geotech rpt geophys & geol survs madoc tp · geotechnical report 010 geophysical and geological...

60
31C11SW2002 2.20360 MADOC GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 Madoc Township, Hastings County, Ontario prepared by Lloyd G. D. Thompson, B.A.Se., M.Se., Ph.D., P.Eng. Completed for OPAP Grant No. OPG 99-136 - January 15, 20000 Reformatted for claim assessment work - April 15, 2000 Qualified Person and Supervisor of Surveys: Dr. Lloyd G. D. Thompson, P.Eng, Geophysicist (Retired) Claim Owner: Surface Rights - Mineral rights - Dr. James L. Walsh 23 North Street, Perth, Ontario Dr. Lloyd G. D. Thompson RR 3, Tweed, Ontario KOK 3JO 2-2036 O

Upload: others

Post on 08-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

31C11SW2002 2.20360 MADOC

GEOTECHNICAL REPORT010

GEOPHYSICAL AND GEOLOGICAL SURVEYSMining Claim No. 1077464

East Half Lot 5, Concession 6 Madoc Township, Hastings County, Ontario

prepared by

Lloyd G. D. Thompson, B.A.Se., M.Se., Ph.D., P.Eng.

Completed for OPAP Grant No. OPG 99-136 - January 15, 20000 Reformatted for claim assessment work - April 15, 2000

Qualified Person and Supervisor of Surveys: Dr. Lloyd G. D. Thompson, P.Eng, Geophysicist (Retired)

Claim Owner: Surface Rights -

Mineral rights -

Dr. James L. Walsh23 North Street, Perth, Ontario

Dr. Lloyd G. D. ThompsonRR 3, Tweed, Ontario KOK 3JO

2-2036 O

Page 2: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

31C11SW2002 2.20360

TABLE OF CONTENTS

MADOC 010C

PageI. SUMMARY lII. INTRODUCTION 2

A. General 2B. Project Location 2C. Access 2D. Geology 2

III. GRID SURVEY 3IV. GEOLOGICAL MAPPING AND SAMPLING 4

A. Work Done 4B. Results 4

V. ELEVATION SURVEY 5A. Purpose 5B. Instrumentation 5C. Work Done 5D. Results 6

VI. MAGNETOMETER SURVEYS 6A. Purpose 6B. Instrumentation 6C. Magnetic Surveying Work Done 6D. Magnetic Profiling Results 7

VII. GRAVITY METER SURVEYING 8A. Purpose 8B. Instrumentation 8C. Gravity Surveying Work Done 9D. Gravity Profiling Results 10

VIII. SURFACE SAMPLE ANALYSIS 11A. Work Done 11B. Analysis Results 11

I.. FINAL RESULTS AND CONCLUSIONS 11.. FINAL RECOMMENDATIONS 12.I. REFERENCES 13.II. APPENDIX A - Qualifications of Dr. L. Thompson 14.III. APPENDIX B - Value of Assessment Work Done 16

Page 3: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

LIST OF ILLUSTRATIONS AND TABLES

Figure 1.

Figure 2. Figure 3.

Figure 4.

Figure 5.

Figure 6.

Figure 7.

Figure 8.

Figure 9.

Figure 10.

Figure 11.

Figure 12.

Figure 13.

Figure 14.

Figure 15.

Figure 16.

Figure 17 .

Figure 18.

Figure 19.

Follows PageKey Topographic Map Showing Location of Project Area 2 Location of Project Area on Madoc Claim Map 2 Claim Map Showing Location of Project Grid Area, Traverse Lines, Survey Stations and Topographic Features 2 Detailed Map of Survey Grid Area Showing Grid and Traverse Lines, Line Cutting Survey Stations, Rock Sample Locations, Auger Holes and Topographic Features 2 Geological Map of Survey Grid Area with Topographic Features 4 Elevation Contour Map with Some Topographic Features 6 Reconnaissance Magnetic Anomaly Profiles for Traverse Lines 50, 250 and 450 Looking North 7 Reconnaissance Magnetic Anomaly Profiles for Traverse Lines 650, 850, 1050 and 1250 Looking North 7 Computer Shaded Contour Map of Reconnaissance Magnetic Anomaly Data (North Lot Line is to Left on the Sheet) 7 Hand-drawn Contour Map of Reconnaissance Magnetic Anomaly Data 7 Detailed Magnetic Anomaly Profile for Traverse Line 50 with Elevation Profile and Surface Geology Looking North 7 Detailed Magnetic Anomaly Profile for Traverse Line 250 with Elevation Profile and Surface Geology Looking North 7 Detailed Magnetic Anomaly Profile for Traverse Line 450 with Elevation Profile and Surface Geology Looking North 7 Detailed Magnetic Anomaly Profile for Traverse Line 650 with Elevation Profile and Surface Geology Looking North 7 Detailed Magnetic Anomaly Profile for Traverse Line 850 with Elevation Profile and Surface Geology Looking North 7 Detailed Magnetic Anomaly Profile for Traverse Line 1050 with Elevation Profile and Surface Geology Looking North 7 Detailed Magnetic Anomaly Profile for Traverse Line 1250 with Elevation Profile and Surface Geology Looking North 7 Detailed Magnetic Anomaly Profile for Traverse Line 1600 Looking East 7 Bouguer Gravity Anomaly Profiles for Traverse Lines 50 and 250 with Peak Magnetic Anomaly Locations and Surface Geology Looking North 10

(continued)

Page 4: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure 20. Bouguer Gravity Anomaly Profile for Traverse Line 450 with Peak Magnetic Anomaly Locations and Surface Geology Looking North 10

Figure 21. Bouguer Gravity Anomaly Profile for Traverse Line 650 with Peak Magnetic Anomaly Locations and Surface Geology Looking North 10

Figure 22. Bouguer Gravity Anomaly Profile for Traverse Line 850 with Peak Magnetic Anomaly Locations and Surface Geology Looking North 10

Figure 23. Bouguer Gravity Anomaly Profiles for Traverse Lines 1050 and 1250 with Peak Magnetic Anomaly Locations and Surface Geology Looking North 10

Table 1. Reconnaissance Magnetometer Survey Readings 7Table 2. Detailed Magnetometer Survey Readings 7Table 3. Gravity Meter Observations 9Table 4. Gravity Survey Data Reduction 10Table 5. Surface Sample Density Analysis Results 11

Page 5: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

GEOTECHNICAL REPORT

GEOPHYSICAL AND GEOLOGICAL SURVEYSMining Claim No. 1077464

East Half Lot 5, Concession 6 Madoc Township. Hastings County, Ontario

by

Dr. Lloyd G. D. Thompson, P.Eng.

APRIL 15, 2000

I. SUMMARY

Exploration work done on the subject claim from May 14, 1999 to January 21, 2000 included:

1. A survey grid 800 ft X 1200 ft with 100 ft E-W spacing and 200 ft N-S spacing established relative to the claim and township property boundary lines and Lot and Concession lines. This grid required 8950 ft (2.73 km or 1.69 mi) of line cutting and the placing of 70 pickets.

2. A preliminary geological survey of the grid area.

3. A first order elevation survey of 60 stations in the grid area covering a distance of 5200 ft (1.59 km or 0.98 mi).

4. A reconnaissance magnetic survey with stations at 100 ft intervals along 7 traverse lines across the grid area. This covered a distance of 5200 ft (1.59 km or 0.98 mi) with 59 stations.

5. A detailed magnetic survey with stations at 50 ft intervals along 7 traverse lines across the grid area. This covered a distance of 6250 ft (1.91 km or 1.18 mi) with 132 stations.

6. A gravity survey with stations at 100 ft intervals along7 traverse lines across the grid area. This covered a distanceof 5200 ft (1.59 km or 0.98 mi) with 59 stations.

7. Identification and density analysis of 37 rock samples taken as part of the geological survey.

8. Data processing and report preparation.

Page 6: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

II. INTRODUCTION

A. GENERAL

The objective was to perform geophysical surveys over as much as possible of the central area of the property that contains a "granite" ridge in contact with carbonate rock which could host a new hematite deposit. Magnetic and gravity surveys were included as well as geological and topographical mapping and sample analysis.

This work project was labour intensive especially on the part of the claim holder since the work was geophysical and geological surveying. He had to do much of the line cutting as well as doing the professional surveying. The line cutting was particularly difficult since the hedge rows and bush areas had accumulated over 100 years of growth and piled up dead trees and brush. Even in the open fields, which had been planted with pine trees, the weeds were as high as a man and had to be cut with a gas brush cutter. The grid lines had to be cleared about 5 ft wide to allow passage of the gravity meter in its bulky and heavy carrying frame. In some instances, it took 2 persons a half day to cut through a 40 ft wide hedge row. In other instances of heavy forest/bush, only about 200 ft could be cleared in one day.

B. PROJECT LOCATION

The key location of the project area is shown in Figure l which is a portion of NTS map sheet 31C/11 West, Kaladar. The area is at Latitude 44 deg. 31 min. 40.6 sec. North and Longitude 77 deg. 28 min. 36.4 sec. West. The project exploration area is within the East Half of Lot 5, Concession 6, Madoc Township, Hastings County, Ontario as shown in Figure 2 which is part of the Madoc Township claim map. The Half Lot is held as mining claim No. 1077464 by the author. The location of the project survey grid with relation to the lot and claim boundaries with the traverse lines, survey stations, access road and other topo graphic features is shown in Figure 3. A detailed map of the survey grid area showing the grid and traverse lines, line cutting, survey stations, rock sample and auger hole locations and topographic features is shown in Figure 4.

