goddard space flight center ground system supply chain ... · ground system supply chain...

16
Goddard Space Flight Center Ground System Supply Chain Requirements Flow-Down for the Joint Polar Satellite System Tim Bowser Chief Safety and Mission Assurance Officer October 22, 2014 https://ntrs.nasa.gov/search.jsp?R=20150000297 2019-04-29T20:09:42+00:00Z

Upload: nguyendat

Post on 30-Apr-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

Ground System Supply Chain Requirements Flow-Down for

theJoint Polar Satellite System

Tim BowserChief Safety and Mission Assurance Officer

October 22, 2014

https://ntrs.nasa.gov/search.jsp?R=20150000297 2019-04-29T20:09:42+00:00Z

Page 2: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

JPSS-n

GCOM-n

TDRS

StoredMission Data

TelemetryTracking & Control

Legend:RetainIntermediateproduct (RIP)

DataQuality Report

Mission SupportData

GCOM@ KSAT

GCOMSMDWSC

FieldTerminals

JPSS Ground System B2.0 Operational Flows OV-1

FieldTerminals

Jul 14, 2014

HRDLRD Operations

Coordination

Launch Support, Commissioning & Contingency(Example of Use)

MSDFDF

Ancillary Data,ODAD,SDAD

EUMETSATOps & DP

xDRs / Metadata

X-BandKa-Band

X-Band

X-Band

S-Band

X-Band

NWS TG (NOAA)

FNMOCSCaN / NASA POP

Joint Polar Satellite System (JPSS) Ground System

Provides Enterprise Management & Ground Operations, Flight Operations, Data Acquisition, Data Routing, Data Product Generation,

Data Product Cal/Val and Direct Readout Support services

Joint Polar Satellite System (JPSS) Ground System

Provides Enterprise Management & Ground Operations, Flight Operations, Data Acquisition, Data Routing, Data Product Generation,

Data Product Cal/Val and Direct Readout Support services

NASACOR

CMDCryptoKeys

GPS

OtherLCFs (inc.

STAR)

AlgorithmUpdates

NASA/NSF @ McMurdo

LaunchSupport

NESDIS/ESPC

(NOAA)

X-Band

DMSP-Fn

Metop-n

SuomiNPP

X-Band

Coriolis / WindSat

Security

DMSPOps

(NOAA /6 SOPS)

WindSat DP

(FNMOCvia DISA)

DMSP DP(AFWA)

CLASS(NOAA)

CoriolisOps

(NRL BP)

SDS

GCOMOps

(JAXA)

WOTIS

CERES DP(LaRC)

CERESRDRs only

APsonly

NSF @ CO

NSFinternetservices

EOS/NASAMissions

X-BandNASA

@ KSAT

SMD Backup

CARA

AFWANAVO-CEANO

APsonly

GCOMSDR

SSN / ISNs

Page 3: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

Where did we start?

• Started with a Standard Flight MAR• Converted to a JPSS Ground Specific MAR• Incorporated Code 300 Ground MAR Recommendations• Put JPSS Ground MAR on contract with Raytheon Common

Ground System (CGS)• Flow down appropriate MAR sections to Raytheon

Subcontractors• Verified flow down through Raytheon Subcontractor SOW’s

and MAIP Compliance Matrices• Performed Independent NASA Audits (Code 302 and On-site)• Applied Lessons Learned and Updates

Page 4: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

Flow Down

•JPSS Ground Mission Assurance Requirements (MAR) Doc # 474-00177• Applicable to the following JPSS Ground development entities:

• Raytheon Common Ground System (CGS)• Data Products Engineering & Services (DPES), Government Resource for Algorithm

Verification, Independent Testing, and Evaluation (GRAVITE), Field Terminal System (FTS)

• JPSS Flight Vehicle Simulator (FVS) and Flight Vehicle Test Suite (FVTS)

•JPSS Ground Mission Assurance Implementation Plan (MAIP)•Defines common approach/activities “How To” document and each element above has its individual MAIP

• Includes MA objectives and fundamental• Provides reference to subordinate MA/QA plans• Describes organization structure and roles and responsibilities• Implementation enforced via the MAR compliance matrix• Data Item Description (DIDs) as applicable to the JPSS Ground MAR

• Supplier MAR Compliance Matrix also flown down and verified• Updates being provided as required

