gsm partial test report - ООО "Гамма" · pdf fileno. description pass fail...

55
GSM (Global System for Mobile Communications) PARTIAL TEST REPORT Number: SH_GT_305651REV1 - Date: 2011-12-16 according to GCF-CC (v3.44.1) and NAPRD03 (v5.9) for Shanghai Simcom Ltd. User Equipment Type: SIM5320AD Final Hardware Version: V1.03 Final Software Version: SIM5320AD_V1.5_B05V01 supporting the following technologies: GSM 850/900/1800/1900 & FDD Band II, V This test report consists of 13 pages and the following annexes: Annex A - Accreditation Certificate 2 pages Annex B - Test Equipment 3 pages Annex C - PICS/PIXIT Information 27 pages Annex D - Photographs 2 pages Annex E - Detailed Test Verdicts 8 pages This revised test report replaces GSM test report number SH_GT_305651. CETECOM Shanghai is accredited according to DIN EN ISO/IEC 17025 by: D-PL-12099-01-01 CETECOM Shanghai Communication Testing and Consulting Co., Ltd. Building 3,No.1500, Zuchongzhi Road ♦ 201203 Shanghai ♦ China Phone: +86 (0) 21 6879 5890 ♦ Fax: +86 (0) 21 6879 5786 ♦ E-mail: [email protected] ♦ http://www.cetecom.com Registered in Pudong/Shanghai, China, Reg.-No.: 310115400213668 Board of Directors: Dr. Harald Ansorge, Hans Peter May (chairman) TOM 1.6.4.9 © Copyright ♦ All rights reserved by CETECOM Shanghai

Upload: hatu

Post on 23-Mar-2018

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

GSM

(Global System for Mobile Communications)

PARTIAL TEST REPORT Number: SH_GT_305651REV1 - Date: 2011-12-16

according to GCF-CC (v3.44.1) and NAPRD03 (v5.9)

for

Shanghai Simcom Ltd. User Equipment Type:

SIM5320AD

Final Hardware Version: V1.03 Final Software Version: SIM5320AD_V1.5_B05V01

supporting the following technologies: GSM 850/900/1800/1900 & FDD Band II, V

  

This test report consists of 13 pages and the following annexes:

Annex A - Accreditation Certificate 2 pages Annex B - Test Equipment 3 pages Annex C - PICS/PIXIT Information 27 pages Annex D - Photographs 2 pages Annex E - Detailed Test Verdicts 8 pages

This revised test report replaces GSM test report number SH_GT_305651.

CETECOM Shanghai is accredited according to

DIN EN ISO/IEC 17025 by:

 

D-PL-12099-01-01

  

CETECOM Shanghai Communication Testing and Consulting Co., Ltd.Building 3,No.1500, Zuchongzhi Road ♦ 201203 Shanghai ♦ China

Phone: +86 (0) 21 6879 5890 ♦ Fax: +86 (0) 21 6879 5786 ♦ E-mail: [email protected] ♦ http://www.cetecom.com Registered in Pudong/Shanghai, China, Reg.-No.: 310115400213668 Board of Directors: Dr. Harald Ansorge, Hans Peter May (chairman)

 TOM 1.6.4.9 © Copyright ♦ All rights reserved by CETECOM Shanghai

 

Page 2: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 2 of 13  

Contents

1. TEST RESULTS1.1. Summary of Test Results

1.2. CETECOM Shanghai's Different Types of Test Reports

1.3. Documentation Received from the Client/Manufacturer

1.4. Validity of Test Results

2. ADMINISTRATIVE DATA2.1. Identification of the Responsible Testing Laboratory

2.2. Identification of the Testing Location(s)

2.3. Organizational Items

2.4. Identification of the Client

2.5. Identification of the Manufacturer

3. EQUIPMENT UNDER TEST (EUT) AND ANCILLARY EQUIPMENT (AE)3.1. Identification of the Equipment Under Test

3.2. Front View of the Equipment Under Test

3.3. Identification of all Used Test Samples of the Equipment Under Test

3.4. Identification of the Ancillary Equipment

4. APPLIED REFERENCE DOCUMENTS4.1. Leading Reference Documents for Testing

4.2. Specific Reference Documents for Testing

4.3. Additional Reference Documents for Testing

Annex A - Accreditation Certificate Annex B - Test Equipment Annex C - PICS/PIXIT Information Annex D - Photographs Annex E - Detailed Test Verdicts

Page 3: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 3 of 13  

1. Test Results  

1.1. Summary of Test ResultsTables 1a and 1b summarize the final test results of the tested user equipment. Detailed results for each test caseincluding the used/subcontracted testing location (according to sec. 2.2) are documented in Annex E of this testreport. An explanation of the terms used for each column in tables 1a and 1b is given below.Table 1a: Summary of Test Results according to GCF related Frequency Bands

Specification Amount of Test CasesGSM 900 GSM 1800 GCF NI

No. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC

3GPP TS 51.010-111 General Tests 0 0 0 0 0 0 0 0 0 12 Transceiver 3 0 0 3 0 0 0 0 0 13 Transmitter 43 0 0 0 0 0 0 14 Receiver 0 0 0 0 0 0 0 0 0 15 Timing advance and absolute delay 0 0 0 0 0 0 0 0 0 16 Reception time tracking speed 0 0 0 0 0 0 0 0 0 17 Access times during handover 0 0 0 0 0 0 0 0 0 18 Temporary reception gaps 0 0 0 0 0 0 0 0 0 19 Channel release after unrecoverable errors 0 0 0 0 0 0 0 0 0 20 Cell selection and reselection 0 0 0 0 0 0 0 0 0 21 Received signal measurements 0 0 0 0 0 0 0 0 0 22 Transmit power control timing and confirmation 0 0 0 0 0 0 0 0 0 25 Tests of layer 2 signalling functions 0 0 0 0 0 0 0 0 0 26 Testing of layer 3 functions 0 0 0 0 0 0 0 0 0 27 Testing SIM/ME interface 0 0 0 0 0 0 0 0 0 28 Test of autocalling restrictions 0 0 0 0 0 0 0 0 0 29 Testing of bearer services 0 0 0 0 0 0 0 0 0 30 Speech teleservices 0 0 0 0 0 0 0 0 0 31 Test of supplementary services 0 0 0 0 0 0 0 0 0 32 Testing of speech transcoding functions 0 0 0 0 0 0 0 0 0 33 Mobile station features 0 0 0 0 0 0 0 0 0 34 Short message service (SMS) 0 0 0 0 0 0 0 0 0 41 GPRS Paging, TBF establishment/release and DCCH related procedures 0 0 0 0 0 0 0 0 0 42 Test of Medium Access Control (MAC) protocol 0 0 0 0 0 0 0 0 0 43 RLC Test Cases 0 0 0 0 0 0 0 0 0 44 Test Case requirements to GPRS mobility management 0 0 0 0 0 0 0 0 0 45 Session Management Procedure 0 0 0 0 0 0 0 0 0 46 LLC and SNDCP Tests 0 0 0 0 0 0 0 0 0 47 Dual Transfer Mode 0 0 0 0 0 0 0 0 0 51 EGPRS Paging, TBF establishment/release and DCCH related procedures 0 0 0 0 0 0 0 0 0 52 EGPRS Test of Medium Access Control (MAC) protocol 0 0 0 0 0 0 0 0 0 53 Test of EGPRS Radio Link Control (RLC) Protocol 0 0 0 0 0 0 0 0 0 57 EGPRS Dual Transfer Mode 0 0 0 0 0 0 0 0 0 58 Latency reductions 0 0 0 0 0 0 0 0 0 60 Inter-system hard handover from GSM to UTRAN 0 0 0 0 0 0 0 0 0 Testing SIM interface, Reference: 3GPP TS 51.010-4 0 0 0 0 0 0 0 0 0 Testing SIM interface, Reference: 3GPP TS 31.124 0 0 0 0 0 0 0 0 0

Total: 46 0 0 0 0 0 046 0

43 0

Page 4: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 4 of 13  

Table 1b: Summary of Test Results according to PTCRB related Frequency Bands Specification Amount of Test Cases

GSM 850 GSM 1900 PTCRB NI PTCRB BANo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC PASS FAIL INC

3GPP TS 51.010-111 General Tests 0 0 0 0 0 0 0 0 0 0 0 0 12 Transceiver 3 0 0 3 0 0 0 0 0 0 0 0 13 Transmitter 43 0 0 43 0 0 0 0 0 0 0 0 14 Receiver 0 0 0 0 0 0 0 0 0 0 0 0 15 Timing advance and absolute delay 0 0 0 0 0 0 0 0 0 0 0 0 16 Reception time tracking speed 0 0 0 0 0 0 0 0 0 0 0 0 17 Access times during handover 0 0 0 0 0 0 0 0 0 0 0 0 18 Temporary reception gaps 0 0 0 0 0 0 0 0 0 0 0 0 19 Channel release after unrecoverable errors 0 0 0 0 0 0 0 0 0 0 0 0 20 Cell selection and reselection 0 0 0 0 0 0 0 0 0 0 0 0 21 Received signal measurements 0 0 0 0 0 0 0 0 0 0 0 0 22 Transmit power control timing and confirmation 0 0 0 0 0 0 0 0 0 0 0 0 25 Tests of layer 2 signalling functions 0 0 0 0 0 0 0 0 0 0 0 0 26 Testing of layer 3 functions 0 0 0 0 0 0 0 0 0 0 0 0 27 Testing SIM/ME interface 0 0 0 0 0 0 0 0 0 0 0 0 29 Testing of bearer services 0 0 0 0 0 0 0 0 0 0 0 0 30 Speech teleservices 0 0 0 0 0 0 0 0 0 0 0 0 31 Test of supplementary services 0 0 0 0 0 0 0 0 0 0 0 0 33 Mobile station features 0 0 0 0 0 0 0 0 0 0 0 0 34 Short message service (SMS) 0 0 0 0 0 0 0 0 0 0 0 0 41 GPRS Paging, TBF establishment/release and DCCH related procedures 0 0 0 0 0 0 0 0 0 0 0 0 42 Test of Medium Access Control (MAC) protocol 0 0 0 0 0 0 0 0 0 0 0 0 43 RLC Test Cases 0 0 0 0 0 0 0 0 0 0 0 0 44 Test Case requirements to GPRS mobility management 0 0 0 0 0 0 0 0 0 0 0 0 45 Session Management Procedure 0 0 0 0 0 0 0 0 0 0 0 0 46 LLC and SNDCP Tests 0 0 0 0 0 0 0 0 0 0 0 0 51 EGPRS Paging, TBF establishment/release and DCCH related procedures 0 0 0 0 0 0 0 0 0 0 0 0 52 EGPRS Test of Medium Access Control (MAC) protocol 0 0 0 0 0 0 0 0 0 0 0 0 53 Test of EGPRS Radio Link Control (RLC) Protocol 0 0 0 0 0 0 0 0 0 0 0 0 60 Inter-system hard handover from GSM to UTRAN 0 0 0 0 0 0 0 0 0 0 0 0 70 Location Services 0 0 0 0 0 0 0 0 0 0 0 0 Testing SIM interface, Reference: 3GPP TS 51.010-4 0 0 0 0 0 0 0 0 0 0 0 0 PTCRB RFT 002, RFT 006, Reference: PVG.03 0 0 0 0 0 0 0 0 0 0 0 0 PTCRB RFT 077, Reference: PTCRB Bearer Agnostic AT Command Test Specific. 0 0 0 0 0 0 0 0 0 0 0 0 PTCRB RFT 062, Reference: PTCRB Bearer Agnostic TTY Test Specification 0 0 0 0 0 0 0 0 0 0 0 0 Testing SIM interface, Reference: 3GPP TS 31.124 0 0 0 0 0 0 0 0 0 0 0 0

Total: 46 0 0 46 0 0 0 0 0 0 0 0

Page 5: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0
Page 6: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 6 of 13  

2. Administrative Data 

2.1. Identification of the Responsible Testing LaboratoryCompany Name: CETECOM Shanghai

Department: Mobile Communications

Address: Building 3,No.1500, Zuchongzhi Road201203 Shanghai China

Telephone: +86 (0) 21 6879 5890

Fax: +86 (0) 21 6879 5786

Responsible Test Lab Manager: Mr. Zhiang Yuan

 

2.2. Identification of the Testing Location(s)Company Name: CETECOM Shanghai

Address: Building 3,No.1500, Zuchongzhi Road201203 Shanghai China

 

2.3. Organizational ItemsCETECOM Shanghai Reference No.: 1-4036/11

CETECOM Shanghai Order No.:CETECOM Shanghai Testing Manager: Ms. Lisa Song

CETECOM Shanghai Deputy TestingManager: Mr. Jinhua Yang

Start of Testing: 2011-11-30

End of Testing: 2011-12-01

Page 7: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 7 of 13  

2.4. Identification of the ClientCompany Name: Shanghai Simcom Ltd.

Address: Building A,SIM Technology Building,No.633,JinzhongRoad,Changning District,Shanghai 200335P.R.C

Contact Person: Mr. Yongsheng Li

Telephone: +86-21-32523134

Fax: +86-21-32523020

 

2.5. Identification of the ManufacturerCompany Name: Shanghai Simcom Ltd.

Address: Building A,SIM Technology Building,No.633,JinzhongRoad,Changning District,Shanghai 200335P.R.C

Contact Person: Mr. Yongsheng Li

Telephone: +86-21-32523134

Fax: +86-21-32523020

Note: This data is based on the client's information.

Page 8: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 8 of 13  

3. Equipment Under Test (EUT) and Ancillary Equipment (AE) 

3.1. Identification of the Equipment Under TestBrand Name: SIMCOM

Type Name: SIM5320AD

Marketing Name: SIM5320AD

GSM Frequency Bands: GSM 850/900/1800/1900

UMTS Frequency Bands: FDD Band II, V

FCC ID Number: UDV-1103022011009

Industry Canada ID: N/A

Special Features / Comments: Test Report

 

3.2. Front View of the Equipment Under Test 

Page 9: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 9 of 13  

3.3. Identification of all used Test Samples of the Equipment Under TestEUT ID * Serial Number Hardware Version Software Version

EUT1 001 V1.03 SIM5320AD_V1.5_B05V01 *) The equipment under test identifier (EUT ID) is used to simplify the identification in this test report

 

3.4. Identification of the Ancillary EquipmentAE ID * Description Serial Number HW Status SW Status

--- --- --- --- ---*) The ancillary equipment identifier (AE ID) is used to simplify the identification in this test report

Page 10: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 10 of 13  

4. Applied Reference Documents 

4.1. Leading Reference Documents for TestingThe equipment under test (EUT) has been tested at CETECOM Shanghai's (own or subcontracted) laboratoriesaccording to the leading reference documents given in table 2 below:

Table 2: Leading Reference Documents

No. Identity Document Title Version/Date[1] GCF-CC Global Certification Forum - Certification Criteria v3.44.1

(2011-10)

[2] NAPRD03 GSM N.A. Permanent Reference Document v5.9(2011-10)

 

4.2. Specific Reference Documents for TestingTable 3 summarizes specific reference documents such as harmonized standards or test specifications which wereused for testing at CETECOM Shanghai's (own or subcontracted) laboratories.

