guidelines for bba project report

Upload: nikhil-tiwari

Post on 06-Jul-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/17/2019 Guidelines for Bba Project Report

    1/6

    G U IDEL I NE S F O R BBA PROJECT REP O R T

    Project Report duly completed in all regards needs to be submitted to Respective Project

    Guides on or before 15th May, 201!

    A. The Project Report, wherever specified will be submitted in the typed form as per the

    following requirements:

    i. The typing should be done on one side of the paper 

    ii. The general tet shall be justified and typed in the !ont style "Times #ew Roman$and !ont si%e &'.

    iii. (eading shall be typed in the !ont style "Times #ew Roman and !ont si%e &) and

     bold.

    iv. *ubheading shall be typed in the !ont style "Times #ew Roman and !ont si%e &'and bold.

    v. The *ummer Training Report be typed in &.+ one and a half-

    space. ut the References/ibliography should be typed in a single space. 

    vi. Page numbers at the bottom of the each page. 0argins should be '1 on the left

    and &1 on the right.

    vii. The paper should be A2) si%e.

    viii. The evaluation shall be done in the manner specified in the *cheme of 3amination of the programme. The Project Report shall carry &44 mar5s.

    i. The project report must be about 64 2&'4 pages.

    . "#o copies of the project report in spiral binding along #ith $% must be

    made and one copy must be submitted to the institute!

    i. 0a5e sure that the acceptance certificate in your report is signed by your guide

     before you ma5e the final submission of the report.

    $&MP&'('") &* + PR&($" R(P&R"

    The sequence in which the project report material should be arranged and bound should be as

    follows:

    1- $over Page ."itle Page-/ Title, #ame of the 7andidate 8niversity roll #o.-, #ame of 

    9uide, Regional center name with 8niversity #ame and emblem- and Place, 0onth andear of submission. Refer Anneure2 ;-

  • 8/17/2019 Guidelines for Bba Project Report

    2/6

    2- %eclaration by the )tudent: Refer Anneure2 ;;

    - $ertificate by the Guide: Refer Anneure2;;;

    - +cno#ledgements/ The candidate may than5 all those who helped in the preparation of 

     project.

    5- "able of $ontents/ Refer Anneure2;<

    - $ompany Profile : An overview of the organi%ationa. ;ntroduction

     b. (istory of the organi%ation

    c. *pecial featuresd. =epartmental study2 objectives, methodology > limitations

    e. =etailed study of department related to your *peciali%ation

    3- Main 4ody of the Project/ This is core aspect of your project giving in detail your 

     project wor5. The project may be divided into ? to ) 7hapters with suitable Titles, the first Chapter being Introduction and the last being Conclusion > suggestions

    - 6ist of References .if any-/ The listing of references should be typed ' spaces below the

    heading @R3!3R3#73*1 in alphabetical order in single spacing left justified. *hould

     be numbered consecutively in square BC brac5ets, throughout the tet and should becollected together in the reference list at the end of your report. The references should be

    numbered in the order they are used in the tet. The name of the author/authors should be

    immediately followed by the year and other details.

    R(*(R('$() .*or (7ample-

    A typical illustrative list given below relates to the citation eample quoted above.

    B&C. Ariponnammal, *. and #atarajan, *. &DD)- "Transport Phonomena of *m *el E

    As$, Pramana Fournal of Physics

  • 8/17/2019 Guidelines for Bba Project Report

    3/6

    Annexure-I 

    Project Report

    &n

    9Project Report "itle:>

    .)ubmitted in partial fulfillment for 44+, $!$!) ;niversity, Meerut-

    >

  • 8/17/2019 Guidelines for Bba Project Report

    4/6

    > >

  • 8/17/2019 Guidelines for Bba Project Report

    5/6

    Annexure-III

    C#!$IFICA$#>

     !his is to certify that the project entitled "''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''( is theoriginal work carried out by _____________________________ student of BBA #.#.S. $ni%ersity, &eerut, during the year'''''''''', in partial

    ful(llment of the re)uirements for the award of the Degree of BBAand that the project has not formed the basis for the awardpre%iously of any degree, diploma, associateship, fellowship or anyother similar title.

    Signature of the *uide :lace:Date:

  • 8/17/2019 Guidelines for Bba Project Report

    6/6

    Annexure I)

    $a*le o +ontent,>

    CA$#! %O $I$L# A3# %O

    > >