C. ACCESS

From Madoc on Highway 7, take Highway 62 north about 1.2 mi. (2 km.) to Riggs Road. Turn right and go about O.6 mi. (l km.) to an entrance to the property.

D. GEOLOGY

The project claim area has not been geologically mapped in any detail. ODM map 2154 shows a small granite outcrop with an inferred narrow band of granite with nearly vertical dip trending south on to the East Half of Lot 4. A small hematite pit is shown on the south part of the granite. ODM GR No. 73 reported

Page 7: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

302.000m.E. 05 0 4

Surveyed, compiled, drawn and printed by Ihe Army Survey Est., R C.E. 1945 Aerial photography by R C.A.F.. 1946-48Converled from the first edition or Ihe 1:63360 map to 1:50000 by Ihe AS E. 1950.

3/C///IVEST K A LAD A R

Scale 1:50,000 l

loon SOP

looo va ol t-| M i-t l-j i-l

Page 8: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure Uo. 2 Location of Project Areaon MaH o c Claim Map

VI VIIMADOC

ntingdon Twp. MA p J999

Page 9: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

TOWNS H IP X '/Z LOTS', CowciTSS'ON 6

HO. /O 7 7464 M. R, o.

Figure No. Claim Map Showing Location of Project Grid Area, Traverse Liner;, Survey Stations and Topographic Features

Page 10: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

iMo. 4 Detailed Mfip o l Purvey uriu Aroa Showing Grid and Traverse Lines, Line Cutting Survey Stations, Rock Sample Locations, Auger Holes and Topographic Features

GRIPJ-ZGEND

or LOT (FT)

s &M PL eSCALE: l :r-

(TJ 72*

SHAPOYV S?L.G.O.TDEC. '99

Page 11: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

this as an open cut which had a narrow band of hematite-bearing carbonate rock in contact with granite on the west side. To the south on the East Half of Lot 4, there is a large area of amphibolite which contained the old St. Charles iron mine which produced hematite ore up to 1899. On the east boundary of the claim Lot, a small outcrop of Shadow Lake limestone is shown on Woods Road. Further south and to the northeast are large areas of Shadow Lake limestone (basal conglomerate). To the west is a large area mapped as marble.

III.

A survey grid of the project area had to be established prior to performing other project work. The area of interest for surveying was a "granite" ridge just west of the centre of the Lot with a north-south trend. It contains an old large pit and numerous small pits and blasted areas. The north-east Lot corner and the north Lot line were the only clear references for measuring purposes. From the northeast Lot corner along the north Lot line, the "granite" ridge is contained between the 1000 ft and 1400 ft marks. The entrance to the property is at 1200 ft. On examination of the property, it was found that lines from the 800 ft mark to the 1600 ft mark would adequately give survey traverse line profiles across the outcrop ridge. The objective was to run a series of traverse lines across the ridge to cover as much of the ridge as possible from the north Lot line in order to locate areas of mineral interest for further detailed investigation. On this basis, a 200 ft interval for the traverse lines was selected which gave a basic 200 ft grid. Survey stations along the traverse lines were to be at 100 ft intervals. The grid was set up with the traverse lines parallel to the north Lot line as shown in Figures 3 and 4. The base grid line was established 50 ft south of the north claim line with stations at 100 ft intervals. The 1200 ft station was taken as the survey base station. The 1200 ft line was established as the main north-south base line with stations every 100 ft so far as possible. Also the stations along the west grid line at 1600 ft were established at 100 ft intervals. The grid was expanded to establish traverse lines at 250 ft, 450 ft, 650 ft, 850, 1050 ft and 1250 ft. from the north Lot line. The 1250 line ran into a steep bluff at the edge of a large pond at 1200 ft and could not be extended further. Since additional lines to the south would also run into the pond, the grid was stopped at the 1250 traverse line. At several locations (see Figure 4) the squaring of the grid was checked with diagonal lines. A total of 70 survey pickets were established to give 59 grid survey stations along the 7 traverse lines. The grid work was done on 22 days on May 14, June 16 and from Aug. 16 to Sept.20, 1999 by the claim holder and l helper. It required 8950 ft (1.7 mi or 2.7 km) of line cutting, chaining and picketing.

Page 12: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

IV. GEOLOGICAL MAPPING AND SAMPLING

A. WORK DONE

The geological mapping was just for general reconnaisance mapping and particularly to note the geology along the traverse lines. Some geological mapping and sampling was done during the other field survey work. More specifically the field mapping and sampling were done by the claim holder on 5 separate days on Sept.27, Oct.27 5, 29, Nov. 17, and Dec. 29, 1999. In addition, sample identification was done on 6 days on Aug. 28, Sept l 6 8, Nov. 9 6. 12 and Dec. 4, 1999. Pam Sangster and Chris Papertzian, Resident and District Geologists, MNDM, Tweed inspected the property on Oct. 27,199 to assist in the identification of the geology. Samples of the various rock types and mineralized material (hematite/magnetite) were taken at locations shown on Figure 4. Of the numerous samples taken, density (Specific Gravity) measurements were made on 36 samples which are reported in a later section "Surface Sample Analysis".

B. RESULTS

The most significant geological finding was that the "granite" proved to be actually rhyolite. This was determined by Pam Sangster and Chris Papertzian, MNDM, Tweed. Although the weathered surface of the outcrop ridge did look like granite, samples showed that the rock was very fine grained with a conchoidal-like fracture and varied from light red on the west side to dark red in the central part to black on the east side. This was the same as the known rhyolite belt exposed 1.5 miles (2.4 km) further north on Highway 62. Ms Sangster also suggested the possibility that the rhyolite could be the responsible agent for creating the hematite and magnetite mineralization.

The results of the geological mapping of the survey grid area are shown in Figure 5. This is a preliminary reconnaissance map only and is very general in nature. A significant feature is the presence of an outcrop area of amphibolite in the northwest corner of the grid area that was not previously mapped. Some small pits have been blasted at the contact of the amphibolite and the red rhyolite which produced samples with compact hematite and magnetite. On the east side of the ridge a carbonate band was identified by a series of small pits traced from the old pit and a bluff of exposed carbonate. Dark red rhyolite was on the west side of the carbonate band but black rhyolite was on the east side. Earthy hematite appeared to form at the sides of the carbonate zone with minor magnetite on the west side and much more magnetite in the black rhyolite on the east side. South of the old pit there appears to be a fault or erosional feature where the old trail is located since the high ridge with the old pit ends just past the 1050 traverse line. At the northeast corner of the grid area there is a high knoll with an outcrop of Shadow Lake Sandstone. Also there is an outcrop knoll of Shadow Lake Limestone at the old farm house on the east side of the Lot. It appears that much of the higher ground east of the grid area

Page 13: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 5 Geological Map of SurveyGrid Area with Topographic Features

tx^ rea o p 0L u rt-

Page 14: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

could contain Shadow Lake over the Precambrian rocks.

As shown in Figure 4, an auger hole was drilled at grid location 100+1600 to check the continued extension and dip of the amphibolite outcrop surface shown in Figure 5. Bedrock was at 3"2" indicating the amphibolite continued at about the same dip. On Line 250 at the 1050 ft mark, an auger hole through relatively flat overburden hit bedrock at 3'5" indicating only a shallow soil cover (see Figure 12). On line 450 at the 1050 ft mark, an auger hole was drilled through overburden near the base of a steep slope of black rhyolite. Bedrock was at only 10" indicating the black rhyolite continued at the same steep slope (see Figure 13). The surface geology along each traverse line is marked on the elevation profile shown in Figures 11 through 17.

V. ELEVATION SURVEY

A. PURPOSE

The elevation survey was done primarily for the gravity survey which requires first, order levelling of the gravity stations to 0.01 ft. for the reduction of gravity data to Bouguer anomalies. It was also to provide a correlation between an elevation horizon on outcrop slopes and mineral bearing zones. Also it was to provide information about the elevation at which Shadow Lake paleozoics overlay the precambrian rocks.

B. INSTRUMENTATION

A T.H.S. Co. Theodolite Model No. 165-40993 provided by the claim holder was used for the survey.

C. WORK DONE

Prior to starting the elevation survey, a Bench Mark elevation was established using a Geodetic Positioning System (GPS). For a Bench Mark station, the Shadow Lake outcrop at 50+1100 was selected. From a series of measurements at the four Lot corners and the Bench Mark outcrop, the B.M. coordintes were averaged at 44 degrees, 31 minutes, 40.6 seconds North and 77 degrees, 28 minutes, 36.4 seconds West. The B.M. elevation was averaged at 669.5 ft but for convenience was taken as 670.0 ft. This work was done on May 14 and Oct. 25,1999 by the author.

The elevation surveying was actually done after the gravity meter survey had been done. This was because the gravity meter stations could not be exactly at the grid survey stations and the elevations had to be at the gravity stations. The elevation survey is considered first in the report because the elevation profiles are used in conjunction with the magnetic anomaly profiles. Elevations were observed at gravity stations at 100 ft intervals along each of the traverse lines. These data were used for an elevation contour map and elevation profiles along the traverse lines as well as for gravity data reduction. This work was done by the claim holder with one helper on 3 days on Oct.