Table 3: Specific Reference Documents

No. Identity Document Title Version/Date[3] 3GPP TS 51.010-1 3rd Generation Partnership Project; Technical Specification Group

GSM/EDGE Radio Access Network; Digital cellular telecommunicationssystem (Phase 2+); Mobile Station (MS) conformance specification; Part 1:Conformance specification

v9.7.0Release 9(2011-09)

[4] 3GPP TS 51.010-2 3rd Generation Partnership Project; Technical Specification GroupGSM/EDGE Radio Access Network; Digital cellular telecommunicationssystem; Mobile Station (MS) conformance specification; Part 2: ProtocolImplementation Conformance Statement (PICS) proforma specification

v9.7.0Release 9(2011-09)

Page 11: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 11 of 13  

 

4.3. Additional Reference Documents for TestingTable 4 summarizes additional reference documents which were used for testing at CETECOM Shanghai's (own orsubcontracted) laboratories.

Table 4: Additional Reference Documents

No. Identity / Description Valid Since[5] 200409-13_A-04-xxx_TC_13_16_2_4_1_TS8950G_r2

Error in Test Case 13.16.2.4.1 on R&S TS8950G (for INFO) Request: 200409- 132004-09-13

[6] 200502-48_Validation_Status_of_TC13_17_1 on_TP9Validation Status of TC13_17_1 on TP9.doc Request: 200502- 48

2005-02-28

[7] 200602-09Problem indentfied with TC13.17.2 as it may unfairly fail a conformant terminal Request: 200602-09 & 200602- 59

2006-02-09

[8] 200604-163Non-implementation of GERAN CR on TC 13.16.2.4.1

2006-05-04

[9] 200706-44.ZIP5_day_rule_TP9_20070608, RAT for RSPASS SW on TS 895X (for INFO)

2007-06-15

[10] 200803-003Issue with test cases 13.17.2 & 14.18.6 in 3GPP TS51.010

2008-03-12

[11] 200803-004Problem with 13.16.2.4.1, 13.17.3.4.1 on certain mobile implementation

2008-03-12

[12] 200803-014Revalidation of TC13.17.4 on TP5

2008-03-21

[13] 200809-033Problem when testing some R6 mobiles on the TS8950G

2008-09-24

[14] A-03-xxx_TC13_16_2_4_1Error in the test requirements in TC 13.16.2.4.1 for multislot uplink configuration (for INFO)Request: 200505- 69

2005-05-27

[15] A-04-xxx_TC_13_16_3_TS8950G_r2.docError in Test Case 13.16.3 on R&S TS8950G (for INFO) Request: 200409- 15

2004-09-13

[16] A-04-xxx_TC_13_17_1&4Error in TCs 13.17.1 and 13.17.4 on the R&S TS8950G Test Platform Request: 200410-04

2004-10-11

[17] A-05-xxx_TC_13_16_2_4_1_TS8950GError in TC 13.16.2.4.1 on the R&S TS8950G Test Platform (for INFO) Request: 200411- 47

2004-11-29

Page 12: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 12 of 13  

No. Identity / Description Valid Since[18] CAG-05-xxx_TS8950G_Downgrade_13_17_1

Test Case 13.17.1 on R&S TS8950G2005-02-01

[19] CR_5Day_TS8950G_Downgrade_13_17_4Test Case 13.17.4 on R&S TS8950G (for INFO) Request: 200502- 07

2005-02-10

[20] PVG_27_xxx_04_TC_13_16_2_4_1_TS8950G_r2Test Case 13.16.2.4.1 on R&S TS8950G PVG27_441

2004-09-14

[21] PVG_validation_status_of_TC13_17_1_on_TS9050GValidation status of TC 13.17.1 on Rohde & Schwarz TS8950G 05/03/03

2005-03-03

[22] PVG_validation_status_of_TC13_17_4_on_TS9050GValidation status of TC 13.17.4 on Rohde & Schwarz TS8950G PVG29_031

2005-03-03

[23] PVG27_442_04_TC_13_16_3_TS8950G_r2Test Case 13.16.3 on R&S TS8950G PVG27_442

2004-09-14

[24] PVG28_xxx_05_TS8950G_Downgrade_13_17_1PVG28_xxx_05_TS8950G_Downgrade_13_17_1 PVG28_727

2005-02-02

[25] PVG29_051_05_TC_13_17_1_&_13_17_4Error in TCs 13.17.1 and 13.17.4 on the Rohde & Schwarz TS8950G Test Platform PVG29_056

2005-03-22

[26] PVG29_xxx_05_TS8950G_Downgrade_13_17_4Test Case 13.17.4 on R&S TS8950G

2005-02-17

[27] PVG32_956_06_5-Day_Rule_TP9_13172_020206Problem indentfied with TC13.17.2 as it may unfairly fail a conformant terminal PVG32_956

2006-02-09

[28] PVG33_1292_06Non-implementation of GERAN CR on TC 13.16.2.4.1

2006-05-04

[29] PVG38_0457_07_TP9_RAT-RSPASS.zipAdditional template files for GSM RF test cases

2007-06-15

[30] PVG41_1561_08Issue with test cases 13.17.2 & 14.18.6 in 3GPP TS51.010

2008-03-11

[31] PVG41_1566_08Problem with 13.16.2.4.1, 13.17.3.4.1 on certain mobile implementation

2008-03-11

Page 13: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Date of Report: 2011-12-16 TOM 1.6.4.9 Page 13 of 13  

No. Identity / Description Valid Since[32] PVG43_2324_08

Problem when testing some R6 mobiles on the TS8950G2008-09-24

[33] validation_status_of_TC13_17_4_on_TP9Validation Status of TC 13.17.4 on Rohde & Schwarz TS8950G (TP 9) (for INFO) Request :200502- 49

2005-02-28

Page 14: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

GSM

(Global System for Mobile Communications)

PARTIAL TEST REPORT Number: SH_GT_305651REV1 - Date: 2011-12-16

for

Shanghai Simcom Ltd. User Equipment Type:

SIM5320AD

Final Hardware Version: V1.03 Final Software Version: SIM5320AD_V1.5_B05V01

Annex A: Accreditation Certificate

  

This annex consists of 2 pages

CETECOM Shanghai is accredited according to

DIN EN ISO/IEC 17025 by:

 

D-PL-12099-01-01

  

CETECOM Shanghai Communication Testing and Consulting Co., Ltd.Building 3,No.1500, Zuchongzhi Road ♦ 201203 Shanghai ♦ China

Phone: +86 (0) 21 6879 5890 ♦ Fax: +86 (0) 21 6879 5786 ♦ E-mail: [email protected] ♦ http://www.cetecom.com Registered in Pudong/Shanghai, China, Reg.-No.: 310115400213668 Board of Directors: Dr. Harald Ansorge, Hans Peter May (chairman)

 TOM 1.6.4.9 © Copyright ♦ All rights reserved by CETECOM Shanghai

 

Page 15: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex A: Accreditation CertificateDate of Report: 2011-12-16 TOM 1.6.4.9 Page 2 of 2  

The annex pages of the certificate may be received from CETECOM Shanghai on request.

Page 16: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

GSM

(Global System for Mobile Communications)

PARTIAL TEST REPORT Number: SH_GT_305651REV1 - Date: 2011-12-16

for

Shanghai Simcom Ltd. User Equipment Type:

SIM5320AD

Final Hardware Version: V1.03 Final Software Version: SIM5320AD_V1.5_B05V01

Annex B: Test Equipment

  

This annex consists of 3 pages

CETECOM Shanghai is accredited according to

DIN EN ISO/IEC 17025 by:

 

D-PL-12099-01-01

  

CETECOM Shanghai Communication Testing and Consulting Co., Ltd.Building 3,No.1500, Zuchongzhi Road ♦ 201203 Shanghai ♦ China

Phone: +86 (0) 21 6879 5890 ♦ Fax: +86 (0) 21 6879 5786 ♦ E-mail: [email protected] ♦ http://www.cetecom.com Registered in Pudong/Shanghai, China, Reg.-No.: 310115400213668 Board of Directors: Dr. Harald Ansorge, Hans Peter May (chairman)

 TOM 1.6.4.9 © Copyright ♦ All rights reserved by CETECOM Shanghai

 

Page 17: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex B: Test EquipmentDate of Report: 2011-12-16 TOM 1.6.4.9 Page 2 of 3  

1. Test Equipment Location 

Testing was performed at the following marked location: 

1.1 Location "Essen"Address: CETECOM GmbH

Im Teelbruch 116 45219 Essen Germany

 

1.2 Location "Milpitas, CA"Address: CETECOM Inc.

411 Dixon Landing Road Milpitas, CA 95035 U.S.A.

 

1.3 Location "San Diego, CA"Address: CETECOM Inc. - Branch San Diego

6370 Nancy Ridge Drive, Suite 101 San Diego, CA 92121 U.S.A

 

1.4 Location "Anyang"Address: CETECOM MOVON Ltd.

RN. 221, 126-1, Dusanventuredigme Bldg.,Pyeongchon-dong, Dongan-gu, Anyang-city,Gyeonggi-do Anyang 431-070 Korea

 

1.5 Location "Shanghai"Address: CETECOM Shanghai Communication Testing and

Consulting Co., Ltd. Building 3,No.1500, Zuchongzhi Road 201203 Shanghai China

 

Page 18: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex B: Test EquipmentDate of Report: 2011-12-16 TOM 1.6.4.9 Page 3 of 3  

2. List of Test Equipment 

2.1 R&S TS8950/52GID: R&S TS8950G [SH 1]

Location: Shanghai (1.5)

Serialnumber: 100021

Hardware: SSCU var. 04

Software version: Base Software: CR02P2P BP version 1.33 and v.1.50 CR02P2P ASP version 3.34 and v.3.35 and v.3.37 and v.3.38 and v.4.90 and v.5.27 and v.5.28 CR02P2P EP version 1.62 and v.1.71 and v.3.21 FSU Firmware/Application version 4.21SP1 MOPSI version BP v1.32, EP v1.62, ASP v3.37 and v.BP v1.32, EP v1.71, ASP v4.63 RF-LIB version 3.93 and v.4.43 and v.4.4202 and v.5.01 and v.5.03 and v.5.12 and v.5.13 andv.5.20 and v.5.20 patch 01 and v.5.21 and v.5.22 and v.5.23 and v.10.37 and v.10.41 andv.10.50 RS-PASS Common version 10.37+patch 01 and v.10.41 and v.10.50 Test Case Software: RS-PASS-APPL version 4.41 and v.4.43 and v.5.01 and v.5.03 and v.5.05 + Patch03 andv.5.15 + Patch02 and v.5.03 +FB and v.5.05 +FB and v.5.03 +FB +R7 and v.5.05 +FB +R7 andv.5.05 + Patch04 and v.5.20 and v.5.20 p1 and v.5.20 RF-Lib Patch01 and v.5.21 and v.5.23 TOM Tool Software: General Integration Tool version 2.7.6.90

Ambient Conditions: Temperature: 20°C - 26°C Rel. Humidity: 20% - 75%

Calibration: Due date for the next test equipment calibration: 2012-02-18  

ID: R&S TS8950GW [SH 2]Location: Shanghai (1.5)

Serialnumber: 100014

Hardware:

Software version: Base Software: CR02P2P BP version 1.33 and v.1.50 CR02P2P ASP version 4.90 and v.5.10 and v.5.27 and v.5.28 CR02P2P EP version 2.02 and v.3.21 FSU Firmware/Application version 4.31 XP MOPSI version BP v1.32, EP v1.71, ASP v4.63 RF-LIB version 5.01 and v.5.02+ASP3.38+Patch2 and v.5.03 and v.5.04 and v.5.05 + Patch1and v.5.12+patch2 and v.5.13 and v.5.20 and v.5.21 and v.5.22 and v.5.23 and v.10.41 andv.10.50 RS-PASS Common version 10.37+patch 01 and v.10.41 and v.10.50 Test Case Software: RS-PASS-APPL version 5.03 +FB +R7 and v.5.03 +FB +R7+P3 and v.5.20 p1 and v.5.21 andv.5.23

Ambient Conditions: Temperature: 20°C - 26°C Rel. Humidity: 20% - 75%

Calibration: Due date for the next test equipment calibration: 2012-02-17

Page 19: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

GSM

(Global System for Mobile Communications)

PARTIAL TEST REPORT Number: SH_GT_305651REV1 - Date: 2011-12-16

for

Shanghai Simcom Ltd. User Equipment Type:

SIM5320AD

Final Hardware Version: V1.03 Final Software Version: SIM5320AD_V1.5_B05V01

Annex C: PICS/PIXIT Information

  

The PICS/PIXIT data given or referenced in this annex is based on the latest informationreceived from the client or user equipment (UE) manufacturer, either verbally or in writing.Therefore, this given information has been used for testing at CETECOM Shanghai for theabove mentioned UE configuration. It is the responsibility of the legal owner of the tested UE(i.e. owner of the UE's brand name as given on the cover page of this report) to verify thecorrectness of the data on the following pages and to indicate any possible incorrectness toCETECOM Shanghai.

  

This annex consists of 27 pages

CETECOM Shanghai is accredited according to

DIN EN ISO/IEC 17025 by:

 

D-PL-12099-01-01

  

CETECOM Shanghai Communication Testing and Consulting Co., Ltd.Building 3,No.1500, Zuchongzhi Road ♦ 201203 Shanghai ♦ China

Phone: +86 (0) 21 6879 5890 ♦ Fax: +86 (0) 21 6879 5786 ♦ E-mail: [email protected] ♦ http://www.cetecom.com Registered in Pudong/Shanghai, China, Reg.-No.: 310115400213668 Board of Directors: Dr. Harald Ansorge, Hans Peter May (chairman)

 TOM 1.6.4.9 © Copyright ♦ All rights reserved by CETECOM Shanghai

 

Page 20: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

CETECOM Mobile Communications

© Copyright All rights reserved by CETECOM document created by the head office: CETECOM GmbH MC Im Teelbruch 116 45219 Essen Germany

CTC-MC-TE-007 version 2.11E date: 2010-01-15 (P)ICS/(P)IXIT Form for 2G Terminals page 1 of 26

Dear valuable customer,

In order to evaluate a Terminal Equipment’s (TE) performance and applicable testing requirements, the test laboratory must receive a corresponding PICS/PIXIT which defines the TE’s implemented capabilities, options, and features.