Page 5: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

Provisions

•JPSS Ground MAR Provisions

• Increased Quality involvement in JPSS Ground System

• MAR applicable to Prime & subcontractors

• Support NASA conducted audits, assessments, or surveys

• Comprehensive System Safety, RMA, and Software Assurance programs

• Participation in NASAs Integrated Independent Review Program

• MRB membership including Government representative as a voting member

• GIDEP & NASA Alert assessments

• Mishap reporting and investigation

• Calibration and ESD

• Comprehensive End Item Data Package

• GSFC ‘Gold Rules’

• Participation in risk management process

• Supplier Quality

Page 6: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

Verification

• NASA Code 302 Audit of Raytheon/Aurora Common Ground System-June 2013 and 2014• NASA MA In-Plant Software and Hardware Assurance Oversight and Internal Audit• Fairbanks Command and Data Acquisition Station (FCDAS) Antenna Installation

• Pre-Ship Review at L3/ Datron, Simi Valley, CA• Oversight to the successful installation and site acceptance testing of the new “4A”

antenna, Fairbanks, Alaska• Svalbard, Norway (KSAT)

• SG-60 Installation• Participation in the PSR of new receptors planned for Svalbard (SG-60)• Oversight to the successful installation and site acceptance testing

• SG-4 Refurbishment• L3/Datron Gear replacement for SG-4

• Participation in planning/coordination discussions• Review of safety procedures• Safety and Mission Assurance Oversight during installation

• Raytheon Common Ground System Block 2.0 Hardware shipment/receipt/installation

• GRAVITE, FVS and FVTS upgrades

Page 7: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

SMA Facility OversightNOAA Satellite Operations Facility (NSOF)

• Monitoring of ongoing GSA conducted facility improvement efforts - On-site x-raying evaluation survey to

verify safety procedures and precautions

- Data Center Core Drilling- Installation of pipes

• Review of ESD procedures• Receipt/Inspection/Placement of Block 2.0

Hardware• Hardware Installation and audits

Page 8: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

SMA Facility OversightNOAA Satellite Operations Facility (NSOF)

Interface Data Processing Segment (IDPS)

Command, Control and Communications Segment (C3S)

GRAVITE Servers

NASA and Raytheon Safety and Mission Assurance witnessed all installation of new equipment and continuously monitors existing equipment in concert with NOAA facilities management and safety.

Page 9: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

Key Supplier Site Visits and Partnerships between Raytheon/NASA/Vendors

Situational Awareness and Improved Communications on Network Services

Page 10: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

• Performed independent safety oversight of Fairbanks Receptor Deployment and Installation

• Lessons Learned from this antenna installation captured to assist in the SG60 Antenna Installation in Svalbard, Norway

• Review of site safety hazards and mitigations for future activities

4A Antenna Installation NOAA Gilmore Creek Fairbanks, Alaska

July 2013

Page 11: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

4A Antenna Installation NOAA Gilmore Creek Fairbanks, Alaska

July 2013

L3/Datron Installed. Raytheon Site Acceptance. NASA SMA witness.

Page 12: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

L3/Datron Installed. Raytheon Site Acceptance. NASA SMA witness.

SG-60 Antenna Installation Svalbard, NorwayAugust 2013

Page 13: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

SG-4 Antenna Refurbishment May 2014

Kongsberg Satellite Services (KSAT)Svalbard, Norway

Page 14: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

SG-4 Antenna Refurbishment May 2014

• Replace 6 Gears

• 2-Elevation, 2-Azimuth, 2-3rdAxis

• Replace 6 Brushless Servo motors

• 2-Elevation, 2-Azimuth, 2-3rdAxis

• Replace 3 Servo Cabinets

• Elevation, Azimuth, 3rd Axis Servo Cabinets

• Replace 1 DEU

• Replace 1 Tracking Receiver

• Clean and Dress Bull Gears

• Perform scheduled maintenance

Page 15: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

SG-4 Antenna Refurbishment May 2014

Removal of Elevation gear and motor

Page 16: Goddard Space Flight Center Ground System Supply Chain ... · Ground System Supply Chain Requirements Flow-Down for the ... Commissioning & Contingency ... SMD Backup CARA NAVO- AFWA

Goddard Space Flight Center

Summary

• Developed Safety and Mission Assurance Requirements for a Significant Ground System that covers several missions

• Infused Safety, Quality, Reliability, Availability and Maintainability into typical COTS type products

• Identified and Mitigated 77 Safety Critical Hazards, 5 of which included Flight Commands and Controls

• Eliminated Single Points of Failure through Ground Availability Reliability Working Groups (FTA’s/FMECA’s)

• Validated and Verified the Implementation of the Mission Assurance Requirements Flow Down to Prime, Subcontract and Site Support Contractors

• Witnessed Deployments to Assure Quality and Ensure Safety