gupta vrindavana nivas at sri dham...

13
Gupta Vrindavana Nivas at Sri Dham Mayapur

Upload: phamnga

Post on 18-Aug-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

Gupta Vrindavana Nivas at Sri Dham Mayapur

Page 2: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

Gupta Vrindavan Nivas is the first of several Developments planned by the Mayapur Core Planning Team with a view to providing quality, affordable, pleasant, and secure housing in Mayapur. All profits will be used for Mayapur Development and Infrastructure.

Apartments will be sold, freehold, to followers of Srila Prabhupada. On completion the management of this complex will be handed over to the Owners Association.

Although not shown in the presentation the complex will be secured with a fence which will be planted with flowering bushes. 24 hour guards are envisioned as well as permenant gardener(s).

We are planning for a self contained, organic sewage system (Living Machine) which will recycle waste water for the gardens etc.

Construction is scheduled to start in Oct 2011 in the South West of the plot (Apartments A1 to B6). The second phase (Apartments C1 to E6) will begin as soon as feasable depending on sales etc. Note that pre-construction purchasers will get the advantage of a 10% discount on the price of the apartments.

The colors and external finishes shown in this presentation are not final and are subject to change.

From South East Roof

Page 3: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

GVN Developers, Isodyan, P.O. Sri Mayapur, Dist. Nadia W.B. India Ph. +919732880265 [email protected]

Project Site

Vansi Bhavan

LocationNote that apart from the existing roads, there will be an

internal road link to the temple

Taranpur Road

Bhaktivedanta Acadmeny

N

Page 4: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

The layout of the Plot is follows principles of Vastu as far as possible.

Only 39% of the plot is builtup with the remaining 61% being open gardens etc. The Floor Area Ratio is only 1.2.

The Project comprises 32 Apartments designed with Vastu principles in mind:4 x 3 Bedroom19 x 2 Bedroom9 x 1 Bedroom

There is also a small utility building in the South East for guards, Generator and storage etc.

N

3 x1 Bedroom (c4-C6)

3 x 2 Bedroom (D1-D3)

3x 2 Bedroom D4-D6)

3x1 Bedroom (E1-E3)

3x2 Bedroom (E4-E6)

Utility Building

3x2 Bedroom (C1-C3)

3x2 Bedroom (B4-B6)

3x1Bedroom (B1-B3)

3x2 Bedroom (A5-A7)& 1x2 Bedroom Special (A8)

4x3 Bedroom (A1-A4)

Page 5: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

From the front entrance (South)

3 Bedroom Apartments

1"

Living/Dining

Bedroom

Bedroom Kitchen

Bedroom with Attached Bath

Balcony

3 Bedroom layout(A1-A4)

Bathroom

Page 6: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

Living/Dining

Bedroom

Kitchen

Bathroom

1 Bedroom layout(B1-B3)

Balcony

Living/Dining

Bedroomw/attached Bathroom& closet

Bedroom

Kitchen

Balcony

2 Bedroom layout(A5-A7)

Bath

Page 7: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

From North EastRoof

Furnished 2 Bedroom

Furnished 1 Bedroom

Page 8: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

2 bedroom Layout(A8)

A8 is an apartment witha covered deck and private

roof area

Kitchen

Living/Dining

Bedroomw/attached Bathroom& closet

CoveredDeck

BedroomBath

Bedroom w/attached Bath

BedroomBathroom

Kitchen

Living/Dining

Balcony

2 Bedroom layout(B4-B6)

Page 9: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

2 Bedroom layout(C1-C3)

Bedroom

Living/Dining

KitchenBedroom

Bath

Bath

Balcony

Living/Dining Bedroom

Kitchen Bathroom

Balcony

One Bedroom Layout(C4-C6)

Page 10: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

Bedroom

Living/Dining

Kitchen

BathroomBathroom

Bedroom

Balcony2 Bedroom

Layout(D1-D3)

2 Bedroom Layout(D4-D6)

Bedroom

Bedroomw/attached

Bath

KitchenLiving/Dining

BathBalcony

Page 11: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

1 Bedroom Layout(E1-E3)Bedroom

KitchenLiving/Dining

2 Bedroom Layout(E4-E6)

Living/Dining

Kitchen

BedroomBedroom

BathBath

Bath

Page 12: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

View from West. Note that there is a usable space below the building for parking etc.

Special layout 2 Bedroom Apartment

Page 13: Gupta Vrindavana Nivas at Sri Dham Mayapurmayapur.com/sites/default/files/files/gvn_presents_low.pdf · Gupta Vrindavan Nivas is ... Construction is scheduled to start in Oct 2011

Specifications

Facilities3 Bedroom Apartments3 bedrooms, one with an attached bathroom. Separate bathroom for the use of the other bedrooms. Spacious living/dining area with a balcony facing South, and a kitchen.

The Super Built up area is 1544 sft. The Built up area is 1346sft with a living space of 1208sft.

2 Bedroom Apartments2 bedrooms, one with an attached bathroom. Separate bathroom for the use of the other bedroom. Spacious living/dining area with a balcony facing the inner park, and a kitchen.

The Super Built up area is aprox 1380 sft. The Built up area is 1180sft with a living space of 1000sft. (Varies slightly according to Apartment)

1 Bedroom ApartmentsBedroom, bathroom, Kitchen, and a large living/dining area with a balcony facing the inner park.

The Super Built up area is aprox 850sft. The Built up area is 650sft with a living space of 531sft. (Varies slightly according to Apartment)

We plan to supply all apartments with power inverter systems to ensure constant power, and there will be a small backup generator to run the water pumps when required. Solar powered hot water is also envisioned for the project.

FinishesThe standard finish for all the apartments will be marble floors, with granite bench tops. The walls will be finished with plaster of paris panning ready for painting which will be up to the purchaser.

The internal doors and windows will be finished with polish and the external windows will be painted according to the external color scheme of the building.

The outer fence will be planted with flowering bushes and trees. The gardens will also be planted with local flora with a Tulsi Stamba in the center (Brahma Stan).

All pre construction purchasers will have the oportunity to upgrade the marble at their own cost if they so desire.

An interior decorator will also be available for those who need help with interior color schemes etc.

BookingThe project is open for booking. Pre construction payments attracts a discount of 10% (Payments schedule: 50% on booking, 30% after completion of structure, and balance on completion). Price on application.

GVN Developers, Isodyan, P.O. Sri Mayapur, Dist. Nadia W.B. India Ph. +919732880265 [email protected]