An accurately completed PICS/PIXIT will allow the test laboratory to:

1. Appropriately determine the required test cases;

2. Avoid testing features/capabilities which are not supported;

3. Maximize test system usage and minimize testing duration;

4. Optimize overall project scheduling and management.

Therefore, it is imperative that this document is completed accurately and received by CETECOM prior to the start of any official Terminal Type Testing (TTT).

Please take some time to complete ALL PICS/PIXIT information contained herein, sign the last page, and then either fax or pdf/eMail the entire document (including the signed last page) to your CETECOM contact person.

Your

C E T E C O M Mobile Communications T e s t L a b T e a m

P.S.: Please note that the PICS/PIXIT information will be included in the corresponding CETECOM Test Report.

Note: Changes towards the last document version are marked in blue color.

Page 21: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 2 of 26

PICS – Protocol Implementation Conformance Statement (According to Specifications 3GPP TS 51.010-2 v9.0.0 and 3GPP TS 51.010-4 v4.14.1)

Table A.1 (3GPP TS 51.010-2): Types of Mobile Stations

Item Release Type of Mobile Station Supported1 Phase2 Standard GSM Band (P-GSM) Y 2 Phase2 Extended GSM Band (E-GSM), (including standard Band) Y 3 R96 R-GSM Band (including standard and E-GSM Band) 4 Phase2 DCS 1800 band Y 5 Phase2 Multiple-band, not simultaneously 6 Phase2 Multiple-band, simultaneously Y 7 Phase2 Small Mobile Station Y 8 Phase2 GSM Power Class 2 9 Phase2 GSM Power Class 3

10 Phase2 GSM Power Class 4 Y 11 Phase2 GSM Power Class 5 12 Phase2 DCS 1800 Power Class 1 Y 13 Phase2 DCS 1800 Power Class 2 14 Phase2 DCS 1800 Power Class 3 15 R96 HSCSD Multislot MS 16 R99 GSM 450 band 17 R99 GSM 480 band 18 R98 PCS 1900 band Y 19 R98 PCS 1900 Power Class 1 Y 20 R98 PCS 1900 Power Class 2 21 R98 PCS 1900 Power Class 3 22 R96 Multislot Class1 23 R96 Multislot Class2 24 R96 Multislot Class3 25 R96 Multislot Class4 26 R96 Multislot Class5 27 R96 Multislot Class6 28 R96 Multislot Class7 29 R96 Multislot Class8 30 R96 Multislot Class9 31 R96 Multislot Class10 32 R96 Multislot Class11 33 R96 Multislot Class12 34 R96 Multislot Class13 35 R96 Multislot Class14 36 R96 Multislot Class15 37 R96 Multislot Class16 38 R96 Multislot Class17 39 R96 Multislot Class18 40 R97 Multislot Class19 41 R97 Multislot Class20 42 R97 Multislot Class21 43 R97 Multislot Class22 44 R97 Multislot Class23 45 R97 Multislot Class24 46 R97 Multislot Class25 47 R97 Multislot Class26 48 R97 Multislot Class27 49 R97 Multislot Class28 50 R97 Multislot Class29 51 R97 GPRS Multislot operation Y 52 R99 EGPRS capable of 8PSK in Uplink, of all Multislot classes Y 53 Rel-4 GSM 700 band 54 Rel-4 GSM 750 band 55 R99 GSM 850 band Y 56 R99 Support of UTRAN Radio Access Technology Y 57 R97 Support of GPRS Multislot class on the uplink Y 58 R99 Support of COMPACT 59 R99 DTM/GPRS Multislot Class 1 60 R99 DTM/GPRS Multislot Class 5 Y 61 R99 DTM/GPRS Multislot Class 9 Y 62 R99 Support of singleslot allocation in DTM/GPRS 63 R99 Support of UTRAN FDD Y

Page 22: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 3 of 26

Item Release Type of Mobile Station Supported64 R99 Support of UTRAN TDD 65 R98 Support of Conventional GPS 66 R99 EGPRS Multislot operation Y 67 R97 GPRS Multislot Class1 Y 68 R97 GPRS Multislot Class2 Y 69 R97 GPRS Multislot Class3 Y 70 R97 GPRS Multislot Class4 Y 71 R97 GPRS Multislot Class5 Y 72 R97 GPRS Multislot Class6 Y 73 R97 GPRS Multislot Class7 Y 74 R97 GPRS Multislot Class8 Y 75 R97 GPRS Multislot Class9 Y 76 R97 GPRS Multislot Class10 Y 77 R97 GPRS Multislot Class11 Y 78 R97 GPRS Multislot Class12 Y 79 R97 GPRS Multislot Class13 80 R97 GPRS Multislot Class14 81 R97 GPRS Multislot Class15 82 R97 GPRS Multislot Class16 83 R97 GPRS Multislot Class17 84 R97 GPRS Multislot Class18 85 R97 GPRS Multislot Class19 86 R97 GPRS Multislot Class20 87 R97 GPRS Multislot Class21 88 R97 GPRS Multislot Class22 89 R97 GPRS Multislot Class23 90 R97 GPRS Multislot Class24 91 R97 GPRS Multislot Class25 92 R97 GPRS Multislot Class26 93 R97 GPRS Multislot Class27 94 R97 GPRS Multislot Class28 95 R97 GPRS Multislot Class29 96 R99 EGPRS Multislot Class1 Y 97 R99 EGPRS Multislot Class2 Y 98 R99 EGPRS Multislot Class3 Y 99 R99 EGPRS Multislot Class4 Y

100 R99 EGPRS Multislot Class5 Y 101 R99 EGPRS Multislot Class6 Y 102 R99 EGPRS Multislot Class7 Y 103 R99 EGPRS Multislot Class8 Y 104 R99 EGPRS Multislot Class9 Y 105 R99 EGPRS Multislot Class10 Y 106 R99 EGPRS Multislot Class11 Y 107 R99 EGPRS Multislot Class12 Y 108 R99 EGPRS Multislot Class13 109 R99 EGPRS Multislot Class14 110 R99 EGPRS Multislot Class15 111 R99 EGPRS Multislot Class16 112 R99 EGPRS Multislot Class17 113 R99 EGPRS Multislot Class18 114 R99 EGPRS Multislot Class19 115 R99 EGPRS Multislot Class20 116 R99 EGPRS Multislot Class21 117 R99 EGPRS Multislot Class22 118 R99 EGPRS Multislot Class23 119 R99 EGPRS Multislot Class24 120 R99 EGPRS Multislot Class25 121 R99 EGPRS Multislot Class26 122 R99 EGPRS Multislot Class27 123 R99 EGPRS Multislot Class28 124 R99 EGPRS Multislot Class29 125 R99 GSM 850 Power Class 2 126 R99 GSM 850 Power Class 3 127 R99 GSM 850 Power Class 4 Y 128 R99 GSM 850 Power Class 5 129 R99 8-PSK GSM Power Class E1 130 R99 8-PSK GSM Power Class E2 Y

Page 23: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 4 of 26

Item Release Type of Mobile Station Supported131 R99 8-PSK GSM Power Class E3 132 R99 8-PSK DCS Power Class E1 133 R99 8-PSK DCS Power Class E2 Y 134 R99 8-PSK DCS Power Class E3 135 R99 8-PSK PCS Power Class E1 136 R99 8-PSK PCS Power Class E2 137 R99 8-PSK PCS Power Class E3 138 R99 8-PSK GSM 850 Power Class E1 139 R99 8-PSK GSM 850 Power Class E2 Y 140 R99 8-PSK GSM 850 Power Class E3 141 Phase2 GSM850 and GSM1800 Band Interworking Y 142 Phase2 GSM900 and GSM1900 Band Interworking 143 Phase2 GSM850 and GSM900 Band Interworking Y 144 R99 DTM/EGPRS Multislot Class 1 145 R99 DTM/EGPRS Multislot Class 5 Y 146 R99 DTM/EGPRS Multislot Class 9 147 R99 Support of singleslot allocation in DTM/EGPRS 148 R99 DTM/GPRS Multislot Class 11 Y 149 Rel-5 GPRS Multislot Class30 150 Rel-5 GPRS Multislot Class31 151 Rel-5 GPRS Multislot Class32 152 Rel-5 GPRS Multislot Class33 153 Rel-5 GPRS Multislot Class34 154 Rel-5 GPRS Multislot Class35 155 Rel-5 GPRS Multislot Class36 156 Rel-5 GPRS Multislot Class37 157 Rel-5 GPRS Multislot Class38 158 Rel-5 GPRS Multislot Class39 159 Rel-5 GPRS Multislot Class40 160 Rel-5 GPRS Multislot Class41 161 Rel-5 GPRS Multislot Class42 162 Rel-5 GPRS Multislot Class43 163 Rel-5 GPRS Multislot Class44 164 Rel-5 GPRS Multislot Class45 165 Rel-5 EGPRS Multislot Class30 166 Rel-5 EGPRS Multislot Class31 167 Rel-5 EGPRS Multislot Class32 168 Rel-5 EGPRS Multislot Class33 169 Rel-5 EGPRS Multislot Class34 170 Rel-5 EGPRS Multislot Class35 171 Rel-5 EGPRS Multislot Class36 172 Rel-5 EGPRS Multislot Class37 173 Rel-5 EGPRS Multislot Class38 174 Rel-5 EGPRS Multislot Class39 175 Rel-5 EGPRS Multislot Class40 176 Rel-5 EGPRS Multislot Class41 177 Rel-5 EGPRS Multislot Class42 178 Rel-5 EGPRS Multislot Class43 179 Rel-5 EGPRS Multislot Class44 180 Rel-5 EGPRS Multislot Class45 181 (Void) --- 182 Rel-7 GSM 710 band 183 Rel-7 T GSM 810 band 184 Rel-4 DTM/EGPRS Multislot Class 11 Y 185 Rel-6 T-GSM 380 band 186 Rel-6 T-GSM 410 band 187 Rel-6 T-GSM 900 band 188 R99 EGPRS Multislot Operation in Uplink Direction Y 189 Rel-5 GMSK_MULTISLOT_POWER_PROFILE 0 Y 190 Rel-5 GMSK_MULTISLOT_POWER_PROFILE 1 Y 191 Rel-5 GMSK_MULTISLOT_POWER_PROFILE 2 Y 192 Rel-5 GMSK_MULTISLOT_POWER_PROFILE 3 Y 193 Rel-5 8-PSK_MULTISLOT_POWER_PROFILE 0 Y 194 Rel-5 8-PSK_MULTISLOT_POWER_PROFILE 1 Y 195 Rel-5 8-PSK_MULTISLOT_POWER_PROFILE 2 Y 196 Rel-5 8-PSK_MULTISLOT_POWER_PROFILE 3 Y 197 Rel-7 Multislot Capability Reduction for Downlink Dual Carrier of 0 or 1 Timeslots 198 Rel-7 Multislot Capability Reduction for Downlink Dual Carrier of 2 or more Timeslots 199 Rel-7 Support of 16 QAM in the Uplink

Page 24: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 5 of 26

Table A.1b (3GPP TS 51.010-2): MS Feature Release Supported

Item Release MS Feature Release Supported Supported Value Allowed Supported1 R97 Release of GPRS supported Y R97, R98, R99, Rel-4, Rel-5, Rel-6, Rel-7, Rel-8 R99 2 R98 Release of AMR supported Y R98, R99, Rel-4, Rel-5, Rel-6, Rel-7, Rel-8 R99 3 R99 Release of EGPRS supported Y R99, Rel-4, Rel-5, Rel-6, Rel-7, Rel-8 R99 4 R98 Release of RRLP supported Y R98, R99, Rel-4, Rel-5, Rel-6, Rel-7, Rel-8 R5

5 R97 Release of Higher Layer supported

R97, R98, R99, Rel-4, Rel-5, Rel-6, Rel-7, Rel-8

6 Rel-4 Release of Acoustic implementation supported

Rel-4, Rel-5, Rel-6, Rel-7, Rel-8

Table A.2 (3GPP TS 51.010-2): Mobile Station Features

Item Release Mobile Station Feature Supported1 Phase2 Display of Called Number Y 2 Phase2 Indication of Call Progress Signals Y 3 Phase2 Country / PLMN Indication Y 4 Phase2 Country / PLMN Selection Y 5 Phase2 Keypad Y 6 Phase2 IMEI Y 7 Phase2 Short Message Overflow Indication Y 8 Phase2 DTE /DCE Interface Y 9 Phase2 ISDN ”S” Interface

10 Phase2 International Access Function Y 11 Phase2 Service Indicator Y 12 Phase2 Autocalling restriction capabilities 13 Phase2 Dual Tone Multi Frequency function Y 14 Phase2 Subscription Identity Management Y 15 Phase2 On / Off switch Y 16 Phase2 Subaddress 17 Phase2 Support of Encryption A5/1 Y 18 (Void) --- 19 Phase2 Short Message Service Cell Broadcast DRX Y 20 Phase2 Abbreviated Dialling Y 21 Phase2 Fixed Dialling Number Y 22 Phase2 Barring of Outgoing Calls Y 23 Phase2 DTMF Control Digits Separator 24 Phase2 Selection of Directory No in Short Messages 25 Phase2 Last Numbers Dialled Y 26 Phase2 At least one autocalling feature 27 Phase2 Alphanumeric display Y 28 Phase2 Other means of display 29 Phase2 Speech indicator Y 30 R96 Support of the extended Short message cell broadcast channel 31 R96 Support of Additional Call Set-up MMI Procedures 32 (Void) --- 33 Ph2(R96) Ciphering Indicator 34 R96 Network’s indication of alerting in the MS $(NI Alert in MS)$ 35 R96 ME-SIM lock Y 36 R96 Service Dialling Numbers 37 R99 Extended timing advance 38 R98 Support of SoLSA 39 R96 Audible Indication of Service Tones 40 Phase2 Autocalling_Cause 27 Implemented in Cat 3 41 R97 Support of GPRS Y 42 R99 Support of EGPRS Y 43 R98 Support of GPRS Encryption Y 44 Phase2 Control of Supplementary Services Y 45 Phase2 Short message Y 46 Phase2 Emergency calls capabilities Y 47 R97 GPRS operation mode class A 48 R97 GPRS operation mode class B Y 49 R97 GPRS operation mode class C Y 50 R99 MS supporting SMS over GPRS Y 51 (Void) --- 52 (Void) --- 53 R99 Support of ECSD 54 R97 GPRS test mode A Y