Page 15: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

25,26 and 28, 1999. Data processing was done by the claim holder on 3 days on Oct. 30, Nov. l and Nov. 10, 1999. A total of 59 stations were surveyed over a distance of 5200' (0.98 mi or 1.59 km) .

D. RESULTS

The actual elevations are given in the gravity survey reduction Table 4. For plotting and contouring purposes the elevations have been rounded off to the nearest foot. An elevation contour map is shown in Figure 6. Since the traverse lines are 200 ft apart the contouring control is not very good. However, the map does provide some information relating to the topographic features shown in Figure 5. Elevation profiles along the traverse lines are presented in Figures 11 through 17 to provide correlation with the surface geology and magnetic anomalies. At the 650 traverse line in Figure 6, there seems to be a slight shift in the north trending outcrop ridge possibly due to an erosional trough or faulting.

VI. MAGNETOMETER SURVEYS

A. PURPOSE

The purpose of the magnetometer survey was to establish detailed magnetic profiles across the selected traverse lines to help identicate a hematite deposit and also the carbonate zone with which the hematite is associated.

B. INSTRUMENTATION

A Geometics Proton Magnetometer Model 512 wasused for this survey. This instrument measures the total earth's magnetic field to a repeated reading precision of + /- one gamma. However, due to erratic drift and some spurious readings the overall accuracy is about + S- 2 5 gamma.

C. MAGNETIC SURVEYING WORK DONE

Magnetic surveying along the traverse lines was first done at 100 ft intervals. Using these data in a Geometrics computer program, a shaded contour map was drawn. For comparison, a hand- drawn contour map was also prepared. The data were also used for magnetic anomaly profiles along each of the traverse lines. These profiles showed immediately that with 100 ft spacing the exact locations of anomaly peaks could not be determined. Therefore this first survey was termed a reconnaissance survey and a second survey was done with a 50 ft spacing and was termed a detailed survey. This detailed survey repeated all the traverse lines and in addition included the west 1600 line. Magnetic anomaly profiles along each of the traverse lines were drawn. The reconnaissance survey was done by the claim holder and l helper on 2 days on Sept. 13 and 21, 1999 and completed 59 stations plus many repeated base stations. A distance of 5200 ft (0.98 mi or 1.59 km) was surveyed. The detailed survey was done

Page 16: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

GA

/D D

IST

AN

CE

l l

•n r1'

j}

WO

i—

1g

oCD

-c!

O

H-

•o

oO

3

r^5

4

Oo;

o

h--

Oo

e

"S

t.O

H

-i)

r*-

/

Page 17: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

on 2 days on Oct. 4 and Nov. 12, 1999 and completed 132 stations plus many repeated base stations. A distance of 6250 ft (1.18 mi or 1.91 km) was surveyed.

D. MAGNETIC PROFILING RESULTS

Data reduction and plotting of the reconnaissance magnetic data were done by the claim holder on 3 days on Sept. 7 S 12 and Oct. 2, 1999. The magnetometer readings taken at 100 ft intervals along the traverse lines are given in Table 1. For plotting purposes the values were rounded to the nearest 10 gamma and a base level of 56000 gamma was subtracted to give magnetic anomaly values. These anomaly values were plotted to give profiles for each traverse line. Figure 7 shows the profiles for lines 50, 250 and 450. Figure 8 shows the profiles for lines 650, 850, 1050 and 1250. It is noted immediately that some anomalies are surprisingly high at 5000 to 7000 gammas but that the location of the peaks of the anomalies cannot be exactly determined with so few data points. Thus the magnetic survey was repeated with a 50 ft station spacing. The reconnaissance anomaly values were also used in a Geometrics computer program to give a shaded contour map shown in Figure 9. This is very general in nature because the station spacing is 100 ft but the traverse lines are spaced at 200 ft. The magnetic anomaly areas stand out clearly but the contours are not smoothly defined. For this reason, a hand-drawn contour map shown in Figure 10 was also prepared for comparison purposes.

Data reduction and plotting of the detailed magnetic data were done by the claim holder on 5 days on Nov. 13 S 15 and Dec. 7, 8 S 9,1999. The magnetometer readings taken at 50 ft intervals along the traverse lines are given in Table 2. For plotting purposes a base level of 56000 gamma was subtracted to give magnetic anomaly values. These values were plotted to give magnetic anomaly profiles for each traverse line. On each profile an elevation profile with the surface geology has been included for correlating the magnetic anomalies with surface elevation and geology. Figure 11 shows line 50, Figure 12 shows line 250, Figure 13 shows line 450, Figure 14 shows line 650, Figure 15 shows line 850, Figure 16 shows line 1050, Figure 17 shows line 1250 and Figure 18 shows the profile along the 1600 line. With the closer station spacing, these profiles generally show a series of sharp, narrow anomaly peaks indicating many narrow bands containing magnetite rather than one broader deposit. While the more southern profiles do show some correlation of a magnetic anomaly with the carbonate zone, they also show a magnetic anomaly to the west over the red rhyolite and to the east over the black rhyolite slope. Of interest is the highest magnetic anomaly at 1400 ft on line 250. This occurs at the top of a red rhyolite ridge with no surface exposure of a magnetite bearing formation. The anomaly has been checked to exist some distance either side of the traverse line. Century old blasted magnetite bearing rock exists nearby which has the second highest density of samples analyzed (3.6 gm/cc). This indicates that a magnetite formation must be nearby or under the

Page 18: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

TABLE NO. l RECONNAISSANCE MAGNETOMETER SURVEY READINGS Geometrics Proton Magnetometer Model 512

Observer: Lloyd G.D. Thompson

MAGNETOMETER I STATION

Sept. 13 - 20,LINE 50

1600150014001300

BASE 120011001000900800

LINE 2501600150014001300120011001000900800

LINE 4501600150014001300120011001000900800

LINE 6501600150014001300120011001000900800

HEADING 1 gamma

1999

572255728057738576115832658671592425789057260

575555906863504578825878559131589585765856929

574385699656684579005782959799601355839956555

578905708857577569025719658448586825765656862

\NOMALY gamma

123012801740161023302670324018901260

15603070750018802790313029601660930

14401000680

19001830380041402400

. 560

189010901580900

1200245026801660860

MAGNETOMETER J STATION

LINE 8501600150014001300120011001000900800

LINE 10501600150014001300120011001000900800

LINE 12501600150014001300120011001000900800

HEADING 1 gamma

571155714556244591156067560267592715732356900

577505679660429610646065559152579085736456947

5706657159590215951961497EST.EST.EST.EST.

WJOMALY gamma

11201150240

31204680427032701320900

1750800

443050604660315019101360950

10701160302035205500400025001250950

Page 19: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

7000 i—

6000 —

2^0 and

Figure No. 7 ReconnaissanceAnor.aly Profiles for TraverseLinesLookins: I^orth

X Ut* 50o LINE 2-5'O

o L INE

J..G-O.T. Dec.'99

HORIZONTAL'' i *

oooGRID OiSTAMCt FROM, NE LOT

Page 20: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. S

6000 \—

Os

O G/l/D

8

Reconnaissance Magnetic Anomaly Profiles for Traverse Lines 6^, ^, 1050 and 1250 Looking North

X

t

oi- i We

. '99

r* f~ \jO ? OCi ^ x v ^L.OT CORNER (FT)

t

Page 21: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

CONTOUR PLOT OF DATA FILE BMMADOC.REV

500.000 1500.00 2500.00 3500.00 4500.00 5500.00

1000.00 2000.00 3000.00 4000.00 5000.00 6000.00 X//

;a'O g

1s .•o

'-O1

03eex:

Di cj T7-1 /V C zT /' rt c? //i jw /? r/V L OT J. l /V/T

SCALE . IS

oQ

5

Is to L"fi on the

Page 22: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 10 Hand-drawn Contour Kap of Reconnaissance Magnetic Anomaly Data

30 f

o

D/STANCZ F ROW

LZGENO

STATION

far)

SCALE ' f '

i,o, o, r. . 'oo

Page 23: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

TABLE NO. 2 DETAILED MAGNETOMETER SURVEY READINGS Geometrics Proton Magnetometer Model 512

Observer: Lloyd G.D. Thompson

MAGNETOMETER READING ANOMALY STATION gamma gamma

Oct. 1-4, 1999 and Nov.LINE 50

16001550150014501400135013001250

BASE 12001150110010501000950900850800

LINE 2501600155015001450140013501300125012001150110010501000950900850800

5727357766573935729057873579265763256470583315798858669589465912958362578085753757167

5758158893590555853063491590205789057939587305913859095600695893058090575885714456831

16, 1999

1273176613931290187319261632470

233119882669294631292362180815371167

15812893305525307491302018901939273031383095.40692930209015881144831

MAGNETOMETER READING ANOMALY STATION gamma gamma

LINE 4501600155015001450140013501300125012001150110010501000950900850800

LINE 6501600155015001450140013501300125012001150110010501000950900850800

5735157675570415680456660574195794359284579186224259741602826007959413583405720856432

5791057544571505763757595574555689856624571985797558419591505866258952576525716856882

135116751041804660

14191943328419186242374142824079341323401208432

191015441150163715951455898624

11981975241931502662295216521168882

Page 24: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

LINE 8501600155015001450140013501300125012001150110010501000950900850800

LINE 10501600155015001450140013601300125012001150110010501000950900850800

5709457049571935694656289579065919358957604935794560219598355921558002573145710656935

5780157208567915727960530597456115858927607765874459180586695799857557575325714957026

109410491193946289

19063193295744931945421938353125200213141106935

18011208791

12794530374551582927477627443180266919981557153211491026

LINE 12501600155015001450140013501300125012001150110010501000950900850800

LINE 160012001150110010501000950900850800750700650600550500450400350300250

57115570855724358034590925913059586602726151760294EST.EST.EST.EST.EST.EST.EST.

