGH TEMP. PROFILE CONTROL SYSTEM: Danieli (2001)HIHI-PROFILE, HIGH TEMP. PROFILE CONTROL SYSTEM: Danieli (2001)-PROFILE, HIGH TEMP. PROFILE CONTROL SYSTEM: Danieli (2001)

eurailSpeed 2005

Milan, 8 november

Main characteristics Rail Tmax=1100 °C Accuracy=0.1 mm Acquisition frequency 30data/sec

Main characteristics Rail Tmax=1100 °C Accuracy=0.1 mm Acquisition frequency 30data/sec

Page 9: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

AUTOMATIC STRAIGHTNESS CONTROL: Tecnogamma (2003)AUTOMATIC STRAIGHTNESS CONTROL: Tecnogamma (2003)

eurailSpeed 2005

Milan, 8 november

Main characteristics Lenght of acquisition: 3m nr. of cameras: 20 Resolution = 0.05 mm Vmax = 2 m/sec

Main characteristics Lenght of acquisition: 3m nr. of cameras: 20 Resolution = 0.05 mm Vmax = 2 m/sec

Page 10: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

AUTOMATIC PROFILE CONTROL: Tecnogamma (2003)AUTOMATIC PROFILE CONTROL: Tecnogamma (2003)

eurailSpeed 2005

Milan, 8 november

Main characteristics Lenght of acquisition: 3m nr. of cameras: 4 Resolution = 0.05 mm Vmax = 2 m/sec

Main characteristics Lenght of acquisition: 3m nr. of cameras: 4 Resolution = 0.05 mm Vmax = 2 m/sec

Page 11: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

rail mill

cooling bed

Roller straightness

automatic testing station

cold saw

inspection bed

storage

Quality controls system for rails

reheating furnacedimensions surface internal

dimensionand shape

(automatic + manual) surfacedefects

(automatic inspection)

metallurgical and

technological properties

straightness(visual + gauges)

automatic internalUS inspection

automatic surface(eddy current)

inspection

dimension andshape

straightness

surface inspection(visual)

eurailSpeed 2005

Milan, 8 november

Page 12: HIGH SPEED TECHNOLOGY INFRASTRUCTURE ENGINEERING FOR HIGH SPEED

eurailSpeed 2005

Milan, 8 november

PRODUCT APPROVALSPRODUCT APPROVALS

Lucchini Piombino has been qualified by RFI according to EN 13674-1

In accordance to Council Directive 96/48/EC, rail 60E1 and 54E1, certified by RINA, can be used in trans-European high speed rail system.

Lucchini Piombino has been qualified by RFI according to EN 13674-1

In accordance to Council Directive 96/48/EC, rail 60E1 and 54E1, certified by RINA, can be used in trans-European high speed rail system.