gilreath diving into the details apwa_presentation_final

32

Upload: florida-public-works-expo-2016-tampa-florida

Post on 16-Apr-2017

94 views

Category:

Government & Nonprofit


4 download

TRANSCRIPT

Page 1: Gilreath diving into the details apwa_presentation_final
Page 2: Gilreath diving into the details apwa_presentation_final

Final deliverable to provide pre-con and post-con GIS asset inventory

4 mile stretch of SR 836 for MDX improvements

Included as a sub to the design/build team

Page 3: Gilreath diving into the details apwa_presentation_final

MDX 5 Year Work Program

TIP• Planning• Capacity• ITS • ORT

CIP• Asset

Upgrades• No roads • No facilities

R&R• Maintenance• Emergency

repairs• Improvements

Page 4: Gilreath diving into the details apwa_presentation_final

MDX 5 Year Work Program Funding Priorities

MDX Systematic Safety Program

System Preservation

Mobility Improvements

• Reduce traffic crashes and injuries• Funds allocated to every MDX

project

• Preserve roadways and bridges• Annually funds renewal and

replacement projects

• Reduce congestion by adding capacity

• Increase capacity by expanding current network

• Funded after safety and system preservation projects

Page 5: Gilreath diving into the details apwa_presentation_final
Page 6: Gilreath diving into the details apwa_presentation_final

SR 836 Operational, Capacity & Interchange Improvements (83628)

Page 7: Gilreath diving into the details apwa_presentation_final

• ORT Conversion

• Exit/entrance conversions

• Divergent Diamond • Express bus service

“Connectivity, Technology, & Transit”

Page 8: Gilreath diving into the details apwa_presentation_final

Phase I

Our Role

Capture Collaboration

Page 9: Gilreath diving into the details apwa_presentation_final

Special Considerations

• Multiple Agency assets

• Environmental aspects

• Major E-W commuter route

Page 10: Gilreath diving into the details apwa_presentation_final

PROJECT COORDINATION

COLLABORATION

DATA MANAGEMENT

DATA EXPANSION

PROJECT DELIVERABLES

Page 11: Gilreath diving into the details apwa_presentation_final

Phase I• Laser scan completed April 2015• Construction started October 2015

Our Role

Page 12: Gilreath diving into the details apwa_presentation_final

Our Role

Phase I - Standard MDX attribute fields

• Unique ID• MDX Route ID• Mile Marker • Lat/Long

Page 13: Gilreath diving into the details apwa_presentation_final

Data Overview

Roadways & Ramps

Page 14: Gilreath diving into the details apwa_presentation_final

Data Overview

• Guardrails• Guardrail Type• Nodes• Beginning/End

attachment type

Page 15: Gilreath diving into the details apwa_presentation_final

Data Overview

• Walls• Wall Type, Height• Attenuators• Type

Page 16: Gilreath diving into the details apwa_presentation_final

Data Overview

• Fences/Gates• Height, Type

Page 17: Gilreath diving into the details apwa_presentation_final

Data OverviewFences/Gates

Page 18: Gilreath diving into the details apwa_presentation_final

Data Overview• Sign Supports/Panels

Page 19: Gilreath diving into the details apwa_presentation_final

Data Overview• Sign Supports/PanelsLighted

Linked & Listed

Page 20: Gilreath diving into the details apwa_presentation_final

Data Overview

ORT structures treated as sign supports

Page 21: Gilreath diving into the details apwa_presentation_final

Data Overview• Drainage Structures• Pipes/Outfalls

Page 22: Gilreath diving into the details apwa_presentation_final

Data Overview

• Lighting• Type, Height,

Support• Power Supply

Page 23: Gilreath diving into the details apwa_presentation_final

Data Overview

Page 24: Gilreath diving into the details apwa_presentation_final

Data Overview

• ITS/ ORT Devices• Detailed attributes• Supporting Poles• Support/Cabinet ID

Page 25: Gilreath diving into the details apwa_presentation_final

Data Overview

• MDX 5-Yr Plan

• ITS/ORT• Detailed

data• Physical• Financial• Detectives• As-builts, survey

Page 26: Gilreath diving into the details apwa_presentation_final

Data Overview

Page 27: Gilreath diving into the details apwa_presentation_final

Phase I Overview• 1,683 asset locations & info added• 4,668 total baseline assets• 342 assets removed

Page 28: Gilreath diving into the details apwa_presentation_final

Phase II Overview

• Concurrent project work • Post project scan

PROJECT COORDINATION

COLLABORATION

DATA MANAGEMENT

DATA EXPANSION

PROJECT DELIVERABLE

S

• Team Coordination • Final review &

acceptance

Page 29: Gilreath diving into the details apwa_presentation_final

Phase II Overview

• Completion Date & Required MDX data• Capital Asset Financial Code• Asset Costs

“Soft” Cost Direct Construction CostIndirect Construction Cost

Asset Cost =

Page 30: Gilreath diving into the details apwa_presentation_final

Phase II Overview• Soft Cost• Design services• Direct Cost• Cost of the asset itself• Indirect Cost• Mobilization, clearing/grubbing, MOT, etc.

“Soft” Cost Direct Construction CostIndirect Construction Cost

Asset Cost =

Page 31: Gilreath diving into the details apwa_presentation_final

Phase II Overview

• Concurrent project work • Post project scan

• Team Coordination • Final review &

acceptance

PROJECT COORDINATION

COLLABORATION

DATA MANAGEMENT

DATA EXPANSION

PROJECT DELIVERABLE

S

Page 32: Gilreath diving into the details apwa_presentation_final

John Gilreath GISPDRMP GIS [email protected]