5724557023572835776358047579115715057167577885758257862578725784057783581185747657785578195791657592

1115108512432034309231303586427255174294400034002500200012501100950

12451023128317632047191111501167178815821862187218401783211814761785181919161592

Page 25: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

4000

3ooo

l*VJ

ll O00 h"

o L

?igure No. 11 Detailed Magnetic Ano-.nalyProfile for Traverse Line 50 with Elevation Profile and Surface Geology Looking North

S CAL g: l"- /doc

oo

"SCALE:: i -

6/C7 r-

S 660

660

Page 26: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 12 Detailed Magnetic Anomaly Profile for Traverse Line 250 with Elevation Profile and Surface Geology Looking North

L.G-D. JAN. 'a

HORIZONTAL

SCALE-' /"-/ao*

GRID F ft o M N e tor (FT)

Page 27: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

5OOO

Figure No. 13

4000

Jetailed Magnetic Anomaly Profile for Traverse Line 450 with Elevation Profile and Surface Geology Lookin? North

CN^ o S & O-

D O

GRID DISTANCE. FffQtA

o oo o

o o oC)o so

LOT (F T)

Page 28: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 1^ Je tailed. Magnetic Anomaly Profile for Traverse Line 650 with Elevation profile and Surface Geology Looking North

3000-t—

X ^i TC

l"- /OOO GAMMAS

51 6 20Os

lDISTANCE

Cio

o Ci o

LoT CORNER ("FT)

Page 29: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. Detailed Magnetic Anomaly Profile for Traverse Line 850 with Elevation profile and Surface Geology Looking North

S'C/tL Z : j - 100

L.&.D.T. JAN. '00

0/1 UK. rteo OUTCROP

Page 30: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 16 detailed Magnetic Anomaly Profile for Traverse Line 1050 with Elevation Profile and Surface Geology Looking North

GRID PROM H& LoT CoR N P R (FT)

Page 31: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

\ 610^^ 600

Figure No. l? Detailed Magnetic Anomaly Profile for Traverse Line 1250 with Elevation Profile and Surface Geology LookingNorth

^5, ^ ^ ^ O Ci O ^ ^ QGRID D/sTXKCt? /^tfa/* Mer J.0r c#A.wtra (FT)

JAN- -OD

ovr/?-frfiPf*

t P/t/tK. f? f O rt H ycliff ftiOG-S AHO OUTCROP Zicpe

1 1 1

V, w POND (W 'AM P)

1 1 1 1

s0

Page 32: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 18 Jetailed Magnetic Anomaly Profile for Traverse Line 1600 Looking East

i

l O

VERTICAL "S C A L ("z: /OOO

tfoff.iz.QM r A L scALf : i-

GRID FRO**

l

LoT^lNPl 8

. '00

Page 33: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

surface red rhyolite. The most interesting traverse line is line 450 (Figure 13). The carbonate zone has been located on the east slope of the ridge and samples of hematite-bearing carbonate have been found. Little century old blasting was done at this spot and the exact width of the carbonate zone is not known. While the observed outcrop was less than 50 ft wide, the high magnetic anomaly at the brow of the ridge at 1150 ft indicates that the zone could be up to 75 ft wide. Also, there is a high magnetic anomaly down the black rhyolite slope at about 1050 ft where outcrop samples of magnetite bearing black rhyolite were found.

VII. GRAVITY METER SURVEY

A. PURPOSE

The purpose of the gravity survey was to obtain gravityanomaly profiles along the traverse lines over the rhyoliteoutcrop ridge in hopes of finding a gravity anomaly that wouldindicate a small deposit of massive compact hematite.

B. INSTRUMENTATION

A North American Gravity Meter AG-1 No. 93 owned by the claim holder was used for the survey. This gravity meter has a high sensitivity calibration factor of 0.09102 milligals per division and is ideal for detecting small anomalies of a few milligals or less. Its reading sensitivity is + S- 0 .1 division which gives a measuring accuracy of + S- 0 .01 milligals. This gravity meter is an original large size model (11* in diameter, 13'' high, weight 27 Ib) but is still in excellent operating condition (the claim holder is the only known living person who can service and repair these instruments). The main spring is well-aged and has little or no drift which allows long traverses to be done without continual base readings. It is temperature controlled with mercury thermostats and electric relays. It operates on 6 volt batteries which are expendable after a season of field use. The instrument must be handled very carefully and is kept in a padded, shocked-mounted carrying pot. For readings, the instrument is set on a tripod with a levelling head. For this project involving transport through heavy bush and forest areas, the battery, shock-mounted carrying pot and gravity meter were secured in a deep-body plastic cart to which 2 long metal rods were attached. The whole assembly weighed about 100 Ibs and was carried by 2 people like a stretcher. Before the field survey, the gravity meter had to be checked and serviced, heated on a 6 volt battery to an operating temperature of 29 degrees Centigrade and left for a few days to stabilize. The measuring range was then reset to the latitude of the survey area and the meter allowed to stabilize. This procedure takes one to 2 weeks. Two 6 volt batteries are required for continous operation of the gravity meter with off-duty charging of the batteries. The gravity meter was transported to the site in a rented station wagon which had a third fold-up seat at the back door where the gravity meter and carrying pot could be placed safely in the foot well. At the site, the gravity meter and pot were placed in the

Page 34: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

carrying cart. Although this gravity meter was cumbersome to transport in the field, it was particularly suitable for this survey project.

C. GRAVITY SURVEYING WORK DONE

Prior to the field survey the gravity meter was prepared for field use. It was serviced and checked, brought to operating temperature, stabilized, range reset and restabilized. This took one week from Sept.14 to 21, 1999 with 3 work days on Sept. 14, 16, and 18. The survey Base Station was at grid location 50+1200. Gravity meter readings were taken relative to this Base at 100 ft spacing along the traverse lines. First the tripod (14 Ib) was carried to the station location, set up and levelled. It was not possible to set up the tripod right at a survey stake so the exact location was measured, recorded and marked for the elevation survey. Also the height of the tripod base plate (Instrument Height) above the ground point was measured and recorded. Then the gravity meter was carried to the site, set up and read. This procedure was time consuming. With only one helper, the claim holder (who placed the tripod) had to make 6 trips back and forth along a traverse line, whereas with 2 helpers (one day) only 2 trips were needed. This field work was done on 5 days on Sept. 22, 23, 24 and 25 and Oct. l, 1999. A total of 59 stations were completed and a distance of 5200 ft (0.98 mi or 1.59 km) was surveyed.

After the elevation survey and its data processing were done, the processing of the gravity data was done. First, the "Observed Gravity" relative to the Base station was calculated. The initial readings were corrected for any small drift by plotting drift curves. The difference in readings from the Base value was calculated and these differences were multiplied by the gravity meter scale factor of 0.09102 milligals per division to give gravity differences in milligals. These data are given in Table 3.

Next, these gravity differences ("Observed Gravity") were processed (Gravity Reduction) by applying various corrections to give gravity anomalies relative to the Base Station which is assumed to have zero gravity anomaly. These corrections included an elevation correction-(-O.09406 milligal per ft), a Bouguer correction (for the attraction of material between the Base level and the station level) and a latitude correction (1.287 mgl/mile or 0.0002437 mgl/ft for this site). The Bouguer correction depends on the density of the local material. For a density of 2.67 gm/cc (the average density of the non-mineralized rock at the site), the combined elevation and Bouguer corrections are a convenient -0.060 mgl/ft. The latitude correction was calculated by drawing a true east-west line through the Base Station and calculating the perpendicular distance from each station to this line (a latitude line). Multiplying by the above factor gave the correction. Adding all the corrections to the observed gravity values gave the bouguer anomaly values. Since these anomaly values were very small and mostly negative, the Base value was

Page 35: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

TABLE NO. 3 GRAVITY METER OBSERVATIONSNorth American Gravity Meter No. 93

Scale Factor 0.09102 mi lligals/division Observer: Lloyd G. D. Thompson

GRAVITY METER STATION

Sept. 22/99Base: 50+119950+109850+100350+90150+801Base: 50+119950+130250+140150+150150+1599Base: 50+1199

Base: 50+1199250+1299250+1201250+1099250+999250+899250+798Base: 50+1199

Sept. 23/99Base: 50+1199450+1401450+1301450+1199450+1099450+999450+897450+802450+1401Base: 50+1199

Base: 50+1199650+1401650+1501650+1599450+1599250+1598250+1501250+1402450+1503650+1401Base: 50+1199