Page 25: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 6 of 26

Item Release Mobile Station Feature Supported55 R97 GPRS test mode B Y 56 EGPRS test mode Y 57 R98 Support of MS-Assisted E-OTD 58 R97 Non-zero value of Non_DRX_Timer Y 59 R98 Support of MS-Based GPS 60 R98 Support of MS-Assisted GPS 61 R98 Privacy Option Supported 62 R99 Support of DTM/GPRS Y 63 R98 Support of MS Assisted EOTD Performance for GMSK 64 R99 Support of MS Assisted EOTD Performance for 8PSK 65 R99 only Support of EGPRS Packet Access enhancement Y 66 (Void) --- 67 R99 Support of MT SMS over GPRS Y 68 (Void) --- 69 R99 Support of DTM/EGPRS Y 70 R99 Support of Extended dynamic allocation Y 71 Rel-6 Support of GAN 72 Rel-4 Support of GERAN FEATURE PACKAGE 1 Y 73 Rel-6 Support of Encryption A5/3 Y 74 Rel-4 Support of Fine Time Assistance 75 R97 Support of Encryption GEA2 Y 76 Rel-6 Support of Encryption GEA3 Y 77 Up to R98 Use of R99 Emergency numbers Y 78 Rel-5 Support of GERAN FEATURE PACKAGE 2 79 Rel-6 Support of GAN to UTRAN CS Handover 80 Rel-6 Support of UTRAN to GAN CS Handover 81 Rel-6 Support of Enhanced DTM CS 82 Rel-6 Support of PS Handover Y 83 Rel-6 Support of simultaneous CS and PS services in GAN 84 Rel-7 Support of Latency reductions 85 Rel-7 Support of Downlink Dual Carrier 86 Rel-7 Support of UEA2 and UIA2 87 Rel-9 Support of Encryption A5/4 88 Rel-9 Support of Encryption GEA4 89 Rel-7 Support of EGPRS2A 90 Rel-7 Support of EGPRS2B 91 Rel-8 eCall only equipment 92 Rel-8 eCall Support on MS

Table A.3 (3GPP TS 51.010-2): Teleservices

Item Release Teleservice Supported1 Phase2 Telephony Y 2 Phase2 Emergency Call Y 3 Phase2 Short Message MT/PP Y 4 Phase2 Short Message MO/PP Y 5 Phase2 SMS Cell Broadcast Y 6 Phase2 Teleservice Alternate Speech and G3 fax 7 Phase2 Teleservice Automatic G3 fax Y 8 R96 Voice Group Call Service (VGCS) 9 R96 Voice Broadcast Service (VBS)

10 R96 SMS description Y

Table A.4 (3GPP TS 51.010-2): Bearer Services

Item Release Bearer Service Supported1 Phase2 Data circuit duplex async. 300 bit/s 2 Phase2 Data circuit duplex async. 1 200 bit/s 3 Phase2 Data circuit duplex async. 1 200/75 bit/s 4 Phase2 Data circuit duplex async. 2 400 bit/s 5 Phase2 Data circuit duplex async. 4 800 bit/s 6 Phase2 Data circuit duplex async. 9 600 bit/s 7 Phase2 Data circuit duplex sync. 1 200 bit/s 8 Phase2 Data circuit duplex sync. 2 400 bit/s 9 Phase2 Data circuit duplex sync. 4 800 bit/s

10 Phase2 Data circuit duplex sync. 9 600 bit/s Y 11 Phase2 PAD Access 300 bit/s 12 Phase2 PAD Access 1 200 bit/s

Page 26: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 7 of 26

Item Release Bearer Service Supported13 Phase2 PAD Access 1 200/75 bits/s 14 Phase2 PAD Access 2 400 bit/s 15 Phase2 PAD Access 4 800 bit/s 16 Phase2 PAD Access 9 600 bit/s 17 Phase2 Packet Access 2 400 bit/s 18 Phase2 Packet Access 4 800 bit/s 19 Phase2 Packet Access 9 600 bit/s 20 Phase2 Alternate Speech/Data 21 Phase2 Speech Followed by Data 22 R97 GPRS Y 23 Rel-6 Bluetooth data rate 24 Rel-6 WLAN data rate

Table A.5 (3GPP TS 51.010-2): Supplementary Services

Item Release Supplementary Service Supported1 Phase2 Calling Line Identification Presentation Y 2 Phase2 Calling Line Identification Restriction Y 3 Phase2 Connected Line Identification Presentation Y 4 Phase2 Connected Line Identification Restriction Y 5 Phase2 Call Forwarding Unconditional Y 6 Phase2 Call Forwarding on Mobile Subscriber Busy Y 7 Phase2 Call Forwarding on No Reply Y 8 Phase2 Call Forwarding on Mobile Subscriber Not Reachable Y 9 Phase2 Call Waiting Y

10 Phase2 Call Hold Y 11 Phase2 Multi Party Service Y 12 Phase2 Closed User Group Y 13 Phase2 Advice of Charge (Information) Y 14 Phase2 Advice of Charge (Charging) Y 15 Phase2 Barring of All Outgoing Calls. Y 16 Phase2 Barring of Outgoing International Calls Y 17 Phase2 Barring of Outgoing International Calls except those directed to the Home PLMN Country Y 18 Phase2 Barring of All Incoming Calls Y 19 Phase2 Barring of Incoming Calls when Roaming Outside the Home PLMN Country Y 20 Phase2 Unstructured SS Data Y 21 R96 enhanced Multi-Level Precedence and Pre-emption service (eMLPP) 22 R96 Call Deflection Y 23 R96 User-to-User signalling 24 R96 Explicit Call Transfer Y 25 R96 Implicit UUS1 26 R98 Sending of implicit UUS1 in the ALERTING message 27 R98 Sending of implicit UUS1 in the CONNECT message 28 R99 Follow Me 29 Rel-4 User-to-Dispatcher Information 30 Rel-4 Compressed User-to-Dispatcher 31 R97 Completion of Calls to Busy SS 32 R97 Completion of Calls to Busy Requests 33 R97 Support of Private Numbering Plan SS 34 R97 Support of Private Numbering Plan , Numbering Plans 35 R97 Name Identification SS Y 36 (Void) --- 37 R98 Support of MO-LR request for a position estimate Y 38 R98 Support of MO-LR request for transfer to 3rd party 39 R98 Support of MT-LR Y 40 R98 Support of MO-LR request for assistance data Y

Page 27: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 8 of 26

Table A.6 (3GPP TS 51.010-2): Groups for possible bearer capabilities

Item Release Bearer Capability Group Supported1 Ph2(R96) Bearer Service 21(20) .. 26, unrestricted digital information transfer capability Y 2 Ph2(R96) Bearer Service 21(20) .. 26, 3.1 kHz audio ex-PLMN information transfer capability Y 3 Ph2(R96) Bearer Service 31(30) .. 34, unrestricted digital information transfer capability; Non-X.32 Cases (BS 31

.. BS 34)

4 Ph2(R96) Bearer Service 31(30) .. 34, unrestricted digital information transfer capability; X.32 Cases 5 Ph2(R96) Bearer Service 31(30) .. 34, 3.1 kHz audio ex-PLMN information transfer capability; Non-X.32 Cases 6 Ph2(R96) Bearer Service 31(30) .. 34, 3.1 kHz audio ex-PLMN information transfer capability; X.32 Cases 7 Ph2(R96) Bearer Service 41(40)..46, PAD Access Asynchronous 8 Ph2(R96) Bearer Service 51(50)..53, Data Packet Duplex Synchronous 9 Phase2 Bearer Service 61, Alternate Speech/Data, "Speech"

10 Phase2 Bearer Service 61, Alternate Speech/Data, .3.1 kHz audio ex-PLMN information transfer capability; Asynchronous

11 Phase2 Bearer Service 61, Alternate Speech/Data, .3.1 kHz audio ex-PLMN information transfer capability; Synchronous

12 Phase2 Bearer Service 81, Speech followed by Data, "Speech" 13 Phase2 Bearer Service 81, Speech followed by Data, .3.1 kHz audio ex-PLMN information transfer capability;

Asynchronous

14 Phase2 Bearer Service 81, Speech followed by Data, .3.1 kHz audio ex-PLMN information transfer capability; Synchronous

15 Phase2 Teleservice 11..12, Speech Y 16 Phase2 Teleservice 61, Alternate Speech and Facsimile group 3; "Speech" 17 Phase2 Teleservice 61, Alternate Speech and Facsimile group 3; Facsimile group 3 18 Phase2 Teleservice 62, Automatic Facsimile group 3 Y

Table A.7 (3GPP TS 51.010-2): Bearer Service 20..26, UDI/RDI

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Signalling Access Protocol (SAP) I.440 Y

X.28nond 2 Phase2 Connection Element (CE) NT Y

bothNT T bothT

3 Phase2 User Info Layer 2 Protocol (UIL2P) ISO6429 Y ICOPnoFlCt Y NAV Y

4 Phase2 Number of Data Bits(NDB) 7 bits Y 8 bits Y

5 Phase2 Parity Information (NPB) odd even 0 1 none Y

6 Phase2 Number of Stop Bits (NSB) 1 bit Y 2 bits Y

7 Phase2 Radio Channel Requirement (RCR) dualHR FR Y dualFR

8 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps Y

9 Phase2 User Rate (UR) 0.3 1.2 2.4 4.8 9.6 Y 1.2/0.075

10 R96 Fixed Network User Rate (FNUR) 9.6 Y 14.4 Y 19.2 28.8 38.4 48 56 NAV

Page 28: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 9 of 26

Item Release Bearer Capability Elements Values Allowed Supported11 R96 Wanted Air Interface User Rate (WAIUR) 9.6 Y

14.4 Y 19.2 28.8 38.4 43.2 57.6 NAV

12 R96 User Initiated Modification Indication (UIMI) not req. upto1 upto2 upto3 upto4 NAV Y

13 R96 Maximum number of Traffic Channels (MaxNumTCH) 1 Y 2 3 4 NAV

10a --- all allowed combinations according to 3GPP TS 07.01 B.1.2.1 (3GPP TS 27.001) implemented (if not, provide detailed description)

Y

Table A.8 (3GPP TS 51.010-2): Bearer Service 20..26, 3.1 kHz

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Signalling Access Protocol (SAP) I.440 Y

X.28nond 2 Phase2 Connection Element (CE) NT Y

bothNT T bothT

3 Phase2 User Info Layer 2 Protocol (UIL2P) ISO6429 Y COPnoFlCt Y NAV Y

4 Phase2 Number of Data Bits (NDB) 7 bits Y 8 bits Y

5 Phase2 Parity Information (NPB) odd even 0 1 none Y

6 Phase2 Number of Stop Bits (NSB) 1 bit Y 2 bits Y

7 Phase2 Radio Channel Requirement (RCR) dualHR FR Y dualFR

8 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps Y

9 Phase2 User Rate (UR) 0.3 1.2 2.4 4.8 9.6 Y 1.2/0.075

10 Phase2 Modem Type (MT) V.21 V.22 V.22bis V.26ter V.32 Y V.23 auto1 Y

11 R96 Fixed Network User Rate (FNUR) 9.6 Y 14.4 Y 19.2 28.8 NAV

Page 29: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 10 of 26

Item Release Bearer Capability Elements Values Allowed Supported12 R96 Wanted Air Interface User Rate (WAIUR) 9.6 Y

14.4 Y 19.2 28.8 38.4 43.2

13 R96 Acceptable channel codings (ACC) 4.8 9.6 Y 14.4 Y NAV

14 R96 User Initiated Modification Indication (UIMI) not req. upto1 upto2 upto3 upto4 NAV Y

15 R96 Maximum number of Traffic Channels (MaxNumTCH) 1 Y 2 3 4 NAV

11a --- all allowed combinations according to 3GPP TS 07.01 B.1.2.2 (3GPP TS 27.001) implemented (if not, provide detailed description)

Y

Table A.9 (3GPP TS 51.010-2): Bearer Service 30..34, UDI, Non-X.32

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Signalling Access Protocol (SAP) I.440

X.21 2 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

3 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

4 Phase2 User Rate (UR) 1.2 2.4 4.8 9.6

5 R96 Fixed Network User Rate (FNUR) 9.6 14.4 19.2 28.8 38.4 48 56 NAV

6 R96 Acceptable channel codings (ACC) 4.8 9.6 14.4 NAV

7 R96 Maximum number of Traffic Channels (MaxNumTCH) 1 2 3 4 NAV

5a --- all allowed combinations according 3GPP TS 07.01 A2 1.3.1.1 (3GPP TS 27.001) implemented (if not, provide detailed description)

Page 30: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 11 of 26

Table A.10 (3GPP TS 51.010-2): Bearer Service 30..34, UDI, X.32

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

2 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

3 Phase2 User Rate (UR) 2.4 4.8 9.6

4 Ph2(R96) User Info Layer 2 Protocol (UIL2P) X.25 (X.75)

5 Ph2(R96) Rate Adaptation (RA) X.31Flag (V.120)

6 R96 Fixed Network User Rate (FNUR) 9.6 14.4 19.2 28.8 38.4 48 56 NAV

7 R96 Wanted Air Interface User Rate (WAIUR) 9.6 14.4 19.2 28.8 38.4 43.2 57 NAV

8 R96 User Initiated Modification Indication (UIMI) not req upto1 upto2 upto3 upto4 NAV

9 R96 Acceptable channel codings (ACC) 4.8 9.6 14.4 NAV

10 R96 Maximum number of Traffic Channels (MaxNumTCH) 1 2 3 4 NAV

4a --- all allowed combinations according to 3GPP TS 07.01 B.1.3.1.2 (3GPP TS 27.001) implemented (if not, provide detailed description)

Table A.10a (3GPP TS 51.010-2): Bearer Service 30..34, UDI, 48 kbps and 56 kbps bit transparent

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Signalling Access Protocol (SAP) I.440

X.21 2 R96 Fixed Network User Rate (FNUR) 48

56 3 --- all allowed combinations according to 3GPP TS 07.01 B.1.3.1.4 (3GPP TS 27.001)

implemented (if not, provide detailed description)

Page 31: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 12 of 26

Table A.10b (3GPP TS 51.010-2): Bearer Service 30..34, UDI, 64 kbps bit transparent

