geocomposite capillary barrier drain (gcbd) for limiting ... · •in fine soil above water table...
TRANSCRIPT
Geocomposite Capillary Barrier Drain Geocomposite Capillary Barrier Drain (GCBD) for limiting moisture changes (GCBD) for limiting moisture changes
in pavementsin pavementsNCHRP Highway IDEA ProgramNCHRP Highway IDEA Program
John C. Stormont, PhD, PE Univ. of New MexicoJohn C. Stormont, PhD, PE Univ. of New MexicoKaren S. Henry, PhD, PE, USACEKaren S. Henry, PhD, PE, USACE--ERDCERDC--CRRELCRREL
Ruth Roberson, Minnesota DOTRuth Roberson, Minnesota DOT
OutlineOutline
1.1. Geocomposite capillary barrier drain Geocomposite capillary barrier drain 2.2. Project backgroundProject background
•• Type 1 project & resultsType 1 project & results•• Muddy roads resultsMuddy roads results
3.3. Type 2 (current) projectType 2 (current) project•• Phase 1 resultsPhase 1 results•• Phase 2 Phase 2
•• DescriptionDescription•• StatusStatus
4.4. GCBD challengeGCBD challenge
Patent No. Patent No. 6,152,653, November 6,152,653, November
20002000
GCBD DevelopmentGCBD Development
1997
IDEA Phase 2
IDEA Phase 1
Sponsors:NMDOT Sponsors:
NHCRP- IDEANYDOTVAOTNHDOT
Lab proof of concept
Sponsors:VAOT
Muddy RoadsOptimize propertiesLarge-scale lab demonstration
200420031998 1999 2000 2001 2002
Sponsors:NHCRP-IDEAMnDOTNYDOT
NM DOT
Field demo with limited measurements
2005 +
Field demo with extensive measurements and design calibration
The GCBD drains water from soils The GCBD drains water from soils beforebefore they saturatethey saturate
The GCBD is a new type of drainage geocompositeThe GCBD is a new type of drainage geocomposite
Capillary BarrierCapillary Barrier
••LargeLarge--poredpored••In fine soil above water tableIn fine soil above water table••Diverts downward infiltrating waterDiverts downward infiltrating water•• Reduces upward, unsaturated flowReduces upward, unsaturated flow
Transport layerTransport layer
Accepts water at higher Accepts water at higher suctions than the suctions than the capillary barrier, and is capillary barrier, and is more conductive than the more conductive than the adjacent fine soiladjacent fine soil
soil
soil
transport layertransport layer
capillary barrier (geonet)capillary barrier (geonet)
separator (geotextile)separator (geotextile)
1.1. Downward moving water is Downward moving water is stopped by capillary barrierstopped by capillary barrier
Subgrade
2.2. The transport layer The transport layer conducts waterconducts water
3.3. Water Water drains laterally drains laterally in the transport in the transport layer due to layer due to slopeslope
How a GCBD works (in a road)How a GCBD works (in a road)
Base
GCBD has multiple functions GCBD has multiple functions ––each improves performanceeach improves performance
•• Drainage (unsaturated, Drainage (unsaturated, saturated)saturated)Accelerates drying of baseAccelerates drying of base
•• Capillary barrier to upward Capillary barrier to upward flowflow
•• ReinforcementReinforcement•• SeparatorSeparator
Applicable to paved and Applicable to paved and unpaved roadsunpaved roads
Capillary Barrier Capillary Barrier Prevents wetting from Prevents wetting from shallow water table or shallow water table or freezefreeze--induced water induced water
movementmovement
ReinforcementReinforcement
Maintains Maintains distinct distinct interface interface between base between base and subgrade and subgrade
SeparationSeparation
Increases base Increases base bearing bearing capacitycapacity
Reduces Reduces stress reaching stress reaching subgradesubgrade