DIAL READING

455.3450. 4450.2452.4453.3455.1454.5459. 4467.3469.9454.9

455.1460.4461.4462.1461.2458.7456.7456.6

456.7458.5453.0448.4450.0466.1468.1464.9457.5455.6

455.5461.4464.8470.9471.7475.4460.3453.7467.6462.4455.3

CORRECTED READING

455.3450. 4450.3452.5453.5455.3454.5459.5467.4470.1455.1

455.1460.2461.1461.6460.6457.8455.6455.1

456.7458.7453.3448.8450.5466.7468.7465.6458.5456.7

455.5461.4464.8471.0471.8475.5460.4453.9467.8

X462.6455.5

METER DELTA R DELTA g HEIGHT BASE BASE

1.461.471.531.471.431.461.501.421.531.481.46

1.461.451.491.451.401.441.491.46

1.461.421.441. 421.421.401.251.401.421.46

1.461.491.491.421.501.401.701.221.481.491.46

0.0-4.9-5.0-2.8-1.80.0

-0.64.4

12.315.00.0

0.05.16.06.55.52.70.50.0

0.02.0

-3.4-7.9-6.210.012.08.91.80.0

0.05.99.3

15.516.320.04.9

-1.612.37.10.0

0.00-0.45-0.46-0.25-0.160.00

-0.050.401.121.370.00

0.000.460.550.590.500.250.050.00

0.000.18

-0.31-0.72-0.560.911.090.810.160.00

0.000.540.851.411.481.820.45

-0.151.120.650.00

Page 36: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Sept. 24/99Base: 50+1199650+14011250+15991250+15011250+14011250+13011250+12121050+12991050+12011050+11011050+10011050+9011050+801850+801850+909850+1002850+1104850+1208850+1301850+1398650+1401Base: 50+1199

Oct. 1/99Base: 50+1199650+1401650+1299650+1201650+1103650+997650+897650+799650+1401850+1499850+15991050+15991050+14991050+1402650+1401Base: 50+1199

449.4456.0463.7462.0461.7461.6458.6451. 9454.1466.3465.6464.4463.1464.1464.7463.3453.0448.6445.8451.4457.5451.8

450.1456.0463.5461.8461.4461.3458.2451.4453.6465.6454.8463.6462.2463.1463.7462.2451. 9447.4444.5450.0456.0450.1

1.461.491.481.501.471.441.391.261.441.451.431.351.301.211.201.391.461.271.431.521.491.46

0.05.9

13.411.711.311.28.11.33.4

15.514.713.512.113.013.612.11.8

-2.7-5.6-0.15.90.0-

0.000.541.221.061.031.020.740.120.311.411.341.231.101.181.241.100.16

-0.25-0.51-0.010.540.00

453.0459.1455.6458.1459.0466.5466.0463.7458.9462.7469.8471.8465.9454.3459.3453.1

453.0458.9455.4457.9458.9466.4465.9463.6458.9462.7469.7471.6465.7454.0458.9453.0

1.461.491.391.491.411.321.231.301.491.441.251.431.451.301.491.46

0.05.92.44.95.9

13.412.910.65.99.7

16.718.612.71.05.90.0

0.000.540.220.450.541.221.170.960.540.881.521.691.160.090.540.00

Page 37: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

increased to 2.00 mgl so that the resulting anomalies were all positive (for easy plotting). This data processing (reduction) is given in Table 4 which includes the ground elevation survey data, the gravity meter height measurements and the final gravity anomaly values. This data reduction and plotting was done by the author on 11 days on June 8, Nov. 2, 3, 4, 29, and 30 and Dec. l, 2, 3, 5, and 6, 1999.

D. GRAVITY PROFILING RESULTS

The gravity anomaly values (still called Bouguer gravity anomalies) in the last column of Table 4 were plotted for each traverse line. The surface geology is also marked below each curve. Figure 19 includes line 50 and line 250. Figure 20 has line 450. Figure 21 has line 650. Figure 22 has line 850. Figure 23 includes line 1050 and line 1250. Profiles 50 through 650 show distinct regional trends which would normally be subtracted from the profiles to give Residual Anomaly Profiles. However, without doing this one can readily see that the anomalies are only 2 or 3 tenths of a milligal. Profiles over lines 850 and 1059 show a small broad anomaly over the whole rhyolite ridge. The anomaly at the west end of line 50 could be attributed to the amphibolite which has a density of about 2.85 compared to 2.55 for red rhyolite and 2.65 for Shadow Lake Limestone. Line 450 has 2 small but interesting anomalies of about 0.3 mgl.

To assess the anomaly that might be expected over a small hematite deposit, calculations were made for model bodies of a sphere, vertical cylinder, vertical infinte sheet and thin dipping sheet. Of these, a small vertical cylinder of finite depth seemed to be the best representation. The overall objective of the exploration project is to find a small, massive compact hematite deposit with a density of 4 to 5 gm/cc. A vertical cylinder near the surface 50 ft in diameter and 100 ft in depth with a density of 5.0 gm/cc would contain about 27,500 tonnes of ore (25,000 tonnes is the target). The host rock has a density of about 2.7 gm/cc which gives a density contrast of 2.3 gm/cc for calculating the gravity over the cylinder which comes to 0.65 mgl (see any geophysics text book). Since an actual hematite deposit is most likely to be a pocket or pod of irregular shape and maybe less than 50 ft wide, the gravity anomaly can be expected to be a little less. The heaviest samples with compact hematite and magnetite found so far have a density of about 3.6 gm/cc. Using this value, the density contrast is only 0.9 gm/cc which gives a gravity over the cylinder of 0.25 mgl. which would contain about 20,000 tonnes of mineralized rock. Since the anomalies on line 450 are 0.3 mgl or higher, the mineral deposits could have a density greater than 3.6 gm/cc and are of interest for further exploration.

10

Page 38: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

TABLE NO. 4 GRAVITY SURVEY DATA REDUCTION

GRAVITY METER STATION

BENCHMARKLINE 50BASE 1199

1599150114011302119910981003901801

LINE 250159815011402129912011099999899798

LINE 450159915031401130111991099999897802

LINE 650159915011401129912011103997897799

DELTA g GROUND METER METER BASE ELEVATION HEIGHT ELEVATION mgal ft ft ft

0.001.371.120.40

-0.050.00

-0.45-0.46-0.25-0.16

1.820.45

-0.150.460.550.590.500.250.05

1.481.120.17-0.31-0.72-0.560.911.090.81

1.410.850.540.220.450.541.221.170.96

670,00

664.65649.90656.13667.29666.38664.65669.69669.32662.86658.27

621.83642.30651.48640.97638.21635.57635.40637.21638.01

624.27631.22640.86645.43651.86647.00628.10622.75624.72

622.73629.16634.24638.81634.95632.44621.16619.74621.65

1.461.481.531.421.501.461.471.531.471.43

1.401.701.221.451.491.451.401.441.49

1.501.481.421.441.421.421.401.251.40

1.421.491.491.391.491.411.321.231.30

666.11651.38657.66668.71667.88666.11671.16670.85664.33659.70

623.23644.00652.70642.42639.70637.02636.80638.65639.50

625.77632.70642.28646.87653.28648.42629.50624.00626.12

624.15630.65635.73640.20636.44633.85622.48620.97622.95

DELTA h BOUGUER LATITUDE BOUGUER ANOMALY BASE CORRECTION CORRECTION ANOMALY +2.00 ft mgal mgal mgal mgal

0.00-14.73-8.452.601.770.005.054.74

-1.78-6.41

-42.88-22.11-13.41-23.69-26.41-29.09-29.31-27.46-26.61

-40.34-33.41-23.83-19.24-12.83-17.69-36.61-42.11-39.99

-41.96-35.46-30.38-25.91-29.67-32.26-43.63-45.14-43.16

0.00-0.88-0.510.160.110.000.300.28

-0.11-0.38

-2.57-1.33-0.80-1.42-1.58-1.75-1.76-1.65-1.60

-2.42-2.00-1.43-1.15-0.77-1.06-2.20-2.53-2.40

-2.52-2.13-1.82-1.55-1.78-1.94-2.62-2.71-2.59

0.000.040.030.020.010.00

-0.01-0.02-0.03-0.04

0.080.070.060.050.050.040.030.020.01

0.130.120.110.100.090.080.070.060.05

0.180.170.160.150.140.130.120.110.10

0.000.530.640.580.070.00

-0.16-0.20-0.39-0.58

-0.67-0.81-0.89-0.91-0.98-1.12-1.23-1.38-1.54

-0.81-0.76-1.15-1.36-1.40-1.54-1.22-1.38-1.54

-0.93-1.11-1.12-1.18-1.19-1.27-1.28-1.43-1.53

2.002.532.642.582.072.001.841.801.611.42

1.331.191.111.091.020.880.770.620.46

1.191.240.850.640.600.460.780.620.46

1.070.890.880.820.810.730.720.570.47

Page 39: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

LINE 8501599149913981301120811041002909801

LINE 10501599149914021299120111011001901801

LINE 125015991501140113011212

1.520.88

-0.01-0.51-0.250.161.101.241.18

1.691.160.090.120.311.411.341.231.10

1.221.061.031.020.74

618.52627.66648.13656.84653.26644.54627.28622.89623.24

613.41629.17647.05645.83641.72622.83622.06621.68621.82

618.26620.69622.12623.88624.01

1.251.441.521.431.271.461.391.201.21

1.431.451.301.261.441.451.431.351.30

1.481.501.471.441.39

619.77629.10649.65658.27654.53646.00628.67624.09624.45

614.84630.62648.35647.09643.16624.28623.49623.03623.12

619.74622.19623.59625.32625.40

-46.34-37.01-16.46-7.84

-11.58 .-20.11-37.44-42.02-41.66

-51.27-35.49-17.76-19.02-22.95-41.83-42.62-43.08-42.99

-46.37-43.92-42.52-40.79-40.71

-2.78-2.22-0.99-0.47-0.69-1.21-2.25-2.52-2.50

-3.08-2.13-1.07-1.14-1.38-2.51-2.56-2.58-2.58

-2.78-2.64-2.55-2.45-2.44

0.22 0.210.200.190.180.180.17'x

0.160.15

0.270.260.250.240.230.220.210.200.19

0.310.300.290.280.27

-1.04-1.13-0.80-0.79-0.76-0.87-0.98-1.12-1.17

-1.12-0.71-0.73-0.78-0.84-0.88-1.01-1.15-1.29

-1.25-1.28-1.23-1,15-1,43

0.960.871.201.211.241.131.020.880.83

0.881.291.271.221.161.120.990.850.71

0.750.720.770.850.57

Page 40: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Fifrure Bouguer Gravity Anomaly Profile for Traverse Lines 50 and 250 with Peak Magnetic Anomaly Locations and Surface Geolosrv Lookin North

