Northern California
Restoration Design and
Implementation (RDI)
Offering Design-Build restoration services
that save clients time and money
• John Zanzi: Landscape Architect and Construction Manager
• Loren Roach, PE: Senior Project Manager, Restoration
Design & Implementation
• Craig Seltenrich: Senior Aquatic Ecologist
• Kevin Derby: Senior Biologist, Wetland Ecologist,
Regulatory Specialist, & Construction Monitor
• Scott Eckardt: Project Manager, Licensed Forester
• Mike Sweesy: Principal / Habitat Restoration Specialist, and
Co-Founder of HRS
• Mark Girard: President, Co-Founder of HRS
Dudek’s restoration experts know the environmental factors, tools, and
timing needed to serve up successful habitat measures
Team Leaders
Dudek’s complete suite of services takes a project from planning and
design to successful habitat construction and implementation.
Integrated Restoration Services
Expertise Benefits
Engineering, hydrology,
Geomorphology
Design/Build approach allows for adaptive management
in the field
Biological Sciences
(Aviation, terrestrial, aquatic)
Species protection/relocation integrated into
construction schedule to avoid delays
Vegetation and Forestry Efficient native harvesting, planting, and long term
habitat establishment
Environmental Planning Conformance with local, regional, state, and federal
environmental plans
Regulatory Compliance Agency coordination and permitting completed before
or concurrent with construction
Construction
(Class A and C contractors)
Understands the science behind the plans and
executes/adapts to produce on time, within budget
Case Study: Blackwood Creek
Local root wads chosen for durability
and strength
Secured with wire, boulders, and fill
dirt to withstand flood events
Two levels of fabric protection
covering willow branches positioned
at estimated high water line
Case Study: Blackwood Creek
Watering and plantings designed to
keep mitigation and growth in placeSite ready for test event
Case Study: Blackwood Creek
Successful stream reintroduction Real event less than one month after
installation complete
Case Study: Blackwood Creek
Successful post flooding mitigation
measuresActive, vibrant growth one month
after flood event
Marketing our RDI Team
• All resources are in-house
– Including construction – The HRS Factor!
• Streamlined and cost efficient process
– Projects move more quickly from
conceptual design to implementation
– reduced risk with reduced project timeine
• Get projects in-the-ground and signed-off by agencies
– Less interpretation & oversight needed
– Flexibility to change – adaptive field design
– Availability of materials
Marketing our RDI Team
For more information, contact:
• John Zanzi [email protected] x5113
• Loren Roach [email protected] x5109
• Mike Sweesy [email protected] x4253
• Mark Girard [email protected] x3221