harvest run - phase 1 - v2 - collierhomes.ca … · specification sheet schedule b heating system...

2
KANTOR WOODLOT PEAR TREE AVE ELM ST PEACH TREE BLVD ELMWOOD AVE BAILEY AVE COULTER AVE CENTENNIAL RD CENTENNIAL RD MARTINGALE TERRACE BRIDLE PATH N S W E PHASE 1 Building permits available spring 2017. Now taking deposits on lots.

Upload: hatuyen

Post on 05-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

KANTOR WOODLOT

PEAR TREE AVE

ELM ST

PE

AC

H

TR

EE

B

LVD

ELM

WO

OD

AV

E

BA

ILE

Y

AV

E

CO

ULT

ER

AV

E

CE

NT

EN

NIA

L R

DC

EN

TE

NN

IAL

RD

MARTINGALE TERRACE

BRIDLE PATH N

S

W E

PHASE 1Building permits

available spring 2017. Now taking deposits

on lots.

EXTERIOR FEATURES

SPECIFICATION SHEETSCHEDULE B

HEATING SYSTEM

KITCHEN

BATHROOMS

GARAGES

MISCELLANEOUS

INTERIOR FEATURES

Building permit and levies included.Sanitary sewers, water and gas, undergroundhydro, telephone, cable TV.Paved street with curb, gutter, sidewalk andstreet lights as per subdivision plan.Entire lot to be graded and fully soddedConcrete foundation, basement and garagefloors. Clay brick per selection from suppliers’samples.All exterior doors are steel insulated.2 Exterior water tap.2 Waterproof exterior electric outlet.All exterior windows double glass.Screens on all operating windows, grills andshutters as shown on model.Insulating glass patio doors complete withscreens, where applicable.Limited lifetime asphalt roof shingles.Pre-finished maintenance free aluminum/vinylseamless eavestrough, soffits, & fascia.Poured concrete porch and patio stones todriveway.Paved driveway

High-efficient forced-air natural gas furnace,sized for each home.Insulation to approved standards,R-50 attic, R-24 wallsDuct work equipped to handle futureair-conditioning

High quality custom-built kitchen cupboardswith a selection of styles and finishes, with rolltop counters.Two speed range hood.Double stainless steel sink.

White/bone fixtures in all bathrooms.Custom built vanities with arborite roll-tops.Quality washerless faucets.Fiberglass tub enclosures.Power exhaust fans where applicable.Mirrors above vanities.

Poured concrete floors.Painted steel sectional doors.Interior walls, drywalled & painted.Electrical outlet, overhead light.Walls painted standard colour.

100-amp electric service with breakerpanel-copper wiring.Heavy duty receptacle for clothes dryer andstove.Standard plastic laundry tub in basementRental gas or electric hot water heaterWater meter installed by PUC and gas meterinstalled by Union Gas.Location as per utility policy.Rough-in for 3 pc washroom in basement.Basements studded, with R20 insulation.

3 Cable & 3 Telephone outlets.Electrical outlets as per Ontario Hydro specs.All subfloors 5/8” tongue and grooveplywood, nailed and screwed.All light fixtures and door chimes supplied andinstalled by Vendor.Choice of high quality broadloom and cushionvinyl as per builder’s samples.Colonial painted trim and series 800 doorsInterior walls of living area and garage to bedrywall.One-half inch gypsum board fastened byscrews on walls.1/2” gypsum board fastened by screws on allinsulated ceilings.All walls painted two coats, three coloursthroughout.Textured and flat ceilings.