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Signalling Access Protocol (SAP) I.440

X.21 2 R96 Acceptable channel codings (ACC) 9.6

14.4 3 R96 Maximum number of Traffic Channels (MaxNumTCH) 5

6 4 --- all allowed combinations according to 3GPP TS 07.01 B.1.3.1.5 (3GPP TS 27.001)

implemented (if not, provide detailed description)

Table A.11 (3GPP TS 51.010-2): Bearer Service 30..34, 3.1 kHz, Non-X.32

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

2 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

3 Phase2 User Rate (UR) 1.2 2.4 4.8 9.6

4 Phase2 Modem Type (MT) V.22 V.22bis V.26ter V.32

5 R96 Other Modem Type (OMT) no other MT V.34 NAV

6 R96 Fixed Network User Rate (FNUR) 9.6 14.4 19.2 28.8 NAV

7 R96 Acceptable channel codings (ACC) 4.8 9.6 14.4 NAV

8 R96 Maximum number of Traffic Channels (MaxNumTCH) 1 2 3 4 NAV

5a --- all allowed combinations according to 3GPP TS 07.01 B.1.3.2.1 (3GPP TS 27.001) implemented (if not, provide detailed description)

Table A.12 (3GPP TS 51.010-2): Bearer Service 30..34, 3.1kHz, X.32

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Connection Element (CE) NT

bothNT T bothT

2 Phase2 Radio Channel Requirement (RCR) dualHR FR dualFR

3 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

4 Phase2 User Rate (UR) 2.4 4.8 9.6

5 Phase2 Modem Type (MT) V.22bis V.26ter V.32

Page 32: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 13 of 26

Item Release Bearer Capability Elements Values Allowed Supported6 R96 Other Modem Type (OMT) no other MT

V.34 NAV

7 R96 Fixed Network User Rate (FNUR) 9.6 14.4 19.2 28.8 NAV

8 R96 Wanted Air Interface User Rate (WAIUR) 9.6 14.4 19.2 28.8 NAV

9 R96 Acceptable channel codings (ACC) 4.8 9.6 14.4 NAV

10 R96 User Initiated Modification Indication (UIMI) not req. upto1 upto2 upto3 upto4 NAV

11 R96 Maximum number of Traffic Channels (MaxNumTCH) 1 2 3 4 NAV

6a --- all allowed combinations according to 3GPP TS 07.01 B.1.3.2.2 (3GPP TS 27.001) implemented (if not, provide detailed description)

Table A.13 (3GPP TS 51.010-2): Bearer Service 40..46, PAD Access

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Connection Element (CE) NT

bothNT T bothT

2 Phase2 User Info Layer 2 Protocol (UIL2P) ISO6429 COPnoFlCt NAV

3 Phase2 Number of Data Bits(NDB) 7 bits 8 bits

4 Phase2 Parity Information (NPB) odd even 0 1 none

5 Phase2 Number of Stop Bits (NSB) 1 bit 2 bits

6 Phase2 Radio Channel Requirement (RCR) dualHR FR dualFR

7 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

8 Phase2 User Rate (UR) 0.3 1.2 2.4 4.8 9.6 1.2/0.075

Page 33: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 14 of 26

Item Release Bearer Capability Elements Values Allowed Supported9 R96 Fixed Network User Rate (FNUR) 9.6

14.4 19.2 28.8 38.4 48 56 NAV

10 R96 Wanted Air Interface User Rate (WAIUR) 9.6 14.4 19.2 28.8 38.4 43.2 57.6 NAV

11 R96 Acceptable channel codings (ACC) 4.8 9.6 14.4 NAV

12 R96 User Initiated Modification Indication (UIMI) not req. upto1 upto2 upto3 upto4 NAV

13 R96 Maximum number of Traffic Channels (MaxNumTCH) 1 2 3 4 NAV

9a --- all allowed combinations according to 3GPP TS 07.01 B.1.4 (3GPP TS 27.001) implemented (if not, provide detailed description)

Table A.14 (3GPP TS 51.010-2): Bearer Service 50..53, Data Packet Duplex Synchronous

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

2 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

3 Phase2 User Rate (UR) 0.3 1.2 2.4 4.8 9.6 1.2/0.075

4 R96 Fixed Network User Rate (FNUR) 9.6 14.4 19.2 28.8 38.4 48 56 NAV

5 R96 Wanted Air Interface User Rate (WAIUR) 9.6 14.4 19.2 28.8 38.4 43.2 57.6 NAV

Page 34: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 15 of 26

Item Release Bearer Capability Elements Values Allowed Supported6 R96 Acceptable channel codings (ACC) 4.8

9.6 14.4 NAV

7 R96 User Initiated Modification Indication (UIMI) not req. upto1 upto2 upto3 upto4 NAV

8 R96 Maximum number of Traffic Channels (MaxNumTCH) 1 2 3 4 NAV

4a --- all allowed combinations according to 3GPP TS 07.01 B.1.5 (3GPP TS 27.001) implemented (if not, provide detailed description)

Table A.15 (3GPP TS 51.010-2): Bearer Service 61, Alternate Speech/Data, "Speech"

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

Table A.16 (3GPP TS 51.010-2): Bearer Service 61, Alternate Speech/Data, 3.1kHz, Async

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Connection Element (CE) NT

bothNT T bothT

2 Phase2 User Info Layer 2 Protocol (UIL2P) ISO6429 COPnoFlCt NAV

3 Phase2 Number of Data Bits (NDB) 7 bits 8 bits

4 Phase2 Parity Information (NPB) odd even 0 1 none

5 Phase2 Number of Stop Bits (NSB) 1 bit 2 bits

6 Phase2 Radio Channel Requirement (RCR) dualHR FR dualFR

7 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

8 Phase2 User Rate (UR) 0.3 1.2 2.4 4.8 9.6 1.2/0.075

9 R96 Modem Type (MT) V.21 V.22 V.22bis V.26ter V.32 V.23 auto1

10 --- all allowed combinations according to 3GPP TS 07.01 B.1.6.2.1 (3GPP TS 27.001) implemented (if not, provide detailed description)

Page 35: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 16 of 26

Table A.17 (3GPP TS 51.010-2): Bearer Service 61, Alternate Speech/Data, 3.1kHz, Sync

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

2 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

3 Phase2 User Rate (UR) 1.2 2.4 4.8 9.6

4 R96 Modem Type (MT) V.22 V.22bis V.26ter V.32

5 --- all allowed combinations according to 3GPP TS 07.01 B.1.6.2.2 (3GPP TS 27.001) implemented (if not, provide detailed description)

Table A.18 (3GPP TS 51.010-2): Bearer Service 81, Speech followed by Data, "Speech"

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

Table A.19 (3GPP TS 51.010-2): Bearer Service 81, Speech followed by Data, 3.1kHz, Async

Item Release Bearer Capability Elements Values Allowed Supported1 Phase2 Connection Element (CE) NT

bothNT T bothT

2 Phase2 User Info Layer 2 Protocol (UIL2P) ISO6429 COPnoFlCt NAV

3 Phase2 Number of Data Bits(NDB) 7 bits 8 bits

4 Phase2 Parity Information (NPB) odd even 0 1 none

5 Phase2 Number of Stop Bits (NSB) 1 bit 2 bits

6 Phase2 Radio Channel Requirement (RCR) dualHR FR dualFR

7 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

8 Phase2 User Rate (UR) 0.3 1.2 2.4 4.8 9.6 1.2/0.075

9 R96 Modem Type (MT) V.21 V.22 V.22bis V.26ter V.32 V.23 auto1

10 --- all allowed combinations according to 3GPP TS 07.01 B.1.7.2.1 (3GPP TS 27.001) implemented (if not, provide detailed description)

Page 36: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 17 of 26

Table A.20 (3GPP TS 51.010-2): Bearer Service 81, Speech followed by Data, 3.1kHz, Sync Item Release Bearer Capability Elements Values

Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

2 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

3 Phase2 User Rate (UR) 1.2 2.4 4.8 9.6

4 R96 Modem Type (MT) V.22 V.22bis V.26ter V.32

5 --- all allowed combinations according 3GPP TS 07.01 B.1.7.2.2 (3GPP TS 27.001) implemented (if not, provide detailed description)

Table A.21 (3GPP TS 51.010-2): Teleservice 11..12, Speech Item Release Bearer Capability Elements Values

Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR Y dualFR Y

Table A.22 (3GPP TS 51.010-2): Alternate Speech and Facsimile group 3, Speech Item Release Bearer Capability Elements Values

Allowed Supported1 Phase2 Radio Channel Requirement (RCR) dualHR

FR dualFR

Table A.23 (3GPP TS 51.010-2): Alternate Speech and Facsimile group 3, Facsimile group 3 Item Release Bearer Capability Elements Values

Allowed Supported1 Phase2 Connection Element (CE) NT

bothNT T bothT

2 Phase2 User Info Layer 2 Protocol (UIL2P) X.25 NAV

3 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps

4 Phase2 User Rate (UR) 2.4 4.8 9.6

5 --- all allowed combinations according 3GPP TS 07.01 B.1.10.2 (3GPP TS 27.001) implemented (if not, provide detailed description)

Table A.24 (3GPP TS 51.010-2): Teleservice 62, Automatic G3 fax Item Release Bearer Capability Elements Values

Allowed Supported1 Phase2 Connection Element (CE) NT

bothNT T Y bothT

2 Phase2 User Info Layer 2 Protocol (UIL2P) X.25 NAV Y

3 Phase2 Intermediate Rate (IR) 8 kbps 16 kbps Y

4 Phase2 User Rate (UR) 2.4 4.8 9.6 Y

5 --- all allowed combinations according to 3GPP TS 07.01 B.1.11 (3GPP TS 27.001, annex B) implemented (if not, provide detailed description)

Y

Page 37: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 18 of 26

Table A.25 (3GPP TS 51.010-2): Additional Information

Item Release Additional Information Supported1 Phase2 at least one half rate service Y 2 Phase2 Speech supported for Full rate version 1 (GSM FR) Y 3 Phase2 Speech supported for Half rate version 1 (GSM HR) Y 4 Phase2 at least one data service Y 5 Phase2 at least one full rate data service Y 6 Phase2 at least one half rate data service 7 Phase2 at least one non transparent data service Y 8 Phase2 at least one transparent data service Y 9 Phase2 only transparent data service

10 Phase2 at least one asynchronous data service Y 11 Phase2 at least one asynchronous non transparent data service Y 12 Phase2 2.4 k full rate data mode 13 Phase2 2.4 k half rate data mode 14 Phase2 4.8 k full rate data mode 15 Phase2 4.8 k half rate data mode 16 Phase2 9.6 k full rate data mode Y 17 Phase2 non transparent service with full rate channel at a user rate of 4.8 kbit/s 18 Phase2 at least one bearer capability Y 19 Phase2 at least one MT circuit switched basic service Y 20 Phase2 at least one MO circuit switched basic service Y 21 Phase2 only SDCCH 22 Phase2 at least one service on traffic channel supported Y 23 Phase2 dual rate radio channel types (no relation to supported speech codecs) Y 24 Phase2 only full rate radio channel type (no relation to supported speech codecs) 25 Phase2 at least one teleservice Y 26 Phase2 CC protocol for at least one BC Y 27 Phase2 only circuit switched basic service supported by the mobile is emergency call 28 Phase2 Fax Error Correction Mode 29 Phase2 at least one supplementary service Y 30 Phase2 non call related supplementary service Y 31 Phase2 at least one short message service Y 32 Phase2 (SMS) reply procedure Y 33 Phase2 replace SMS 34 Phase2 display of received SMS Y 35 Phase2 SMS status report capabilities Y 36 Phase2 Storing of short messages in the SIM Y 37 Phase2 Storing of short messages in the ME Y 38 Phase2 detach on power down Y 39 Phase2 detach on SIM remove 40 Phase2 SIM removable without power down 41 Phase2 ID-1 SIM 42 Phase2 Plug-In SIM Y 43 Phase2 Disable PIN feature Y 44 Phase2 PIN2 feature Y 45 Phase2 Feature requiring entry of PIN2 Y 46 Phase2 Chars 0-9, *, # supported Y 47 Phase2 A, B, C, D chars. Supported 48 Phase2 automatically enter automatic selection of PLMN mode Y 49 Phase2 alerting indication to the user Y 50 R98 Appl. Layer is always running 51 Phase2 Immediate connect supported for all circuit switched basic services 52 Phase2 In-Call modification 53 Phase2 follow-on request procedure Y 54 Phase2 refusal of call Y 55 Phase2 RF amplification 56 Phase2 Number of B-party number for autocalling is greater than the number of entries in the blacklist 57 Phase2 Handset MS supporting speech Y 58 Phase2 MT2 Configuration Y 59 Phase2 MT2 Configuration or any other possibility to send data over Um interface Y 60 Rel-4 Permanent Antenna Connector Y 61 Phase2 Pseudo-synchronized handover supported Y 62 R96 5V only SIM/ME interface 63 R96 3V only SIM/ME interface 64 R96 3V/5V SIM/ME interface 65 Phase2 Speech supported for Full rate version 2 (GSM EFR) Y

66a Phase2 RLP supports non default parameters Y 66b R96 Support of listening to voice broadcast calls (VBS listening)

Page 38: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 19 of 26

Item Release Additional Information Supported67 R96 Support of originating voice broadcast call (VBS originating) 68 R96 Support of listening to voice group calls (VGCS listening) 69 R96 Support of talking in voice group calls (VGCS talking) 70 R96 Support of originating voice group call (VGCS originating) 71 R96 Support reduced NCH monitoring 72 R96 14.4 k data mode Y 73 Phase2 Implementation of cause number 27 of busy autocalling in category 2 74 Phase2 Implementation of cause number 27 of busy autocalling in category 3 75 (Void) --- 76 Phase2 * Artificial ear type 1 (* Phase 2 up to and including Release 4) 77 Phase2 Artificial ear type 3.2, Low leak option Y 78 R96 Artificial ear type 3.4 79 R98 Speech supported for Full rate version 3 (FR AMR) Y 80 R96 NCH monitoring in group receive mode 81 R96 NCH monitoring in group transmit mode 82 R96 NCH monitoring in dedicated mode 83 R97 Support of one PDP context activation Y 84 R97 Support of more than one PDP context activation Y 85 R97 Support of more than one PDP context activation simultaneously on the same SAPI Y 86 R97 Support of GPRS data compression Y 87 R98 Support of GPRS header compression Y 88 R97 Support of Network requested PDP context activation Y 89 R97 Support for user settings of minimum QoS Y 90 R97 Automatic GPRS attach procedure at switch-on/power-on Y 91 R97 MMI controlled attach/detach procedures for non-GPRS services Y 92 R97 Automatic attach procedure when MS identity cannot derived by the network Y 93 R98 Automatic MM IMSI attach procedure at switch-on / power-on Y 94 R96 Support of SIM Application Toolkit Y 95 R98 1,8V only SIM/ME interface 96 R98 1,8V/3V SIM/ME interface Y 97 Phase2 Multiple SM MO/PP on same RR link Y 98 Phase2 Support of stored list cell selection 99 Phase2 at least one service not support immediate connection Y