OUTCROP RID

AMD Q

OUTCROP {NOLL

GRID LOT (FT)

Page 41: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 20 Bouguer Gravity Anomaly Profile for Traverse Line ^50 with peak Magnetic Anomaly Locations and Surface Geology Looking North

X-4

Oi i .o

I

Ci O

L e } f "- O, f

sc/u. F : i "~ /o o

RHYOLITE. ouTc.no P

OUTC.fl.oP RIOGF

o-,8

eft t po o

F#ot*\Ne LOToQ

Oo C*

oOD OO

(FT)

Page 42: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 21 Bouguer Gravity Anomaly Profile for Traverse Line 650 with Peak Magnetic Anor.aly Locations and Surface Geology Looking North

vix

ll. O o

cc

se A L e-; i*- /o o''

DSC. '99

———lo o

GR f D D/STAVCft

w z LOT

Page 43: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Figure No. 22 Bouguer Gravity AnomalyProfile for Traverse Line 850 with Peak Magnetic Anomaly Locations and Surface Geology Looking North

O

Xk /-o

OUTCROP t o u re no p RIDGE 6lo P e

F : i"- o, s milligal*

SCALZ:!99

OsCs Ci

O0o o

0

D/STANCE F&OAK. N e LOT CORtVER (f* r)

oCi Q

J?o l

Page 44: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

[fi d)

.5tr

dr; -H c Jri

-H

O

OrH

Cu

-P^u

(D G)

c3e, w (x, oO

S-i

Oc

oi -c; i-)•a; ^ -^ .

cTO

-H

^ ^

^ H

O

^og^

.O

CO C

O

•*-- -rH

*3^

OC3to

TJ

O

^-i Q)

f, .H

^

—!

ec -P

J^ ri

.H

(B ro

.C

Go V

i O

C

-t-*

O

^ O

to

C

O33

O. ^

^4 co

fi

0)

bil

•H

-i 800

9oo

-

1000

uoo

ovi

1600

Page 45: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

VIII. SURFACE SAMPLE ANALYSIS

A. WORK DONE

A Density (Specific Gravity) Analysis of surface bulk samples was done by the claim holder in his own laboratory facilities. This analysis was done not only for geological mapping but also for the gravity survey data reduction and interpretation for which the average densities of the host rock and mineral samples are required. An Ohaus Triple Beam Balance with maximum direct load of 610 grams was used to measure the Density of the samples. The balance sensitivity was 0.01 grams. Measurements were made to 0.1 grams which gave 4 significant figures in the measured weights. This ensured a three-figure accuracy in the Density determinations. The surface samples were trimmed to lumps of less than 610 grams. Measurements were made on 36 samples from the survey site and one on a reference sample of specular hematite from Brazil. The analysis was done by the claim holder on 9 days on June 7, Sept. 28 S 29, Oct. 23 5- 31, Nov. 5 , 8 ,18 and 19, 1999.

B. ANALYSIS RESULTS

The results of the surface sample analysis are given in Table 5 . The average densities for the different rock types areas foilows:

Amphibolite schist 2.86Amphibolite/rhyolite/hematite/magnetite 3.59Light red rhyolite 2.51Dark red rhyolite 2.68Black rhyolite 2.79Carbonate/black rhyolite 2.65Black rhyolite/magnetite/chalcopyrite 2.95Shadow Lake limestone/sandstone 2.69Earthy red hematite 3.41Black rhyolite/magnetite/hematite 3.17Specular hematite (Brazil) 5.24

The heaviest samples of mineralized rock were of magnetite and hematite in black rhyolite from a small pit at the 1050 line with a density of 3.68 gm/cc and of magnetite and hematite in the contact zone of amphibolite and red rhyolite near the 250 line with a density of 3.64 gm/cc. This indicates that the amphibolite/red rhyolite contact zone as well as the carbonate zone has good potential for hematite deposits.

IX. FINAL RESULTS AND CONCLUSIONS

This exploration project was successful and very beneficial for the Ontario mining industry. The project survey grid provided the basis for detailed mapping of the project area to give the accurate location of topographic, exploration and mining features. It will also be a valuable reference base for future exploration and mining purposes. The project work

11

Page 46: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

TABLE 5. SURFACE SAMPLE DENSITY ANALYSIS RESULTS.

SAMPLE NO. DESCRIPTION

GRID LOCATION

SAMPLE WEIGHT

DENSITY gm/cc

175+1350 403 gm

1 Amphibolite Schist 50+1300 287 gm2 Amphibolite Schist 150+1500 410 gm3 Amphibolite Schist 150+1500 308 gm4 Amphibolite Schist 150+1500 194 gm5 Amphibolite/Rhyolite 175+1450 371 gm

transition zone6 Mineralized Amphi

bolite/Rhyolite from small pit at contact zone

7 As 6 above with 250+1400 484 gm magnetite/hematite at peak magnetic anomaly

8 As 7 above9 As 7 above

10 Light red Rhyolite11 Light red Rhyolite12 Dark red Rhyolite13 Mineralized dark

red Rhyolite14 Dark red Rhyolite15 Black Rhyolite, from

east side of ridge16 As 15 above17 As 15 above grading

from dark red Rhyolite18 Weathered alteration

zone of carbonate with black Rhyolite

19 As 18 above20 As 18 above with

earthy red hematite21 Black Rhyolite with

magnetite/chaicopyrite22 As 21 above23 Shadow Lake Limestone

basal conglomerate float rock

24 Shadow Lake Sand- Off grid 408 gm stone/limestone from outcrop knoll at farm house S barn

25 Earthy red Hematite 1040+1290 437 gm from big pit

26 As 25 above 1040+1290 254 gm27 As 25 above 1040+1290 478 gm

2.842.842.902.862.77

250+1400250+1400175+1300250+1335250+1400550+1200

560+1390850+1120

850+1120650+1100

450+1080

450+1085450+1085

450+1050

450+10501050+1100

531572214299256383

292287

117246

176

580547

240

256308

gmgmgmgmgmgm

gmgm

gmgm

gm

gmgm

gm

gmgm

3.10

3.56

3.643.542.522.502.612.74

2.682.73

2.822.83

2.73

2.662.57

3.12

2.782.72

2.65

3.36

3.533.35

Page 47: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

28 Black Rhyolite with Magnetite/Hematite from small pit

29 As 28 above30 As 28 above31 As 28 above32 As 28 above33 Black Rhyolite with

Magnetite/Hematite from big pit

34 As 33 above35 Black Rhyolite with

Magnetite (loose blasted rock)

36 As 35 above37 Specular Hematite

from Brazil

1050+1350 542 gm

1050+1350 1050+1350 1050+1350 1050+1350 1040+1290

1040+1290 450+1150

450+1150ReferenceSample

181 gm220 gm546 gm413 gm270 gm

138 gm 591 gm

233 gm 119 gm

2.83

2.802.913.683.682.75

2.833.61

3.425.24

Page 48: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

provided magnetic, gravity, elevation and geological profiles along 7 traverse lines across a mineralized rhyolite outcrop ridge covering a heretofore unexplored area 800 ft by 1250 ft of a claim available for exploration and mine development.

Although no huge hematite deposit was indicated by the survey profiles, much information about the property was obtained and 2 or 3 sites for more detailed exploration were located. The magnetic anomalies on most of the profiles were..narrow and very sharp indicating only narrow veins containing magnetite. Of interest is the fact that large magnetic anomalies occur on the east slope of the ridge in black rhyolite and even beyond in the flat overburden area. In particular, the magnetic anomaly on line 450 at 1050 ft in black rhyolite is of interest because samples contain compact hematite as well as magnetite. Also, the magnetic anomaly on line 250 at 1400 ft is interesting because it occurs near the contact of amphibolite and red rhyolite and samples contain compact hematite and magnetite. The St. Charles iron mine to the south that produced hematite ore up to 1899 is located in a large body of amphibolite so that hematite associated with the amphibolite on the survey area is a distinct possibility. The gravity anomaly profile for line 250 does not show any anomaly where the high magnetic anomaly occurs. Hence, there is no possibility of a significant hematite deposit or even a magnetite deposit. However, there is a gravity anomaly on line 50 of over 0.3 mgl over the amphibolite outcrop which could indicate the presence of hematite. On line 450 there is a gravity anomaly east of the carbonate zone over black rhyolite as well as a magnetite anomaly. This location, therefore, has a good potential for a hematite/magnetite deposit. Also, the gravity anomaly at the west end of line 450 could be explored further. The gravity profiles along lines 850 and 1050 show a broad gravity anomaly over the whole rhyolite ridge which indicates the subsurface rock has a higher density than the assumed 2.67 gm/cc, probably from iron and copper mineralization (noted in some dark red rhyolite samples).

