getting the most from your team outline

5
The Stockholm Syndrome Is Not a Management Technique Office politics Stress from annual budget process tweaks team dynamics How to Get the Most Out of Your Project Team yright © 2012 Tom Noble. All rights reserved.

Upload: tomnoble

Post on 07-Aug-2015

131 views

Category:

Business


0 download

TRANSCRIPT

The Stockholm SyndromeIs Not a Management Technique

Office politics Stress from annual budget process tweaks team dynamics

How to Get the Most Out of Your Project Team

Copyright © 2012 Tom Noble. All rights reserved.

Six Phases of a Project

1. Planning, Space Programming

2. Conceptual Design

3. Schematic Design

4. Design Development

5. Construction Documents

6. Construction Administration

Copyright © 2012 Tom Noble. All rights reserved.

The “Other” Six Phases of a Project

1. Enthusiasm

2. Disillusionment

3. Panic

4. Search for the Guilty

5. Punishment of the Innocent

6. Praise and Honors for the Non-Participants

Copyright © 2012 Tom Noble. All rights reserved.

Presentation Outline

“Living the Dream:”Healing the sick,

saving the dying,

bringing signature projects to life.

Ooh, ah. Economic Downturn and Healthcare Reform Increase Pressure to

Get More for Less

What Does Project Humor Tell Us About Project Reality?

Tools, Techniques, Team?

Leadership

Copyright © 2012 Tom Noble. All rights reserved.

The remainder of this material is designed to support the personal presentation of the principles and insights. Please contact Tom Noble if you wish to explore this study further.

Copyright © 2012 Tom Noble. All rights reserved.