100 (Void) --- 101 (Void) --- 102 Phase2 EFR_EmgCallSetup message contains the bearer capability Y 103 Phase2 Support of MonitorPCH_GroupTransmitMode 104 Rel-4 Integral_Antenna 105 R97 User requested combined GPRS and non-GPRS detached without powering off 106 R97 User requested non-GPRS detached Y 107 Phase2 Artificial ear type 3.2, High leak option 108 R96 Artificial ear type 3.3 109 Phase2 Support of Multiple SMS Y 110 R97 Cell Reselection after T3184 Expiry Y 111 R97 GPRS attach attempted automatically due to outstanding request Y 112 R98 Speech supported for Half rate version 3 (HR AMR) Y 113 R5 AMR LoopBack Modes Y 114 R99 TTY services 115 R99 Support of Secondary PDP Context Activation Y 116 Phase2 Support of MO SMS Concatenation Y 117 Phase2 Support of MT SMS Concatenation Y 118 R97 NITZ Supported Y 119 R97 Use of NITZ DST (Daylight Saving Time) Y 120 (Void) --- 121 R97 Re-attach automatically when the network commands a detach with no cause value 122 R98 Support of GPRS header compression algorithm type RFC 1144 Y 123 R99 Support of GPRS header compression algorithm type RFC 2507 Y 124 Rel-6 Support of ROHC algorithm type RFC 3241 125 Rel-6 Support of ROHC algorithm type RFC 3242 126 Rel-6 Support of ROHC algorithm type RFC 3408 127 Rel-6 Support of ROHC algorithm type RFC 3095 128 R97 The way to trigger transferring of new user data in a different PDP context while an uplink transfer is in progress Y 129 R99 Support of DARP phase 1 130 R99 Support of Card Application 131 Rel-5 Support of GSM half rate speech version 6 (O-TCH/AHS) 132 R99 MS with improved receiver performance 133 Rel-5 Support of GSM speech full rate version 4 (O-TCH/WFS) 134 R97 Verification for correct repetition of new password Y 135 R99 MS using reduced interslot dynamic range in multislot configurations

Page 39: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 20 of 26

Item Release Additional Information Supported136 Rel-5 Support of GSM speech half rate version 4 (O-TCH/WHS) 137 Rel-5 Support of GSM Speech Full Rate version 5 (TCH/WFS) 138 Phase2 Support of overwriting the existing Class 2 SMS 139 Rel-6 Support of Repeated SACCH 140 R98 Support for a method for resetting stored A-GPS assistance data 141 Rel-7 Support of DARP phase 2 142 Rel-4 Support of Rel-4 acoustic implementation Y 143 R99 MS with no components having RF performance sensitive to vibration condition during testing 144 R97 Use of NITZ Full Name Y 145 R97 Use of NITZ Short Name Y 146 R97 Use of NITZ Universal Time Y 147 R97 Use of NITZ Local Time Zone Y 148 R99 MS using a temporary antenna connector 149 Rel-6 Support of Repeated FACCH 150 Rel-7 Support of HATS Y

Table A.25.1 (3GPP TS 51.010-2): Additional Information (requiring values)

Item Release Additional Information Support Values Allowed Supported1 R98 AMR C/I normalization factor (AFS GSM 900) (units: dB) 0 …

2 R98 Loop C delay Full rate (round trip delay, in number of TDMA frames) Y 0 … 1TDMA F

3 R99 AMR C/I normalization factors (AFS, DARP), GSM 900 12 values representing SS adjustment of variable normalization factors for C/I values as stated in 14.10.3 (units: dB)

Y

0 … , 0 … ,

...

... 0 …

4 R99 AMR C/I normalization factors (AHS, DARP), GSM 900 10 values representing SS adjustment of variable normalization factors for C/I values as stated in 14.10.4 (units: dB)

Y

0 … , 0 … ,

...

... 0 …

5 Rel-5 O-TCH/F C/I normalization factor (GSM 900) (units: dB) 0 …

6 R98 Loop C delay Half rate (round trip delay, in number of TDMA frames) Y 0 … 1TDMA F

7 R99

Averaging time Tav This time is the time between the first and the last measurement sample taken on one carrier during one averaging period when measurering received signal strength

Y 0 … 577us

8 Rel-5 TCH/WFS C/I normalization factor (GSM 900) (units: dB) 0 …

9 Rel-5 TCH/WFS CI normalization factors (TCH/WFS, DARP, GSM 900) 12 values representing SS adjustment of variable normalization factors for C/I values as stated in 14.10.9 (units: dB)

0 … , 0 … ,

...

... 0 …

10 R98 MS LCS Notification timeout timer (units: seconds) Y 1 … 20 11 R98 AMR C/I normalization factor (AFS GSM 850) (units: dB) 0 … 12 R98 AMR C/I normalization factor (AFS GSM 700) (units: dB) 0 … 13 R98 AMR C/I normalization factor (AFS GSM 450) (units: dB) 0 … 14 R98 AMR C/I normalization factor (AFS DCS 1800) (units: dB) 0 … 15 R98 AMR C/I normalization factor (AFS PCS 1900) (units: dB) 0 … 16 R98 AMR C/I normalization factor (AHS GSM 900) (units: dB) 0 … 17 R98 AMR C/I normalization factor (AHS GSM 850) (units: dB) 0 … 18 R98 AMR C/I normalization factor (AHS GSM 700) (units: dB) 0 … 19 R98 AMR C/I normalization factor (AHS GSM 450) (units: dB) 0 … 20 R98 AMR C/I normalization factor (AHS DCS 1800) (units: dB) 0 … 21 R98 AMR C/I normalization factor (AHS PCS 1900) (units: dB) 0 …

22 R99 AMR C/I normalization factors (AFS, DARP, GSM 850) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.3 (units: dB)

0 … , 0 … ,

... 0 …

23 R99 AMR C/I normalization factors (AFS, DARP, GSM 700) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.3 (units: dB)

0 … , 0 … ,

... 0 …

24 R99 AMR C/I normalization factors (AFS, DARP, GSM 450) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.3 (units: dB)

0 … , 0 … ,

... 0 …

25 R99 AMR C/I normalization factors (AFS, DARP, DCS 1800) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.3 (units: dB)

0 … , 0 … ,

... 0 …

Page 40: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 21 of 26

Item Release Additional Information Support Values Allowed Supported

26 R99 AMR C/I normalization factors (AFS, DARP, PCS 1900) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.3 (units: dB)

0 … , 0 … ,

... 0 …

27 R99 AMR C/I normalization factors (AHS, DARP, GSM 850) 10 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.4 (units: dB)

0 … , 0 … ,

... 0 …

28 R99 AMR C/I normalization factors (AHS, DARP, GSM 700) 10 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.4 (units: dB)

0 … , 0 … ,

... 0 …

29 R99 AMR C/I normalization factors (AHS, DARP, GSM 450) 10 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.4 (units: dB)

0 … , 0 … ,

... 0 …

30 R99 AMR C/I normalization factors (AHS, DARP, DCS 1800) 10 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.4 (units: dB)

0 … , 0 … ,

... 0 …

31 R99 AMR C/I normalization factors (AHS, DARP, PCS 1900) 10 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.4 (units: dB)

0 … , 0 … ,

... 0 …

32 Rel-5 O-TCH/F C/I normalisation factor (GSM 850) (units: dB) 0 … 33 Rel-5 O-TCH/F C/I normalisation factor (GSM 700) (units: dB) 0 … 34 Rel-5 O-TCH/F C/I normalisation factor (GSM 450) (units: dB) 0 … 35 Rel-5 O-TCH/F C/I normalisation factor (DCS 1800) (units: dB) 0 … 36 Rel-5 O-TCH/F C/I normalisation factor (PCS 1900) (units: dB) 0 … 37 Rel-5 TCH/WFS C/I normalisation factor (GSM 850) (units: dB) 0 … 38 Rel-5 TCH/WFS C/I normalisation factor (GSM 700) (units: dB) 0 … 39 Rel-5 TCH/WFS C/I normalisation factor (GSM 450) (units: dB) 0 … 40 Rel-5 TCH/WFS C/I normalisation factor (DCS 1800) (units: dB) 0 … 41 Rel-5 TCH/WFS C/I normalisation factor (PCS 1900) (units: dB) 0 …

42 Rel-5 TCH/WFS C/I normalization factors (TCH/WFS, DARP, GSM850) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.9 (units: dB)

0 … , 0 … ,

... 0 …

43 Rel-5 TCH/WFS C/I normalization factors (TCH/WFS, DARP, GSM700) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.9 (units: dB)

0 … , 0 … ,

... 0 …

44 Rel-5 TCH/WFS C/I normalization factors (TCH/WFS, DARP, GSM450) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.9 (units: dB)

0 … , 0 … ,

... 0 …

45 Rel-5 TCH/WFS C/I normalization factors (TCH/WFS, DARP, DCS1800) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.9 (units: dB)

0 … , 0 … ,

... 0 …

46 Rel-5 TCH/WFS C/I normalization factors (TCH/WFS, DARP, PCS1900) 12 values representing SS adjustment of variable normalisation factors for C/I values as stated in 14.10.9 (units: dB)

0 … , 0 … ,

... 0 …

Support of UTRAN Radio Access Technology

Table A.27 (3GPP TS 51.010-2): Support of UTRAN Radio Access Technology

Item Release Additional Information Supported1 R99 Conversational / speech / UL:12.2 DL:12.2 kbps / CS RAB + UL:3.4 DL 3.4 kbps SRBs for DCCH Y 2 R99 Streaming / unknown / UL:14.4/DL:14.4 kbps / CS RAB + UL:3.4 DL 3.4 kbps SRBs for DCCH Y 3 R99 Streaming / unknown / UL:28.8/DL:28.8 kbps / CS RAB + UL:3.4 DL 3.4 kbps SRBs for DCCH Y 4 R99 Streaming / unknown / UL:57.6/DL:57.6 kbps / CS RAB + UL:3.4 DL 3.4 kbps SRBs for DCCH Y

Page 41: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 22 of 26

Support of SIM Application Toolkit

Supported SIM Application Toolkit Releases

Item SIM Application Toolkit Release Supported1 ME supports all SIM Application Toolkit features according to R96 2 ME supports all SIM Application Toolkit features according to R97 3 ME supports all SIM Application Toolkit features according to R98 4 ME supports all SIM Application Toolkit features according to R99 5 ME supports all SIM Application Toolkit features according to Rel-4 6 ME supports all SIM Application Toolkit features according to Rel-5 7 ME supports all SIM Application Toolkit features according to Rel-6

Table of Optional Features (according to 3GPP TS 51.010-4 Section 3.3 Table A.1)

Item Option Supported1 Capability Configuration parameter 2 Sustained text 3 UCS2 coding scheme for Entry 4 Extended Text String 5 Help information 6 Icons 7 Class A: Dual Slot 8 Detachable reader 9 Class B: RUN AT

10 Class C: LAUNCH BROWSER 11 Class D: Soft keys 12 Class E: B.I.P related to CSD 13 Screen sizing parameters 14 Screen Resizing 15 UCS2 coding scheme for Display 16 Mobile supporting GPRS 17 Mobile supporting UDP 18 Mobile supporting TCP 19 Redial in Set Up Call 20 Mobile decision to respond with "No response from user" in finite time 21 Class E: B.I.P related to GPRS 22 Mobile supporting Called Party Subaddress 23 Mobile supporting Fixed Dialling Numbers 24 Mobile supporting Barred Dialling Numbers 25 Mobile supporting “+CIMI” in combination with Run AT Command 26 UCS2 in Cyrillic 27 Mobile supporting ‘9EXX’response code for SIM data download error 28 Mobile supporting Envelope Call Control always sent to the SIM during automatic redial mode 29 Mobile supporting 2nd alpha identifier in SET UP CALL

30 Mobile supporting Open Channel (GPRS) not containing a Network Access Name TLV when no default Access Point Name is set in the terminal configuration

31 Preferred buffer size supported by the terminal for Open Channel command is greater than 0 byte and less than 65535 bytes

32 Terminal supports Dual Transfer Mode (allowing GPRS connection and call at the same time) 33 Terminal supports Long ForwardToNumber 34 Terminal executes User confirmation phase before sending PDP context activation request 35 Terminal supports SAT and USAT 36 ME requesting for user confirmation before sending the Envelope Call Control command 37 ME requesting for user confirmation after sending the Envelope Call Control command 38 ME supports Call Hold Supplementary Service 39 (Void) 40 (Void) 41 (Void) 42 Terminal supports at least one supplementary service 43 Terminal supports "Call Forwarding Unconditional" 44 Terminal supports "Calling Identification Restriction" 45 Terminal supports display capability 46 Terminal supports keypad 47 Terminal supports audio altering 48 Terminal supports speech call 49 Terminal supports multiple languages 50 Terminal displays icons as defined in record 1 of EF(IMG) for Display Text command 51 Terminal displays icons as defined in record 2 of EF(IMG) for Display Text command 52 Terminal displays icons as defined in record 5 of EF(IMG) for Display Text command