NCHRP Highway IDEA Type 1 ProjectNCHRP Highway IDEA Type 1 Project
1.1. Selected optimal transport Selected optimal transport layerlayer
2.2. Rained on cracked Rained on cracked pavementpavement
•• GCBD drained water from GCBD drained water from unsaturated base courseunsaturated base course
•• Accelerated base course Accelerated base course dryingdrying
•• Protected subgrade from Protected subgrade from wettingwetting
020
4060
80100
120
CSFM
F300TG
1000C
FMC
FHNYLSO
RBX
HTXTG
LASSNW
FGTC
M5
FGW
KTR
11TC
M1
GEO
9EG
LASS
Cap
illary
rise
(cm
)
Dense-Graded BaseAsphalt
SubgradeGeotextile
Ditch DrainHoleTensiometer
GCBD or Separator (Control Section)
1
0
0 3 61 2 4 5
Hei
ght (
m)
Length (m)
Separator
TransportLayer
NetExperimental Experimental apparatusapparatus
Suction head 13 mm Suction head 13 mm above interface, 1 hr. above interface, 1 hr. storm (10 year storm (10 year design storm)design storm)
0
100
200
300
400
500
600
0 1 2 3 4 5 6Elapsed time (days)
25 26 27 29 32
0
100
200
300
400
500
600
25 26 27 29 32
AC
-P
AV
EM
EN
T
BA
SE
SU
BG
RA
DE
GC
BD
CRACK
26 25
29
2728
303132
Vermont Agency of TransportationVermont Agency of TransportationUniversity of VermontUniversity of VermontERDCERDC--CRRELCRRELGeo Design Geo Design -- John LensJohn LensApplied Research AssociatesApplied Research Associates
Muddy Roads, Windsor, VTMuddy Roads, Windsor, VT
CESeparatorCMGCBDCW
75’ 100’
Weighted CBR, 0-3 inches depth
0
5
10
15
20
25
30
35
40
45
4/6/2003 4/8/2003 4/10/2003 4/12/2003 4/14/2003 4/16/2003
CB
R
GCBDControl-WestControl-Middle
Spring thaw, 2003, GCBDSpring thaw, 2003, GCBD
IDEA Type 2 Project IDEA Type 2 Project –– GCBD for GCBD for limiting moisture changes in limiting moisture changes in
pavementspavements
Facilitate transfer of GCBD technology into Facilitate transfer of GCBD technology into practice practice –– paved roadspaved roads
1.1. GCBD connection to edge drain pipe and GCBD connection to edge drain pipe and construction details (completed)construction details (completed)
2.2. MnMn Road test section installationRoad test section installation•• FHWA pooled fund FHWA pooled fund –– TPF 5(126)TPF 5(126)−− MI, NY, MNMI, NY, MN•• Construction JuneConstruction June--August, 2006August, 2006
Engineer Research and Development CenterUS Army Corpsof Engineers
Laboratory testing of GCBD-edgedrain pipe configuration
Water added at surface cracks
Base Course Material
Sub Grade MaterialGravel
TGLASSGeo GridTGLASS
Tensiometers
Pavement
Water collected from edgedrain pipe
-100
0
100
200
300
400
500
600
700
0 50 100 150 200
Time, minutes
Cum
mul
ativ
e W
ater
C
olle
cted
, ml
With GCBD Without GCBD
Subgrade
Base course
Fine filter aggregate
GCBD
Slotted drain pipe
Subgrade
Base course
Fine filter aggregate
GCBD
Slotted drain pipe
Optimal connection to subsurface Optimal connection to subsurface drainagedrainage
Minnesota Department of Minnesota Department of Transportation Transportation –– MnRoadMnRoad ProjectProject
+OWP
+IWP
CL
-IWP
-OWP
400 }{TGeo
400 }{
TNo Geo
Sensor Cabinet
N
E
S
W
Sensor Cabinet
Research PlanResearch Plan
100
TNoGeo
4" HMA
Clay Loam
6” DGB6”
10”
13”
24”
8”Sensor Locations
HDS
CS616 ECH2OTE
MnRoadMnRoadInstrumentationInstrumentation
GCBD ChallengeGCBD Challenge
•• Who will license the patent?Who will license the patent?
•• Transport layer manufacturerTransport layer manufacturer•• Geotextile manufacturerGeotextile manufacturer•• Geonet manufacturerGeonet manufacturer•• Do we need venture capital?Do we need venture capital?