The geological mapping made the important discovery that the "granite" was actually Rhyolite (an acid metavolcanic). Also, the north part of the survey area was a different geological regime with amphibolite and Shadow Lake (basal conglomerate) which appeared to be present at the higher elevations to the east. The elevation contour map (Figure 6), although general in nature, correlates well with the topograhic features shown in the geology map (Figure 5). There appears to be discontinuities in the rhyolite ridge, probaly caused by glaciation or faulting, at the 250, 650 and 1150 grid lines.

X. FINAL RECOMMENDATIONS

Further exploration work on the project survey grid area would be beneficial. Additional detailed geophysical surveying and perhaps diamond drilling over the amphibolite area at the west end of line 50, the area at the west end of line 450 and particularly at the east end of line 450 at the 1000 ft mark are

12

Page 49: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

recommended. Also, there are still 800 ft along the rhyolite ridge to the south , 600 ft to the west and 800 ft to the east that are still open for exploration.

XI. REFERENCES

ODM Map 2154, 1967

ODM GR No. 73, 1968

13

Page 50: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

XII. APPENDIX A

QUALIFICATIONS Dr. Lloyd G. D. Thompson, P.Eng.

CANADIAN Citizen, VETERAN RCAF Pilot, Prof. Engineer in Mining. B.A.Se. 1950, U. of T. Engineering Physics, Geophysics. M.Se. 1951 and Ph.D. 1956, U.W.O. Physics. Permanent Prospectors Licence A33703.

1948-50: Underground geothermal surveys in 15 mines in Kirkland Lake, Larder Lake, Timmins, Sudbury, Thetford Mines, Fort Coulonge area and Cadillac-Malartic area.

1951: Gravity survey, Kam Kotia property, Timmins, for Hollinger Mine .

1951-58: Regional gravity surveys over most of Ontario, Quebec, Manitoba, Saskatchewan and Northwest Territories for Department of Mines and Technical Surveys, Ottawa. Developed improved Pendulum Apparatus for measuring gravity.

1958-64: Developed first successful airborne gravity meter system and made first airborne gravity meter surveys for USAF. Developed improved airborne gravity meter instrumentation.

1961-71: Principal Investigator for NASA for gravity experiments for lunar program. Developed first quartz vertical gravity gradient meter. Gravity and gravity gradient surveys, Brothers, Oregon for lunar exploration program.

1964-74: Adjunct Professor of Oceanography, Northeastern University, Boston, Mass. Taught M.Se. courses in marine geophysics, ocean instruments, and marine seismic systems.

1968: Gravity meter test survey on deep ocean submersible Aluminaut, Puerto Rico Trench area, for U.S. Naval Oceanographic Office, Washington, D.C.

1971-74: Research Scientist, Weston Seismological Observatory, Boston College, Boston, Mass. Developed quartz angular accelerometer for USAF inertial guidance test facility.

1972-74: Gold property exploration and mine development, Port Dufferin, N.S., for Lons Mining Ltd., London, Ont.

1975-76: Regional Mines Engineer, MNR, Sec. 9 of Mining Act.

1977-84: Regional Mineral Resources Coordinator, MNR Central Region, Pits and Quarries Control Act.

14

Page 51: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

1984-89: Regional Geophysicist for Southern Ontario, MNDM Tweed. Developed first Computer Assisted Portable Seimograph and shallow seismic reflection technique. Numerous seismic surveys for faults, sand and gravel deposits and water acquifers. Numerous magnetic surveys over magnetite deposits. Geophysical study of fluorite deposits in Madoc-Tweed area.

1989: Retired from MNDM.

1957-1998: Prospecting, exploration and development of magnetite property in South Canonto Township, Frontenac Co. Magnetic and gravity surveys, sample analyses, diamond drilling, and OPAP projects in 1993, 1994, and 1996. Closure Plan completed, approved and production started in 1997. Property acquired by Jarvis Resources Ltd. in 1998.

15

Page 52: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

XIII. APPENDIX B

VALUE OF ASSESSMENT WORK DONE

The exploration work completed in this report was done under OPAP Grant No. OPG 99-136. The labour costs and allowed expenses under OPAP are simply to assist the prospector and do not reflect the true value of the exploration work done. Also, no compensation is allowed for the use of all field equipment, survey instruments, laboratory test facilities and office facilities provided by the grantee. In this particular project, Dr. Thompson personally did all of the work (with a helper) which could not be done or evaluated as a turnkey or contract operation. Therefore, the work was done as a series of individual survey projects which can be evaluated. For the OPAP project, the labour costs were based the number of work days and not the survey cost per line kilometer. This was particularly applicable for this survey work which was done on the basis of the number of survey stations established on a grid. Therefore, it is best to evaluate the work done on a work day basis and to evaluate each type of survey individually.

Several geophysical, exploration and local labour sources were contacted to establish current "Industry Standard" survey costs with the following results:

LABOUR Per Day Rate

Consultant Geologist S1200Industrial Mineral Consultant 1000Senior Geologist 500 (Av}Junior Geologist 300 (Av)Prof. Land Surveyor, P.Eng. 800 (Av)Surveyor Assistant 300Geophysical Instrument Operator 500Geophysical Assistant 200Local Professional Line Cutter 300Local Casual Line Cutter 200

INSTRUMENT RENTAL Per Week Rate

Gravity Meter, Scintrex, High Sensitivity CD3M 1700 (Pro-rated per CG3 rate plus S200 service charge + GST + Delivery)

Dr. Thompson provides mining and geophysical exploration services and surveys under TOMLID IRON MINES, a Registerd Ontario Proprietorship. TOMLID (Dr. Thompson) has instruments and equipment for grid, magnetic, gravity, seismic and elevation (differential levelling) surveys. Also, it has office facilities for data processing, reduction, analysis and interpretation with geophysical computer programs. Also, it has laboratory facilities for rock density analysis and instrument repairs.

16

Page 53: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Services are provided by TOMLID per the following reduced rate schedule:

LABOUR Rate Per Dav

Consultant Mining Engineer and Geophysicist, P.Eng. S1320For long term project Consultant 1000Project Field Supervisor 500Land Surveyor, P.Eng. 500Surveyor Assistant 200Geologist 300Geophysical Instrument Operator 400Geophysical Survey Assistant 200Casual Line Cutter 150Data Processing/Interpretation 300Draftsman 200Report Author 500Word Processing 150

RENTALS Rate Per Week

North American Gravity Meter, High Sensitivity S1250Magnetometer, Sharpe, Needle Type 45T.H.S. Theodolite, Rod and Chain 100Soil Auger and Extension 5Gas Weed/Brush Cutter with Gas 5

Rock Sample Density Analysis - Per Sample $75

Since Dr. Thompson performed a multi-role function on this OPAP exploration project, the value of the survey work done has appropriately been calculated based on the above rate schedule for TOMLID IRON MINES. A summary of the value of the work done foilows:

GRID SURVEY (800 1 X 1200') - 22 days, 59 stations, 2.73 km- Difficult Work - see p.2

Consultant Geophysicist 2 days $2000Project Supervisor 2 days 1000Land Surveyor 2 days 1000Line Cutter 16+20 days 5400Draftsman 2 days 400

GEOLOGY MAPPING AND SAMPLING - 11 days, 36 samples, 3.50 kmGeologist 11 days $3300Draftsman 4 days 800

RECONNAISSANCE MAGNETIC SURVEY - 5 days, 59 stations, 1.59 kmInstrument Operator 2 days $800Assistant l day 200Data Processing 3 days 900Draftsman 4 days 800

17

Page 54: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

DETAILED MAGNETIC SURVEY - 7 days, 132 stations, 1.91 kmInstrument Operator 2 days $800Assistant 2 days 400Data Processing 5 days 1500Draftsman 4 days 800

GRAVITY SURVEY - 19 days, 59 stations, 1.59 kmInstrument Operator 8 days $ 3200Assistant 4 days 800Data Reduction 11 days 3300Draftsman 3 days 600

ELEVATION SURVEY - 6 days, 59 stations, 1.59 kmLand Surveyor 3 days SlSOOAssistant 3 days 600Data Processing 3 days 900Draftsman 2 days 400

REPORT PREPARATION - 11 days, 18 pages, 5 Tables, 23 FiguresConsultant Geophysicist l day SlOOOReport Author 5 days 2500Word Processing 5 days 750

TOTAL LABOUR DAYS 130

TOTAL VALUE OF LABOUR $35650

Under OPAP no compensation is allowed for the use of field equipment, survey instruments, office and laboratory facilities owned and provided by the grantee. The rental cost of such equipment and instruments and the value of the use of such facilities must be included in the value of the assessment work done. The expenditures allowed under OPAP plus those provided by TOMLID per the schedule on p.17 are as follows:

Per OPAP:

Per TOMLID:

Vehicle Rental (no km included) S1926.00 Supplies 283.64 Travel (km) 625.80 Food 456.61 Supplies 44.92 Gravity Meter Rental (l week) - see p.9 1250.00 Theodolite'Rental (l week) - see p.5,6 100.00 Soil Auger and Extension (l day) - see p.5 1.50 Weed/Brush Cutter S Gas (l week) - see p.2 5.00 Sample Density Analysis @ $75 per sample 2700.00 Line - Cutting Equipment - no charge Grid Surveying Equipment - no charge Geological S Sampling Equipment - no charge

TOTAL EXPENDITURES

TOTAL VALUE OF ASSESSMENT SURVEY WORK DONE

S7393.47

$43043.47

18

Page 55: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Ontario Ministry ofNorthern Developmentand Mines

Declaration of Assessment Work Performed on Mining LandMining Act, Subsection 65(2) and 66(3), R.8.O. 1990

Transaction Number (office use)

wooqo. OOP 61Assessment Files Research Imaging

Personal Information collected on this form Is obtained under the authority of subsections 65(2) and 66(3) of the Mining Act. Under section 8 of the Mining Act, the information Is a public record. This Information will be used to review the assessment work and correspond with the mining land holder. r Recorder, Ministry ol Northern Development and Mines, 6th Floor,

31C11SW2002 2.20360 MADOC 900recording a claim, use form 0240.

o n Q si *Z *J O \ )1. Recorded holder(s) (Attach a list if necessary)Mftniai

L L oy O G.^.TTfoWPSG*/Address ^ ^/e/? 3

TWttD f o/y KoK ^^OName

Address

Client Number JLO/ ^ ?6

Telephone Number6^-478-^42

Fax Number

Client Number

Telephone Number

Fax Number

2. Type of work performed: Check ( s ) and report on only ONE of the following groups for this declaration.

rpfeieotechnical: prospecting, surveys, i—i Physical: drilling, stripping, l—J assays and work under section 18 (regs) '—' trenching and associated aassays Rehabilitation

Work Type MrfG WET* C-

So/i.

Office UseCommodity

Total S Value of Work Claimed -43. OOtp

Oty 1 Monthf?Vnr Day | Month Yur

NTS ReferenceGlobal Positioning System Data (If available) 2A71 yv"3l' f 0-6" N

-77" 1i8' 3C,y*M

Township/AreaMining Division a

M or G-Plan Number Resident Geologist District

Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.

3. Person or companies who prepared the technical report (Attach a list if necessary)Namt

Address A

oy O (S~.P. -jTH&MPx&M

\ A 3 TVVG&O , ^/y KoK 3 JOName

Address

Name

Address

Telephone Number x 1 9 j j -? ft — ^""C" Gf ̂ O t * "" i f cP ^ 7 S*~

Fan Number

Telephone Nu

Fan Number

Telephone Ni

Fan Number

mber

RECEIVEDmber MAY l ^ 2000

HtOSCIENCE ASSESSMENT OfFICE

4. Certification by Recorded Holder or Agent

. O .. ____ ___________— , do hereby certify that l have personal knowledge of the facts set(Print Name)forth in this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after Its completion and, to the best of my knowledge, the annexed report Is true.Signature of Recorded Holder or Agent

Agent's Address Telephone Number

Date

Fax Number

Page 56: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

5. Work to be recorded and distributed, jthe-mining Irnd where work was performed,

this form.

Work can only be assigned to claims that are contiguous (adjoining) to at the time work was performed. A map showing the contiguous link

M,u3l W.U.HH...,^.... .w,,,,. (joooqaGocol r* O /i-; /^Mining Calm Number. Or If work was done on other eligible mining land, show In this column the location number indicated on the claim map.

eg

eg

eg

1

2

3

4

5

6

7

8

9

10

11

' 1 2

i 1314

1 15

TB 7827

1234567

1234568

/0-77^^

Number of Claim Unite. For other mining land, list hectares.

16 ha

12

2

^

Column Totals

Value of work performed on this claim or other mining land.

S26, 825

0

S 8, 892

V,o4^

M,ojMi?

Value of work applied to this claim.

N/A

524,000

S 4,000

^ tyooo.oc

\

q,0O304

^ ' -' AV ^-' Value of workassigned to other mining claims.

324,000

0

0

O

tea'nk. Value V work to be distributed at a future date.

S2.825

0

S4.892

*39.0SiA

——————— f if ft a

Sr.-'^

l, , do hereby certify that the above work credits are eligible under(Print Full Name)

subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to the claim where the work was done.Signature of Recorded Holder or Agent Authorized in Writing Date

6. Instructions for cutting back credits that are not approved.

Some of the credits claimed in this declaration may be cut back. Please check ( *- ) in the boxes below to show howyou wish to prioritize the deletion of credits:

\*3 1 . Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated.

D 2. Credits are to be cut back starting with the claims listed last, working backwards; or

D 3. Credits are to be cut back equally over all claims listed in this declaration; or D 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Note: If you have not indicated how your credits are to be deleted, credits will be followed by option number 2 If necessary.

For Office Use Only________________Received Stamp Deemed Approved Date

Date Approved

Date Notification Sent

Total Value of Credit Approved

Approved for Recording by Mining Recorder (Signature)

Page 57: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Ontario Ministry ofNorthern Developmentand Mines

Statement of Costs for Assessment Credit

Transaction Number (office use)

c oco-51Personal information collected on this form is obtained under the authority of subsection 6 (1) of (he AssessmeofyVork RfOu|a(#h 6/96. Under sectiqrr 8 of the Mining Act, this information is a public record. This information will be used to review the assessment work and^fiprresporjcfwitH t|fe mining land hdldjr. Questions about this collection should be directed to a Provincial Mining Recorder, Ministry of Northern Development and Mines, 3rd Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5.

5 DETAILWork Type

Units of workDepending on the type of work, list the number of hours/days worked, metres of drilling, kilometres of grid line, number of samples, etc.

Cost Per Unit of work

Total Cost

* J f* .O.g^^^^y Ay/IP,s 2-73

tt fi ji w^* -j s *~AA*4t?f /T ^T..?. ^j * f *" r f /^ J ̂ O ^Vj^1 ' r t *F j* j O ' *S &V ooX sr b* ys s? srns /.s? K/* 1 9 1* o ,ao - o o

. f. f/ 2.~70O , 00•7300 .00

-G&-7300.00

Associated Costs (e.g. supplies, mobilization and demobilization).

wf/ry AWALyx/s t*j#z*-/ 2700,00'

Transportation Costs

Food and Lodging Costsc?pt P -^ f̂ o&t?

Total Value of Assessment Work

Calculations of Filing Discounts:

1. Work filed within two years of performance is claimed at 100^0 of the above Total Value of Assessment Work.2. If work is filed after two years and up to five years after performance, it can only be claimed at 50"Xo of the Total

Value of Assessment Work. If this situation applies to your claims, use the calculation below:

TOTAL VALUE OF ASSESSMENT WORK v. 0 .50 = Total S value of worked claimed.

Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in verification and/or correction/clarification. If verification and/or correction or part of the assessment work submitted.

ts within 45 days of a request for le Minister may reject all

MAYCertification verifying costs:

l, t l*oyD (^ f).

2000

-f do hereby certify, that the a •OO CM rate as may reasonably(please print full name)

be determined and the costs were incurred while conducting assessment work on the lands indicated on the accompanying

Declaration of Work form as(recorded holder, agent, or state company position with signing authority)

l am authorized to make this certification.

0212(03/97)

Signature Date

Page 58: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Ministry of Ministers duNorthern Development Developpement du Nordand Mines et des Mines Ontario

Geoscience Assessment Office 933 Ramsey Lake Road

September 11, 2000 6th FloorSudbury, Ontario

LLOYD GEORGE DAVID THOMPSON P3E 6B5R.R. #3TWEED, Ontario Telephone: (888) 415-9845KOK-3JO Fax: (877)670-1555

Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm

Dear Sir or Madam: Submission Number: 2 .20360

Status Subject: Transaction Number(s): W0090.00051 Deemed Approval

We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.

Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.

If you have any questions regarding this correspondence, please contact LUCILLE JEROME by e-mail at [email protected] or by telephone at (705) 670-5858.

Yours sincerely,

ORIGINAL SIGNED BYSteve B. BeneteauActing Supervisor, Geoscience Assessment OfficeMining Lands Section

Correspondence ID: 15204

Copy for: Assessment Library

Page 59: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

Work Report Assessment Results

Submission Number: 2 .20360

Date Correspondence Sent: September 11, 2000 Assessor:LUClLLE JEROME

Transaction First Claim Number NumberW0090.00051 1077464

Section:14 Geophysical MAG 12 Geological GEOL 14 Geophysical GRAV 18 Other OTHER

Township(s) l Area(s) MADOC

StatusDeemed Approval

Approval DateAugust 27, 2000

Correspondence to:Resident Geologist Tweed, ON

Assessment Files Library Sudbury, ON

Recorded Holder(s) and/or Agent(s):LLOYD GEORGE DAVID THOMPSON TWEED, Ontario

Page: 1Correspondence ID: 15204

Page 60: GEOTECH RPT GEOPHYS & GEOL SURVS MADOC TP · GEOTECHNICAL REPORT 010 GEOPHYSICAL AND GEOLOGICAL SURVEYS Mining Claim No. 1077464 East Half Lot 5, Concession 6 ... surveying was a

w s o to O O

Mar

mor

a Tw

p.