Page 42: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 23 of 26

Item Option Supported53 Terminal displays icons as defined in record 1 of EF(IMG) for Get Inkey command 54 Terminal displays icons as defined in record 2 of EF(IMG) for Get Inkey command 55 Terminal displays icons as defined in record 5 of EF(IMG) for Get Inkey command 56 Terminal displays icons as defined in record 1 of EF(IMG) for Get Input command 57 Terminal displays icons as defined in record 2 of EF(IMG) for Get Input command 58 Terminal displays icons as defined in record 5 of EF(IMG) for Get Input command 59 Terminal displays icons as defined in record 1 of EF(IMG) for Play Tone command 60 Terminal displays icons as defined in record 2 of EF(IMG) for Play Tone command 61 Terminal displays icons as defined in record 5 of EF(IMG) for Play Tone command 62 Terminal displays icons as defined in record 1 of EF(IMG) for Set Up Menu command 63 Terminal displays icons as defined in record 2 of EF(IMG) for Set Up Menu command 64 Terminal displays icons as defined in record 5 of EF(IMG) for Set Up Menu command 65 Terminal displays icons as defined in record 1 of EF(IMG) for Select Item command 66 Terminal displays icons as defined in record 2 of EF(IMG) for Select Item command 67 Terminal displays icons as defined in record 5 of EF(IMG) for Select Item command 68 Terminal displays icons as defined in record 1 of EF(IMG) for Send Short Message command 69 Terminal displays icons as defined in record 2 of EF(IMG) for Send Short Message command 70 Terminal displays icons as defined in record 5 of EF(IMG) for Send Short Message command 71 Terminal displays icons as defined in record 1 of EF(IMG) for Send SS command 72 Terminal displays icons as defined in record 2 of EF(IMG) for Send SS command 73 Terminal displays icons as defined in record 5 of EF(IMG) for Send SS command 74 Terminal displays icons as defined in record 1 of EF(IMG) for Send USSD command 75 Terminal displays icons as defined in record 2 of EF(IMG) for Send USSD command 76 Terminal displays icons as defined in record 5 of EF(IMG) for Send USSD command 77 Terminal displays icons as defined in record 1 of EF(IMG) for Set Up Call command 78 Terminal displays icons as defined in record 2 of EF(IMG) for Set Up Call command 79 Terminal displays icons as defined in record 5 of EF(IMG) for Set Up Call command 80 Terminal displays icons as defined in record 1 of EF(IMG) for Set Up Idle Mode Text command 81 Terminal displays icons as defined in record 2 of EF(IMG) for Set Up Idle Mode Text command 82 Terminal displays icons as defined in record 5 of EF(IMG) for Set Up Idle Mode Text command 83 Terminal displays icons as defined in record 1 of EF(IMG) for Run AT Command command 84 Terminal displays icons as defined in record 2 of EF(IMG) for Run AT Command command 85 Terminal displays icons as defined in record 5 of EF(IMG) for Run AT Command command 86 Terminal displays icons as defined in record 1 of EF(IMG) for Send DTMF command 87 Terminal displays icons as defined in record 2 of EF(IMG) for Send DTMF command 88 Terminal displays icons as defined in record 5 of EF(IMG) for Send DTMF command 89 Terminal displays icons as defined in record 1 of EF(IMG) for Launch Browser command 90 Terminal displays icons as defined in record 2 of EF(IMG) for Launch Browser command 91 Terminal displays icons as defined in record 5 of EF(IMG) for Launch Browser command

ME’s default configuration (according to 3GPP TS 51.010-4 Section 5.4 Table A.2)

Item Description Status Value 1 DISPLAY TEXT: No response from user Timeout interval C 2 GET INKEY: No response from user Timeout interval C 3 GET INPUT: No response from user Timeout interval C 4 SELECT ITEM: No response from user Timeout interval C 5 Preferred buffer size supported by the terminal for Open Channel command C 6 Channel Id C

NOTE: Conditional values shall be provided if the corresponding option is supported in the Table A.1 (of 3GPP TS 51.010-4)

Details of TERMINAL PROFILE Support (according to 3GPP TS 51.010-4 Annex E)

Item Release Terminal Profile Supported1 R96 Profile Download Y 2 R96 SMS-PP data download Y 3 R96 Cell Broadcast data download 4 R96 Menu selection Y 5 R97 ’9EXX’ response code for SIM data download error Y 6 R98 Timer expiration Y 7 R98 USSD string data object supported in call control Y 8 R99 Envelope Call Control always sent to the SIM during automatic redial mode Y 9 R96 Command result Y

10 R96 Call Control by SIM Y 11 R97 Cell identity included in Call Control by SIM Y 12 R98 MO short message control by SIM Y 13 R97 Handling of the alpha identifier Y 14 R97 UCS2 Entry supported 15 R97 UCS2 Display supported

Page 43: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 24 of 26

Item Release Terminal Profile Supported16 R98 Display of the extension text Y 17 R96 DISPLAY TEXT Y 18 R96 GET INKEY Y 19 R96 GET INPUT Y 20 R96 MORE TIME Y 21 R96 PLAY TONE Y 22 R96 POLL INTERVAL Y 23 R96 POLLING OFF Y 24 R96 REFRESH Y 25 R96 SELECT ITEM Y 26 R96 SEND SHORT MESSAGE Y 27 R96 SEND SS Y 28 R98 SEND USSD Y 29 R96 SET UP CALL Y 30 R96 SET UP MENU Y 31 R96 PROVIDE LOCAL INFORMATION (LOCI & IMEI) Y 32 R97 PROVIDE LOCAL INFORMATION (NMR) Y 33 R98 SET UP EVENT LIST Y 34 R98 Event : MT call Y 35 R98 Event : Call connected Y 36 R98 Event : Call disconnected Y 37 R98 Event : Location status Y 38 R98 Event : User activity Y 39 R98 Event : Idle screen available Y 40 R98 Event : Card reader status Y 41 R99 Event : Language selection Y 42 R99 Event : Browser Termination Y 43 R99 Event : Data available Y 44 R99 Event : Channel status Y 45 R96 RFU --- 46 R96 RFU --- 47 R96 RFU --- 48 R96 RFU --- 49 R98 POWER ON CARD 50 R98 POWER OFF CARD 51 R98 PERFORM CARD APDU 52 R98 GET READER STATUS (Card reader status) 53 R99 GET READER STATUS (Card reader identifier) 54 R96 RFU --- 55 R96 RFU --- 56 R96 RFU --- 57 R98 TIMER MANAGEMENT (start, stop) Y 58 R98 TIMER MANAGEMENT (get current value) Y 59 R98 PROVIDE LOCAL INFORMATION (date, time and time zone) Y 60 R98 Binary choice in GET INKEY Y 61 R98 SET UP IDLE MODE TEXT Y 62 R98 RUN AT COMMAND (i.e. class "b" is supported) 63 R98 2nd alpha identifier in SET UP CALL Y 64 R98 2nd capability configuration parameter 65 R98 Sustained DISPLAY TEXT Y 66 R98 SEND DTMF command Y 67 R98 PROVIDE LOCAL INFORMATION - BCCH Y 68 R99 PROVIDE LOCAL INFORMATION (language) Y 69 R99 PROVIDE LOCAL INFORMATION (Timing Advance) Y 70 R99 LANGUAGE NOTIFICATION Y 71 R99 LAUNCH BROWSER Y 72 R96 RFU --- 73 R99 Soft keys support for SELECT ITEM Y 74 R99 Soft Keys support for SET UP MENU Y 75 R96 RFU --- 76 R96 RFU --- 77 R96 RFU --- 78 R96 RFU --- 79 R96 RFU --- 80 R96 RFU --- 81 R99 Maximum number of soft keys available (‘FF’ = RFU) 7 82 R99 Maximum number of soft keys available (‘FF’ = RFU) 83 R99 Maximum number of soft keys available (‘FF’ = RFU) 84 R99 Maximum number of soft keys available (‘FF’ = RFU)

Page 44: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 25 of 26

Item Release Terminal Profile Supported85 R99 Maximum number of soft keys available (‘FF’ = RFU) 86 R99 Maximum number of soft keys available (‘FF’ = RFU) 87 R99 Maximum number of soft keys available (‘FF’ = RFU) 88 R99 Maximum number of soft keys available (‘FF’ = RFU) 89 R99 OPEN CHANNEL Y 90 R99 CLOSE CHANNEL Y 91 R99 RECEIVE DATA Y 92 R99 SEND DATA Y 93 R99 GET CHANNEL STATUS Y 94 R96 RFU --- 95 R96 RFU --- 96 R96 RFU --- 97 R99 CSD supported by ME 98 R99 GPRS supported by ME Y 99 R96 RFU ---

100 R96 RFU --- 101 R96 RFU --- 102 R99 Number of channels supported by ME 7 103 R99 Number of channels supported by ME 104 R99 Number of channels supported by ME 105 R99 Number of characters supported down the ME 8 106 R99 Number of characters supported down the ME 107 R99 Number of characters supported down the ME 108 R99 Number of characters supported down the ME 109 R99 Number of characters supported down the ME 110 Rel-8 No display capability (i.e. class "ND" is indicated) Y 111 Rel-8 No keypad available (i.e. class "NK" is indicated) Y 112 R99 Screen Sizing Parameters 113 R99 Number of characters supported across the ME display 12 114 R99 Number of characters supported across the ME display 115 R99 Number of characters supported across the ME display 116 R99 Number of characters supported across the ME display 117 R99 Number of characters supported across the ME display 118 R99 Number of characters supported across the ME display 119 R99 Number of characters supported across the ME display 120 R99 Variable size fonts Supported 121 R99 Display can be resized 122 R99 Text Wrapping supported 123 R99 Text Scrolling supported 124 R96 RFU --- 125 R96 RFU --- 126 R99 Width reduction when in a menu 127 R99 Width reduction when in a menu 128 R99 Width reduction when in a menu 129 R99 TCP 130 R99 UDP 131 R96 RFU --- 132 R96 RFU --- 133 R96 RFU --- 134 R96 RFU --- 135 R96 RFU --- 136 R96 RFU --- 137 R96 RFU --- 138 R96 RFU --- 139 R96 RFU --- 140 R96 RFU --- 141 R96 RFU --- 142 R96 RFU --- 143 R96 RFU --- 144 R96 RFU --- 145 R99 Protocol Version 14 146 R99 Protocol Version 147 R99 Protocol Version 148 R99 Protocol Version 149 R96 RFU --- 150 R96 RFU --- 151 R96 RFU --- 152 R96 RFU ---

Page 45: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

(P)ICS/(P)IXIT Form for 2G Terminals created by CETECOM 2011-05-20 14:05 CTC-MC-TE-007 V2.11E-2010-01-15 page 26 of 26

PIXIT – Protocol Implementation Extra Information for Testing

Power Supply Nominal battery voltage 3.8 V

Maximal testing voltage 4.2 V

Minimal testing voltage 3.5 V

Receiver Intermediate Frequencies GSM850 GSM900 GSM1800 GSM1900

Flo – Local Oscillator frequency applied to first receiver mixer MHz MHz MHz MHz

IF1 – First intermediate frequency MHz MHz MHz MHz

IF2 – Second intermediate frequency MHz MHz MHz MHz

IF3 – Third intermediate frequency MHz MHz MHz MHz

Additional Information Support

Controlled Early Classmark Sending

MS originated XID negotiation after PDP context activation

Internal Baudot-CTM signal conversion (if TTY is supported)

The PICS and PIXIT information stated on the previous pages are valid for the fol lowing Terminal Equipment Type:

Brand Name:

Terminal Equipment Type:

Hardware Version:

Software Version:

Date (yyyy-mm-dd) Printed Name Signature

Page 46: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

GSM

(Global System for Mobile Communications)

PARTIAL TEST REPORT Number: SH_GT_305651REV1 - Date: 2011-12-16

for

Shanghai Simcom Ltd. User Equipment Type:

SIM5320AD

Final Hardware Version: V1.03 Final Software Version: SIM5320AD_V1.5_B05V01

Annex D: Photographs

  

This annex consists of 2 pages

CETECOM Shanghai is accredited according to

DIN EN ISO/IEC 17025 by:

 

D-PL-12099-01-01

  

CETECOM Shanghai Communication Testing and Consulting Co., Ltd.Building 3,No.1500, Zuchongzhi Road ♦ 201203 Shanghai ♦ China

Phone: +86 (0) 21 6879 5890 ♦ Fax: +86 (0) 21 6879 5786 ♦ E-mail: [email protected] ♦ http://www.cetecom.com Registered in Pudong/Shanghai, China, Reg.-No.: 310115400213668 Board of Directors: Dr. Harald Ansorge, Hans Peter May (chairman)

 TOM 1.6.4.9 © Copyright ♦ All rights reserved by CETECOM Shanghai

 

Page 47: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex D: PhotographsDate of Report: 2011-12-16 TOM 1.6.4.9 Page 2 of 2  

1. Photographs of the Equipment Under Test 

1.1 Front View of EUT

Page 48: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

GSM

(Global System for Mobile Communications)

PARTIAL TEST REPORT Number: SH_GT_305651REV1 - Date: 2011-12-16

for

Shanghai Simcom Ltd. User Equipment Type:

SIM5320AD

Final Hardware Version: V1.03 Final Software Version: SIM5320AD_V1.5_B05V01

Annex E: Detailed Test Verdicts

  

This annex consists of 8 pages

CETECOM Shanghai is accredited according to

DIN EN ISO/IEC 17025 by:

 

D-PL-12099-01-01

  

CETECOM Shanghai Communication Testing and Consulting Co., Ltd.Building 3,No.1500, Zuchongzhi Road ♦ 201203 Shanghai ♦ China

Phone: +86 (0) 21 6879 5890 ♦ Fax: +86 (0) 21 6879 5786 ♦ E-mail: [email protected] ♦ http://www.cetecom.com Registered in Pudong/Shanghai, China, Reg.-No.: 310115400213668 Board of Directors: Dr. Harald Ansorge, Hans Peter May (chairman)

 TOM 1.6.4.9 © Copyright ♦ All rights reserved by CETECOM Shanghai

 

Page 49: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex E: Detailed Test VerdictsDate of Report: 2011-12-16 TOM 1.6.4.9 Page 2 of 8  

Contents Page

1. General Description 3

2. Terms used in the Test Result Table 3

2.1 Main Terms 3

2.2 Terms in Column "Verdict" 4

2.3 Terms in Column "Notes" 5

3. Detailed Results 5

3.1 Test Results according to 3GPP TS 51.010-1 6

Page 50: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex E: Detailed Test VerdictsDate of Report: 2011-12-16 TOM 1.6.4.9 Page 3 of 8  

1. General DescriptionThis annex of the GSM test report includes tables with detailed test results of the equipment under test (EUT). 

2. Terms used in the detailed test result tableThis section defines the terms which are used in the enclosed detailed test result tables. 

2.1 Main TermsThe following main terms are used in the detailed test result tables:

Term ExplanationTest Case Test case identifier of the corresponding test specification as referenced in section 4 of this test report.

TestDescription

Name of the test case as referenced in the corresponding test specification.

Cat Category of the related test case in the related frequency band. The interpretation of thecorresponding category is defined in the related Permanent Reference Document GCF-CC and/orNAPRD03.

Verdict Verdict for each test case. See section 2.2 of this annex for detailed information.

Loc If testing has been performed in subcontracted laboratories, this term identifies the testing locationaccording to section 1 of Annex B.

Notes Information about used test samples, special test situations, special test setups or specialinterpretations of the test results. See section 2.3 of this annex for detailed information.

Page 51: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex E: Detailed Test VerdictsDate of Report: 2011-12-16 TOM 1.6.4.9 Page 4 of 8  

2.2 Terms in column "Verdict"The following terms are used in the detailed test result tables to identify the verdicts of each test case in the givenGSM frequency bands:

Verdict ExplanationPASS EUT has been tested at CETECOM Shanghai's (own or subcontracted) laboratories and is conformant to

the applied standards for this test case in the given GSM frequency band.

FAIL EUT has been tested at CETECOM Shanghai's (own or subcontracted) laboratories but is notconformant to the applied standards for this test case in the given GSM frequency band.

PASS/---- For not completely validated tests only the validated parts of the test are "PASS" as mentioned above.

INC. "Inconclusive": EUT has been tested at CETECOM Shanghai's (own or subcontracted) laboratories butthe test verdict for this test case in the given GSM frequency band is ambiguous. Detailed explanation isgiven in the note for the corresponding test case.

N/A "Not Applicable": According to the client's and/or manufacturer's documentation (PICS/PIXIT) this test isnot applicable in the given GSM frequency band.

N/R "Not Required": This test case is not required for conformance testing in the given frequency band dueto special rules accepted in the corresponding certification regime. Examples: - Test case only needs to be tested in one single frequency band

- Test case only needs to be tested with limited parameters or settings- Test case has exceptions (e.g. due to test specification or test platform faults)- Test case is waived by the certification committee

R "Redundant": This test has not been performed in the given GSM frequency band but the testrequirement has been verified by means of another test case (e.g. in an other technology).

NO This test has not been performed with the EUT in the given GSM frequency band and/or with the giventest parameter(s) although the test may be mandatory for conformance testing.

GSM850 This test has not been performed in the given GSM frequency band but in the GSM 850 frequency bandinstead. The result for this test is given in the appropriate column for "GSM 850".

GSM900 This test has not been performed in the given GSM frequency band but in the GSM 900 frequency bandinstead. The result for this test is given in the appropriate column for "GSM 900".

GSM1800 This test has not been performed in the given GSM frequency band but in the GSM 1800 frequencyband instead. The result for this test is given in the appropriate column for "GSM 1800".

GSM1900 This test has not been performed in the given GSM frequency band but in the GSM 1900 frequencyband instead. The result for this test is given in the appropriate column for "GSM 1900".

---- Test is not defined or not validated in the given GSM frequency band or not used by the specificcertification regime.

Page 52: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex E: Detailed Test VerdictsDate of Report: 2011-12-16 TOM 1.6.4.9 Page 5 of 8  

2.3 Terms in column "Notes" 

2.3.1 Test samples used for testingThe detailed test result table contains numerical notes (e.g. "1,4,...") to identify the EUT test samples used for eachperformed test case.

These numerical notes directly refer to the corresponding EUT identifier defined in section 3.3 of the test report (e.g.note "1,4" indicates that the given test case in the given GSM frequency band has been tested with both userequipment test samples identified as EUT1 and EUT4). 

2.3.2 Additional Reference Documents for TestingThe detailed test result table may also contain numerical notes in brackets (e.g. "[9],[14],..."). These notes directlyrefer to the corresponding "additional reference documents for testing" as listed in section 4.3 (table 4) of the TestReport. They indicate that these additional reference documents have been applied to the corresponding testcase(s). 

2.3.3 Special Test Situations, Test Setups and Verdict InterpretationsThe detailed test result table may also contain letter notes (e.g. "A,C,...") to identify special test situations, specialtest setups or special interpretations for the given test case. The following letter notes are used:

Note Explanation  --- no letter note used --- 

3. Detailed Test Result TableThe test result table in the following section includes detailed information for all performed test cases.

Page 53: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex E: Detailed Test VerdictsDate of Report: 2011-12-16 TOM 1.6.4.9 Page 6 of 8  

3.1 Test Results according to 3GPP TS 51.010-1 Test Results of Shanghai Simcom Ltd. SIM5320AD

3GPP TS 51.010-1 Requirement GCF-CC (v3.44.1) GCF-CC (v3.44.1) NAPRD03 (v5.9) NAPRD03 (v5.9)

Test Case Test DescriptionGSM 900 GSM 1800 GSM 850 GSM 1900

Cat Verdict Notes Cat Verdict Notes Cat Verdict Notes Cat Verdict Notes

12.1.1

Conducted spurious emissions, MS allocated a channel --- ----- --- --- ----- --- --- ----- --- --- ----- ---

Normal Temperature \ Normal Voltage A PASS 1,[9] A PASS 1,[9] A PASS 1,[29] A PASS 1,[29]

Normal Temperature \ Low Voltage A PASS 1,[9] A PASS 1,[9] A PASS 1,[29] A PASS 1,[29]

Normal Temperature \ High Voltage A PASS 1,[9] A PASS 1,[9] A PASS 1,[29] A PASS 1,[29]

13.2

Frequency error under multipath and interference conditions --- ----- --- --- ----- --- --- ----- --- --- ----- ---

Normal Temperature \ Normal Voltage A PASS 1,[9] A PASS 1,[9] A PASS 1,[29] A PASS 1,[29]

Low Temperature \ Low Voltage A PASS 1,[9] A PASS 1,[9] A PASS 1,[29] A PASS 1,[29]

Low Temperature \ High Voltage A PASS 1,[9] A PASS 1,[9] A PASS 1,[29] A PASS 1,[29]

High Temperature \ Low Voltage A PASS 1,[9] A PASS 1,[9] A PASS 1,[29] A PASS 1,[29]

High Temperature \ High Voltage A PASS 1,[9] A PASS 1,[9] A PASS 1,[29] A PASS 1,[29]

13.16.1

Frequency error and phase error in GPRS multislot configuration --- ----- --- --- ----- --- --- ----- --- --- ----- ---

Normal Temperature \ Normal Voltage A PASS 1,[13] A PASS 1,[13] A PASS 1,[32] A PASS 1,[32]

Low Temperature \ Low Voltage A PASS 1,[13] A PASS 1,[13] A PASS 1,[32] A PASS 1,[32]

Low Temperature \ High Voltage A PASS 1,[13] A PASS 1,[13] A PASS 1,[32] A PASS 1,[32]

High Temperature \ Low Voltage A PASS 1,[13] A PASS 1,[13] A PASS 1,[32] A PASS 1,[32]

High Temperature \ High Voltage A PASS 1,[13] A PASS 1,[13] A PASS 1,[32] A PASS 1,[32]

Vibration X-Axis A PASS 1,[13] A PASS 1,[13] A PASS 1,[32] A PASS 1,[32]

Vibration Y-Axis A PASS 1,[13] A PASS 1,[13] A PASS 1,[32] A PASS 1,[32]

Vibration Z-Axis A PASS 1,[13] A PASS 1,[13] A PASS 1,[32] A PASS 1,[32]

Please refer to GSM test report Annex E section 2 for detailed information of the used terms and notes.

Page 54: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex E: Detailed Test VerdictsDate of Report: 2011-12-16 TOM 1.6.4.9 Page 7 of 8  Test Results of Shanghai Simcom Ltd. SIM5320AD

3GPP TS 51.010-1 Requirement GCF-CC (v3.44.1) GCF-CC (v3.44.1) NAPRD03 (v5.9) NAPRD03 (v5.9)

Test Case Test DescriptionGSM 900 GSM 1800 GSM 850 GSM 1900

Cat Verdict Notes Cat Verdict Notes Cat Verdict Notes Cat Verdict Notes

13.16.2-1

Transmitter output powerin GPRS multislotconfiguration - MS withpermanent or temporaryantenna connector

--- ----- --- --- ----- --- --- ----- --- --- ----- ---

NormalTemperature \Normal Voltage

A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[20],[28],[31],[32] A PASS 1,[20],[28],[31],[32]

Low Temperature\ Low Voltage

A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[20],[28],[31],[32] A PASS 1,[20],[28],[31],[32]

Low Temperature\ High Voltage

A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[20],[28],[31],[32] A PASS 1,[20],[28],[31],[32]

High Temperature\ Low Voltage A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[20],[28],[31],[32] A PASS 1,[20],[28],[31],[32]

High Temperature\ High Voltage A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[5],[8],[11],[13],[14],[17] A PASS 1,[20],[28],[31],[32] A PASS 1,[20],[28],[31],[32]

13.16.3

Output RF spectrum inGPRS multislotconfiguration

--- ----- --- --- ----- --- --- ----- --- --- ----- ---

NormalTemperature \Normal Voltage

A PASS 1,[13],[15] A 1,[13],[15] A PASS 1,[23],[32] A PASS 1,[23],[32]

Low Temperature\ Low Voltage

A PASS 1,[13],[15] A PASS 1,[13],[15] A PASS 1,[23],[32] A PASS 1,[23],[32]

Low Temperature\ High Voltage

A PASS 1,[13],[15] A PASS 1,[13],[15] A PASS 1,[23],[32] A PASS 1,[23],[32]

High Temperature\ Low Voltage A PASS 1,[13],[15] A PASS 1,[13],[15] A PASS 1,[23],[32] A PASS 1,[23],[32]

High Temperature\ High Voltage A PASS 1,[13],[15] A PASS 1,[13],[15] A PASS 1,[23],[32] A PASS 1,[23],[32]

13.17.1

Frequency error andmodulation accuracy inEGPRS configuration

--- ----- --- --- ----- --- --- ----- --- --- ----- ---

NormalTemperature \Normal Voltage

A PASS 1,[6],[13],[16],[18] A PASS 1,[6],[13],[16],[18] A PASS 1,[21],[24],[25],[32] A PASS 1,[21],[24],[25],[32]

Low Temperature\ Low Voltage

A PASS 1,[6],[13],[16],[18] A PASS 1,[6],[13],[16],[18] A PASS 1,[21],[24],[25],[32] A PASS 1,[21],[24],[25],[32]

Low Temperature\ High Voltage

A PASS 1,[6],[13],[16],[18] A PASS 1,[6],[13],[16],[18] A PASS 1,[21],[24],[25],[32] A PASS 1,[21],[24],[25],[32]

High Temperature\ Low Voltage A PASS 1,[6],[13],[16],[18] A PASS 1,[6],[13],[16],[18] A PASS 1,[21],[24],[25],[32] A PASS 1,[21],[24],[25],[32]

High Temperature\ High Voltage A PASS 1,[6],[13],[16],[18] A PASS 1,[6],[13],[16],[18] A PASS 1,[21],[24],[25],[32] A PASS 1,[21],[24],[25],[32]

Please refer to GSM test report Annex E section 2 for detailed information of the used terms and notes.

PASS

Page 55: GSM PARTIAL TEST REPORT - ООО "Гамма" · PDF fileNo. Description PASS FAIL INC PASS FAIL INC PASS FAIL INC ... TBF establishment/release and DCCH related procedures 0 0 0 0

This report shall not be reproduced except in full without the written approval of CETECOM Shanghai© Copyright ♦ All rights reserved by CETECOM Shanghai

Mobile Communications Building 3,No.1500, Zuchongzhi Road

201203 Shanghai · China

Partial GSM Test Report No. SH_GT_305651REV1Annex E: Detailed Test VerdictsDate of Report: 2011-12-16 TOM 1.6.4.9 Page 8 of 8  Test Results of Shanghai Simcom Ltd. SIM5320AD

3GPP TS 51.010-1 Requirement GCF-CC (v3.44.1) GCF-CC (v3.44.1) NAPRD03 (v5.9) NAPRD03 (v5.9)

Test Case Test DescriptionGSM 900 GSM 1800 GSM 850 GSM 1900

Cat Verdict Notes Cat Verdict Notes Cat Verdict Notes Cat Verdict Notes

13.17.2

Frequency error undermultipath andinterference conditions inEGPRS conditions

--- ----- --- --- ----- --- --- ----- --- --- ----- ---

NormalTemperature \Normal Voltage

A PASS 1,[7],[10],[13] A PASS 1,[7],[10],[13] A PASS 1,[27],[30],[32] A PASS 1,[27],[30],[32]

Low Temperature\ Low Voltage A PASS 1,[7],[10],[13] A PASS 1,[7],[10],[13] A PASS 1,[27],[30],[32] A PASS 1,[27],[30],[32]

Low Temperature\ High Voltage A PASS 1,[7],[10],[13] A PASS 1,[7],[10],[13] A PASS 1,[27],[30],[32] A PASS 1,[27],[30],[32]

High Temperature\ Low Voltage

A PASS 1,[7],[10],[13] A PASS 1,[7],[10],[13] A PASS 1,[27],[30],[32] A PASS 1,[27],[30],[32]

High Temperature\ High Voltage

A PASS 1,[7],[10],[13] A PASS 1,[7],[10],[13] A PASS 1,[27],[30],[32] A PASS 1,[27],[30],[32]

13.17.3-1

EGPRS Transmitteroutput power- MS withpermanent or temporaryantenna connector

--- ----- --- --- ----- --- --- ----- --- --- ----- ---

NormalTemperature \Normal Voltage

A PASS 1,[11],[13] A PASS 1,[11],[13] A PASS 1,[31] A PASS 1,[31]

Low Temperature\ Low Voltage A PASS 1,[11],[13] A PASS 1,[11],[13] A PASS 1,[31] A PASS 1,[31]

Low Temperature\ High Voltage A PASS 1,[11],[13] A PASS 1,[11],[13] A PASS 1,[31] A PASS 1,[31]

High Temperature\ Low Voltage

A PASS 1,[11],[13] A PASS 1,[11],[13] A PASS 1,[31] A PASS 1,[31]

High Temperature\ High Voltage

A PASS 1,[11],[13] A PASS 1,[11],[13] A PASS 1,[31] A PASS 1,[31]

13.17.4

Output RF spectrum inEGPRS configuration --- ----- --- --- ----- --- --- ----- --- --- ----- ---

NormalTemperature \Normal Voltage

A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[22],[25],[26],[32] A PASS 1,[22],[25],[26],[32]

Low Temperature\ Low Voltage A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[22],[25],[26],[32] A PASS 1,[22],[25],[26],[32]

Low Temperature\ High Voltage

A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[22],[25],[26],[32] A PASS 1,[22],[25],[26],[32]

High Temperature\ Low Voltage

A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[22],[25],[26],[32] A PASS 1,[22],[25],[26],[32]

High Temperature\ High Voltage

A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[12],[13],[16],[19],[33] A PASS 1,[22],[25],[26],[32] A PASS 1,[22],[25],[26],[32]

Please refer to GSM test report Annex E section 2 for detailed information of the used terms and notes.